Foundation pit supporting mechanism for building engineering construction

By designing the foundation pit support mechanism including the bottom plate, baffles, drainage troughs and connecting rods, the problems of cumbersome components and weak connections are solved, and the rapid installation and efficient drainage of the foundation pit support mechanism are achieved, ensuring the safety of the foundation pit. Security.

CN221895786UInactive Publication Date: 2024-10-25HUBEI YUTU CONSTR ENG CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202322770723.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-16
Publication Date
2024-10-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing foundation pit support mechanism has complicated components and lacks firm connection methods during installation, resulting in gaps, affecting the drainage effect and affecting the safety of the foundation pit.

Method used

A foundation pit support mechanism including a bottom plate, a baffle, a drainage trough, a water diversion pipe, a drainage trough, a tenon and a tenon groove is designed. The baffle and the bottom plate are firmly connected through connecting rods and connecting holes, and the drainage trough and Aqueducts carry out water diversion and drainage.

Benefits of technology

It achieves rapid installation and firm connection of the foundation pit support mechanism, avoids gaps, improves drainage efficiency, and ensures the safety of the foundation pit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895786U_ABST
    Figure CN221895786U_ABST
Patent Text Reader

Abstract

The utility model relates to a foundation pit supporting mechanism for constructional engineering construction, which relates to the field of constructional engineering and comprises a bottom plate, a baffle plate, a connecting rod, a partition plate, a gutter and the like, the baffle plate is mounted on one side of the bottom plate, a drainage groove is arranged on the baffle plate, a water conduit is arranged below the drainage groove, and the gutter is arranged below the water conduit. A water guide groove is arranged on one side of the baffle, seepage water on the inner wall of a foundation pit can be discharged through the water guide groove, a second connecting arm is installed on the other side of the baffle, one end of a connecting rod can be installed on the second connecting arm, the other end of the connecting rod is connected with a first connecting arm on the bottom plate, and the function of supporting the baffle can be achieved. The tenons can be connected with the mortises in one side of the other bottom plate, and firm connection between the foundation pit supporting mechanisms can be guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of construction engineering, in particular to a foundation pit supporting mechanism for construction engineering. Background Art

[0002] Due to the rapid development of modern construction technology, more and more construction projects have emerged. Foundation pit is a part of the construction process that must be constructed. The safety of the foundation pit is also a guarantee of construction safety. Foundation pit support is to ensure the safety of underground structure construction and the surrounding environment of the foundation pit. It is a support, reinforcement and protection measure for the side walls of the foundation pit and the surrounding environment. Therefore, in order to ensure the safety of the foundation pit, a reliable foundation pit support mechanism is very important.

[0003] Patent No. CN214993892U proposes a foundation pit support mechanism that is conducive to drainage, which includes a foundation pit bottom plate, a foundation pit wall plate and a partition plate. A first placement groove is provided at the end of the foundation pit bottom plate, and the foundation pit wall plate is placed in the first placement groove. The middle of the foundation pit bottom plate is fixedly connected to the foundation pit wall plate through a first fixing rod, and the top of the foundation pit wall plate is fixedly connected to the bottom of the partition plate through a second fixing rod. The foundation pit bottom plate and the middle of the partition plate are fixedly connected through a third fixing rod. The bottom of the foundation pit wall plate and the partition plate are fixedly provided with a fixing seat, and the fixing seat is fixedly connected to the foundation pit bottom plate, which can provide excellent drainage. It can effectively reinforce the foundation pit support, ensure the stability of the foundation pit, and at the same time ensure the discharge of seepage in the foundation pit support to ensure the safety inside the foundation pit. However, when installing the foundation pit support mechanism, the internal components are relatively complicated to install, and there is no good connection method between the multiple base plates. Installation only relies on contact, which easily leads to gaps during splicing. When draining, water flows into the foundation pit along the gaps, affecting the safety of the foundation pit. For this reason, we need a foundation pit support mechanism that can achieve firm splicing and is conducive to drainage. Utility Model Content

[0004] In view of the above problems, the utility model provides a foundation pit support mechanism for construction engineering

[0005] To achieve the above purpose, the utility model adopts the following technical solutions.

[0006] A foundation pit support mechanism for construction engineering includes a base plate, a tenon is provided on one side of the base plate, a tenon groove is provided on the other side of the base plate, a baffle is provided on one end of the base plate, a drainage groove is designed on the outer wall of the baffle, a water diversion pipe is connected below the drainage groove, a water diversion groove is provided below one end of the water diversion pipe close to the inner wall of the baffle, and the water diversion groove is connected to the drainage groove.

[0007] Preferably, a fixing plate 1 is provided on the inner wall of the baffle, a connecting plate 2 is mounted on the fixing plate 1, a connecting arm 2 is mounted on the connecting plate 2, and a connecting hole 2 is provided in the connecting arm 2.

[0008] Preferably, a mounting groove is provided in the middle above the bottom plate, a partition is installed on the mounting groove, two fixing frames are installed on the surface of the partition, and a plurality of mounting holes are provided on the fixing frames.

[0009] Preferably, a fixing plate 2 is arranged on the bottom plate between the mounting groove and the baffle, a connecting plate 1 is installed on the fixing plate 2, a connecting arm 1 is installed on the connecting plate 1, a connecting hole 1 is arranged in the connecting arm 1, the connecting arm 1 is connected to the connecting arm 2 through a connecting rod, and connecting holes 3 are arranged at both ends of the connecting rod.

[0010] According to the above scheme,

[0011] Compared with the prior art, the beneficial effects are as follows:

[0012] This solution can use a connecting rod to connect the baffle and the base plate to achieve firm support for the baffle, and the internal structure of the foundation pit support mechanism is simple, and the staff can quickly install it to improve work efficiency. The tenon and mortise are arranged on the base plate to achieve a firm connection between multiple foundation pit support mechanisms to avoid gaps. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a diagram showing the foundation pit support mechanism of the utility model;

[0014] Figure 2 This is a diagram showing the outer wall of the baffle of the foundation pit support mechanism of the utility model;

[0015] Figure 3 This is a display diagram of the partition of the foundation pit support mechanism of the utility model;

[0016] Figure 4 This is a display diagram of the connecting rod of the foundation pit support mechanism of the utility model.

[0017] In the figure: 1, bottom plate; 2, baffle; 3, fixing plate 1; 4, fixing plate 2; 5, connecting plate 1; 6, connecting arm 1; 7, connecting hole 1; 8, connecting plate 2; 9, connecting arm 2; 10, connecting hole 2; 11, water diversion trough; 12, drainage trough; 13, water diversion pipe; 14, mortise and tenon; 15, tenon; 16, drainage trough; 17, partition; 18, fixing frame; 19, mounting hole; 20, connecting rod; 21, connecting hole 3; 22, mounting groove. DETAILED DESCRIPTION

[0018] The utility model is further described in detail below with reference to the accompanying drawings and through specific embodiments. The following embodiments are merely illustrative and not limiting of the protection scope of the utility model.

[0019] Example

[0020] As shown in the figure: The foundation pit support mechanism for construction engineering includes:

[0021] A foundation pit support mechanism for construction engineering includes a base plate 1, on which a mounting groove 22 is provided, the mounting groove 22 is used to install a partition 17, the partition 17 can separate a water diversion part, a fixing frame 18 is installed under the partition 17, and there are multiple mounting holes 19 on the fixing frame 18, and bolts can be installed in the mounting holes 19, so that the partition 17 can be firmly fixed on the base plate 1.

[0022] Furthermore, a baffle plate 2 is provided on one end of the bottom plate 1, and the baffle plate 2 can support and reinforce the side wall of the foundation pit. A drainage groove 16 is provided on the outer wall of the baffle plate 2, and a water diversion pipe 13 is installed below the drainage groove 16. The water diversion pipe 13 passes through the baffle plate 2, and a water diversion groove 11 is provided on the bottom plate 1 below one end of the water diversion pipe 13. The water diversion groove 11 is inclined to facilitate the flow of water. A drainage groove 12 is connected to one end of the water diversion groove 11, and the drainage grooves 12 can be connected between multiple support mechanisms to discharge water.

[0023] Furthermore, a fixing plate 3 is provided on the inner wall of the baffle 2, a connecting plate 28 is installed on the fixing plate 3, a connecting arm 29 is installed on the connecting plate 28, a connecting hole 20 is provided on the connecting arm 29, and the connecting hole 21 can be connected to the connecting hole 3 21 at one end of the connecting rod 20, a fixing plate 24 is installed on the bottom plate 1, a connecting plate 5 is installed on the fixing plate 24, a connecting arm 6 is provided on the connecting plate 5, a connecting hole 7 is provided on the connecting arm 6, and the connecting hole 7 can be connected to the connecting hole at the other end of the connecting rod 20, so as to realize the connection and fixation between the baffle 2 and the bottom plate 1, and make the baffle 2 more firm, a tenon 15 is provided on one side of the bottom plate 1, and the tenon 15 can be connected to the tenon groove 14 on one side of the bottom plate 1 of other foundation pit support mechanisms, so that each support mechanism can be firmly connected.

[0024] The working process of the utility model is as follows: the foundation pit support mechanism is installed close to the side wall of the foundation pit, one end of the connecting rod 20 is installed in the connecting arm 16, the connecting rod 20 and the connecting arm 16 are connected and fixed by bolts, the other end of the connecting rod 20 is installed in the connecting arm 29, the connecting rod 20 and the connecting arm 29 are connected and fixed by bolts, and then the bottom of the partition 17 is installed in the mounting groove 22 on the base plate 1, one side of the fixing frame 18 is fixed to the partition 17 by bolts, and the other side is fixed to the base plate 1, and the partition 17 and the base plate 1 are fixed by the fixing frame 18, and finally the tenon 15 on the supporting mechanism is installed in the tenon groove 14 on another supporting mechanism, so as to realize the connection between multiple supporting mechanisms. When the side wall of the foundation pit seeps water, the water flows into the water diversion pipe 13 along the drainage groove 16, flows into the water diversion trough 11 through the water diversion pipe 13, and finally the water flows into the drainage trough 12 for discharge.

[0025] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.

Claims

1. A foundation pit support mechanism for construction engineering, comprising a bottom plate (1), characterized in that: A tenon (15) is provided on one side of the bottom plate (1), a tenon groove (14) is provided on the other side of the bottom plate (1), a baffle (2) is provided on one end of the bottom plate (1), a drainage groove (16) is designed on the outer wall of the baffle (2), a water diversion pipe (13) is connected below the drainage groove (16), a water diversion groove (11) is provided below one end of the water diversion pipe (13) close to the inner wall of the baffle (2), and the water diversion groove (11) is connected to the drainage groove (12).

2. A foundation pit support mechanism for construction engineering according to claim 1, characterized in that: A fixing plate (3) is arranged on the inner wall of the baffle (2), a connecting plate (8) is mounted on the fixing plate (3), a connecting arm (9) is mounted on the connecting plate (8), and a connecting hole (10) is arranged in the connecting arm (9).

3. A foundation pit support mechanism for construction engineering according to claim 2, characterized in that: A mounting groove (22) is arranged in the middle above the bottom plate (1), a partition plate (17) is installed on the mounting groove (22), two fixing frames (18) are installed on the surface of the partition plate (17), and a plurality of mounting holes (19) are arranged on the fixing frames (18).

4. A foundation pit support mechanism for construction engineering according to claim 3, characterized in that: A fixing plate 2 (4) is arranged on the bottom plate (1) between the mounting groove (22) and the baffle plate (2), a connecting plate 1 (5) is installed on the fixing plate 2 (4), a connecting arm 1 (6) is installed on the connecting plate 1 (5), a connecting hole 1 (7) is arranged in the connecting arm 1 (6), the connecting arm 1 (6) is connected to the connecting arm 2 (9) via a connecting rod (20), and connecting holes 3 (21) are arranged at both ends of the connecting rod (20).

Citation Information

Cited By

  • Anti-blocking drainage device and method for foundation pit support water seepage

    CN119553704A

  • An anti-blocking drainage device and method for seepage water in foundation pit support

    CN119553704B