Foundation pile for hydraulic engineering construction

By setting a stable fixing device inside the foundation pile, using the cooperation of the trapezoidal column and the spring, combined with the movement of the threaded rod and the conical block, the problem of the existing foundation pile loosening in the weak soil layer is solved, and the stable fixation of the foundation pile is achieved. , which enhances the rigidity of the foundation.

CN221895754UActive Publication Date: 2024-10-25SHANXI TAIXIN HUTUO RIVER WATER SUPPLY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420505508.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2024-10-25
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

The surface of the existing foundation piles is straight and smooth, with a small contact area, which makes them easy to loosen in soft soil layers and affects the stability of the building.

Method used

A foundation pile for water conservancy project construction is designed, which is equipped with a stable fixing device inside, including a mounting sleeve, a guide rod, a trapezoidal column, a first spring, a threaded sleeve, a mounting plate, a second spring, a fixed column, a threaded rod and a tapered The block, through the trapezoidal column contacting the soil, compresses the spring, retracts and inserts into the soil again, combining the movement of the threaded rod and the conical block to increase the stability of the foundation pile in the soil.

Benefits of technology

It improves the stability and fit of foundation piles in the soil, ensures that the foundation piles can be stably fixed in the soil, and enhances the rigidity of the foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895754U_ABST
    Figure CN221895754U_ABST
Patent Text Reader

Abstract

The utility model relates to a foundation pile for hydraulic engineering construction, which comprises a foundation pile body, a stabilizing and fixing device is arranged in the foundation pile body, the stabilizing and fixing device comprises a mounting sleeve, a guide rod and a trapezoidal column, the mounting sleeve is fixedly mounted in the foundation pile body, the guide rod is fixedly mounted on the outer surface of the mounting sleeve, and the trapezoidal column is fixedly mounted on the guide rod. The outer surface of the guide rod is slidably connected with a trapezoidal column. According to the foundation pile for hydraulic engineering construction, the foundation pile body is installed in a soil layer, when the trapezoidal columns make contact with the outer surface of soil, the trapezoidal columns can compress the first springs and retract into the foundation pile body, and after the foundation pile body thoroughly enters the soil, the trapezoidal columns can be inserted into the soil again under the acting force of the first springs; the threaded rod is rotated to drive the conical block to move downwards, the conical block pushes the four push rods to move outwards to push the four fixing columns out of the foundation pile body to be inserted into the soil, and therefore the purpose that the foundation pile body can be stably fixed after entering the soil is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation piles, in particular to a foundation pile for water conservancy project construction. Background Art

[0002] Water conservancy project foundation piles are a type of foundation piles used for water conservancy project construction. When the upper soil layer is weak and cannot meet the bearing capacity and deformation requirements of the water conservancy project construction, and there is a better soil layer below, the piles are used to penetrate the soft soil layer to transfer the load of the water conservancy project construction to the lower soil layer with stronger bearing capacity, thereby increasing the rigidity of the foundation.

[0003] However, the surface of the existing foundation piles is a straight and smooth structure, and the contact area between the foundation piles and the soil is small. During long-term use, due to the high water content in the foundation, the soil is prone to loosening, causing the foundation piles to loosen and shift, affecting the stability of the building. Therefore, a foundation pile for water conservancy project construction is proposed. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a foundation pile for water conservancy project construction, which has the advantages of being able to be stably fixed after entering the soil, and solves the problem that the stability of ordinary foundation piles needs to be improved after entering the soil.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: A foundation pile for water conservancy project construction, comprising a foundation pile body, wherein a stabilizing fixing device is arranged inside the foundation pile body;

[0006] The stabilizing fixing device comprises a mounting sleeve, a guide rod, a trapezoidal column, a first spring, a threaded sleeve, a mounting plate, a second spring, a fixing column, a threaded rod and a tapered block; the mounting sleeve is fixedly mounted inside the pile body, the guide rod is fixedly mounted on the outer surface of the mounting sleeve, the trapezoidal column is slidably connected to the outer surface of the guide rod, the first spring is fixedly mounted on the outer surface of the mounting sleeve, the threaded sleeve is fixedly mounted on the inner bottom wall of the pile body, the mounting plate is fixedly mounted inside the mounting sleeve, the second spring is fixedly mounted inside the mounting plate, a fixing column is arranged inside the pile body, the threaded rod is threadedly connected to the top of the pile body, and a tapered block is fixedly mounted on the outer surface of the threaded rod.

[0007] Furthermore, the number of the guide rods and trapezoidal columns is six, the six guide rods are respectively located on the left and right sides of the mounting sleeve, the interiors of the six trapezoidal columns are respectively slidably connected to the outer surfaces of the six guide rods, and the left and right sides of the six trapezoidal columns respectively penetrate the inner left wall and the inner right wall of the pile body and extend to the outside of the pile body.

[0008] Furthermore, the number of the first springs is six, and the left and right sides of the six first springs are respectively fixedly connected to the opposite sides of the six trapezoidal columns.

[0009] Furthermore, a threaded ring matched with the threaded rod is arranged inside the threaded sleeve, the number of the mounting plates is two, and two auxiliary rods are fixedly installed inside the two mounting plates respectively.

[0010] Furthermore, the number of the second springs is four, the outer surfaces of the two auxiliary rods are respectively slidably connected with four push rods, and the opposite sides of the four second springs are respectively fixedly connected to the sides of the four push rods away from the threaded rod.

[0011] Furthermore, the tops of the four push rods are respectively fixedly connected to one side of the four fixing columns close to the threaded rod, the left and right sides of the four fixing columns respectively penetrate the interior of the mounting sleeve and the interior of the pile body, and the bottom of the threaded rod penetrates the tops of the two mounting plates and is threadedly connected to the threaded ring inside the threaded sleeve.

[0012] Beneficial Effects

[0013] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0014] The foundation pile for water conservancy project construction is installed in the soil layer by workers, and then the outer surface of the foundation pile body is knocked by workers to make it descend. When the trapezoidal column contacts the outer surface of the soil, the trapezoidal column will compress the first spring, and at the same time, the trapezoidal column will be retracted into the interior of the foundation pile body. Then, when the foundation pile body completely enters the soil, the trapezoidal column will be inserted into the soil again under the action of the first spring to expand, thereby initially improving the fit with the soil and increasing the stability of the foundation pile body in the soil. Then, the threaded rod is rotated to drive the conical block to move downward, and the four push rods are pushed outward by the conical block, thereby pushing the four fixing columns out of the foundation pile body and inserting it into the soil, thereby achieving the purpose of stable fixation of the foundation pile body after entering the soil. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the front structure of the utility model;

[0016] Figure 2 This is a front sectional structural schematic diagram of the utility model;

[0017] Figure 3 For this utility model Figure 2 Enlarged structural diagram at A in the middle.

[0018] In the figure: 1. pile body; 2. stabilizing fixture; 201. mounting sleeve; 202. guide rod; 203. trapezoidal column; 204. first spring; 205. threaded sleeve; 206. mounting plate; 207. second spring; 208. fixing column; 209. threaded rod; 210. conical block. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] See also Figure 1-3 , a foundation pile for water conservancy project construction, comprising a foundation pile body 1, wherein a stabilizing fixing device 2 is arranged inside the foundation pile body 1;

[0021] The stabilizing fixing device 2 comprises a mounting sleeve 201, a guide rod 202, a trapezoidal column 203, a first spring 204, a threaded sleeve 205, a mounting plate 206, a second spring 207, a fixing column 208, a threaded rod 209 and a conical block 210. The mounting sleeve 201 is fixedly installed inside the foundation pile body 1, the guide rod 202 is fixedly installed on the outer surface of the mounting sleeve 201, the trapezoidal column 203 is slidably connected to the outer surface of the guide rod 202, the first spring 204 is fixedly installed on the outer surface of the mounting sleeve 201, the threaded sleeve 205 is fixedly installed on the inner bottom wall of the foundation pile body 1, the mounting plate 206 is fixedly installed inside the mounting sleeve 201, the second spring 207 is fixedly installed inside the mounting plate 206, the fixing column 208 is arranged inside the foundation pile body 1, the threaded rod 209 is threadedly connected to the top of the foundation pile body 1, and the conical block 210 is fixedly installed on the outer surface of the threaded rod 209.

[0022] Specifically, Figure 2 As shown, when the trapezoidal column 203 contacts the outer surface of the soil, the trapezoidal column 203 will compress the first spring 204, and at the same time the trapezoidal column 203 will be retracted into the interior of the pile body 1, and then when the pile body 1 completely enters the soil, the trapezoidal column 203 will be inserted into the soil again under the action of the first spring 204.

[0023] Specifically, Figure 2 As shown, the push rod is provided with an arc adapted to the conical block 210, so that when the threaded rod 209 drives the conical block 210 to move downward, the four push rods can be smoothly pushed outward through the conical block 210, so that the four fixing columns 208 can be inserted into the soil from the inside of the pile body 1.

[0024] Specifically, Figure 3As shown, when the conical block 210 descends, it pushes the push rod along the auxiliary rod to squeeze the second spring 207. When the fixed column 208 is no longer needed, the threaded rod 209 is rotated to bring the conical block 210 upward. The push rod moves inward along the auxiliary rod under the force of the second spring 207, thereby retracting the external fixed column 208.

[0025] Specifically, Figure 2 As shown, the first spring 204 and the second spring 207 are both made of 304 stainless steel springs. Springs made of this material have good corrosion resistance and rust resistance, and can maintain good elasticity and mechanical properties in the soil.

[0026] When implementing, follow these steps:

[0027] 1) First, the pile body 1 is installed inside the soil layer, and then workers knock it down;

[0028] 2) After the trapezoidal column 203 is released from the soil, it will squeeze the first spring 204 and retract into the pile body 1;

[0029] 3) When the foundation pile body 1 is completely inserted into the soil, the trapezoidal column 203 is inserted into the soil under the action of the first spring 204;

[0030] 4) Finally, the threaded rod 209 is rotated to drive the conical block 210 to descend, thereby pushing the fixing column 208 out of the pile body 1 and inserting it into the soil.

[0031] To sum up, for the foundation piles used in the construction of the water conservancy project, the foundation pile body 1 is installed inside the soil layer, and then the workers knock on the outer surface of the foundation pile body 1 to make it drop. When the trapezoidal column 203 contacts the outer surface of the soil, the trapezoidal column 203 will compress the first spring 204, and at the same time, the trapezoidal column 203 will be retracted into the interior of the foundation pile body 1. Then, when the foundation pile body 1 completely enters the soil, the trapezoidal column 203 will be inserted into the soil again under the action of the first spring 204 to expand, thereby initially improving the fit with the soil and increasing the stability of the foundation pile body 1 in the soil. Then, the threaded rod 209 is rotated to drive the conical block 210 to move downward, and the four push rods are pushed outward by the conical block 210, so that the four fixing columns 208 are pushed out of the foundation pile body 1 and inserted into the soil, thereby achieving the purpose of being able to stably fix the foundation pile body 1 after entering the soil.

[0032] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A foundation pile for water conservancy project construction, comprising a foundation pile body (1), characterized in that: A stabilizing fixing device (2) is provided inside the foundation pile body (1); The stabilizing fixing device (2) comprises a mounting sleeve (201), a guide rod (202), a trapezoidal column (203), a first spring (204), a threaded sleeve (205), a mounting plate (206), a second spring (207), a fixing column (208), a threaded rod (209) and a conical block (210); the mounting sleeve (201) is fixedly mounted inside the foundation pile body (1); the guide rod (202) is fixedly mounted on the outer surface of the mounting sleeve (201); the trapezoidal column (203) is slidably connected to the outer surface of the guide rod (202); A first spring (204) is fixedly mounted on the outer surface of the mounting sleeve (201); a threaded sleeve (205) is fixedly mounted on the inner bottom wall of the foundation pile body (1); a mounting plate (206) is fixedly mounted inside the mounting sleeve (201); a second spring (207) is fixedly mounted inside the mounting plate (206); a fixing column (208) is arranged inside the foundation pile body (1); a threaded rod (209) is threadedly connected to the top of the foundation pile body (1); a conical block (210) is fixedly mounted on the outer surface of the threaded rod (209).

2. A foundation pile for water conservancy project construction according to claim 1, characterized in that: The number of the guide rods (202) and the trapezoidal columns (203) are both six, the six guide rods (202) are respectively located on the left and right sides of the mounting sleeve (201), the interiors of the six trapezoidal columns (203) are respectively slidably connected to the outer surfaces of the six guide rods (202), and the left and right sides of the six trapezoidal columns (203) respectively penetrate the inner left wall and the inner right wall of the pile body (1) and extend to the outside of the pile body (1).

3. A foundation pile for water conservancy project construction according to claim 1, characterized in that: The number of the first springs (204) is six, and the left and right sides of the six first springs (204) are respectively fixedly connected to the opposite sides of the six trapezoidal columns (203).

4. The foundation pile for water conservancy project construction according to claim 1, characterized in that: The threaded sleeve (205) is provided with a threaded ring matched with the threaded rod (209) inside, the number of the mounting plates (206) is two, and the insides of the two mounting plates (206) are respectively fixed with two auxiliary rods.

5. A foundation pile for water conservancy project construction according to claim 4, characterized in that: The number of the second springs (207) is four, and the outer surfaces of the two auxiliary rods are respectively slidably connected with four push rods, and the opposite sides of the four second springs (207) are respectively fixedly connected to the sides of the four push rods away from the threaded rod (209).

6. A foundation pile for water conservancy project construction according to claim 5, characterized in that: The tops of the four push rods are respectively fixedly connected to one side of the four fixing columns (208) close to the threaded rod (209); the left and right sides of the four fixing columns (208) respectively penetrate the interior of the mounting sleeve (201) and the interior of the foundation pile body (1); the bottom of the threaded rod (209) penetrates the tops of the two mounting plates (206) and is threadedly connected to the threaded ring inside the threaded sleeve (205).