Long-arm collection ship with garbage drainage device and garbage salvage equipment

By installing a garbage diversion device on the long-arm collection ship, the jet is used to push the accumulated garbage to the collection ship body, which solves the problem in the existing technology that the garbage accumulation is difficult to flow and leaks, and improves the collection effect of floating garbage.

CN221914549UActive Publication Date: 2024-10-29CHANGSHA YINGFENG ENVIRONMENTAL IND CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420488446.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-10-29
Estimated Expiration
2034-03-13

AI Technical Summary

Technical Problem

When existing long-arm collection boats intercept floating garbage, the flexible interception belt is subject to water flow resistance, which makes the garbage accumulation difficult to flow and easy to leak from the bottom of the interception belt, resulting in poor collection effect.

Method used

A long-arm collection ship with a garbage diversion device is designed, including a collection hull, an interception arm device and a garbage diversion device. The garbage diversion device consists of a flow supply device, a diversion pipe and a nozzle. The nozzle of the nozzle faces the collection hull. The collection opening is used to push the accumulated garbage to the collection hull through the jet to avoid leakage.

Benefits of technology

It effectively avoids the problem of garbage being missed due to accumulation and difficulty in flowing, and improves the collection effect of floating garbage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221914549U_ABST
    Figure CN221914549U_ABST
Patent Text Reader

Abstract

The utility model discloses a long-arm collecting ship with a garbage drainage device and garbage salvage equipment, the long-arm collecting ship comprises a collecting ship body, an intercepting arm device and the garbage drainage device, the intercepting arm device is arranged on the collecting ship body and is provided with an intercepting belt which is released on the water surface to intercept garbage; the garbage drainage device comprises a flow supply device, a drainage pipe and a spray pipe, the flow supply device is arranged on the collection ship body, one end of the drainage pipe communicates with the flow supply device, the other end of the drainage pipe is guided to the interception belt, the spray pipe is arranged at the end, away from the flow supply device, of the drainage pipe, and a nozzle of the spray pipe faces the collection opening of the collection ship body when the interception belt is released; when the floating garbage is gathered, the flow supply device can be controlled to supply flow to the spray pipe through the drainage pipe, the fluid is sprayed out from the nozzle, the gathered floating garbage is pushed to the collecting opening of the collecting ship body, the phenomenon that the floating garbage leaks from the intercepting belt due to the fact that the floating garbage is gathered and not prone to flowing is avoided, and the purpose of improving the floating garbage collecting effect is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of cleaning boats, and in particular relates to a long-arm collection boat with a garbage drainage device and garbage salvaging equipment. Background Art

[0002] With the development of society, the government has higher and higher requirements for the control of floating garbage in rivers and lakes, and the market demand for floating garbage salvage equipment is also increasing. The emergence of long-arm collection boats has perfectly solved the problem of collecting floating garbage on the surface of rivers and lakes, greatly improving operational efficiency.

[0003] The existing long-arm collection ship is mainly composed of a collection hull and an interception arm device. The main function of the interception arm device is to gather floating garbage on the water surface into the collection cabin of the collection hull. When the interception belt of the interception arm device is released, it can be pulled by a tugboat to unfold the interception belt, so that the interception belts of the two interception arm devices form an "eight" open shape. Since the flexible interception belt is subject to greater water flow resistance during the garbage interception process, the interception belt is set in an arc shape (such as Figure 1 As shown in the figure, floating garbage is likely to accumulate in the area (A) close to the collection vessel. The accumulated floating garbage is not easy to flow and is easy to leak from the bottom of the interception zone, resulting in poor floating garbage collection effect. Utility Model Content

[0004] In view of the above-mentioned defects or shortcomings, the utility model provides a long-arm collection ship and garbage salvaging equipment with a garbage drainage device, aiming to solve the technical problem that floating garbage is easily difficult to flow due to aggregation and leaks from the bottom of the interception belt.

[0005] To achieve the above-mentioned objectives, the utility model provides a long-arm collecting boat with a garbage drainage device in a first aspect, wherein the long-arm collecting boat with the garbage drainage device comprises a collecting hull, an intercepting arm device and a garbage drainage device; the intercepting arm device is arranged on the collecting hull and has an intercepting belt for releasing on the water surface to intercept garbage; the garbage drainage device comprises a flow supply device, a drainage pipe and a nozzle, the flow supply device is arranged on the collecting hull, one end of the drainage pipe is connected to the flow supply device, and the other end is guided to the intercepting belt, the nozzle is arranged at one end of the drainage pipe away from the flow supply device, and the nozzle of the nozzle is arranged toward the collecting opening of the collecting hull when the intercepting belt is released.

[0006] In an embodiment of the utility model, a drainage pump for draining the garbage collection chamber is provided on the collection hull, the drainage pump is configured as a flow supply device, and the pump outlet is connected to the drainage pipe.

[0007] In the embodiment of the utility model, a drainage pipe is also provided on the collection hull, and the garbage drainage device further comprises a control valve, which is used to select one between the drainage pipe and the drainage pipe to be connected to the drainage pump.

[0008] In the embodiment of the utility model, the drainage pipe is extended along the width direction of the collecting hull and has drainage ports at both ends.

[0009] In an embodiment of the utility model, the drainage pump is located at the stern of the collecting hull, and the drainage pipe includes a first pipe section and a second pipe section which are arranged in sequence. The first pipe section is arranged on the outer side of the collecting hull and guides from the drainage pump to the collecting opening. The second pipe section is arranged on the intercepting belt and is arranged close to the collecting opening when the intercepting belt is released. The nozzle is arranged on the second pipe section.

[0010] In the embodiment of the utility model, the nozzle of the nozzle is arranged at the same height as the waterline of the interception zone.

[0011] In the embodiment of the utility model, the drainage pipe is arranged below the waterline of the interception zone.

[0012] In an embodiment of the utility model, the nozzle of the nozzle is located on the inner side of the interception belt, the drainage pipe is located on the lower side of the interception belt, and a counterweight is provided on the interception belt, and the center of gravity of the drainage pipe and the center of gravity of the nozzle are respectively arranged on both sides of the counterweight.

[0013] In the embodiment of the utility model, there are multiple nozzles, and the multiple nozzles are sequentially arranged at intervals along the length direction of the drainage tube.

[0014] To achieve the above objectives, the second aspect of the utility model provides a garbage salvage equipment, wherein the garbage salvage equipment includes a tugboat and a long-arm collection boat with a garbage drainage device as described above, the tugboat is used to connect with the interception belt and can tow and release the interception belt on the water surface.

[0015] Through the above technical solution, the long-arm collection ship with a garbage drainage device provided by the embodiment of the utility model has the following beneficial effects:

[0016] When the above-mentioned long-arm collection ship with a garbage drainage device is used, since it includes a collection hull, an intercepting arm device and a garbage drainage device, a flow supply device of the garbage drainage device is arranged on the collection hull, one end of the drainage pipe is connected to the flow supply device, and the other end is guided to the interception belt, and a nozzle is arranged at an end of the drainage pipe away from the flow supply device, and the nozzle of the nozzle is arranged toward the collecting opening of the collection hull when the interception belt is released. In the case that floating garbage accumulates, the flow supply device can be controlled to supply flow to the nozzle through the drainage pipe, and the fluid is ejected from the nozzle of the nozzle, thereby pushing the accumulated floating garbage to the collecting opening of the collection hull, avoiding the floating garbage from leaking from the interception belt due to the difficulty in flowing due to accumulation, thereby achieving the purpose of improving the collection effect of floating garbage.

[0017] Other features and advantages of the present invention will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings are used to provide a further understanding of the embodiments of the present utility model and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the embodiments of the present utility model, but do not constitute a limitation on the embodiments of the present utility model. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without creative work. In the drawings:

[0019] Figure 1 It is a schematic diagram of the formation of an accumulation area of ​​floating garbage in the interception zone according to the utility model;

[0020] Figure 2 It is a structural schematic diagram of a long-arm collection ship with a garbage drainage device according to an embodiment of the utility model;

[0021] Figure 3 It is a partial structural schematic diagram of a long-arm collection ship with a garbage drainage device according to an embodiment of the utility model;

[0022] Figure 4 It is a schematic diagram of the longitudinal cross-sectional structure of the interception belt, the drainage pipe and the nozzle according to one embodiment of the utility model;

[0023] Figure 5 It is a schematic structural diagram of a collecting hull according to an embodiment of the utility model.

[0024] Description of Reference Numerals

[0025] 100 Collection hull 101 Collection open

[0026] 102 Garbage collection compartment 103 Cabin bottom plate

[0027] 104 Drainage compartment 105 Drainage pipe

[0028] 200 Interceptor belt 201 Counterweight

[0029] 300 Garbage drainage device 310 Flow supply device

[0030] 320 drainage tube 321 first tube section

[0031] 322 Second pipe section 330 Nozzle

[0032] 331 Nozzle 400 Towing Boat DETAILED DESCRIPTION

[0033] The specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0034] The long-arm collection boat with a garbage drainage device and the garbage salvaging equipment of the present invention will be described below with reference to the accompanying drawings.

[0035] like Figure 2 and Figure 3 As shown, the utility model provides a long-arm collection ship with a garbage drainage device, wherein the long-arm collection ship with the garbage drainage device comprises:

[0036] Collect hull 100;

[0037] An interception arm device, which is arranged on the collection hull 100 and has an interception belt 200 for releasing on the water surface to intercept garbage;

[0038] The garbage drainage device 300 includes a flow supply device 310, a drainage pipe 320 and a nozzle 330. The flow supply device 310 is arranged on the collection hull 100. One end of the drainage pipe 320 is connected to the flow supply device 310, and the other end is guided to the interception belt 200. The nozzle 330 is arranged at one end of the drainage pipe 320 away from the flow supply device 310, and the nozzle 331 of the nozzle 330 is arranged toward the collection opening 101 of the collection hull 100 when the interception belt 200 is released.

[0039] When the long-arm collection vessel with the garbage drainage device is used, the vessel comprises a collection vessel 100, an interception arm device and a garbage drainage device 300. The flow supply device 310 of the garbage drainage device 300 is arranged on the collection vessel 100. One end of the drainage pipe 320 is connected with the flow supply device 310, and the other end is directed to the interception belt 200. The nozzle 330 is arranged at one end of the drainage pipe 320 away from the flow supply device 310, and the nozzle 331 of the nozzle 330 releases the garbage in the interception belt 200. In the case where the floating garbage is accumulated, the flow supply device 310 can be controlled to supply flow to the nozzle 330 via the drainage pipe 320, and the fluid is ejected from the nozzle 331 of the nozzle 330, so that the accumulated floating garbage can be pushed toward the collecting opening 101 of the collecting hull 100, thereby preventing the floating garbage from escaping from the intercepting belt 200 due to the difficulty in flowing due to accumulation, thereby achieving the purpose of improving the collection effect of floating garbage.

[0040] Specifically, the number of interception arm devices on the collection hull 100 can be two, and correspondingly, the number of drainage pipes 320 in the garbage drainage device 300 also needs to be two, one end of the two drainage pipes 320 is respectively connected to the flow supply device 310, and the other end of the two drainage pipes 320 is respectively directed to the interception belts 200 of the two interception arm devices, and the two drainage pipes 320 are provided with nozzles 330 on the interception belt 200, and the nozzles 330 are preferably arranged on a section of the interception belt 200 that is close to the collection opening 101 of the collection hull 100 when the interception belt 200 is released, so as to be able to directly spray fluid on the area where floating garbage accumulates. In addition, the fluid supplied by the flow supply device 310 to the drainage pipes 320 and the nozzles 330 can be water, air, or other suitable gases and liquids.

[0041] In the embodiment of the utility model, the collection hull 100 is provided with a drainage pump for draining the garbage collection chamber 102. The drainage pump can be set as the above-mentioned flow supply device 310, and the pump outlet is connected to the drainage pipe 320. It should be particularly noted that, if Figure 2 and Figure 5 As shown, floating garbage and water flow can enter the garbage collection chamber 102 from the collection opening 101 of the collection hull 100, and the bottom plate 103 of the garbage collection chamber 102 can be set in the form of a filter screen, and the water flow can be discharged to the drainage chamber 104 below the garbage collection chamber 102 while carrying the floating garbage. The drainage pump is set in the drainage chamber 104 to discharge the water in the drainage chamber 104. In the prior art, it is generally set to discharge the water to the external water area through the drainage pump. The utility model can use the drainage pump as the flow supply device 310 of the garbage drainage device 300, and directly use the water in the drainage chamber 104 as the injection fluid in the garbage drainage device 300, so that there is no need to add an additional power source and fluid storage tank to the collection hull 100, which saves production costs and facilitates production. Of course, the utility model is not limited to this, and it is also possible to add a flow supply device 310 including a power source and a fluid storage tank.

[0042] Please see again Figure 2 and Figure 3In the embodiment of the utility model, a drain pipe 105 is also provided on the collection hull 100, and the garbage drainage device 300 also includes a control valve, which is used to select one between the drainage pipe 320 and the drain pipe 105 to be connected to the drainage pump. By adding the drain pipe 105 and the control valve, the application of the drainage pump in different working scenarios can be realized. Specifically, when it is necessary to drain the floating garbage, the switching control valve can be controlled to select the drainage pipe 320 to be connected with the drainage pump, so that the water flow is directed to the drainage pipe 320 and the nozzle 330, and sprayed through the nozzle 331 of the nozzle 330, so as to flush the accumulated floating garbage to the collection opening 101 of the collection hull 100 to prevent the accumulation of floating garbage; when it is not necessary to drain the floating garbage, the switching control valve can be controlled to select the drainage pipe 105 to be connected with the drainage pump, so that the water flow is discharged to the external waters through the drainage pipe 105.

[0043] In the embodiment of the utility model, the drain pipe 105 is extended along the width direction of the collection hull 100 and has drain ports at both ends. The drain pipe 105 is extended along the width direction of the collection hull 100 so that drain ports are formed at both ends of the drain pipe 105 to improve drainage efficiency, and the water discharged from the drain ports at the left and right ends of the collection hull 100 will not affect the navigation of the hull, so as to solve the problem in the prior art that the traction boat 400 and the drainage pump drainage both provide navigation power for the collection hull 100, resulting in difficulty in power coordination and inconvenience in operation.

[0044] In an embodiment of the utility model, the drainage pump is located at the tail of the collecting hull 100, and the drainage pipe 320 includes a first pipe section 321 and a second pipe section 322 which are arranged in sequence. The first pipe section 321 is arranged on the outer side of the collecting hull 100 and guides from the drainage pump to the collecting opening 101. The second pipe section 322 is arranged on the intercepting belt 200 and is arranged close to the collecting opening 101 when the intercepting belt 200 is released. The nozzle 330 is arranged on the second pipe section 322. Since the drainage pump is located at the tail of the collection hull 100 and the collection opening 101 is located at the head of the collection hull 100, in order to guide the water flow of the drainage pump to the interception belt 200 extending from the collection opening 101, the drainage pipe 320 needs to include a first pipe section 321 that guides the collection opening 101 from the drainage pump and a second pipe section 322 arranged on the interception belt 200. Since the first pipe section 321 does not need to participate in the retraction and release of the interception belt 200, the first pipe section 321 can be fixed on the collection hull 100, and the outer side of the collection hull 100 is selected instead of the hull deck or the internal space, which can play a role of not occupying space. It should be particularly noted that the second pipe section 322 does not need to be set on the entire length of the interception belt 200, and can be specifically set on the 1 / 3 or 1 / 2 length section of the interception belt 200 when it is released and close to the collection opening 101.

[0045] like Figure 4 As shown, in the embodiment of the utility model, the nozzle 331 of the nozzle 330 is arranged at the same height as the waterline of the interception belt 200, so that the water flow sprayed by the nozzle 331 can be directly sprayed on the garbage floating on the water surface. Specifically, according to the design of the interception belt 200 and the counterweight 201 on the interception belt 200, the waterline of the interception belt 200 can be predetermined. When the drainage pipe 320 is arranged on the interception belt 200, it is also necessary to ensure that the nozzle 331 is arranged at the same height as the waterline of the interception belt 200.

[0046] In the embodiment of the utility model, the drainage tube 320 is arranged below the waterline of the interception belt 200 to avoid the drainage tube 320 being suspended above the water surface and affecting the upright balance of the interception belt 200 .

[0047] Please see again Figure 4 In the embodiment of the utility model, the nozzle 331 of the nozzle 330 is located on the inner side of the interception belt 200, the drainage pipe 320 is located on the lower side of the interception belt 200, and a counterweight 201 is provided on the interception belt 200, and the center of gravity of the drainage pipe 320 and the center of gravity of the nozzle 330 are respectively arranged on both sides of the counterweight 201, thereby ensuring the balance of the arrangement of the garbage drainage device 300 on the interception belt 200, and the nozzle 331 of the nozzle 330 is located on the inner side of the interception belt 200, and the center of gravity of the drainage pipe 320 and the center of gravity of the nozzle 330 are respectively arranged on both sides of the counterweight 201, and there is basically no tube body of the drainage pipe 320 on the inner side of the interception belt 200, so that the drainage pipe 320 will not contact the floating garbage inside the interception belt 200, thereby avoiding dirt and affecting the flow of garbage.

[0048] In the embodiment of the utility model, the number of the nozzles 330 can be multiple, and the multiple nozzles 330 are sequentially spaced along the length direction of the drainage pipe 320. By increasing the number of nozzles 330, the flow speed of the floating garbage can be further increased. Specifically, the multiple nozzles 330 are sequentially spaced along the length direction of the second pipe section 322.

[0049] In addition, the utility model also provides a garbage salvaging device, wherein the garbage salvaging device comprises a tugboat 400 and a long-arm collection ship with a garbage drainage device as described above, wherein the tugboat 400 is used to connect with the interception belt 200 and to tow and release the interception belt 200 on the water surface. Since the garbage salvaging device adopts all the technical solutions of the above embodiments, it has at least all the beneficial effects brought by the technical solutions of the above embodiments, which will not be described one by one here.

[0050] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, "plurality" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0051] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0052] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0053] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A long-arm collection ship with a garbage drainage device, characterized in that: The long-arm collection ship with the garbage drainage device comprises: Collect Hull (100); An interception arm device, arranged on the collection hull (100) and having an interception belt (200) for releasing on the water surface to intercept garbage; The garbage drainage device (300) comprises a flow supply device (310), a drainage pipe (320) and a nozzle (330), wherein the flow supply device (310) is arranged on the collection hull (100), one end of the drainage pipe (320) is connected to the flow supply device (310), and the other end is directed to the interception belt (200), the nozzle (330) is arranged at one end of the drainage pipe (320) away from the flow supply device (310), and the nozzle (331) of the nozzle (330) is arranged toward the collection opening (101) of the collection hull (100) when the interception belt (200) is released.

2. The long-arm collection ship with a garbage drainage device according to claim 1, characterized in that: The collection hull (100) is provided with a drainage pump for draining water from the garbage collection chamber (102); the drainage pump is configured as the flow supply device (310), and the pump outlet is in communication with the drainage pipe (320).

3. The long-arm collection ship with a garbage drainage device according to claim 2 is characterized in that: The collecting hull (100) is also provided with a drainage pipe (105), and the garbage drainage device (300) further comprises a control valve, wherein the control valve is used to select one between the drainage pipe (320) and the drainage pipe (105) to be connected to the drainage pump.

4. The long-arm collection ship with a garbage drainage device according to claim 3 is characterized in that: The drainage pipe (105) is extended along the width direction of the collection hull (100) and has drainage ports at both ends.

5. The long-arm collection ship with a garbage drainage device according to claim 2, characterized in that: The drainage pump is located at the tail of the collecting hull (100), and the drainage pipe (320) includes a first pipe section (321) and a second pipe section (322) which are arranged in sequence. The first pipe section (321) is arranged on the outer side of the collecting hull (100) and leads from the drainage pump to the collecting opening (101), and the second pipe section (322) is arranged on the intercepting belt (200) and is arranged close to the collecting opening (101) when the intercepting belt (200) is released. The nozzle (330) is arranged on the second pipe section (322).

6. The long-arm collection ship with a garbage drainage device according to any one of claims 1 to 5, characterized in that: The nozzle (331) of the nozzle (330) is arranged at the same height as the waterline of the interception zone (200).

7. The long-arm collection ship with a garbage drainage device according to any one of claims 1 to 5, characterized in that: The drainage pipe (320) is arranged below the waterline of the interception zone (200).

8. The long-arm collection ship with a garbage drainage device according to any one of claims 1 to 5, characterized in that: The nozzle (331) of the nozzle (330) is located on the inner side of the interception belt (200), the drainage pipe (320) is located on the lower side of the interception belt (200), and a counterweight (201) is provided on the interception belt (200), and the center of gravity of the drainage pipe (320) and the center of gravity of the nozzle (330) are respectively arranged on both sides of the counterweight (201).

9. The long-arm collection ship with a garbage drainage device according to any one of claims 1 to 5, characterized in that: There are a plurality of nozzles (330), and the plurality of nozzles (330) are sequentially spaced apart along the length direction of the drainage pipe (320).

10. A garbage salvaging device, characterized in that: The garbage salvaging equipment comprises a tugboat (400) and a long-arm collection boat with a garbage drainage device according to any one of claims 1 to 9, wherein the tugboat (400) is used to connect with the interception belt (200) and can tow and release the interception belt (200) on the water surface.

Citation Information

Cited By

  • Long-arm unmanned ship and cooperative control method thereof

    CN122877266A