Precast concrete tower drum structure

By using steel frames and post-casting materials to connect the tube sections in the precast concrete tower, a steel mesh structure is formed, which solves the problem of unstable shear resistance at the joints of the tube sections and improves the bending load-bearing capacity and fatigue resistance of the tower. , ensuring the safety and construction stability of the tower.

CN221896741UActive Publication Date: 2024-10-25北京峰筑工程技术研究院有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420799406.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2024-10-25
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

The shear resistance of precast concrete tower tube joints is unstable and it is difficult to provide reliable shear bearing capacity under horizontal loads, which may lead to safety problems.

Method used

Steel frames and post-casting materials are used to connect the upper and lower tube sections, and a steel mesh structure is formed between the tube sections to provide stable shear load-bearing capacity and improve the bending load-bearing capacity and fatigue resistance of the overall tower.

Benefits of technology

It significantly improves the shear bearing capacity stability of the tube joints and the overall stiffness and bearing capacity of the tower, reduces deformation and fatigue stress during construction, and enhances the fatigue resistance of the tower.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221896741U_ABST
    Figure CN221896741U_ABST
Patent Text Reader

Abstract

A precast concrete tower tube structure is characterized in that a tower tube is formed by vertically connecting tube sections, each tube section comprises precast concrete, reinforcing steel bars and steel ribs, the reinforcing steel bars comprise circumferential reinforcing steel bars and longitudinal reinforcing steel bars, the circumferential reinforcing steel bars and the longitudinal reinforcing steel bars form reinforcing steel bar meshes, the steel ribs are located between the reinforcing steel bar meshes and extend out of the surface of the precast concrete, and the corresponding steel ribs of the vertically adjacent tube sections are connected. And a post-pouring material is poured in the connecting area. The connecting structure has the advantages of being good in shear resistance at the joints, good in bearing capacity, rigidity and fatigue resistance of the tower drum, and capable of improving safety in the construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of precast concrete structures, in particular to a precast concrete tower structure. Background Art

[0002] my country is vigorously developing wind power generation, and the tower is an important component. At present, the wind power tower has exceeded 100 meters, and many of them adopt a mixed structure of precast concrete tower and steel tower. The precast concrete tower is composed of multiple sections, and cement mortar is applied between the sections. The vertical connection is made of external prestressed steel bars. The shear resistance of the joints of the sections is unstable, and safety problems may occur under the action of horizontal loads. Utility Model Content

[0003] The utility model provides a prefabricated concrete tower structure, which achieves the goal of improving the shear resistance performance of the joints of the cylinder sections.

[0004] To achieve the above purpose, the utility model adopts the following technical solutions.

[0005] A precast concrete tower structure, the tower is composed of cylinder sections, the cylinder sections include precast concrete, steel bars and steel frames; the steel bars include circumferential steel bars and longitudinal steel bars; the circumferential steel bars and longitudinal steel bars form a steel mesh; the steel frames are located between the steel meshes; the steel frames extend out of the surface of the precast concrete; the steel frames corresponding to the upper and lower adjacent cylinder sections are connected, and the connection area is cast with post-casting materials.

[0006] Preferably, the cylinder section is circular or polygonal; the steel frame is a straight steel, an angle steel, a channel steel, an I-beam, an H-beam, a king-beam or a combination thereof; and the post-casting material is concrete or cement mortar.

[0007] Preferably, the steel skeleton is continuous or separate.

[0008] Preferably, the steel frame is surrounded by a steel cage; the steel cage has closed stirrups.

[0009] Preferably, the steel frame includes a main steel member and an end plate, which are fixedly connected.

[0010] Preferably, the steel frame includes a main steel member and a shear member, which are fixedly connected.

[0011] Preferably, the longitudinal reinforcements of the cylinder segment extend out of the precast concrete surface, are connected as a whole in the connection area, and are wrapped by the post-cast material.

[0012] Preferably, the tower structure is provided with prestressed steel bars; the prestressed steel bars are located inside the precast concrete of the cylinder section or outside the precast concrete.

[0013] Compared with the prior art, the utility model has the following characteristics and beneficial effects.

[0014] 1. The cylinder sections are connected by steel frames and sealed with post-casting materials, which is beneficial to improve the stability of the shear bearing capacity at the cylinder section joints and the shear bearing capacity of the cylinder sections under small axial compression ratios; it is beneficial to improve the stiffness and bearing capacity of the tower, reduce deformation under wind loads or earthquakes, and improve its fatigue resistance; during construction, the bearing capacity and stiffness of the temporary tower structure are improved.

[0015] 2. Steel frames, steel bars and concrete are used to connect the cylinder sections to form a combined connection, which further improves the bending and shear bearing capacity of the tower connection parts and reduces fatigue stress.

[0016] 3. The tower structure is partially equipped with prestressed steel bars, which are prestressed to form an overall structure, thereby improving the bearing capacity and stiffness of the tower structure and improving its fatigue resistance.

[0017] 4. End plates are set on the vertical steel frames to facilitate connection and improve construction speed. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0019] Figure 1 Schematic diagram of cylinder section Figure 1 .

[0020] Figure 2 Schematic diagram of the cross section of the cylinder connection area Figure 1 .

[0021] Figure 3 Schematic diagram of the expansion of the tube section elevation Figure 1 .

[0022] Figure 4 Connection diagram of upper and lower cylinder sections Figure 1 .

[0023] Figure 5 Schematic diagram of cylinder section Figure 2 .

[0024] Figure 6 Schematic diagram of the cross section of the cylinder connection area Figure 2 .

[0025] Figure 7 Schematic diagram of the expansion of the tube section elevation Figure 2 .

[0026] Figure 8 Connection diagram of upper and lower cylinder sections Figure 2 .

[0027] Fig. 9 Connection diagram of upper and lower cylinder sections Figure 3 .

[0028] Fig.10 Schematic diagram of the expansion of the tube section elevation Figure 3 .

[0029] Fig.11 Steel skeleton Figure 1 .

[0030] Fig.12 Steel skeleton Figure 2 .

[0031] Fig.13 Steel skeleton Figure 3 .

[0032] Figure numbers: A-cylinder section, 1-precast concrete, 2-reinforcement, 2.1-circumferential reinforcement, 2.2-vertical reinforcement, 3-steel frame, 3.1-main steel member, 3.2-shear member, 3.3-hole, 3.4-end plate, 3.5-anchor reinforcement, 4-post-cast material, 5-prestressed reinforcement.

[0033] Specific implementation method: In order to better understand the purpose, technical solution and function of the utility model, the utility model is further described in detail below with reference to the accompanying drawings. Here, the illustrative embodiments of the utility model and their descriptions are used to explain the utility model, but are not intended to limit the utility model.

[0034] In the description of the present utility model, it is to be understood that the terms "include / comprise", "consist of..." or any other variations thereof are intended to cover non-exclusive inclusion, so that a product, device, process or method including a series of elements includes not only those elements, but also other elements not explicitly listed when necessary, or also includes elements inherent to such product, device, process or method. In the absence of further restrictions, the elements defined by the phrases "include / comprise..." or "consist of..." do not exclude the presence of other identical elements in the product, device, process or method including the elements.

[0035] In the present utility model, unless otherwise clearly specified and limited, the term "fixed connection" should be understood in a broad sense, for example: it can be a sleeve connection, a lap joint, a welding connection, a bolt connection, or a combination of the above connections; the terms "installation", "connection", "connected" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two components or the interaction relationship between two components; the term "through-length steel bar" means that the steel bar is continuous without disconnection, or the steel bar is disconnected but the disconnected steel bars are fixedly connected. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0036] The following is a detailed description of the implementation of the present invention using preferred implementation methods in conjunction with the accompanying drawings.

[0037] like Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown, the precast concrete tower structure is composed of cylinder sections A connected up and down, and cylinder section A includes precast concrete 1, steel bars 2 and steel frames 3; steel bars 2 include circumferential steel bars 2.1 and longitudinal steel bars 2.2; circumferential steel bars 2.1 and longitudinal steel bars 2.2 form a steel mesh; steel frames 3 are located between the steel meshes; steel frames 3 extend out of the surface of the precast concrete 1; steel frames 3 corresponding to the cylinder sections A adjacent to each other are fixedly connected, and post-casting 4 is cast in the connection area. The steel frame is fixedly connected by bolting or welding; the longitudinal steel bars 2.2 do not extend out of the surface of the precast concrete 2.1, and there is no connection at the joint.

[0038] After analysis, the author of the utility model found that in engineering practice, the tower currently uses prefabricated concrete cylinder sections placed together up and down, and is connected as a whole through the prestressing of external prestressed steel bars. Under the action of horizontal forces such as wind or earthquake, the tower is subjected to bending moment and shear force, and the pressure at the joints of its cylinder sections is in an uneven distribution state, which will cause the friction force at the joints to vary greatly and be unevenly distributed, making it difficult to provide reliable shear bearing capacity. Under extreme loads, some areas are even in a tensile state, and the corresponding friction force drops to 0. This may lead to insecurity. During construction, when prestress is not applied, the cylinder sections rely on the friction of their own weight to resist horizontal forces, which is prone to large displacement or even collapse.

[0039] The utility model adopts steel frames and post-casting materials to connect the upper and lower cylinder sections. Under the action of horizontal load, when the pressure at the joint is greater than 0, the shear bearing capacity of the steel frames and the friction between the post-casting materials and the cylinder sections jointly provide shear bearing capacity, among which the shear bearing capacity of the steel frames is relatively stable, which can improve the stability of the shear bearing capacity at the joint. When the pressure is 0 or even under tension, the steel frames provide shear bearing capacity, which can effectively improve the shear bearing capacity and stability at the joint. Thereby improving the safety of the tower. The upper and lower cylinder sections are connected by steel frames, which improves the bending bearing capacity, shear bearing capacity and overall stiffness of the connection area, and reduces fatigue stress. During construction, the upper and lower cylinder sections are connected by steel frames to form a temporary tower structure, which effectively improves the bearing capacity and stiffness of the temporary tower structure and reduces or prevents collapse during construction.

[0040] In specific implementation, the cylinder section A is circular or polygonal, the steel frame 3 is a straight steel, angle steel, channel steel, I-beam, H-shaped steel, king-shaped steel or a combination thereof, and the post-casting material 4 is concrete or cement mortar. The concrete of the utility model includes ordinary concrete, recycled concrete, high-strength concrete, self-compacting concrete, fiber concrete, grouting material, UHPC, etc. The steel frame 3 is separated.

[0041] In specific implementation, the number of steel frames shall be no less than 3 and evenly distributed. Function: To provide rigidity and bearing capacity during construction.

[0042] When implementing it, Fig.10 As shown, the steel frame 3 is continuous. Function: to improve the bearing capacity and fatigue resistance of the tower tube body, and to form a composite force between the steel frame and the tube section.

[0043] In specific implementation, the steel frame 3 of the precast concrete tower structure is surrounded by a steel cage with closed stirrups, which improves the bearing capacity and ductility of the tower in the steel frame area and enhances the connection performance between the steel frame and the cylinder section.

[0044] When implementing it, Fig.13 As shown, the steel frame 3 includes a main steel member 3.1 and an end plate 3.4, which are fixedly connected. Function: to improve the convenience of connection.

[0045] When implementing it, Fig.11 As shown, the main steel member 3.1 is fixedly connected to the shear member 3.2. Function: To improve the connection performance between the steel frame 3 and the precast concrete.

[0046] When implementing it, Fig.12 As shown, the main steel member 3.1 is fixedly connected to the anchor steel bar 3.3. Function: To improve the connection performance between the steel frame 3 and the precast concrete.

[0047] like Figure 5 , Figure 6 , Figure 7 , Figure 8 As shown, the steel frame 3 and longitudinal reinforcement 2.2 of the cylinder section A extend out of the surface of the precast concrete 1, are connected as a whole in the connection area, and are wrapped by the post-casting material 4. Function: Form a steel-reinforced concrete composite connection to improve its bearing capacity and fatigue resistance. The steel bar connection method is welding, sleeve connection or overlap. The steel frame connection method is welding or bolting.

[0048] In specific implementation, the post-casting material 4 is UHPC. UHPC has high compressive and tensile bearing capacity, can reduce the length of the steel bar overlap connection, reduce the cracking of the connection area, and improve the fatigue resistance of the connection area.

[0049] When implementing it, Fig. 9 As shown, the tower structure is provided with prestressed steel bars 5, which are located in the precast concrete 1 of the cylinder section. After the prestressed steel bars are prestressed, they form an integral force with the steel frame and the blocking material, thereby improving the bearing capacity and rigidity of the tower and improving the fatigue resistance.

[0050] During specific implementation, the prestressed tendons 5 can be placed outside the precast concrete 1 to form external prestress.

[0051] The above embodiments only express several implementation methods of this patent, and the descriptions are relatively specific and detailed, but they cannot be understood as limiting the scope of this patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model. Therefore, the protection scope of this utility model patent shall be based on the attached claims.

Claims

1. A prefabricated concrete tower structure, Features: The tower structure is composed of a cylinder section (A); the cylinder section (A) comprises precast concrete (1), steel bars (2) and steel frames (3); the steel bars (2) comprise annular steel bars (2.1) and longitudinal steel bars (2.2); the annular steel bars (2.1) and longitudinal steel bars (2.2) form a steel mesh; the steel frames (3) are located between the steel meshes; the steel frames (3) extend out of the surface of the precast concrete (1); the steel frames (3) corresponding to the upper and lower adjacent cylinder sections (A) are connected; and post-casting (4) is cast in the connection area.

2. The precast concrete tower structure according to claim 1, Features: The cylinder section (A) is circular or polygonal; the steel frame (3) is a straight steel, angle steel, channel steel, I-beam, H-beam, king-beam or a combination thereof; the post-casting material (4) is concrete or cement mortar.

3. The precast concrete tower structure according to claim 1, Features: The steel frame (3) is continuous or separate.

4. The precast concrete tower structure according to claim 1, Features: The steel frame (3) is surrounded by a steel cage; the steel cage has closed stirrups.

5. The precast concrete tower structure according to claim 1, Features: The steel frame (3) comprises a main steel part (3.1) and an end plate (3.4), which are fixedly connected.

6. The precast concrete tower structure according to claim 1, Features: The steel frame (3) comprises a main steel part (3.1) and a shear-resistant part (3.2), which are fixedly connected.

7. The precast concrete tower structure according to claim 1, Features: The longitudinal steel bars (2.2) of the cylinder section (A) extend out of the surface of the precast concrete (1), are connected as a whole in the connection area, and are wrapped by the post-casting material (4).

8. The precast concrete tower structure according to claim 1, Features: The tower structure is provided with prestressed steel bars (5); the prestressed steel bars (5) are located inside the precast concrete (1) of the tower section or outside the precast concrete (1).

Citation Information

Cited By

  • Dry-type connected UHPC wind power tower drum, longitudinal joint connecting structure, concrete duct piece and preparation method of dry-type connected UHPC wind power tower drum

    CN120312494A