Hot asphalt seam wiping tool for expressway maintenance

By introducing the design of hydraulic rods and electric slides into highway maintenance tools, the problem of asphalt adhesion is solved, better repair effects and water resources management are achieved, and the safety and efficiency of highway maintenance are improved.

CN221895508UActive Publication Date: 2024-10-25SHANDONG HI SPEED COMPANY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323476982.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-20
Publication Date
2024-10-25
Estimated Expiration
2033-12-20

AI Technical Summary

Technical Problem

During the compaction process of existing hot asphalt caulking tools for highway maintenance, the asphalt easily adheres to the bottom of the compaction mechanism, resulting in poor subsequent use, and the quality of the repaired road surface is reduced, which can easily lead to car accidents.

Method used

A highway maintenance hot asphalt caulking tool including a base, a potting machine, a vacuum cleaner, a caulking gun, a mobile frame, a hydraulic rod and an electric slide is designed to achieve precise compaction of asphalt through the hydraulic rod and electric slide. and removal, avoiding asphalt residue and optimizing water use through spray components.

Benefits of technology

It effectively avoids asphalt remaining at the bottom of the pressure plate, improves the repair effect, ensures smooth road surface, reduces water waste, and improves repair efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895508U_ABST
    Figure CN221895508U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of expressway maintenance, and particularly relates to an expressway maintenance hot asphalt seam wiping tool which comprises a base, a filling and sealing machine and a dust collector are installed above the base, a seam filling gun is installed on the filling and sealing machine, a dust collection head is installed on the dust collector, an operation opening is formed in the surface of the base, and the operation opening is communicated with the dust collection head. A compacting and seam wiping assembly is mounted in the operation opening; the hydraulic rod is operated to enable the pressing plate to move downwards to compact the repaired position, the electric push rod stretches out and draws back to enable the scraping plate to abut against the ground, the pressing plate moves upwards to enable the bottom face of the pressing plate to be parallel to the top end of the scraping plate, the first electric sliding table is operated to enable the scraping plate to slide, and redundant asphalt at the repaired position and asphalt attached to the bottom of the pressing plate are scraped away. Compared with the prior art, asphalt is prevented from remaining at the bottom of the pressing plate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of highway maintenance, in particular to a hot asphalt joint grouting tool for highway maintenance. Background Art

[0002] With the construction of national expressways, the mileage of expressways in the country is getting longer and longer. However, as time goes by, the road surface, road conditions, and affiliated greening of the built expressways have different degrees of problems, which require special personnel to carry out maintenance and protection. In this way, expressway maintenance has emerged. Expressway maintenance is mainly to ensure the quality of expressways and to ensure the smooth flow of expressways. Expressway maintenance, daily maintenance items mainly include cleaning, greening, and road property repair. Usually, when there are major problems with expressways, there will be special maintenance projects to carry out special maintenance of expressways;

[0003] Due to the large volume of traffic on highways, the highways need to be maintained quickly. During the maintenance process, dust may appear on the road surface or cracks, which may easily reduce the quality of the repaired road surface and even lead to traffic accidents in serious cases.

[0004] The existing Chinese patent with announcement number CN217601162U discloses a hot asphalt grouting tool for highway maintenance, including a base frame and a universal wheel fixedly connected to the bottom of the base frame, an asphalt storage box is fixedly connected to the surface of the base frame, a discharge port is opened on the surface of the base frame, a discharge shell is fixedly connected to the inner wall of the discharge port, a sealing groove is opened on the surface of one side of the base frame, a closing mechanism for discharging is movably connected to the inner wall of the sealing groove, and a discharge strip is opened at the bottom of the asphalt storage box.

[0005] In view of the above-mentioned and existing related technologies, the inventors believe that the following defects often exist: the device compacts the asphalt in the cracks through a compacting mechanism, and part of the asphalt will adhere to the bottom of the compacting mechanism, causing the bottom of the compacting mechanism to be uneven, resulting in potholes on the surface of the asphalt during subsequent compaction, and the use effect is not good, which needs to be improved; therefore, a hot asphalt grouting tool for highway maintenance is proposed to address the above problems. Utility Model Content

[0006] In order to make up for the deficiencies of the prior art and solve the above-mentioned technical problems, the utility model provides a hot asphalt grouting tool for highway maintenance.

[0007] The technical solution adopted by the utility model to solve its technical problems is: the utility model describes a highway maintenance hot asphalt grouting tool, comprising a base, a sealing machine and a vacuum cleaner are installed above the base, a caulking gun is installed on the sealing machine, and a dust collector is installed on the vacuum cleaner. An operation port is opened on the surface of the base, and a compaction caulking assembly is installed inside the operation port. The compaction caulking assembly comprises a moving frame, which is set in a circular shape and is slidably connected to the base. A water tank is installed above the base, and a spraying assembly is installed on the water tank. The spraying assembly comprises a water pump, which is fixedly installed on the water tank, and a water inlet of the water pump is connected to the water tank through a pipeline. The operation port is provided to facilitate an operator to observe the repair status of the crack. When maintaining the road surface, the base is pushed to move the operation port above the crack, and the crack area is dusted by the vacuum cleaner. Then, the asphalt in the sealing machine is transported to the crack through the caulking gun for repair.

[0008] Preferably, moving wheels are fixedly connected to the four corners of the bottom of the base, and a control handle is fixedly connected to the top of the base.

[0009] Preferably, a mounting frame is fixedly connected to the top of the movable frame, and the mounting frame is configured to be U-shaped.

[0010] Preferably, hydraulic rods are fixedly connected to both sides of the mounting frame, and a pressure plate is fixedly connected to the driving end of the hydraulic rod. The hydraulic rod is operated to move the pressure plate downward to compact the repaired area.

[0011] Preferably, a lead screw is threadedly connected on both sides of the movable frame, one end of the lead screw is rotatably connected to the base, and a driver is symmetrically fixedly connected on both sides of the top of the base, and the driving end of the driver is fixedly connected to the other end of the lead screw. Running the driver drives the lead screw to rotate so that the movable frame slides inside the operating port, flexibly adjusting its position, thereby driving the nozzle and the pressure plate to adjust their positions.

[0012] Preferably, a lead screw is threadedly connected on both sides of the movable frame, one end of the lead screw is rotatably connected to the base, and a driver is symmetrically fixedly connected on both sides of the top of the base, and the driving end of the driver is fixedly connected to the other end of the lead screw. Running the driver drives the lead screw to rotate so that the movable frame slides inside the operating port, flexibly adjusting its position, thereby driving the nozzle and the pressure plate to adjust their positions.

[0013] Preferably, the scraper is configured to be T-shaped.

[0014] Preferably, the spray assembly further comprises an electric slide 2, and the electric slide 2 is fixedly mounted on a side of the movable frame close to the water pump.

[0015] Preferably, a nozzle is fixedly connected to the slider of the electric slide 2, and the nozzle is connected to the water outlet of the water pump through a pipe. The nozzle is moved to the repair site, and the water pump is operated to draw water from the water tank and spray it to spray the repair site of the road surface. The nozzle is driven by the electric slide 2 to move horizontally, and the driver drives the nozzle to move vertically, so that the nozzle can spray accurately along the repair site to reduce the waste of water resources.

[0016] Preferably, a water inlet end is installed on the top of the water tank, and a water discharge end with a valve is installed on the lower side wall of the water tank.

[0017] The utility model is beneficial in that:

[0018] 1. The utility model operates the hydraulic rod to move the pressure plate downward to compact the repaired area, and the electric push rod is extended to make the scraper against the ground. The pressure plate moves upward to make its bottom surface parallel to the top of the scraper. The electric slide is operated to make the scraper slide to scrape off excess asphalt at the repaired area and asphalt attached to the bottom of the pressure plate. Compared with the prior art, this method avoids asphalt residue at the bottom of the pressure plate.

[0019] 2. The utility model moves the nozzle to the repairing area, operates the water pump to extract water from the water tank and sprays it to the repairing area of ​​the road surface, and drives the nozzle to move horizontally through the electric slide, and drives the nozzle to move vertically through the driver, so that the nozzle can spray accurately along the repairing area, reducing the waste of water resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0021] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0022] Figure 2 For this utility model Figure 1 Bottom view of

[0023] Figure 3 This is a schematic diagram of the structure of the compaction and seaming assembly of the utility model;

[0024] Figure 4 This is a schematic diagram of the structure of the spray assembly of the utility model;

[0025] Figure 5 For this utility model Figure 3 Bottom view of .

[0026] In the figure: 1. Base; 2. Filling machine; 3. Vacuum cleaner; 4. Caulking gun; 5. Vacuum head; 6. Operation port; 7. Compacting and grouting assembly; 71. Moving frame; 72. Mounting frame; 73. Hydraulic rod; 74. Press plate; 75. Lead screw; 76. Electric slide 1; 77. Electric push rod; 78. Scraper; 8. Water tank; 9. Spraying assembly; 91. Water pump; 92. Electric slide 2; 93. Spray head; 10. Moving wheel; 11. Control handle; 12. Driver. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] See also Figure 1-5 As shown, a hot asphalt grouting tool for highway maintenance includes a base 1, a sealing machine 2 and a vacuum cleaner 3 are installed above the base 1, a caulking gun 4 is installed on the sealing machine 2, and a dust head 5 is installed on the vacuum cleaner 3. An operation port 6 is opened on the surface of the base 1, and a compacting and grouting assembly 7 is installed inside the operation port 6. The compacting and grouting assembly 7 includes a moving frame 71, and the moving frame 71 is set in a circular shape. The moving frame 71 is slidably connected to the base 1. A water tank 8 is installed above the base 1, and a spraying assembly 9 is installed on the water tank 8. The spraying assembly 9 includes a water pump 91, and the water pump 91 is fixedly installed on the water tank 8, and the water inlet of the water pump 91 is connected to the water tank 8 through a pipeline. The operation port 6 is provided to facilitate the operator to observe the repair status of the crack. When maintaining the road surface, the base 1 is pushed to move the operation port 6 above the crack, and the crack area is dusted by the vacuum cleaner 3, and then the asphalt in the sealing machine 2 is transported to the crack through the caulking gun 4 for repair.

[0029] Moving wheels 10 are fixedly connected to the four corners of the bottom of the base 1 , and a control handle 11 is fixedly connected to the top of the base 1 .

[0030] A mounting frame 72 is fixedly connected to the top of the movable frame 71 , and the mounting frame 72 is configured to be U-shaped.

[0031] Hydraulic rods 73 are fixedly connected to both sides of the mounting frame 72, and a pressing plate 74 is fixedly connected to the driving end of the hydraulic rod 73. The hydraulic rod 73 is operated to move the pressing plate 74 downward to compact the repaired area.

[0032] A lead screw 75 is threadedly connected to both sides of the movable frame 71, one end of the lead screw 75 is rotatably connected to the base 1, and a driver 12 is symmetrically fixedly connected to both sides of the top of the base 1, and a driving end of the driver 12 is fixedly connected to the other end of the lead screw 75. Running the driver 12 drives the lead screw 75 to rotate so that the movable frame 71 slides inside the operating port 6, and the position is flexibly adjusted, thereby driving the nozzle 93 and the pressure plate 74 to adjust their positions.

[0033] An electric slide 76 is symmetrically fixedly connected to the bottom of the movable frame 71, and an electric push rod 77 is fixedly connected to the bottom of the slider of the electric slide 76. A scraper 78 is fixedly connected to the driving end of the electric push rod 77. After the pressing plate 74 is compacted, the scraper 78 is pressed against the ground by the extension and retraction of the electric push rod 77. The pressing plate 74 moves upward so that its bottom surface is parallel to the top of the scraper 78. The electric slide 76 is operated to make the scraper 78 slide, scraping off excess asphalt at the repaired area and asphalt attached to the bottom of the pressing plate 74. Compared with the prior art, this method avoids asphalt residue at the bottom of the pressing plate 74.

[0034] The scraper 78 is provided in a T-shape.

[0035] The spray assembly 9 also includes an electric slide 92 , which is fixedly mounted on a side of the moving frame 71 close to the water pump 91 .

[0036] A nozzle 93 is fixedly connected to the slider of the electric slide 92, and the nozzle 93 is connected to the water outlet of the water pump 91 through a pipe. The nozzle 93 is moved to the repair area, and the water pump 91 is operated to extract water from the water tank 8 and spray it to spray the road repair area. The electric slide 92 drives the nozzle 93 to move horizontally, and the driver 12 drives the nozzle 93 to move vertically, so that the nozzle 93 can spray accurately along the repair area to reduce the waste of water resources.

[0037] A water inlet is installed on the top of the water tank 8, and a water discharge end with a valve is installed on the lower side wall of the water tank 8.

[0038] Through the personnel in this field, all the electrical components in this case are connected to their corresponding power supplies through wires, and a suitable controller should be selected according to the actual situation to meet the control requirements. The specific connection and control sequence should refer to the following working principle, and the electrical connection between the electrical components is completed in the order of working in sequence. The detailed connection means are well-known technologies in this field. The following mainly introduces the working principle and process, and does not explain the electrical control.

[0039] The parts not involved in the device are the same as those in the prior art or can be implemented by using the prior art.

[0040] Working principle: by setting the operation port 6, it is convenient for the operator to observe the repair situation of the cracks at the height of the road surface. When maintaining the high-speed road surface, push the base 1 to move the operation port 6 to the top of the crack, use the vacuum cleaner 3 to remove dust from the crack area, and then use the caulking gun 4 to transport the asphalt in the potting machine 2 to the crack for repair. Operate the hydraulic rod 73 to move the pressure plate 74 downward to compact the repaired area. Through the extension and retraction of the electric push rod 77, the scraper 78 is pressed against the ground. The pressure plate 74 moves upward to make its bottom surface parallel to the top of the scraper 78. Operate the electric slide 76 to slide the scraper 78 to scrape off the excess asphalt at the repaired area and the asphalt attached to the bottom of the pressure plate 74. Compared with the prior art, it avoids asphalt residue at the bottom of the pressure plate 74.

[0041] Move the nozzle 93 to the repair site, operate the water pump 91 to extract water from the water tank 8 and spray it on the repaired road surface, and drive the nozzle 93 to move horizontally through the electric slide 92, and drive the nozzle 93 to move vertically through the driver 12, so that the nozzle 93 can spray accurately along the repaired area to reduce the waste of water resources.

[0042] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0043] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.

Claims

1. A hot asphalt caulking tool for highway maintenance, comprising a base (1), a sealing machine (2) and a vacuum cleaner (3) are installed above the base (1), a caulking gun (4) is installed on the sealing machine (2), and a vacuum cleaner (5) is installed on the vacuum cleaner (3), characterized in that: An operating port (6) is provided on the surface of the base (1), a compacting and caulking assembly (7) is installed inside the operating port (6), the compacting and caulking assembly (7) comprises a movable frame (71), the movable frame (71) is arranged in a circular shape, the movable frame (71) is slidably connected to the base (1), a water tank (8) is installed above the base (1), a spray assembly (9) is installed on the water tank (8), the spray assembly (9) comprises a water pump (91), the water pump (91) is fixedly installed on the water tank (8), and a water inlet of the water pump (91) is connected to the water tank (8) through a pipeline.

2. The hot asphalt joint grouting tool for highway maintenance according to claim 1, characterized in that: Moving wheels (10) are fixedly connected at the four corners of the bottom of the base (1), and a control handle (11) is fixedly connected at the top of the base (1).

3. The hot asphalt joint grouting tool for highway maintenance according to claim 1, characterized in that: A mounting frame (72) is fixedly connected to the top of the movable frame (71), and the mounting frame (72) is configured to be U-shaped.

4. The hot asphalt joint grouting tool for highway maintenance according to claim 3 is characterized by: Hydraulic rods (73) are fixedly connected to both sides of the mounting frame (72), and a pressure plate (74) is fixedly connected to the driving end of the hydraulic rod (73).

5. The hot asphalt joint filling tool for highway maintenance according to claim 1, characterized in that: Screws (75) are respectively threadedly connected on both sides of the movable frame (71), one end of the screw (75) is rotatably connected to the base (1), and drivers (12) are symmetrically fixedly connected on both sides of the top of the base (1), and the driving end of the driver (12) is fixedly connected to the other end of the screw (75).

6. The hot asphalt joint filling tool for highway maintenance according to claim 1, characterized in that: The bottom of the movable frame (71) is symmetrically fixedly connected to an electric slide (76), the bottom of the slider of the electric slide (76) is fixedly connected to an electric push rod (77), and the driving end of the electric push rod (77) is fixedly connected to a scraper (78).

7. The hot asphalt joint filling tool for highway maintenance according to claim 6, characterized in that: The scraper (78) is configured to be T-shaped.

8. The hot asphalt joint grouting tool for highway maintenance according to claim 1, characterized in that: The spraying assembly (9) further comprises an electric slide platform 2 (92), wherein the electric slide platform 2 (92) is fixedly mounted on a side of the moving frame (71) close to the water pump (91).

9. The hot asphalt joint filling tool for highway maintenance according to claim 8, characterized in that: A nozzle (93) is fixedly connected to the slider of the second electric slide (92), and the nozzle (93) is connected to the water outlet of the water pump (91) through a pipeline.

10. The hot asphalt joint filling tool for highway maintenance according to claim 1, characterized in that: The top of the water tank (8) is provided with a water inlet end, and the lower side wall of the water tank (8) is provided with a water discharge end with a valve.