Prefabricated concrete ring and concrete cylinder
By arranging steel frames and shear-resistant parts at the concrete ring joints of the precast concrete tower, a steel mesh structure is formed, which solves the problem of unstable shear resistance at the concrete ring joints and improves the shear bearing capacity and Anti-fatigue performance ensures the safety and stability of the structure.
Patent Information
- Application Number
- CN202420799333.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-04-17
AI Technical Summary
The shear resistance of the concrete ring joints of precast concrete towers is unstable and safety problems may occur under horizontal loads, especially under wind or earthquake action.
Multiple prefabricated concrete segments are connected through bolts, and steel frames and shear-resistant parts are installed at the joints to form a reinforced mesh structure to improve the shear load-bearing capacity and overall stiffness. Prestressed steel bars are added to enhance the load-bearing capacity and strength of the tower. Anti-fatigue properties.
Significantly improves the shear load-bearing capacity and overall stiffness of the concrete ring, reduces the deformation of the tower under wind load or earthquake action, improves fatigue resistance, and increases the load-bearing capacity and stiffness of the temporary tower during construction to prevent collapse.
Smart Images

Figure CN221896740U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of precast concrete structures, in particular to a precast concrete ring and a concrete cylinder. Background Art
[0002] my country is vigorously developing wind power generation, and the tower is an important component. The precast concrete tower is composed of precast concrete rings, which are often divided into multiple segments. The segments are connected by bolts through reserved holes to form a concrete ring. The upper and lower concrete rings are connected by prestressed steel bars. The shear resistance of the concrete ring joints is unstable, and safety problems may occur under horizontal loads. Utility Model Content
[0003] The utility model provides a prefabricated concrete tower structure, which achieves the purpose of improving the shear resistance of the concrete ring joint.
[0004] A precast concrete ring, comprising a plurality of precast concrete segments; the precast concrete segments comprise precast concrete, steel bars, steel frames and connection holes; the steel bars comprise annular steel bars and longitudinal steel bars; the steel frames extend out of the surface of the precast concrete; the connection holes of the segments are arranged correspondingly and are interspersed with bolts.
[0005] Preferably, the annular steel bars and the longitudinal steel bars form a steel mesh; the steel skeleton is located between the steel meshes; and the steel skeleton is continuous or separate.
[0006] Preferably, the vertical connection areas between the precast concrete segments are filled with filling materials; the precast concrete segments are provided with shear-resistant parts; and the shear-resistant parts extend out of the vertical surfaces of the precast concrete segments.
[0007] Preferably, the longitudinal reinforcement of the segment extends out of the precast concrete surface.
[0008] Preferably, the steel frame is surrounded by a steel reinforcement cage.
[0009] Preferably, the precast concrete rings are connected as a whole along the vertical direction; the steel frames are fixedly connected; and the horizontal connection areas are cast with horizontal postcast materials.
[0010] Preferably, the concrete cylinder is provided with prestressed steel bars; the prestressed steel bars are located inside or outside the precast concrete.
[0011] Compared with the prior art, the utility model has the following characteristics and beneficial effects.
[0012] 1. The segments of the concrete ring are still connected by bolts, and the concrete rings are connected by steel frames, which is conducive to improving the shear bearing capacity of the horizontal connection area of the concrete ring, improving its overall stiffness, reducing the deformation of the tower under wind load or earthquake, and improving its fatigue resistance;
[0013] During construction, before prestressing of the concrete cylinder, the bearing capacity and stiffness of the temporary tower structure are improved.
[0014] 2. The concrete rings are connected by steel frames, steel bars and concrete to form a combined connection, which further improves the bending and shear bearing capacity of the tower connection parts and improves its fatigue resistance.
[0015] 3. Some prestressed steel bars are set in the concrete cylinder and connected with the steel frame to form an overall structure, thereby improving its bearing capacity, rigidity and fatigue resistance.
[0016] 4. Shear members are set between the segments to improve the overall performance of the concrete ring. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0018] Figure 1 Segment cross section diagram Figure 1 .
[0019] Figure 2 Concrete ring cross section Figure 1 .
[0020] Figure 3 Schematic diagram of the pipe segment elevation Figure 1 .
[0021] Figure 4 Schematic diagram of the upper and lower concrete rings connecting the facade Figure 1 .
[0022] Figure 5 Sectional view of the connection area between the upper and lower concrete rings Figure 1 .
[0023] Figure 6 Schematic diagram of the pipe segment elevation Figure 2 .
[0024] Figure 7 Schematic diagram of the upper and lower concrete rings connecting the facade Figure 2 .
[0025] Figure 8 Schematic diagram of the upper and lower concrete rings connecting the facade Figure 3 .
[0026] Fig. 9 Schematic diagram of the pipe segment elevation Figure 3 .
[0027] Fig.10 Steel skeleton Figure 1 .
[0028] Figure numbers: A-concrete ring, 1-precast concrete, 2-reinforcement, 2.1-circumferential reinforcement, 2.2-vertical reinforcement, 3-steel frame, 3.1-main steel part, 3.2-end plate, 4-connecting hole, 5-bolt, 6-vertical post-cast material, 7-prestressed reinforcement.
[0029] Specific implementation method: In order to better understand the purpose, technical solution and function of the utility model, the utility model is further described in detail below with reference to the accompanying drawings. Here, the illustrative embodiments of the utility model and their descriptions are used to explain the utility model, but are not intended to limit the utility model.
[0030] In the description of the present utility model, it is to be understood that the terms "include / comprise", "consist of..." or any other variations thereof are intended to cover non-exclusive inclusion, so that a product, device, process or method including a series of elements includes not only those elements, but also other elements not explicitly listed when necessary, or also includes elements inherent to such product, device, process or method. In the absence of further restrictions, the elements defined by the phrases "include / comprise..." or "consist of..." do not exclude the presence of other identical elements in the product, device, process or method including the elements.
[0031] In the present utility model, unless otherwise clearly specified and limited, the term "fixed connection" should be understood in a broad sense, for example: it can be a sleeve connection, a lap joint, a welding connection, a bolt connection, or a combination of the above connections; the terms "installation", "connection", "connected" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two components or the interaction relationship between two components; the term "through-length steel bar" means that the steel bar is continuous without disconnection, or the steel bar is disconnected but the disconnected steel bars are fixedly connected. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0032] The following is a detailed description of the implementation of the present invention using preferred implementation methods in conjunction with the accompanying drawings.
[0033] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 As shown, a precast concrete ring includes multiple precast concrete segments A. The precast concrete segments A include precast concrete 1, steel bars 2, steel frames 3 and connecting holes 4. The steel bars 2 include annular steel bars 2.1 and longitudinal steel bars 2.2; the steel frames 3 extend out of the surface of the precast concrete 1, and the connecting holes 4 of the segments A are arranged correspondingly and interspersed with bolts 5.
[0034] After analysis, the inventor of the present invention found that the concrete rings of the current concrete tower are placed together and connected as a whole by external prestressed steel bars, relying on friction to resist horizontal forces. Under the action of wind, the tower is subjected to bending moment and shear force, the pressure distribution at its joints is uneven, and the size and distribution of friction at the joints are unstable. During use, some areas of the joints may be tensile under certain working conditions, and the corresponding friction may drop to 0. This may make the hybrid tower unsafe. During construction, before the prestressed steel bars apply prestress, the friction between the conversion tube and the concrete tube relies on the friction generated by their own weight to resist horizontal forces, which is prone to large displacement and even collapse.
[0035] The utility model sets steel frames between the concrete rings. Under the action of wind or other horizontal forces, the steel frames at the joints provide shear bearing capacity, which can improve the stability of the shear bearing capacity at the joints. During construction, the conversion cylinder and the concrete cylinder are connected by steel frames to form a temporary tower structure, which effectively improves the bearing capacity and rigidity of the temporary tower structure and reduces or prevents collapse during construction.
[0036] In specific implementation, the annular steel bars 2.1 and the longitudinal steel bars 2.2 form a steel mesh, and the steel skeleton 3 is located between the steel meshes, and the steel skeleton 3 is separated, thereby improving the anchoring performance of the steel skeleton and the concrete segment.
[0037] In specific implementation, the vertical connection area between the precast concrete segments A is filled with filler, and the precast concrete segments A are provided with shear members, which extend out of the vertical surface of the precast concrete segments A. The shear bearing capacity between the segments of the concrete ring is improved, the overall rigidity of the concrete ring is improved, and its fatigue resistance is improved. The shear member of the utility model is a steel bar, a steel member or a raised precast concrete block.
[0038] When implementing it, Figure 6 and Figure 7 As shown, the segment is arc-shaped; the longitudinal reinforcement 2.2 of the segment extends out of the surface of the precast concrete 1. Function: The longitudinal reinforcement of the segment between the upper and lower rings is connected to form a mixed force with the post-casting material to improve its bearing capacity and rigidity.
[0039] In specific implementation, the steel frame 3 is wrapped by a steel cage; the steel cage has closed stirrups. Function: to improve the connection performance of the steel frame with the concrete ring.
[0040] In specific implementation, the precast concrete rings are connected as a whole along the vertical direction, the steel frame 3 is fixedly connected, and the horizontal connection area is poured with horizontal post-casting 6. Function: The upper and lower precast concrete rings are formed into a whole through the steel frame and the horizontal post-casting, and the joints are subjected to the mixed force of the steel frame and the post-casting, which improves its shear bearing capacity and fatigue resistance.
[0041] When implementing it, Figure 8The concrete cylinder shown is provided with prestressed steel bars 7; the prestressed steel bars 7 are located inside or outside the precast concrete 1. The bearing capacity and rigidity of the tower are further improved, and the fatigue resistance is improved.
[0042] When implementing it, Fig. 9 As shown, the steel frame 3 is continuous. Function: to further improve the bearing capacity and fatigue resistance of the concrete cylinder.
[0043] When implementing it, Fig.10 As shown, the steel frame 3 includes a main steel part 3.1 and an end plate 3.2, which are fixedly connected. Function: Improve construction performance and fatigue resistance.
[0044] The above embodiments only express several implementation methods of this patent, and the descriptions are relatively specific and detailed, but they cannot be understood as limiting the scope of this patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model. Therefore, the protection scope of this utility model patent shall be based on the attached claims.
Claims
1. A prefabricated concrete ring, Features: The precast concrete ring comprises a plurality of precast concrete segments (A); the precast concrete segments (A) comprise precast concrete (1), steel bars (2), steel frames (3) and connection holes (4); the steel bars (2) comprise annular steel bars (2.1) and longitudinal steel bars (2.2); the steel frames (3) extend out of the surface of the precast concrete (1); the connection holes (4) of the segments (A) are arranged correspondingly and are interspersed with bolts (5).
2. The prefabricated concrete ring according to claim 1, Features: The annular steel bars (2.1) and the longitudinal steel bars (2.2) form a steel mesh; the steel skeleton (3) is located between the steel meshes; the steel skeleton (3) is continuous or separated.
3. The prefabricated concrete ring according to claim 1, Features: The vertical connection areas between the precast concrete segments (A) are provided with filling materials; the precast concrete segments (A) are provided with shear-resistant parts; and the shear-resistant parts extend out of the vertical surfaces of the precast concrete segments (A).
4. The prefabricated concrete ring according to claim 1, Features: The longitudinal reinforcement (2.2) of the segment protrudes from the surface of the precast concrete (1).
5. The prefabricated concrete ring according to claim 1, Features: The steel frame (3) is wrapped by a steel cage.
6. A concrete cylinder, Features: The precast concrete rings according to claim 1 are connected as a whole along the vertical direction; the steel frame (3) is fixedly connected; and the horizontal post-casting (6) is poured in the horizontal connection area.
7. The concrete cylinder according to claim 6, Features: The concrete cylinder is provided with prestressed steel bars (7); the prestressed steel bars (7) are located inside the precast concrete (1) or outside the precast concrete (1).