Heavy haul railway subgrade settlement monitoring device
By introducing fixed components and protective components into the heavy-haul railway subgrade settlement monitoring device, the problems of monitoring accuracy and service life are solved, and more accurate settlement monitoring and equipment protection are achieved.
Patent Information
- Application Number
- CN202322709687.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-10
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2033-10-10
AI Technical Summary
Existing heavy-haul railway subgrade settlement monitoring devices have deficiencies in monitoring accuracy and service life, and are especially susceptible to local settlement and construction during heavy-haul railway operation.
A heavy-duty railway subgrade settlement monitoring device including a fixed component and a protective component is designed. The fixed component improves the flexibility and accuracy of the monitoring device through a base plate and a counterweight block, and the protective component protects the device from damage by using a dustproof plate and a buffer spring. Impact of construction debris.
The accuracy and service life of the settlement monitoring device are improved, the settlement of the roadbed can be monitored more accurately, and equipment damage can be effectively prevented during the construction process.
Smart Images

Figure CN221895834U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of heavy-load railway roadbed monitoring, in particular to a heavy-load railway roadbed settlement monitoring device. Background Art
[0002] The main function of the roadbed is to provide the necessary conditions for track or road paving and train or vehicle operation, and to bear the static and dynamic loads of the track and locomotive vehicles or road surface and traffic loads, while transferring and diffusing the loads deep into the foundation. For heavy-load railway roadbeds, settlement monitoring devices are required to monitor and collect roadbed settlement data.
[0003] A Chinese patent with application number 202220887414.0 discloses a railway roadbed settlement monitoring device, which belongs to the field of monitoring technology. The key points of its technical solution include a main body plate, a monitoring rod is arranged on the right side of the top of the main body plate, the bottom of the monitoring rod penetrates the main body plate and extends to the bottom of the main body plate, the surface of the monitoring rod is slidably connected to the inner wall of the main body plate, the top of the main body plate is fixedly connected to the main body rod, the surface of the main body rod is provided with a through groove, the top and bottom of the inner wall of the through groove are fixedly connected with fixed blocks, a monitoring mechanism is fixedly connected between the opposite sides of the two fixed blocks, and warning lights are fixedly installed on the monitoring rod and the top of the main body rod; the monitoring mechanism includes a magnifying glass, a transparent scale plate, a condenser and a laser light, which solves the problem that the existing method of directly monitoring the roadbed with a settlement rod, when the settlement rod falls, it is inconvenient to observe the surface of the settlement rod, thereby affecting the observation.
[0004] A heavy-load railway subgrade settlement monitoring device is a device that monitors the degree of subgrade settlement and deformation. During observation, the subgrade settlement monitoring device needs to be set at the position where observation is required. Surveying and mapping personnel obtain the subgrade deformation rate and the accumulated settlement by measuring the subgrade settlement value. However, the existing subgrade settlement monitoring device only fixes the device on the subgrade, and the bottom side of the device is usually connected to the ground with a flat plate. However, the total amount of heavy-load railway operation is very large, and there is a possibility of local settlement inside the subgrade below the flat plate. However, usually local settlement inside the subgrade will only cause cracks on the road surface, and the cracks cannot drive the flat plate to descend in time, affecting the accuracy of the monitoring device for subgrade settlement monitoring. In addition, the existing settlement monitoring device is easily impacted by building filling debris during railway construction, which can easily affect the accuracy of the settlement monitoring device. Utility Model Content
[0005] The purpose of the utility model is to provide a heavy-load railway roadbed settlement monitoring device to solve the problems raised in the above-mentioned background technology.
[0006] In order to solve the above technical problems, the utility model provides the following technical solutions: a heavy-load railway roadbed settlement monitoring device, comprising a settlement monitoring device body, a monitoring head is installed on the top of the settlement monitoring device body, a fixing component is arranged at the bottom of the settlement monitoring device body, and a protective component is arranged on the top of the settlement monitoring device body;
[0007] The fixing assembly includes a storage box, a cover plate is arranged on the top of the storage box, a circular groove is opened on the top of the cover plate, a long rod is arranged on the bottom of the storage box, a bottom plate is arranged on the bottom of the long rod, two counterweight blocks are arranged on the top of the bottom plate, and a plurality of stabilizing plates are arranged on the bottom of the bottom plate.
[0008] Preferably, the storage box and the cover plate are fixedly connected by bolts, and the bottom end of the settlement monitoring device body is fixedly connected to the middle part of the top end of the cover plate. The interior of the storage box can be used to store some small parts needed for maintaining the monitoring device, so that the staff can find spare parts more quickly when repairing the settlement monitoring device body.
[0009] Preferably, the top end of the long rod is fixedly connected to the middle of the bottom end of the storage box, and the bottom end of the long rod is fixedly connected to the middle of the top end of the bottom plate. The long rod is supported inside the soil so that the bottom end of the storage box does not contact the bottom of the preset pit. In this way, when the soil inside the foundation sinks downward, the collapse of the bottom plate can more easily pull the storage box to change its height.
[0010] Preferably, the bottom ends of the two counterweight blocks are fixedly connected to the two sides of the top of the base plate respectively, and the top ends of the plurality of stabilizing plates are fixedly connected to the bottom end of the base plate. The counterweight blocks increase the weight of the base plate so that the base plate can better press the movement of the soil in the foundation, thereby increasing the monitoring accuracy of the settlement monitoring device body.
[0011] Preferably, the protective component includes a protective cover, a square groove is provided on the top of one side wall of the protective cover, a dustproof plate is arranged on one side of the protective cover, a pull rod is connected to the top of the protective cover, a circular plate is provided at the bottom of the protective cover, a snap ring is provided at the bottom of the circular plate, a protective ring is provided at the top of the circular plate, and buffer springs are provided on all four sides of the protective ring. The protective component is sleeved on the outside of the settlement monitoring device body and does not fit the outer wall of the settlement monitoring device body. During the roadbed construction process, it can effectively prevent construction debris from splashing to the outside of the settlement monitoring device body and colliding with the outer wall of the settlement monitoring device body, thereby affecting the healthy use of the settlement monitoring device body.
[0012] Preferably, the outer wall of the dustproof plate is fixedly connected to the inner wall of the square groove, the bottom end of the protective cover is movably connected to the top of the circular plate, one end of the buffer spring is fixedly connected to one side wall of the protective ring, and the dustproof plate is made of a transparent material. The condition inside the protective cover can be observed through the dustproof plate, so that the staff can more quickly put the protective cover on the outside of the settlement monitoring device body, and the bottom is put on the outside of the protective ring to protect the settlement monitoring device body.
[0013] Preferably, the bottom end of the protective ring is fixedly connected to the top end of the circular plate, the top end of the snap ring is fixedly connected to the bottom end of the circular plate, the bottom of the snap ring is snap-connected to the inside of the circular groove, and the snap ring is used to fix the circular plate to the top of the storage box, so as to facilitate the positioning of the protective cover.
[0014] Compared with the prior art, the beneficial effects achieved by the utility model are:
[0015] First, by setting a fixing component, the utility model can fix the settlement monitoring device at a monitoring point during the use of the heavy-load railway roadbed settlement monitoring device, and when the bottom of the heavy-load railway roadbed is deformed, the bottom plate will move along with the settlement of the roadbed, causing the settlement monitoring device to move, thereby increasing the accuracy of the settlement monitoring device.
[0016] Secondly, by providing a protective component, the utility model can achieve that during the use of the heavy-load railway roadbed settlement monitoring device, the settlement monitoring device can be installed at the monitoring point of the roadbed during the heavy-load railway roadbed construction, and the impact of construction filling debris on the construction is reduced, thereby avoiding damage to the settlement monitoring device and increasing the service life of the settlement monitoring device. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a three-dimensional diagram of the utility model;
[0018] Figure 2 It is a three-dimensional diagram of the fixing assembly of the utility model;
[0019] Figure 3 It is a three-dimensional diagram of the storage box and the protective ring of the utility model;
[0020] Figure 4 It is a three-dimensional diagram of the protective component of the utility model.
[0021] Wherein: 101, storage box; 102, cover plate; 103, circular groove; 104, long rod; 105, bottom plate; 106, counterweight; 107, stabilizing plate; 201, protective cover; 202, square groove; 203, dustproof plate; 204, pull rod; 205, circular plate; 206, snap ring; 207, protective ring; 208, buffer spring; 1. Settlement monitoring device body; 2. Monitoring head. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1 , Figure 2 , Figure 3 and Figure 4 A heavy-load railway roadbed settlement monitoring device comprises a settlement monitoring device body 1, a monitoring head 2 is installed on the top of the settlement monitoring device body 1, a fixing component is arranged at the bottom of the settlement monitoring device body 1, and a protective component is arranged on the top of the settlement monitoring device body 1;
[0024] The fixing assembly includes a storage box 101, a cover plate 102 is arranged on the top of the storage box 101, a circular groove 103 is opened on the top of the cover plate 102, a long rod 104 is arranged on the bottom of the storage box 101, a bottom plate 105 is arranged on the bottom of the long rod 104, two counterweight blocks 106 are arranged on the top of the bottom plate 105, and a plurality of stabilizing plates 107 are arranged on the bottom of the bottom plate 105.
[0025] Specifically, the storage box 101 and the cover plate 102 are fixedly connected by bolts, and the bottom end of the settlement monitoring device body 1 is fixedly connected to the middle of the top end of the cover plate 102 .
[0026] Through the above technical solution, the monitoring head 2 is installed on the top of the settlement monitoring device body 1, and the image monitored by the monitoring head 2 is transmitted to the settlement monitoring device body 1, and finally imported into the computer in the monitoring room for calculation. The interior of the storage box 101 can be used to store some small parts needed for maintaining the monitoring device, so that the staff can find spare parts more quickly when repairing the settlement monitoring device body 1.
[0027] Specifically, the top end of the long rod 104 is fixedly connected to the middle of the bottom end of the storage box 101 , and the bottom end of the long rod 104 is fixedly connected to the middle of the top end of the bottom plate 105 .
[0028] Through the above technical solution, the long rod 104 is supported inside the soil, so that the bottom end of the storage box 101 does not contact the bottom of the preset pit. In this way, when the soil inside the foundation sinks downward, the sinking of the bottom plate 105 can more easily pull the storage box 101 to change its height.
[0029] Specifically, the bottom ends of the two counterweights 106 are fixedly connected to the two sides of the top of the bottom plate 105 , respectively, and the top ends of the plurality of stabilizing plates 107 are fixedly connected to the bottom end of the bottom plate 105 .
[0030] Through the above technical solution, the counterweight block 106 increases the weight of the base plate 105, so that the base plate 105 can better press the movement of the soil in the foundation, thereby increasing the monitoring accuracy of the settlement monitoring device body 1.
[0031] Specifically, the protective component includes a protective cover 201, a square groove 202 is provided on the top of one side wall of the protective cover 201, a dustproof plate 203 is provided on one side of the protective cover 201, a pull rod 204 is connected to the top of the protective cover 201, a circular plate 205 is provided at the bottom of the protective cover 201, a locking ring 206 is provided at the bottom of the circular plate 205, a protective ring 207 is provided at the top of the circular plate 205, and buffer springs 208 are provided on the four sides of the protective ring 207.
[0032] Through the above technical scheme, the protective component is sleeved on the outside of the settlement monitoring device body 1 and does not fit the outer wall of the settlement monitoring device body 1. During the roadbed construction process, it can effectively prevent construction debris from splashing to the outside of the settlement monitoring device body 1 and colliding with the outer wall of the settlement monitoring device body 1, thereby affecting the healthy use of the settlement monitoring device body 1.
[0033] Specifically, the outer wall of the dustproof plate 203 is fixedly connected to the inner wall of the square groove 202 , the bottom end of the protective cover 201 is movably connected to the top end of the circular plate 205 , and one end of the buffer spring 208 is fixedly connected to a side wall of the protective ring 207 .
[0034] Through the above technical solution, the dustproof plate 203 is made of a transparent material, and the condition inside the protective cover 201 can be observed through the dustproof plate 203, so that the staff can more quickly put the protective cover 201 on the outside of the settlement monitoring device body 1, and put the bottom on the outside of the protective ring 207 to protect the settlement monitoring device body 1.
[0035] Specifically, the bottom end of the protection ring 207 is fixedly connected to the top end of the circular plate 205 , the top end of the snap ring 206 is fixedly connected to the bottom end of the circular plate 205 , and the bottom of the snap ring 206 is snap-connected to the inside of the circular groove 103 .
[0036] Through the above technical solution, the snap ring 206 is used to fix the circular plate 205 to the top of the storage box 101, so as to facilitate the positioning of the protective cover 201.
[0037] When in use, the bottom plate 105 is pre-buried at the bottom of the location where the settlement monitoring device body 1 is installed, so that the outer walls of the bottom plate 105, the counterweight block 106 and the stabilizing plate 107 are all wrapped by the soil. The counterweight block 106 increases the weight of the bottom plate 105, so that the bottom plate 105 can adapt to the settlement of the roadbed more quickly and move downward. The stabilizing plate 107 increases the contact area between the bottom of the bottom plate 105 and the soil, making the placement of the bottom plate 105 more stable. The long rod 104 is inserted at the top of the bottom plate 105, and the bottom of the long rod 104 is affected by the soil. The top of the long rod 104 does not contact the soil, and the storage box 101 is set in the pit at the bottom of the settlement monitoring device body 1. When the bottom plate 105 moves downward due to the influence of the roadbed settlement, the storage box 101 can be driven by the long rod 104 to move downward, thereby pulling the settlement monitoring device body 1, so that the settlement monitoring device body 1 can adapt to the settlement of the roadbed. When the roadbed settles as a whole, the monitoring effect remains unchanged. When the roadbed settles locally, it can be quickly monitored by the settlement monitoring device body 1, increasing Increase the monitoring accuracy of the settlement monitoring device body 1; the snap ring 206 is inserted into the inside of the circular groove 103, the circular plate 205 and the protective ring 207 are fixed in position, the settlement monitoring device body 1 is arranged inside the protective ring 207, the outer wall of the settlement monitoring device body 1 does not fit the inner wall of the protective ring 207, hold the pull rod 204 to put the protective cover 201 on the outside of the protective ring 207, and the distance between the inside of the protective cover 201 and the outer wall of the settlement monitoring device body 1 can be observed through the transparent dustproof plate 203, which can be The protective cover 201 can be more quickly put on the outside of the protective ring 207, and the four buffer springs 208 can be wrapped inside the protective cover 201. One end of the four buffer springs 208 will fit against the inner wall of the protective cover 201. In this way, when the protective cover 201 is hit by construction debris, the impact intensity can be alleviated by shaking back and forth and left and right, thereby reducing the damage to the protective cover 201. While protecting the safety of use of the settlement monitoring device body 1, it also increases the service life of the protective cover 201.
[0038] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0039] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A heavy-load railway roadbed settlement monitoring device, comprising a settlement monitoring device body (1), characterized in that: A monitoring head (2) is installed at the top of the settlement monitoring device body (1), a fixing component is arranged at the bottom of the settlement monitoring device body (1), and a protective component is arranged at the top of the settlement monitoring device body (1); The fixing assembly comprises a storage box (101), a cover plate (102) is arranged on the top of the storage box (101), a circular groove (103) is opened on the top of the cover plate (102), a long rod (104) is arranged on the bottom of the storage box (101), a bottom plate (105) is arranged on the bottom of the long rod (104), two counterweight blocks (106) are arranged on the top of the bottom plate (105), and a plurality of stabilizing plates (107) are arranged on the bottom of the bottom plate (105).
2. A heavy-load railway roadbed settlement monitoring device according to claim 1, characterized in that: The storage box (101) and the cover plate (102) are fixedly connected by bolts, and the bottom end of the settlement monitoring device body (1) is fixedly connected to the middle part of the top end of the cover plate (102).
3. The heavy-duty railway subgrade settlement monitoring device according to claim 1, characterized in that: The top end of the long rod (104) is fixedly connected to the middle of the bottom end of the storage box (101), and the bottom end of the long rod (104) is fixedly connected to the middle of the top end of the bottom plate (105).
4. A heavy-load railway roadbed settlement monitoring device according to claim 1, characterized in that: The bottom ends of the two counterweight blocks (106) are respectively fixedly connected to the two sides of the top end of the bottom plate (105), and the top ends of the plurality of stabilizing plates (107) are all fixedly connected to the bottom end of the bottom plate (105).
5. The heavy-load railway roadbed settlement monitoring device according to claim 1, characterized in that: The protective component comprises a protective cover (201), a square groove (202) is provided at the top of one side wall of the protective cover (201), a dustproof plate (203) is provided on one side of the protective cover (201), a pull rod (204) is connected to the top of the protective cover (201), a circular plate (205) is provided at the bottom of the protective cover (201), a locking ring (206) is provided at the bottom of the circular plate (205), a protective ring (207) is provided at the top of the circular plate (205), and buffer springs (208) are provided on four sides of the protective ring (207).
6. A heavy-load railway subgrade settlement monitoring device according to claim 5, characterized in that: The outer wall of the dustproof plate (203) is fixedly connected to the inner wall of the square groove (202), the bottom end of the protective cover (201) is movably connected to the top end of the circular plate (205), and one end of the buffer spring (208) is fixedly connected to a side wall of the protective ring (207).
7. The heavy-load railway subgrade settlement monitoring device according to claim 5, characterized in that: The bottom end of the protective ring (207) is fixedly connected to the top end of the circular plate (205), the top end of the snap ring (206) is fixedly connected to the bottom end of the circular plate (205), and the bottom of the snap ring (206) is snap-connected to the inside of the circular groove (103).