Anti-floating structure of rail open cut station

By arranging expansion pieces and water pressure sensors in the anti-floating anchors, the problem of small contact area between steel bars and concrete is solved, the stability and connection strength of the anti-floating anchors are improved, and effective water pressure under the main body of the foundation pit is achieved. Monitoring and drainage.

CN221895833UActive Publication Date: 2024-10-25CHONGQING INST OF SURVEYING & MAPPING SCI & TECH (CHONGQING MAP COMPILATION CENT)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420470977.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2024-10-25
Estimated Expiration
2034-03-12

AI Technical Summary

Technical Problem

In the existing foundation pit anti-floating structure, the contact area between steel bars and concrete is small, which causes the anti-floating anchor rods to easily slip in the concrete, affecting the overall performance.

Method used

Grooves and expansion pieces are set in the tube body of the anti-floating anchor. The expansion piece expands in the radial direction to increase the contact area with the concrete, and is dynamically monitored and drained through the water pressure sensor in the embedded box.

Benefits of technology

It improves the connection strength between the anti-floating anchor rod and the concrete, prevents slipping, enhances the overall performance, and realizes dynamic water pressure monitoring and drainage pressure relief under the main body of the foundation pit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895833U_ABST
    Figure CN221895833U_ABST
Patent Text Reader

Abstract

The utility model discloses a rail open cut station anti-floating structure which comprises a foundation pit main body and a concrete bottom plate arranged at the bottom of the foundation pit main body, a plurality of anti-floating anchor rod bodies are arranged in the concrete bottom plate, each anti-floating anchor rod body comprises a pipe body and a rod body, the rod bodies are located in the pipe bodies, grooves are formed in the inner walls of the pipe bodies, and the inner walls of the pipe bodies are provided with anti-floating anchor rod bodies. An expansion piece is further arranged on the portion, located on the side wall of the groove, of the rod body, and the expansion piece is used for expanding in the groove in the radial direction of the rod body. According to the utility model, the contact area between the rod body and the concrete can be increased by utilizing the arranged expansion piece, so that the condition that the rod body slips in the concrete is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation pit construction, in particular to an anti-floating structure for an open-cut track station. Background Art

[0002] Open-cut station is a construction method in urban rail transit construction, which refers to the construction method of excavating on the ground and then building the main structure of the station. The advantages of this method are fast construction progress, easy monitoring and management, and the ground can be restored above the station, so that the station has less impact on the surrounding environment. In high-water areas, there is often a situation where the underground structure has less or no soil covering. In this case, the anti-floating problem of open-cut stations is particularly prominent. Therefore, the anti-floating design of open-cut stations is very important for the safety and reliability of underground projects. At present, most of the existing foundation pit anti-floating structures are pre-buried in the concrete bottom plate at the bottom of the main body of the foundation pit. The anti-floating anchor rods are used to resist the floating effect of groundwater on the building. However, the existing anti-floating anchor rods are usually cast in the anchor rod by integrally pouring steel bars and concrete. During the process of pouring steel bars with concrete, the surface of the steel bars has a small contact area with the concrete, which leads to the steel bars moving downward in the concrete while waiting for the concrete to solidify, thereby affecting the overall performance of the anti-floating anchor rod. Utility Model Content

[0003] The technical problem to be solved by the utility model is to overcome the deficiencies in the prior art and aims to provide an anti-floating structure for an open-cut track station, by which the contact area between the rod body and the concrete can be increased by using the expansion piece, thereby avoiding the rod body from sliding in the concrete.

[0004] The utility model is realized by the following technical solutions:

[0005] A kind of anti-floating structure of open-cut railway station, comprising a foundation pit body and a concrete bottom plate arranged at the bottom of the foundation pit body, a plurality of anti-floating anchor rod bodies are arranged inside the concrete bottom plate, the anti-floating anchor rod bodies comprise a tube body and a rod body, the rod body is located inside the tube body, a groove is arranged on the inner wall of the tube body, the rod body is also provided with an expansion piece on the side wall of the groove, the expansion piece is used to expand radially along the rod body in the groove.

[0006] Furthermore, an air intake blind hole is provided on the top of the rod body, and the air intake blind hole is distributed along the axial direction of the rod body. A first through hole is provided on the side wall of the rod body, and the first through hole connects the air intake blind hole with the inside of the expansion member.

[0007] Furthermore, the expansion member is an airbag.

[0008] Furthermore, the anti-floating anchor rod body also includes a connecting rod, a cavity is provided inside the connecting rod, the top of the rod body is inserted into the cavity through the bottom of the connecting rod, and the rod body is connected to the connecting rod through a thread;

[0009] The top of the connecting rod is also provided with an air inlet communicated with the cavity.

[0010] Furthermore, a fixing block is provided in the cavity of the connecting rod, the outer diameter of the fixing block is consistent with the inner diameter of the cavity, and a blocking blind hole is provided at the end of the fixing block facing the rod body, and the inner diameter of the blocking blind hole is consistent with the outer diameter of the rod body;

[0011] The fixing block is also provided with a plurality of second through holes, and the second through holes are distributed along the axial direction of the connecting rod.

[0012] Furthermore, a limiting plate is provided on the inner wall of the tube body, and the circumferential side wall of the limiting plate is connected to the inner wall of the tube body;

[0013] The limiting plate is provided with a connecting hole, the rod body is inserted into the connecting hole, the inner wall of the connecting hole is provided with a limiting groove, the side wall of the rod body is also provided with a protrusion, the protrusion is distributed along the axial direction of the rod body, and the protrusion is located in the limiting groove.

[0014] Furthermore, a connection cover is provided on the end of the connecting rod extending out of the tube body, and the connection cover is connected to the connecting rod through a thread;

[0015] It also includes a drainage pipe pre-buried in the concrete bottom plate, and the drainage pipe is connected to the connection cover through a vertical rod.

[0016] Furthermore, it also includes an embedded box located on the concrete bottom plate, a water pressure sensor is provided inside the embedded box, a hose is provided on the side wall of the connecting cover, and the hose is connected to the inside of the embedded box.

[0017] Furthermore, an opening is provided at the bottom of the embedded box, and a filter is provided in the opening.

[0018] Compared with the prior art, the utility model has the following advantages and beneficial effects:

[0019] 1. The utility model utilizes the expansion piece arranged on the side wall of the rod body to increase the contact area with the concrete after expansion, which can not only improve the connection strength between the rod body and the concrete, but also prevent the rod body from settling during the process of waiting for the concrete to solidify, thereby improving the overall performance of the anti-floating anchor rod body;

[0020] 2. The utility model utilizes the water pressure sensor in the embedded box to dynamically monitor the water pressure under the main body of the foundation pit. When the water pressure reaches a preset value, the water pressure under the main body of the foundation pit can be discharged to the outside, thereby achieving the purpose of draining water and relieving pressure under the main body of the foundation pit. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The drawings described herein are used to provide a further understanding of the embodiments of the present utility model, constitute a part of this application, and do not constitute a limitation of the embodiments of the present utility model. In the drawings:

[0022] Figure 1 It is a schematic diagram of the structure of the utility model;

[0023] Figure 2 This is a schematic diagram of the structure of the anti-floating anchor rod body of the utility model;

[0024] Figure 3 For this utility model Figure 2 The structural diagram of the enlarged part A in the middle;

[0025] Figure 4 It is a structural schematic diagram of the anti-floating anchor rod body of the utility model in another state;

[0026] Figure 5 For this utility model Figure 4 The structural diagram of the enlarged part B in the middle;

[0027] Figure 6 It is a schematic diagram of the internal structure of the embedded box of the utility model.

[0028] Marks and corresponding parts names in the attached drawings:

[0029] 2. Drain pipe; 3. Foundation pit body; 4. Concrete bottom plate; 5. Anti-floating anchor rod body; 6. Pipe body; 7. Protrusion; 8. Limit plate; 9. Rod body; 10. Expansion piece; 11. Connecting rod; 12. Embedded box; 13. Hose; 14. Vertical rod; 15. Connecting cover; 16. Fixing block; 17. Second through hole; 18. Blocking blind hole; 19. Filter; 20. Water pressure sensor. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical solutions and advantages of the utility model more clearly understood, the utility model is further described in detail below in conjunction with embodiments and drawings. The schematic implementation manner of the utility model and its description are only used to explain the utility model and are not intended to limit the utility model.

[0031] Example

[0032] like Figures 1 to 6As shown, the utility model includes a foundation pit body 3 and a concrete base plate 4 arranged at the bottom of the foundation pit body 3, a plurality of anti-floating anchor rod bodies 5 are arranged inside the concrete base plate 4, the anti-floating anchor rod bodies 5 include a tube body 6 and a rod body 9, the rod body 9 is located in the tube body 6, a groove is arranged on the inner wall of the tube body 6, the rod body 9 is located on the side wall of the groove and an expansion member 10 is also arranged, the expansion member 10 is used to expand radially along the rod body 9 in the groove.

[0033] In the prior art, the anti-floating anchor rods are usually formed by casting steel bars and concrete in one piece. However, since the contact area between the steel bars and the concrete is small and the surface of the steel bars is relatively smooth, the steel bars will be displaced downward in the concrete under the action of their gravity while waiting for the concrete to solidify, resulting in poor connectivity between the anti-floating anchor rod and the concrete base plate 4. Therefore, the technical solution provides a groove in the tube body 6, the groove is an annular structure, and the inner diameter of the groove is larger than the inner diameter of the tube body 6; a plurality of expansion pieces 10 are also provided on the side wall of the rod body 9 located in the tube body 6, and the expansion pieces 10 are sequentially distributed along the circumference of the rod body 9. And the expansion piece 10 is located in the groove. The expansion piece 10 provided in the technical solution can expand radially along the rod body 9 in the groove. In this way, when the anti-floating anchor rod body 5 is cast on site, the bottom of the tube body 6 is first inserted into the soil layer or rock layer, and then the rod body 9 is extended into the tube body 6, and then concrete is injected into the tube body 6. Then, the expansion piece 10 is expanded in the groove to change the volume of the expansion piece 10 and increase the contact area between the expansion piece 10 and the concrete. Therefore, under the action of the expansion piece 10 in the expanded state, the rod body 9 can be prevented from falling while waiting for the concrete to solidify, thereby improving the stability of the rod body 9 during the casting process.

[0034] At the same time, the expansion member 10 can squeeze the concrete in the tube body 6 during the gradual expansion process, thereby achieving the purpose of compacting the concrete in the tube body 6 and improving the strength of the concrete inside the anti-floating anchor body 5.

[0035] An air intake blind hole is provided on the top of the rod body 9 and is distributed axially along the rod body 9 . A first through hole is provided on the side wall of the rod body 9 and connects the air intake blind hole with the interior of the expansion member 10 . The expansion member 10 is an airbag.

[0036] The expansion member 10 provided in the present embodiment is an air bag, and when the fluid medium is rushed into the interior of the air bag, it can expand in the groove. In order to ensure that the external fluid medium can enter the expansion member 10, an air intake blind hole is provided at the top of the rod body 9. The external fluid medium enters the rod body 9 through the air intake blind hole at the top of the rod body 9, and then smoothly enters the expansion member 10 through the first through hole, so that the expansion member 10 can expand, increasing the contact area between the expansion member 10 and the concrete, thereby ensuring that the rod body 9 is not easy to sink during the gradual solidification of the concrete.

[0037] At the same time, since the expansion member 10 provided in this embodiment is an air bag, the expansion member 10 can improve the air tightness between the rod body 9 and the concrete when it is in the expanded state, thereby improving the waterproof performance of the rod body 9 in the pipe body 6 and preventing groundwater from leaking to the foundation pit main body 3 through the small gap between the pipe body 6 and the concrete.

[0038] In another embodiment, the expansion member 10 is filled with concrete slurry. Thus, after the concrete slurry filled in the expansion member 10 solidifies, the expansion member 10 can improve the connection strength of the rod body 9 in the pipe body 6 and improve the overall strength of the anti-floating anchor rod body 5.

[0039] The anti-floating anchor rod body 5 also includes a connecting rod 11, which has a cavity inside. The top of the rod body 9 is inserted into the cavity through the bottom of the connecting rod 11, and the rod body 9 is connected to the connecting rod 11 through threads; the top of the connecting rod 11 is also provided with an air inlet connected to the cavity.

[0040] In this embodiment, in order to facilitate the injection of fluid medium into the rod body 9, a connecting rod 11 is further provided at the upper end of the rod body 9. The connecting rod 11 is connected to the rod body 9 by means of a thread. The upper end of the connecting rod 11 extends beyond the top of the tube body 6, which is convenient for connection with the concrete base plate 4 during pouring. At the same time, the threaded connection method can adjust the extension length of the connecting rod 11 on the tube body 6 to meet the use requirements under different working conditions.

[0041] A fixing block 16 is also provided in the cavity of the connecting rod 11, and the outer diameter of the fixing block 16 is consistent with the inner diameter of the cavity. A blind hole 18 is provided at the end of the fixing block 16 facing the rod body 9, and the inner diameter of the blind hole is consistent with the outer diameter of the rod body 9; a plurality of second through holes 17 are also provided on the fixing block 16, and the second through holes 17 are distributed along the axial direction of the connecting rod 11.

[0042] After the injection of the fluid in the expansion piece 10 is completed, in order to avoid the backflow of the fluid injected into the expansion piece 10 under the action of the rebound force of the expansion piece 10, a fixing block 16 is further provided in the connecting rod 11 in this embodiment. After the injection of the fluid inside the expansion piece 10 is completed, the connecting rod 11 is rotated to cause a relative displacement between the connecting rod 11 and the rod body 9, thereby causing the fixing block 16 in the connecting rod 11 to move toward the end of the rod body 9, and finally causing the end of the rod body 9 to be in the blocking blind hole 18 of the fixing block 16, and the blocking blind hole 18 is used to block the air intake blind hole of the rod body 9, thereby avoiding the backflow of the fluid in the expansion piece 10.

[0043] The air inlet provided on the connecting rod 11 is used to inject fluid into the cavity of the connecting rod 11. When the injected fluid is gas, the air pipe of an external air pump is inserted into the air inlet of the connecting rod 11, so as to transport air into the cavity of the connecting rod 11, and the air entering the cavity passes through the second through hole 17 and the air inlet blind hole in turn into the rod body 9, finally achieving the purpose of inflating the expansion piece 10; and when the injected fluid is concrete slurry, the grouting pipe of an external grouting machine is connected to the air inlet of the connecting rod 11, so as to transport concrete slurry into the cavity of the connecting rod 11, and the concrete slurry passes through the second through hole 17, and then the concrete slurry enters the rod body 9 through the air inlet blind hole on the rod body 9, and finally enters the expansion piece 10, so as to achieve the purpose of expanding the expansion piece 10. The connection method of the air pump or grouting machine and the air inlet on the connecting rod 11 used in this embodiment is the prior art and will not be elaborated here.

[0044] A limiting plate 8 is also provided on the inner wall of the tube body 6, and the circumferential side wall of the limiting plate 8 is connected to the inner wall of the tube body 6; a connecting hole is provided on the limiting plate 8, and the rod body 9 is inserted into the connecting hole, and a limiting groove is provided on the inner wall of the connecting hole. A protrusion 7 is also provided on the side wall of the rod body 9, and the protrusion 7 is distributed along the axial direction of the rod body 9, and the protrusion 7 is located in the limiting groove.

[0045] Since the connecting rod 11 is connected to the rod body 9 by means of threads, that is, the relative position between the connecting rod 11 and the rod body 9 can be adjusted by rotating the connecting rod 11, in order to prevent the rod body 9 from rotating synchronously when the construction personnel rotate the connecting rod 11, a limit plate 8 is further provided in the tube body 6 in this embodiment. When the rod body 9 is inserted into the connecting hole on the limit plate 8, the protrusion 7 on the side wall of the rod body 9 is just located in the limiting groove of the connecting hole. Under the action of the protrusion 7 and the limiting groove, the rod body 9 can be limited, so that the rod body 9 will not rotate in the connecting hole of the limit plate 8, thereby achieving the purpose of limiting the rod body 9.

[0046] In order to prevent the limiting plate 8 from blocking the concrete slurry injected into the tube body 6, a plurality of third through holes are provided on the limiting plate 8 so that the concrete injected into the tube body 6 can pass through the limiting plate 8 smoothly through the third through holes.

[0047] The end of the connecting rod 11 extending out of the pipe body 6 is also provided with a connecting cover 15, and the connecting cover 15 is connected to the connecting rod 11 through threads; it also includes a drainage pipe 2 embedded in the concrete base plate 4, and the drainage pipe 2 is connected to the connecting cover 15 through a vertical rod 14.

[0048] It also includes an embedded box 12 located on the concrete bottom plate 4 , wherein a water pressure sensor 20 is disposed inside the embedded box 12 , and a hose 13 is disposed on the side wall of the connecting cover 15 , wherein the hose 13 is connected to the inside of the embedded box 12 .

[0049] At present, the anti-floating design of foundation pit projects, especially the open-cut railway stations under complex geological conditions, is often based on the recommended anti-floating design water level value proposed by the survey unit. However, the anti-floating water level design value obtained by the survey unit during the survey is based on the engineering geology and hydrogeological conditions during the survey period, and does not take into account factors such as changes in surrounding hydrogeological conditions during construction and use or inadequate construction measures. Under complex geological conditions, the buoyancy of the floor slab of the open-cut railway station may be significantly different from the calculated anti-floating value, which may easily cause the station to float as a whole or the floor slab to bulge, causing adverse social impacts. Therefore, when pouring the concrete floor slab 4 in this embodiment, firstly A plurality of embedded boxes 12 are embedded in the soil layer, and a water pressure sensor 20 is arranged in the embedded box 12. The water pressure sensor 20 can monitor the water pressure in the rock layer or soil layer. The drainage pipe 2 is connected to the external water pump. The external world is also provided with a controller connected to the water pressure sensor 20 and the water pump. When the water pressure sensor 20 detects that the water pressure in the rock layer or soil layer reaches a preset value, the controller controls the water pump to start working, and the water in the rock layer or soil layer is pumped into the connecting cover 15 through the hose 13, and then enters the drainage pipe 2 through the vertical rod 14, and finally discharges the groundwater to the outside, thereby achieving the purpose of draining water and relieving pressure of the foundation pit main body 3.

[0050] During on-site construction, first use drilling equipment to drill a hole in the soil or rock layer, install the anti-floating anchor body 5 into the drilled hole, then put the rod body 9 and the connecting rod 11 into the pipe body 6, inject concrete into the box pipe body 6, and then immediately inject a fluid medium into the expansion piece 10 to expand it. After the concrete injected into the pipe body 6 solidifies, install the connecting cover 15 on the connecting rod 11, and install the drain pipe 2. Finally, cast the concrete base plate 4, so that the upper end of the anti-floating anchor body 5 is pre-buried in the concrete base plate 4 and integrally connected to the concrete base plate 4. At the same time, since the set drain pipe 2 is also pre-buried in the concrete base plate 4, and the drain pipe 2 is connected to the connecting rod 11 through the connecting cover 15, the connection strength between the anti-floating anchor body 5 and the concrete base plate 4 is further improved.

[0051] The bottom of the embedded box 12 is provided with an opening, and a filter screen 19 is provided in the opening.

[0052] In order to prevent the hose 13 from being blocked by stones during the process of draining and relieving the pressure of groundwater, a filter screen 19 is provided in this embodiment.

[0053] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the utility model in detail. It should be understood that the above description is only the specific implementation method of the utility model and is not used to limit the protection scope of the utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the protection scope of the utility model.

Claims

1. An anti-floating structure for an open-cut railway station, comprising a foundation pit body (3) and a concrete bottom plate (4) arranged at the bottom of the foundation pit body (3), characterized in that: A plurality of anti-floating anchor rod bodies (5) are arranged inside the concrete base plate (4), and the anti-floating anchor rod bodies (5) include a tube body (6) and a rod body (9). The rod body (9) is located inside the tube body (6), and a groove is arranged on the inner wall of the tube body (6). An expansion member (10) is also arranged on the side wall of the groove where the rod body (9) is located, and the expansion member (10) is used to expand radially along the rod body (9) in the groove.

2. The anti-floating structure of an open-cut railway station according to claim 1, characterized in that: An air intake blind hole is provided at the top of the rod body (9), and the air intake blind hole is distributed along the axial direction of the rod body (9). A first through hole is provided on the side wall of the rod body (9), and the first through hole connects the air intake blind hole with the interior of the expansion member (10).

3. The anti-floating structure of an open-cut railway station according to claim 1, characterized in that: The expansion member (10) is an air bag.

4. The anti-floating structure of an open-cut railway station according to claim 1, characterized in that: The anti-floating anchor rod body (5) further comprises a connecting rod (11), a cavity is provided inside the connecting rod (11), the top of the rod body (9) is inserted into the cavity through the bottom of the connecting rod (11), and the rod body (9) is connected to the connecting rod (11) via a thread; The top of the connecting rod (11) is also provided with an air inlet which is in communication with the cavity.

5. The anti-floating structure of an open-cut railway station according to claim 4, characterized in that: A fixing block (16) is also provided in the cavity of the connecting rod (11), the outer diameter of the fixing block (16) is consistent with the inner diameter of the cavity, and a blocking blind hole (18) is provided at the end of the fixing block (16) facing the rod body (9), the inner diameter of the blocking blind hole is consistent with the outer diameter of the rod body (9); The fixing block (16) is also provided with a plurality of second through holes (17), and the second through holes (17) are distributed axially along the connecting rod (11).

6. The anti-floating structure of an open-cut railway station according to claim 1, characterized in that: A limiting plate (8) is also provided on the inner wall of the tube body (6), and the circumferential side wall of the limiting plate (8) is connected to the inner wall of the tube body (6); The limiting plate (8) is provided with a connecting hole, the rod body (9) is inserted into the connecting hole, the inner wall of the connecting hole is provided with a limiting groove, the side wall of the rod body (9) is also provided with a protrusion (7), the protrusion (7) is distributed along the axial direction of the rod body (9), and the protrusion (7) is located in the limiting groove.

7. The anti-floating structure of an open-cut railway station according to claim 4, characterized in that: A connecting cover (15) is also provided on the end of the connecting rod (11) extending outside the tube body (6), and the connecting cover (15) is connected to the connecting rod (11) via a thread; It also comprises a drainage pipe (2) pre-buried in the concrete bottom plate (4), wherein the drainage pipe (2) is connected to the connection cover (15) via a vertical rod (14).

8. The anti-floating structure of an open-cut railway station according to claim 7, characterized in that: It also includes an embedded box (12) located on the concrete bottom plate (4), a water pressure sensor (20) is provided inside the embedded box (12), a hose (13) is provided on the side wall of the connection cover (15), and the hose (13) is connected to the inside of the embedded box (12).

9. The anti-floating structure of an open-cut railway station according to claim 8, characterized in that: The bottom of the embedded box (12) is provided with an opening, and a filter screen (19) is provided in the opening.