Anchor plate type retaining wall for high-filled and semi-filled embankment

Through the anchor plate type retaining wall structure, the connection between anchor rods and tie rods is used to resist soil pressure on high-fill and half-filled embankments, which solves the problems of land occupation and construction difficulty of retaining walls in the existing technology, and achieves reasonable stress and Low cost construction effect.

CN221895821UActive Publication Date: 2024-10-25CHINA RUILIN ENG TECH CO LTD DONGGUAN BRANCH
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420480022.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-10-25
Estimated Expiration
2034-03-13

AI Technical Summary

Technical Problem

In high-fill and semi-fill embankments, the retaining wall structure of the existing technology cannot meet the requirements of land occupation and construction difficulty. The cantilever retaining wall requires excavation of the slope earth, and the construction of the pile-plate retaining wall is complex and costly.

Method used

The anchor plate type retaining wall structure is adopted, including the base, bottom plate, panel and anchor rod. The anchor rod is set in the existing slope soil. The panel and the original slope are backfilled with soil. They are connected to the anchor rod through tie rods. The panel is pulled under the pull. It resists earth pressure and allows the road roller to crush the fill to form a composite structural retaining wall.

Benefits of technology

It overcomes the problems of retaining wall occupying land and difficulty in construction in the existing technology, and achieves the effects of reasonable stress bearing of the structure, convenient construction and relatively low cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895821U_ABST
    Figure CN221895821U_ABST
Patent Text Reader

Abstract

The utility model relates to an anchor plate type retaining wall for a high-filled and semi-filled embankment, belongs to the field of highway and urban road engineering, and particularly relates to a composite structure retaining wall structure for the high-filled and semi-filled embankment. The anchor rod is arranged in a current side slope soil body, the panel is in a vertical state, backfill soil is arranged between the panel and an original slope surface, the panel is connected with the anchor rod through a pull rod, the panel resists soil pressure under the traction of the pull rod and the anchor rod, the pull rod is arranged in a horizontal state, and soil rolling of a road roller is not affected; the retaining wall is arranged on a high-filled and semi-filled embankment to form the retaining wall with the composite structure. The problems of difficulty in model selection, high construction difficulty and high manufacturing cost of the high-filled and semi-filled embankment in the prior art are solved. The retaining wall is reasonable in structure stress, convenient to construct and relatively low in manufacturing cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an anchor plate type retaining wall for high fill and semi-fill embankments, belongs to the field of highway and urban road engineering, and particularly relates to a composite structure retaining wall structure for high fill and semi-fill embankments. Background Art

[0002] In some high-fill sections of highways and urban roads, it is a common embankment method to use sloped soil rolling to form embankments. Generally, the slope of the fill section is 1:1.5, that is, the fill height is 1m, and the slope needs to extend 1.5m outside the roadside. The use of slope in high-fill sections requires a lot of land outside the road sideline. If the foot of the slope is not flat, but a slope that continues to slope downward, the foot of the fill should continue to extend outward. The use of retaining walls can greatly reduce the land occupation and is a common method to reduce the land occupation in fill sections. However, for retaining walls with a height of more than 5m, the specifications also have regulations. The "Technical Code for Slope Engineering of Buildings" GB50330-2013 stipulates that the soil slope of gravity retaining walls should not exceed 10m, the reinforced concrete cantilever retaining walls should not exceed 6m, and the reinforced concrete buttress retaining walls should not exceed 10m. In some embankment sections, the type of embankment slope is limited by conditions and it is difficult to choose a conventional method. For example, the highway is built along the mountainside and the highway line encounters a concave section with a natural slope that is 1 to 2 lanes deep into the highway. The slope is 10 to 12 meters high and the conventional backfilling method with a slope width of 15 to 18 meters requires more land. If a retaining wall is set at the edge of the highway, less land can be occupied. However, it is difficult to complete the retaining walls of the prior art with one structure. For example, if a cantilever retaining wall is used, it needs to be made into two layers of staggered steps and still occupies a certain width of land outward. If a buttress retaining wall is used, although it can be built from the edge of the highway land to the top without occupying additional land, the buttress retaining wall of the high embankment requires a wider wall heel, relying on the backfill on the wall heel to press down the buttress retaining wall to resist overturning and sliding. When constructing a buttress retaining wall, it is necessary to slope and dig out the heel of the wall. The originally dense slope surface is dug out, and then backfilled with soil after the retaining wall is built. This method is not suitable for semi-filled embankments.

[0003] The prior art has an anchor-type retaining wall, in which holes are drilled in the soil of the slope, anchors are set in the holes, rib columns are set at the position of the retaining wall, the anchors pull the rib columns, and prefabricated retaining plates are embedded on the inner side of the rib columns. This method has certain defects when used for high-fill and semi-fill embankments. The anchors are set at an inclination angle of 15° to the horizontal. After the rib columns are installed on the retaining plates, soil is filled between the retaining plates and the existing slope surface. Since the anchors are relatively dense, the fill cannot be compacted by a roller. This anchor-type retaining wall is mostly used for road cutting retaining where the compaction requirement of the fill behind the wall is not high. This retaining wall is set below the slope of the highway to prevent slope collapse, but it is not suitable for the semi-fill embankment in this example. There is also a pile-plate retaining wall in the prior art, in which pile foundations are buried deep underground on a slope, piles are extended to the top of the slope above the ground, retaining plates are embedded between the piles, and the strong bending resistance of the piles is used to support the backfill pressure behind the retaining plates. Since there are no structures in the backfill area, a roller can be used to compact the soil. This retaining wall can be used for the semi-filled embankment in this example, but the plate-type retaining wall is difficult to construct and has a high cost. Summary of the invention

[0004] The purpose of the utility model is to provide an anchor plate type retaining wall for high fill and semi-fill embankment, which is composed of a base, a bottom plate, a panel and an anchor rod. The anchor rod is set in the existing slope soil, the panel is in an upright state, and the panel and the original slope surface are backfilled. The panel is connected with the anchor rod by a tie rod. The panel resists the soil pressure under the traction of the tie rod and the anchor rod. The tie rod is set in a horizontal state and does not affect the rolling of the backfill by the roller. It is set in the high fill and semi-fill embankment to form a composite structure retaining wall. The beneficial effects are: it overcomes the drawbacks of the existing cantilever retaining wall for the retaining wall of the high fill and semi-fill embankment, which needs to dig out the existing slope soil and then backfill; it solves the problem of the difficulty and high cost of the pile-plate retaining wall. The retaining wall structure is reasonable in force, convenient in construction and relatively low in cost.

[0005] The utility model is realized by the following technologies: an anchor plate type retaining wall for high fill and semi-fill embankment, mainly comprising a base 1, a bottom plate 2, and a panel 3, an anchor rod 5 is arranged in the soil of an original slope surface 4, backfill soil 6 is between the panel 3 and the original slope surface 4, a pull rod 7 is arranged between the panel 3 and the original slope surface 4, the pull rod 7 is arranged in a horizontal state, the panel 3 is provided with a panel anchor ring 8, an anchor rod ring 9 is arranged at the end of the anchor rod 5, a fastener 10 is arranged in the middle of hooks at both ends of the pull rod 7, one end of the pull rod 7 is connected to the panel anchor ring 8, and the other end is connected to the anchor rod ring 9, the fastener 10 can adjust the pulling force of the pull rod 7 on the panel 3, and the panel 3, under the pulling and support of the backfill soil 6, constitutes an anchor plate type retaining wall for high fill and semi-fill embankment.

[0006] The base 1 is a stone sheet rolled and embedded in the foundation, which plays the role of stabilizing the foundation, bearing the upper load and preventing the retaining wall from sliding.

[0007] The bottom plate 2 and the panel 3 are cast in situ using reinforced concrete.

[0008] The fastener 10 is a turnbuckle screw, and the pull rods 7 on both sides are screwed on the turnbuckle screw with opposite threads. When the middle of the pull rods 7 on both sides of the turnbuckle screw is tightened, the entire pull rod 7 is shortened, which plays a tensioning and pulling role.

[0009] The outer periphery of the pull rod 7 and the fastener 10 is wrapped by a pull rod protection layer 11 .

[0010] The angle α between the anchor rod 5 and the horizontal is 5-15°, and the grouting body 12 is filled between the anchor rod 5 and the soil to increase the friction between the anchor rod 5 and the soil.

[0011] The longitudinal length of the retaining wall is W = 5~20m per level, and a deformation joint 13 is set at the connection between the two levels. The deformation joint 13 is vertically connected from top to bottom. The bottom plate 2 of the same level is horizontally arranged along the longitudinal direction of the retaining wall. The elevation of the base 1 of the retaining wall is adjusted at the deformation joint 13 between the two levels. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is a cross-sectional view of the embankment of the utility model;

[0013] Figure 2 Schematic diagram of the retaining wall elevation.

[0014] In the figure: 1-base, 2-bottom plate, 3-panel, 4-original slope, 5-anchor, 6-backfill, 7-tie rod, 8-panel anchor ring, 9-anchor ring, 10-fastener, 11-tie rod protection layer, 12-grouting body, 13-deformation joint, 14-drainage hole, 15-pavement structure layer, 16-crash pier. DETAILED DESCRIPTION

[0015] In order for those skilled in the art to better understand the present invention, Figure 1-2 To further explain the utility model, in the description of the specification, the terms "upper", "lower", "left", "right", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships commonly understood by those skilled in the art. They are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the structure referred to must have a specific direction, be constructed and operated in a specific direction. The contents mentioned in the implementation mode are not limitations of the utility model.

[0016] The utility model is a retaining wall for high embankment, mainly including a base 1, a bottom plate 2, and a panel 3. Anchor rods 5 are arranged in the soil of the original slope 4. Backfill soil 6 is provided between the panel 3 and the original slope 4. A pull rod 7 is arranged between the panel 3 and the original slope 4. The pull rod 7 is arranged in a horizontal state and does not affect the rolling of the backfill by the roller. The panel 3 is provided with a panel anchor ring 8, and the end of the anchor rod 5 is provided with an anchor rod ring 9. The two ends of the pull rod 7 are provided with hooks and a fastener 10 is arranged in the middle. One end of the pull rod 7 is connected to the panel anchor ring 8, and the other end is connected to the anchor rod ring 9. The fastener 10 can adjust the pulling force of the pull rod 7 on the panel 3. Under the pulling and support of the backfill soil 6, the panel 3 constitutes an anchor plate retaining wall for high embankment semi-filled embankment. The cross-sectional view of the embankment of the utility model is shown in FIG. Figure 1 .

[0017] At the bottom of the original slope 4, a trench for filling the base 1 is excavated. The base 1 is embedded in the foundation by rolling with stone slabs and rolled with a heavy roller. The base 1 plays a role in stabilizing the foundation, bearing the upper load and preventing the retaining wall from sliding.

[0018] On the original slope 4, according to the designed horizontal spacing and the height of the upper and lower layers, a horizontal drilling rig is used to drill holes for setting anchor rods 5, with a hole diameter of 100~150mm, and the angle α between the anchor rods 5 and the horizontal is 5~15°. The vertical spacing of the anchor rods 5 is generally 1~1.5m, and the horizontal spacing is 1~2m. The length of the anchor rods 5 is calculated and determined in combination with the setting spacing and geological conditions. The anchor rods 5 are inserted into the holes, and support frames are arranged on the anchor rods 5 at intervals to center the anchor rods 5 in the holes. Grouting bodies 12 are filled between the anchor rods 5 and the soil to increase the friction between the anchor rods 5 and the soil. The grouting body 12 uses cement mortar with a mix ratio of cement: sand: water of 1:3:0.5~0.6. Anchor rings 9 are welded to the positions where the anchor rods 5 are exposed on the original slope 4.

[0019] The bottom plate 2 and the face plate 3 are cast in situ with reinforced concrete. Tie the steel bars of the bottom plate 2 on the compacted base 1, cast the bottom plate 2 concrete first with formwork, tie the steel bars of the face plate 3 on the bottom plate 2, cast the face plate 3 concrete with formwork, and the pouring height at one time should not be too high, which can refer to the vertical spacing of the tie rod 7. When pouring the face plate 3, the face plate anchor ring 8 is embedded in the concrete, and the height and position of the face plate anchor ring 8 correspond to the anchor rod ring 9. The construction joint of the concrete pouring of the face plate 3 should be set about 300mm above the face plate anchor ring 8. When pouring the upper layer of concrete, the construction joint should be filled with cement slurry to facilitate concrete bonding.

[0020] There is backfill soil 6 between the panel 3 and the original slope 4. The backfill soil 6 should be backfilled and compacted in layers as the panel 3 is poured. The compacted thickness of each layer is controlled to be 300~500mm. The backfill is stopped when it is compacted to about 100mm above the panel anchor ring 8. A groove with a width and depth of about 200mm is dug on the line connecting the corresponding panel anchor ring 8 and the anchor ring 9. This groove is used to set the tie rod 7. One end of the tie rod 7 is hooked on the panel anchor ring 8, and the other end is hooked on the anchor ring 9. The fastener 10 uses a basket screw. The tie rods 7 on both sides are screwed on the basket screw and have reverse threads. When the middle of the tie rods 7 on both sides of the basket screw is tightened, the entire tie rod 7 is shortened, which plays a tensioning and pulling role. When tightening the fastener 10, the force should be moderate, and tensioning is appropriate. The tie rod 7 is embedded in the groove, and concrete is poured in the groove to form a tie rod protective layer 11. The tie rod 7 and the fastener 10 are wrapped with the tie rod protective layer 11. After the concrete pouring of the tie rod protection layer 11 is completed, the backfill soil 6 is continuously filled and compacted in layers.

[0021] The longitudinal length of the retaining wall is W = 5~20m per level. A deformation joint 13 is set at the junction of two levels. The deformation joint 13 is vertically connected from top to bottom. The bottom plate 2 of the same level is set horizontally along the longitudinal direction of the retaining wall. If there is a slope on the original ground, the elevation of the base 1 of the retaining wall is adjusted at the deformation joint 13 between the two levels. When pouring the panel 3, a drainage hole 14 should be reserved. The horizontal spacing of the drainage holes 14 is 2~4m, and the vertical spacing is 1~2m. Figure 2 .

[0022] When the panel 3 and the backfill soil 6 are constructed to the top, the pavement structure layer 15 is laid on the backfill soil 6 and the existing slope top, and the crash pier 16 is cast on the top of the panel 3. Figure 1 .

[0023] The description and drawings of this application are only a specific implementation method and are not restrictive. Under the guidance of this application, technicians in this field can make many forms without departing from the scope of protection of the purpose of this application, all of which are within the scope of protection of this application.

Claims

1. An anchor plate retaining wall for high fill and semi-fill embankment, characterized by: The retaining wall mainly comprises a base (1), a bottom plate (2), and a panel (3). An anchor rod (5) is arranged in the soil of the original slope surface (4). The panel (3) is in an upright state. Backfill soil (6) is provided between the panel (3) and the original slope surface (4). A pull rod (7) is arranged between the panel (3) and the original slope surface (4). The pull rod (7) is arranged in a horizontal state. The panel (3) is provided with a panel anchor ring (8). An anchor rod ring (9) is provided at the end of the anchor rod (5). A fastener (10) is provided in the middle of the two ends of the pull rod (7). One end of the pull rod (7) is connected to the panel anchor ring (8), and the other end is connected to the anchor rod ring (9). The fastener (10) can adjust the pulling force of the pull rod (7) on the panel (3). Under the pulling force and the support of the backfill soil (6), the panel (3) forms an anchor plate retaining wall for high fill and semi-fill embankments.

2. The anchor plate retaining wall for high fill and semi-fill embankment according to claim 1 is characterized in that: The base (1) is a stone sheet rolled and embedded in the foundation, which plays the role of stabilizing the foundation, bearing the upper load and preventing the retaining wall from sliding.

3. The anchor plate retaining wall for high fill and semi-fill embankment according to claim 1 is characterized by: The base plate (2) and the face plate (3) are cast in situ using reinforced concrete.

4. The anchor plate retaining wall for high fill and semi-fill embankment according to claim 1 is characterized in that: The fastener (10) adopts a turnbuckle screw, and the pull rods (7) on both sides are screwed on the turnbuckle screw with opposite threads. When the pull rods (7) on both sides of the turnbuckle screw are tightened, the middle of the pull rod (7) is moved, and the entire pull rod (7) is shortened, which plays a tensioning and pulling role.

5. The anchor plate retaining wall for high fill and semi-fill embankment according to claim 1 is characterized by: The outer periphery of the pull rod (7) and the fastener (10) is wrapped by a pull rod protective layer (11).

6. The anchor plate retaining wall for high fill and semi-fill embankment according to claim 1 is characterized by: The angle α between the anchor rod (5) and the horizontal when it is inserted into the soil is 5 to 15°, and a grouting body (12) is filled between the anchor rod (5) and the soil to increase the friction between the anchor rod (5) and the soil.

7. The anchor plate retaining wall for high fill and semi-fill embankment according to claim 1 is characterized by: The retaining wall has a longitudinal length W of 5-20 m per level, and a deformation joint (13) is arranged at the junction of two levels. The deformation joint (13) is vertically connected from top to bottom. The bottom plate (2) of the same level is arranged horizontally along the longitudinal direction of the retaining wall. The two levels are staggered at the deformation joint (13) to adjust the elevation of the base (1) of the retaining wall.

Citation Information

Cited By

  • Diagonal draw bar type retaining wall

    CN120844620A