Universal type pile fixing device for constructional engineering
By using a servo motor, screw rod and sliding rod structure in the pile fixing device for construction projects, the automatic centering of the foundation pile and the up and down movement of the splint are realized, which solves the problems of position deviation of the foundation pile and fixed height of the splint in the existing technology. Improved fixation effect and safety.
Patent Information
- Application Number
- CN202420498283.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-03-14
AI Technical Summary
The existing foundation pile fixing device cannot automatically position, resulting in position deviation of the foundation piles, and the height of the splint is fixed and cannot be raised or lowered with the foundation piles, resulting in poor fixing effect.
A universal pile fixing device for construction engineering is designed, which uses a servo motor, screw rod, sliding rod and splint structure to realize the automatic centering of the foundation pile and the up and down movement of the splint. The second servo motor drives the second screw rod and The T-shaped plate drives the first splint and the second splint to move relative to each other to realize automatic centering of the foundation pile and the lifting and lowering of the splint with the foundation pile.
It realizes the automatic centering of foundation piles and the flexible lifting and lowering of splints, improves the fixing effect, reduces the need for manual adjustment, and enhances the stability and safety of the pile nailing process.
Smart Images

Figure CN221895780U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction equipment, in particular to a universal pile fixing device for construction engineering. Background Art
[0002] At construction sites, it is often necessary to drive piles into the ground. Traditionally, the work of fixing piles is done by two workers, one holding the pile and the other swinging the hammer. This method requires very high coordination between the two workers. First, the worker holding the pile must have a steady hand, while the worker swinging the hammer must have an accurate hand. If one of these two requirements is not met, the pile may be set crooked at best, or even a hand-hitting accident may occur at worst. Therefore, pile fixing devices were developed.
[0003] When the existing pile fixing device is in use, the pile cannot be automatically positioned, resulting in a deviation between the position of the pile and the ground where the pile needs to be nailed, and the operator needs to manually adjust it. In addition, the height of the clamping plate of the existing pile fixing device is fixed. During the process of nailing the pile, the clamping plate cannot be raised or lowered with the pile. After the pile is nailed into the ground for a certain distance, the fixing device needs to be removed to continue nailing the pile, and the fixing effect is not good. Utility Model Content
[0004] In view of the above problems, the utility model proposes a universal pile fixing device for construction engineering to solve the above problems.
[0005] The utility model is implemented as follows: a universal pile fixing device for construction engineering comprises a base, an outer wall of the base is provided with a through hole, an upper end face of the base is fixedly connected with an L-shaped plate, a first screw rod is rotatably connected between the L-shaped plate and the base, a first servo motor is installed on the upper end face of the L-shaped plate, an output end of the first servo motor is fixedly connected with the first screw rod, a U-shaped plate is threadedly connected with the outer wall of the first screw rod, a second screw rod is rotatably connected inside the U-shaped plate, a second servo motor is installed on the left end face of the U-shaped plate, an output end of the second servo motor is fixedly connected with the second screw rod, both ends of the outer wall of the second screw rod are threadedly connected with T-shaped plates, a first clamping plate is fixedly connected with the left end face of the T-shaped plate on the right, and two symmetrically distributed second clamping plates are fixedly connected with the right end face of the T-shaped plate on the left.
[0006] In order to facilitate the fixing of the base, as a preferred general type of pile fixing device for construction engineering of the utility model, the outer wall of the base is threadedly connected with two symmetrically distributed threaded rods, the lower end surfaces of the two threaded rods are rotatably connected with mounting plates, the lower end surfaces of the two mounting plates are fixedly connected with two symmetrically distributed pins, the upper end surfaces of the two mounting plates are fixedly connected with two symmetrically distributed limit rods, and the four limit rods are slidably connected to the base.
[0007] In order to facilitate the downward movement of the foundation pile between the first clamping plate and the second clamping plate, as a preferred general-purpose pile fixing device for construction engineering of the utility model, balls are rotatably provided on the inner walls of the first clamping plate and the second clamping plate.
[0008] In order to facilitate the stable sliding of the L-shaped plate and the U-shaped plate, as a preferred general pile fixing device for construction engineering of the utility model, two symmetrically distributed first sliding rods are fixedly connected between the L-shaped plate and the base, the U-shaped plate is slidably connected to the two first sliding rods, and the inside of the U-shaped plate is fixedly connected to two symmetrically distributed second sliding rods, and the two T-shaped plates are slidably connected to the two second sliding rods.
[0009] In order to facilitate the relative or opposite movement of the first clamping plate and the second clamping plate, as a preferred general-purpose pile fixing device for construction engineering of the utility model, the threads at both ends of the second screw rod are in opposite directions.
[0010] In order to facilitate the movement of the equipment, as a preferred general-purpose pile fixing device for construction engineering of the utility model, the lower end surface of the base is provided with four symmetrically distributed rollers.
[0011] In order to facilitate the control of the equipment, as a preferred general-purpose pile fixing device for construction engineering of the utility model, the outer wall of the L-shaped plate is provided with a controller, and the first servo motor and the second servo motor are both electrically connected to the controller.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] This universal pile fixing device for construction engineering can drive the first clamping plate and the second clamping plate to move relative to each other through the second servo motor, the second screw rod, the second slide rod, the T-shaped plate, the first clamping plate and the second clamping plate, so as to fix the foundation pile, and can automatically center the foundation pile without the need for staff to adjust. The first servo motor, the first screw rod, the first slide rod and the U-shaped plate can cooperate to drive the first clamping plate and the second clamping plate to move up and down, so that the first clamping plate and the second clamping plate can move downward while the pile is nailed, and the fixing effect is good. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is the overall structural diagram of a universal pile fixing device for construction engineering of the utility model;
[0015] Figure 2 This is a top view of a universal pile fixing device for construction engineering of the utility model;
[0016] Figure 3 The utility model is a left view of a universal pile fixing device for construction engineering.
[0017] In the figure, 1, base; 2, L-shaped plate; 3, first servo motor; 4, first screw rod; 5, first slide rod; 6, U-shaped plate; 7, second servo motor; 8, second screw rod; 9, second slide rod; 10, T-shaped plate; 11, first clamping plate; 12, second clamping plate; 13, ball bearing; 14, through hole; 15, roller; 16, threaded rod; 17, mounting plate; 18, pin; 19, limit rod; 20, controller. DETAILED DESCRIPTION
[0018] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0019] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.
[0020] See also Figure 1-3 A universal pile fixing device for construction engineering comprises a base 1, a through hole 14 is opened on the outer wall of the base 1, an L-shaped plate 2 is fixedly connected to the upper end surface of the base 1, a first screw rod 4 is rotatably connected between the L-shaped plate 2 and the base 1, a first servo motor 3 is installed on the upper end surface of the L-shaped plate 2, an output end of the first servo motor 3 is fixedly connected to the first screw rod 4, a U-shaped plate 6 is threadedly connected to the outer wall of the first screw rod 4, a second screw rod 8 is rotatably connected inside the U-shaped plate 6, a second servo motor 7 is installed on the left end surface of the U-shaped plate 6, an output end of the second servo motor 7 is fixedly connected to the second screw rod 8, both ends of the outer wall of the second screw rod 8 are threadedly connected to a T-shaped plate 10, a first clamping plate 11 is fixedly connected to the left end surface of the T-shaped plate 10 on the right, and two symmetrically distributed second clamping plates 12 are fixedly connected to the right end surface of the T-shaped plate 10 on the left.
[0021] In this embodiment: start the second servo motor 7, the second servo motor 7 drives the second screw rod 8 to rotate, the second screw rod 8 is a bidirectional screw rod, and then drives the two T-shaped plates 10 to slide relatively along the two second sliding rods 9, and then drives the first clamping plate 11 and the second clamping plate 12 to move relative to each other, so that the foundation pile is clamped between the first clamping plate 11 and the second clamping plate 12 for fixation, and the foundation pile is clamped by the relative movement of the first clamping plate 11 and the second clamping plate 12, which can automatically center the foundation pile so that the foundation pile and the through hole 14 are concentric, and no staff adjustment is required, start the first servo motor 3, the first servo motor 3 drives the first screw rod 4 to rotate, and then drives the U-shaped plate 6 to slide downward along the two first sliding rods 5, and then drives the first clamping plate 11 and the second clamping plate 12 to move downward, so that in the process of nailing piles, the first clamping plate 11 and the second clamping plate 12 can move downward with the foundation pile, and the fixing effect is good.
[0022] As a technical optimization scheme of the utility model, the outer wall of the base 1 is threadedly connected with two symmetrically distributed threaded rods 16, the lower end surfaces of the two threaded rods 16 are rotatably connected with a mounting plate 17, the lower end surfaces of the two mounting plates 17 are fixedly connected with two symmetrically distributed pins 18, the upper end surfaces of the two mounting plates 17 are fixedly connected with two symmetrically distributed limit rods 19, and the four limit rods 19 are all slidably connected to the base 1.
[0023] In this embodiment, the threaded rod 16 is rotated, and the threaded rod 16 drives the mounting plate 17 to move downward, thereby driving the pin 18 to move downward and insert into the ground, thereby fixing the base 1 to prevent the device from moving when nailing.
[0024] As a technical optimization solution of the present invention, balls 13 are rotatably provided on the inner walls of the first clamping plate 11 and the second clamping plate 12 .
[0025] In this embodiment, the balls 13 are rotatably arranged on the inner walls of the first clamping plate 11 and the second clamping plate 12, so that the first clamping plate 11 and the second clamping plate 12 can be easily moved on the outer wall of the pile.
[0026] As a technical optimization solution of the utility model, two symmetrically distributed first sliding rods 5 are fixedly connected between the L-shaped plate 2 and the base 1, the U-shaped plate 6 is slidably connected to the two first sliding rods 5, the inside of the U-shaped plate 6 is fixedly connected to two symmetrically distributed second sliding rods 9, and the two T-shaped plates 10 are slidably connected to the two second sliding rods 9.
[0027] In this embodiment: by slidingly connecting the U-shaped plate 6 with the two first slide bars 5, the U-shaped plate 6 can move up and down stably, and by slidingly connecting the two T-shaped plates 10 with the two second slide bars 9, the two T-shaped plates 10 can move left and right stably.
[0028] As a technical optimization solution of the present invention, the thread directions at both ends of the second screw rod 8 are opposite.
[0029] In this embodiment, the thread directions of the two ends of the second screw rod 8 are set to be opposite, so that when the second screw rod 8 rotates, the two T-shaped plates 10 are driven to move relative to or away from each other.
[0030] As a technical optimization solution of the present invention, four symmetrically distributed rollers 15 are provided on the lower end surface of the base 1 .
[0031] In this embodiment, rollers 15 are arranged on the lower end surface of the base 1 to facilitate movement of the device.
[0032] As a technical optimization solution of the present invention, a controller 20 is disposed on the outer wall of the L-shaped plate 2 , and the first servo motor 3 and the second servo motor 7 are both electrically connected to the controller 20 .
[0033] In this embodiment, the device is controlled by the controller 20, which saves time and effort and improves the degree of automation.
[0034] The working principle and use process of the utility model are as follows: when in use, the base 1 is first moved to the specified position so that the through hole 14 is opposite to the position of the nail pile, and then the two threaded rods 16 are rotated in sequence, the threaded rods 16 drive the mounting plate 17 to move downward, and then drive the pin 18 to move downward and insert into the ground, so as to fix the base 1, and then use the lifting equipment to lift the pile, and insert the lower end of the pile into the through hole 14, and then start the second servo motor 7, the second servo motor 7 drives the second screw rod 8 to rotate, the second screw rod 8 is a bidirectional screw rod, and then drives the two T-shaped plates 10 to slide relatively along the two second sliding rods 9, and then drives the first clamping plate 11 and the second clamping plate 12 Relative movement, thereby clamping the pile between the first clamping plate 11 and the second clamping plate 12 for fixation, the pile is clamped by the relative movement of the first clamping plate 11 and the second clamping plate 12, and the pile can be automatically centered so that the pile and the through hole 14 are concentric, and no adjustment is required by the staff. Then, the pile is hammered into the ground using the pile nailing equipment. While nailing the pile, the first servo motor 3 is started, and the first servo motor 3 drives the first screw rod 4 to rotate, thereby driving the U-shaped plate 6 to slide downward along the two first sliding rods 5, thereby driving the first clamping plate 11 and the second clamping plate 12 to move downward, so that in the process of nailing the pile, the first clamping plate 11 and the second clamping plate 12 can move downward with the pile, and the fixing effect is good.
[0035] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A universal pile fixing device for construction engineering, comprising a base (1), wherein the outer wall of the base (1) is provided with a through hole (14), characterized in that: The upper end surface of the base (1) is fixedly connected to an L-shaped plate (2), a first screw rod (4) is rotatably connected between the L-shaped plate (2) and the base (1), a first servo motor (3) is mounted on the upper end surface of the L-shaped plate (2), an output end of the first servo motor (3) is fixedly connected to the first screw rod (4), a U-shaped plate (6) is threadedly connected to the outer wall of the first screw rod (4), a second screw rod (8) is rotatably connected inside the U-shaped plate (6), a second servo motor (7) is mounted on the left end surface of the U-shaped plate (6), an output end of the second servo motor (7) is fixedly connected to the second screw rod (8), both ends of the outer wall of the second screw rod (8) are threadedly connected to a T-shaped plate (10), a first clamping plate (11) is fixedly connected to the left end surface of the T-shaped plate (10) on the right, and two symmetrically distributed second clamping plates (12) are fixedly connected to the right end surface of the T-shaped plate (10) on the left.
2. A universal pile fixing device for construction engineering according to claim 1, characterized in that: The outer wall of the base (1) is threadedly connected to two symmetrically distributed threaded rods (16); the lower end surfaces of the two threaded rods (16) are rotatably connected to mounting plates (17); the lower end surfaces of the two mounting plates (17) are fixedly connected to two symmetrically distributed pins (18); the upper end surfaces of the two mounting plates (17) are fixedly connected to two symmetrically distributed limiting rods (19); and the four limiting rods (19) are slidably connected to the base (1).
3. A universal pile fixing device for construction engineering according to claim 1, characterized in that: Balls (13) are rotatably arranged on the inner walls of the first clamping plate (11) and the second clamping plate (12).
4. A universal pile fixing device for construction engineering according to claim 1, characterized in that: Two symmetrically distributed first sliding rods (5) are fixedly connected between the L-shaped plate (2) and the base (1), the U-shaped plate (6) is slidably connected to the two first sliding rods (5), the interior of the U-shaped plate (6) is fixedly connected to two symmetrically distributed second sliding rods (9), and the two T-shaped plates (10) are both slidably connected to the two second sliding rods (9).
5. A universal pile fixing device for construction engineering according to claim 1, characterized in that: The threads at both ends of the second screw rod (8) are in opposite directions.
6. A universal pile fixing device for construction engineering according to claim 1, characterized in that: The lower end surface of the base (1) is provided with four symmetrically distributed rollers (15).
7. A universal pile fixing device for construction engineering according to claim 1, characterized in that: A controller (20) is disposed on the outer wall of the L-shaped plate (2), and the first servo motor (3) and the second servo motor (7) are both electrically connected to the controller (20).