Material elevator for house building construction
By using a combination of receiving components and contact loading components on the housing construction hoist, the automatic receiving and pushing of materials is realized, which solves the problems in the existing technology of reduced stability and difficulty in automatic pushing caused by manual pulling of materials. , improving construction efficiency and safety.
Patent Information
- Application Number
- CN202421164191.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-27
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-05-27
AI Technical Summary
The existing building construction hoist requires personnel to manually pull materials in small house construction, which reduces the stability of personnel and cannot realize automatic pushing of materials, affecting construction efficiency and safety.
A material hoist for housing construction is designed. It adopts a combination of receiving components and contact material loading components, and realizes automatic receiving and pushing of materials through structures such as hydraulic cylinders, guide plates, pushers, and springs. The hoist It can automatically transfer materials to reduce personnel risks during operations.
It improves the safety and convenience of personnel during operation, realizes automatic pushing of materials, reduces manual operations, and improves construction efficiency and safety.
Smart Images

Figure CN221916932U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a material hoist for building construction. Background Art
[0002] During the construction of a building, the hoist is often an important tool to assist the construction. Especially in high-rise buildings or high-rise structure projects, the hoist is used to transport personnel and construction materials up and down the floors, which significantly improves work efficiency, reduces physical labor intensity, and ensures the safety of heavy material handling;
[0003] When existing hoists are used in small-sized house construction, they are completed by small cranes. However, there are also some shortcomings during the operation. First, during the operation, when the material is lifted to the lifting position, personnel need to manually pull the material and straighten it into the house by human traction. This process reduces the stability of personnel during the operation. Second, although some construction facilities will build a lifting area, personnel still need to operate in real time to move the material into the house, and it is impossible to realize the automatic pushing of the material.
[0004] Therefore, the present application proposes a material hoist for building construction. Utility Model Content
[0005] In view of the deficiencies in the prior art, the utility model provides a material hoist for building construction, which solves the problems mentioned in the background technology.
[0006] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:
[0007] A material hoist for building construction comprises a base, a guide groove is arranged on the top of the base, and a mounting groove is arranged on the base between the guide grooves, a receiving assembly is assembled together with the inside of the mounting groove and the guide groove, a contact material loading assembly is fixedly mounted on the top of the receiving assembly, a supporting structure is assembled on the front side of the top of the base, a winch is fixedly mounted on the top of the supporting structure, and a lifting frame is hoisted at the output end of the winch; the receiving assembly comprises a hydraulic cylinder, a guide plate, and a push head, a guide plate is slidably mounted inside the guide groove, a push head is arranged inside the mounting groove, and the ends of the guide plate and the push head are jointly engaged with the contact material loading assembly The components are assembled and connected, a hydraulic cylinder is fixedly installed inside the mounting groove, and the output end of the hydraulic cylinder is installed and connected to the inner side of the push head; the contact loading component includes a mounting cavity, an upper electric contact, a lower electric contact, a docking seat, a spring, and a loading cover; the guide plate and the end of the push head are jointly fixedly installed with the mounting cavity, springs are evenly distributed on the bottom of the mounting cavity, the mounting cavity is jointly docked with a docking seat through the springs, the docking seat passes through the mounting cavity, the loading cover is fixedly installed on the top of the docking seat, the upper electric contact and the lower electric contact are respectively fixedly installed on the top and bottom of the mounting cavity, and the upper electric contact and the lower electric contact correspond to each other.
[0008] Furthermore, mounting components are fixedly installed on both sides of the base, and the mounting components include mounting foot plates and mounting openings. Mounting foot plates are fixedly installed on both sides of the base, and the mounting foot plates are provided with mounting openings.
[0009] Furthermore, the receiving assembly also includes a guide rail, and the guide groove is provided with a guide rail slidably connected to the guide plate, and the guide plate slides in the guide groove through the guide rail.
[0010] Furthermore, the supporting structure includes a supporting seat, a supporting shoulder, a supporting arm, and a supporting plate. The front side of the top of the base is equipped with a supporting seat, the top of the supporting seat is jointly fixedly installed with a supporting shoulder, and mutually connected supporting arms are fixedly installed between the supporting shoulder and the supporting seat, support plates are fixedly installed between the supporting arms, and a winch is fixedly installed on the top of the supporting plate.
[0011] Furthermore, a through guide port is provided on the support plate, a rope is wound on the winch, and the winch is connected to the top of the material lifting frame through the rope.
[0012] Furthermore, the contact type loading assembly also includes a limiting member, and a docking port communicating with the interior is provided on the top of the installation cavity, the docking port is penetrated by the docking seat, and a limiting member is fixedly installed on the bottom of the docking seat.
[0013] Furthermore, a guide plate is fixedly mounted on the top of the guide plate, and the guide plate is located at the rear side of the contact type material loading assembly, and the top of the guide plate is chamfered.
[0014] The utility model provides a material hoist for building construction. Compared with the prior art, it has the following beneficial effects:
[0015] 1. Through the receiving component, the lifted materials can not only be reached out to receive the materials, but also the received materials can be pushed and slid to guide the lifted materials into the house. There is no need for personnel to reach out to take the materials, which increases the safety of personnel during operation.
[0016] 2. Through the cooperation between the contact loading component and the receiving component, when the material is completed, the touch operation of the elevator will be completed due to the large pressure factor of the material, so that the elevator can automatically transfer and push the material when the material is received, making it more convenient for personnel to work. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 The utility model shows a schematic diagram of the overall assembly state of the hoist;
[0019] Figure 2 The schematic diagram of the structure of the first assembly state of the hoist of the utility model is shown;
[0020] Figure 3 The schematic diagram of the structure of the hoist of the utility model in the second assembly state is shown;
[0021] Figure 4 It shows a schematic structural diagram of the first assembly state of the receiving assembly and the contact type material loading assembly of the utility model;
[0022] Figure 5 It shows a schematic structural diagram of the receiving assembly and the contact type material loading assembly of the utility model in the second assembly state;
[0023] As shown in the figure: 1. Base; 11. Mounting groove; 12. Guide groove; 2. Mounting component; 21. Mounting foot plate; 211. Mounting port; 3. Guide plate; 4. Winch; 5. Receiving assembly; 51. Hydraulic cylinder; 52. Guide plate; 53. Guide rail; 54. Push head; 6. Support structure; 61. Support seat; 62. Support shoulder; 63. Support arm; 64. Support plate; 7. Contact loading assembly; 71. Mounting cavity; 711. Docking port; 72. Upper electric contact; 73. Lower electric contact; 74. Docking seat; 75. Spring; 76. Loading cover; 77. Limiting member; 8. Lifting frame. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model is described clearly and completely. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] Embodiment 1
[0026] In order to solve the technical problems in the background technology, the following material hoist for building construction is provided:
[0027] Combination Figure 1-Figure 5 As shown, the material hoist for building construction provided by the utility model comprises a base 1, a guide groove 12 is arranged on the top of the base 1, and a mounting groove 11 is arranged on the base 1 between the guide grooves 12, a receiving assembly 5 is assembled together with the interior of the mounting groove 11 and the guide groove 12, a contact-type material loading assembly 7 is fixedly mounted on the top of the receiving assembly 5, a supporting structure 6 is assembled on the front side of the top of the base 1, a winch 4 is fixedly mounted on the top of the supporting structure 6, and a lifting frame 8 is hoisted on the output end of the winch 4;
[0028] During the process, the personnel can first stably assemble the elevator in the required lifting operation area, start the winch 4 on the supporting structure 6, and the winch 4 can drive the lifting frame 8 to perform lifting and lowering movements to complete the lifting operation of the lifting frame 8. The personnel can then place the required lifted materials inside the lifting frame 8, and through the receiving component 5, not only can the lifted materials be probed out to receive the materials, but the received materials can also be slid and pushed, so as to guide the lifted materials into the house, without the need for personnel to probe out to take the materials, thereby increasing the stability of the personnel during the operation, and during the lifting process, the contact loading component 7 cooperates with the receiving component 5, and when the material is completed, the touch operation of the elevator will be completed due to the large pressure factor of the material, so that the elevator can automatically transfer and push the materials when the material is received, making it more convenient for personnel to operate.
[0029] The receiving assembly 5 includes a hydraulic cylinder 51, a guide plate 52, and a push head 54. The guide plate 52 is slidably installed inside the guide groove 12, and the push head 54 is arranged inside the installation groove 11. The ends of the guide plate 52 and the push head 54 are assembled and connected with the contact loading assembly 7. The hydraulic cylinder 51 is fixedly installed inside the installation groove 11, and the output end of the hydraulic cylinder 51 is installed and connected with the inner side of the push head 54; the contact loading assembly 7 includes a mounting cavity 71, an upper electric contact sheet 72, a lower electric contact sheet 73, a docking seat 74, a spring The spring 75, the material carrying cover 76, the guide plate 52 and the end of the push head 54 are fixedly installed with the installation cavity 71, the springs 75 are evenly distributed on the bottom of the installation cavity 71, the installation cavity 71 is connected with the docking seat 74 through the spring 75, the docking seat 74 runs through the installation cavity 71, and the material carrying cover 76 is fixedly installed on the top of the docking seat 74. The top and bottom of the installation cavity 71 are respectively fixedly installed with the upper electric contact sheet 72 and the lower electric contact sheet 73, and the upper electric contact sheet 72 and the lower electric contact sheet 73 correspond to each other;
[0030] During this period, when the material is lifted to the operating point by the winch 4, the lifting frame 8 is in a suspended state, and the personnel can start the hydraulic cylinder 51. The output end of the hydraulic cylinder 51 can push the push head 54 to complete the pushing of the installation cavity 71. While the installation cavity 71 is conducting, the guide plate 52 completes the auxiliary pushing of the installation cavity 71, prompting the installation cavity 71 to reach the lowering of the lifting frame 8, ensuring that the loading cover 76 and the lifting frame 8 correspond to each other, and then the lifting frame 8 is lowered to make the lifting frame 8 placed on the loading cover 76. At this time, the loading cover 76 is subjected to downward pressure, prompting the upper electric contact sheet 72 and the lower electric contact sheet 73 to contact each other. At this time, the control of the hydraulic cylinder 51 is completed, and the automatic recovery of the lifting frame 8 is completed. The personnel can wait for extraction at the rear of the base 1.
[0031] Embodiment 2
[0032] like Figure 1 and Figure 5 As shown, based on the above embodiment, this embodiment further provides the following contents:
[0033] In this embodiment, mounting components 2 are fixedly installed on both sides of the base 1. The mounting components 2 include mounting feet 21 and mounting openings 211. The mounting feet 21 are fixedly installed on both sides of the base 1, and the mounting openings 211 are provided on the mounting feet 21.
[0034] During this period, personnel need to install and fix the hoist through the installation component 2 on the base 1. The purpose is to ensure the stable operation of the hoist. The assembly method is to match the installation port 211 on the installation foot plate 21 with external parts and assemble it in the lifting position.
[0035] In this embodiment, the receiving assembly 5 further includes a guide rail 53 . The guide groove 12 is provided with the guide rail 53 slidably connected to the guide plate 52 . The guide plate 52 slides in the guide groove 12 via the guide rail 53 .
[0036] During this period, when the guide plate 52 is conducting, the guide plate 52 will slide smoothly in the guide groove 12 through the guide rail 53, so that the stability of the guide plate 52 during sliding can be guaranteed, and the load-bearing performance of the elevator can be guaranteed.
[0037] In this embodiment, the top of the guide plate 52 is fixedly mounted with a guide plate 3 , and the guide plate 3 is located at the rear side of the contact type material loading assembly 7 , and the top of the guide plate 3 is chamfered.
[0038] The guide plate 3 cooperates with the contact material loading assembly 7 to facilitate personnel to unload or take materials;
[0039] The guide plate 3 can ensure the flatness of the top of the base 1 and ensure that the material will not be affected by the guide groove 12 and the installation groove 11;
[0040] During this period, the guide plate 3 and the contact-type loading assembly 7 move synchronously, and then the personnel can remove the lifting frame 8 from the contact-type loading assembly 7, and then unload the material through the guide plate 3 to complete the extraction.
[0041] Embodiment 3
[0042] like Figure 1-Figure 5 As shown, based on the above embodiment, this embodiment further provides the following contents:
[0043] In this embodiment, the support structure 6 includes a support seat 61, a support support 62, a support arm 63, and a support plate 64. The support seat 61 is assembled on the front side of the top of the base 1, and the support support 62 is fixedly installed on the top of the support seat 61. A support arm 63 connected to each other is fixedly installed between the support support 62 and the support seat 61, and a support plate 64 is fixedly installed between the support arms 63. The winch 4 is fixedly installed on the top of the support plate 64.
[0044] During this period, the support structure 6 completes the reception of the hoist 4 and the material lifting frame 8;
[0045] The support arm 63 and the support beam 62 not only realize the outward extension of the hoist, but also support the support beam 62, so as to ensure the stability of the support beam 62 during operation and ensure the stability of the hoist during operation.
[0046] In this embodiment, a through guide port is provided on the support plate 64, a rope is wound on the winch 4, and the winch 4 is connected to the top of the material lifting frame 8 via the rope.
[0047] During this time, the rope on the winch 4 performs an up and down hoisting movement in the guide opening;
[0048] Start the hoist 4, and the hoist 4 can complete the hoisting of the top of the lifting frame 8 through the rope, so that it can perform lifting movement.
[0049] In this embodiment, the contact loading assembly 7 further includes a limiter 77 . The top of the mounting cavity 71 is provided with a docking port 11 communicating with the interior. The docking port 711 is penetrated by the docking seat 74 . The limiter 77 is fixedly installed at the bottom of the docking seat 74 .
[0050] During this period, when the loading cover 76 is subjected to force, it will drive the docking seat 74 to move downward, and the docking seat 74 will move up and down in the docking port 711;
[0051] When the loading cover 76 loses pressure, the spring 75 will be reset until the stopper 77 contacts the inner wall of the mounting cavity 71 .
[0052] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0053] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. Material hoist for building construction, characterized by: The invention comprises a base (1), the top of the base (1) is provided with a guide groove (12), and the base (1) between the guide grooves (12) is provided with a mounting groove (11), the mounting groove (11) and the guide groove (12) are internally provided with a receiving assembly (5), the top of the receiving assembly (5) is fixedly provided with a contact-type material loading assembly (7), the front side of the top of the base (1) is provided with a supporting structure (6), the top of the supporting structure (6) is fixedly provided with a hoist (4), and the output end of the hoist (4) is hoisted with a material lifting frame (8); The receiving assembly (5) comprises a hydraulic cylinder (51), a guide plate (52), and a push head (54); the guide plate (52) is slidably installed inside the guide groove (12); the push head (54) is arranged inside the mounting groove (11); the ends of the guide plate (52) and the push head (54) are assembled and connected with the contact type material loading assembly (7); the hydraulic cylinder (51) is fixedly installed inside the mounting groove (11), and the output end of the hydraulic cylinder (51) is installed and connected with the inner side of the push head (54); the contact type material loading assembly (7) comprises a mounting cavity (71), an upper electric contact sheet (72), a lower electric contact sheet (73), a docking seat (74), The spring (75), the material carrying cover (76), the guide plate (52) and the end of the push head (54) are fixedly installed with a mounting cavity (71), the bottom of the mounting cavity (71) is evenly distributed with springs (75), the mounting cavity (71) is butt-jointed with a docking seat (74) through the spring (75), the docking seat (74) penetrates the mounting cavity (71), the top of the docking seat (74) is fixedly installed with a material carrying cover (76), the top and bottom of the mounting cavity (71) are respectively fixedly installed with an upper electric contact sheet (72) and a lower electric contact sheet (73), and the upper electric contact sheet (72) and the lower electric contact sheet (73) correspond to each other.
2. The material hoist for building construction according to claim 1, characterized in that: The base (1) is fixedly mounted with mounting components (2) on both sides, the mounting components (2) comprising mounting foot plates (21) and mounting openings (211), the base (1) is fixedly mounted with mounting foot plates (21) on both sides, and the mounting foot plates (21) are provided with mounting openings (211).
3. The material hoist for building construction according to claim 2, characterized in that: The receiving assembly (5) further comprises a guide rail (53), the guide groove (12) is provided with a guide rail (53) slidably connected to the guide plate (52), and the guide plate (52) slides in the guide groove (12) via the guide rail (53).
4. The material hoist for building construction according to claim 3 is characterized in that: The support structure (6) comprises a support seat (61), a support shoulder (62), a support arm (63), and a support plate (64); the front side of the top of the base (1) is equipped with the support seat (61); the top of the support seat (61) is fixedly mounted with the support shoulder (62); and a mutually connected support arm (63) is fixedly mounted between the support shoulder (62) and the support seat (61); a support plate (64) is fixedly mounted between the support arms (63); and the winch (4) is fixedly mounted on the top of the support plate (64).
5. The material hoist for building construction according to claim 4 is characterized in that: The support plate (64) is provided with a through guide port, a rope is wound on the hoist (4), and the hoist (4) is connected to the top of the material lifting frame (8) through the rope.
6. The material hoist for building construction according to claim 5, characterized in that: The contact loading assembly (7) further comprises a limiting member (77); a docking port (711) communicating with the interior is disposed at the top of the mounting cavity (71); the docking port (711) is penetrated by the docking seat (74); and a limiting member (77) is fixedly mounted at the bottom of the docking seat (74).
7. The material hoist for building construction according to claim 6, characterized in that: A guide plate (3) is fixedly mounted on the top of the guide plate (52), and the guide plate (3) is located at the rear side of the contact-type material loading assembly (7), and the top of the guide plate (3) is chamfered.
