Gas replacement device for dry ice production
By designing the support mechanism, ventilation mechanism and gas storage mechanism, the pressure difference between the vacuum tank and the gas storage tank is used for gas replacement, which solves the problems of gas mixing and cumbersome operation, achieves pure gas replacement and simplifies the fullness verification process.
Patent Information
- Application Number
- CN202420563883.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-22
AI Technical Summary
The existing gas replacement device is prone to gas mixing during the replacement process, and it is cumbersome to check whether the tank is full.
A gas replacement device for dry ice production is designed, including a support mechanism, a ventilation mechanism and a gas storage mechanism. The pressure difference between the vacuum tank and the gas storage tank is used to replace the gas based on the principle that carbon dioxide is heavier than air, and is observed through a pressure gauge. Whether the gas tank is filled with carbon dioxide simplifies the fullness verification process.
It achieves pure replacement of gas, avoids gas mixing, simplifies the operation process of gas tank fullness inspection, and improves the intuitiveness and simplicity of the work.
Smart Images

Figure CN221917440U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gas replacement, in particular to a gas replacement device for dry ice production. Background Art
[0002] Dry ice is solid carbon dioxide, which is obtained by condensing carbon dioxide into a colorless liquid under a pressure of 6250.5498 kPa and then rapidly solidifying it under low pressure. Carbon dioxide is needed for the production of dry ice, and a displacement device is required for its preparation.
[0003] If the authorization announcement number is CN 205933252U discloses a carbon dioxide gas recovery device, which includes: a membrane contactor, an air inlet pipeline, an air outlet pipeline, a liquid inlet pipeline and a recovery pipeline; the air inlet pipeline is connected to the air inlet of the membrane contactor and conveys gas containing carbon dioxide; the air outlet pipeline is connected to the air outlet of the membrane contactor and outputs gas from which carbon dioxide is removed; the liquid inlet pipeline is connected to the liquid inlet of the membrane contactor and conveys carbon dioxide absorption liquid; the recovery pipeline is connected to the liquid outlet of the membrane contactor and recovers the separated carbon dioxide gas and carbon dioxide absorption liquid. The carbon dioxide gas recovery device of the utility model has low operating cost, simple control, and can obtain pure carbon dioxide gas after recovery, and occupies a small space. At the same time, the carbon dioxide gas recovery device of the utility model can use carbon dioxide absorption liquid to realize the cyclic absorption of carbon dioxide gas.
[0004] However, the existing gas replacement devices are prone to gas mixing during replacement, resulting in impure gas. At the same time, the operation is relatively cumbersome when checking whether the tank is full. Utility Model Content
[0005] The purpose of the utility model is to provide a gas replacement device for dry ice production to solve the problems raised in the above background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A gas replacement device for dry ice production includes a support mechanism, a ventilation mechanism and a gas storage mechanism, wherein the ventilation mechanism is located in the middle of the support mechanism, and the gas storage mechanism is located on the middle right side of the support mechanism. The support mechanism includes a base plate, a support column is fixedly installed on the left side of the bottom end of the base plate, a support plate is fixedly installed on the top of the support column, an exhaust fan is fixedly installed on the top of the support plate, an exhaust pipe is fixedly installed on the front end of the exhaust fan, and the front end of the exhaust pipe passes through the support plate and is movably installed on a first connecting screw barrel.
[0008] Preferably, the ventilation mechanism includes a vacuum tank, which is fixedly installed on the left side of the top of the base plate, and a first exhaust pipe is fixedly installed on the left side of the top of the vacuum tank, a first valve is movably installed at the front end of the first exhaust pipe, a first connecting nut is movably installed at the top of the first exhaust pipe, and the first connecting nut is movably installed on the outside of the first connecting barrel.
[0009] Preferably, a pressure gauge is fixedly installed on the front side of the top of the vacuum tank, a first air intake pipe is fixedly installed on the right side of the top of the vacuum tank, a second valve is movably installed on the front end of the first air intake pipe, and a second connecting nut is movably installed on the upper right end of the first air intake pipe.
[0010] Preferably, the gas storage mechanism includes an air storage tank, which is fixedly installed on the right side of the top of the base plate, a second exhaust pipe is fixedly installed on the left side of the top of the air storage tank, a second connecting screw is fixedly installed on the left end of the second exhaust pipe, and a second connecting nut is movably installed on the outer side of the second connecting screw.
[0011] Preferably, a third exhaust pipe is fixedly installed on the right side of the top end of the gas storage tank, a third valve is fixedly installed on the front end of the third exhaust pipe, and a third connecting nut is fixedly installed on the right end of the third exhaust pipe.
[0012] Preferably, a second air intake pipe is fixedly installed on the lower side of the front end of the air storage tank, a fourth connecting nut is fixedly installed on the right end of the second air intake pipe, and a fourth valve is fixedly installed on the top end of the second air intake pipe. Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. A gas replacement device for dry ice production, carbon dioxide enters the gas tank through the second air inlet pipe. Using the principle that carbon dioxide is heavier than air, carbon dioxide pushes air into the top of the vacuum tank. At the same time, due to the pressure in the vacuum tank, the air on the top of the gas tank is sucked into the vacuum tank. The vacuum operation replacement can ensure that the carbon dioxide in the gas tank is purer and avoid mixing with other gases.
[0014] 2. The gas replacement device for dry ice production observes the scale of the pressure gauge. When the scale returns to zero, it indicates that the air in the gas tank has been completely extracted, thereby indicating that the gas tank is full of carbon dioxide, thereby completing the gas replacement in the gas tank. It is more intuitive to check that the gas tank is full by observing the pressure gauge, and the work is simpler. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 2 It is a structural schematic diagram of the support mechanism of the utility model;
[0017] Figure 3It is a structural schematic diagram of the ventilation mechanism of the utility model;
[0018] Figure 4 It is a structural schematic diagram of the gas storage mechanism of the utility model.
[0019] In the figure: 101, supporting mechanism; 102, ventilation mechanism; 103, gas storage mechanism; 104, bottom plate; 105, supporting column; 106, supporting plate; 201, vacuum pump; 202, vacuum pipe; 203, first connecting screw barrel; 204, vacuum tank; 205, first exhaust pipe; 206, first valve; 301, first connecting nut; 302, pressure gauge; 303, first air inlet pipe; 304, second valve; 305, second connecting nut; 306, air storage tank; 401, second exhaust pipe; 402, second connecting screw barrel; 403, third exhaust pipe; 404, third valve; 405, third connecting nut; 406, second air inlet pipe; 501, fourth connecting nut; 502, fourth valve. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figure 1-Figure 4 As shown, a technical solution provided by the utility model:
[0022] A gas replacement device for dry ice production includes a support mechanism 101, a ventilation mechanism 102 and a gas storage mechanism 103, wherein the ventilation mechanism 102 is located in the middle of the support mechanism 101, and the gas storage mechanism 103 is located on the middle right side of the support mechanism 101. The support mechanism 101 includes a base plate 104, a support column 105 is fixedly installed on the left side of the bottom end of the base plate 104, a support plate 106 is fixedly installed on the top of the support column 105, an exhaust fan 201 is fixedly installed on the top of the support plate 106, an exhaust pipe 202 is fixedly installed on the front end of the exhaust fan 201, and the front end of the exhaust pipe 202 passes through the support plate 106 and is movably installed on the first connecting screw barrel 203.
[0023] Through the above scheme, the vacuum tank and the gas storage tank can be supported by the bottom plate, the vacuum pump can be supported by the support column and the support plate, and the vacuum tube can be evacuated into a vacuum by the vacuum pump.
[0024] In this embodiment, preferably, the ventilation mechanism 102 includes a vacuum tank 204, the vacuum tank 204 is fixedly installed on the left side of the top of the base plate 104, a first exhaust pipe 205 is fixedly installed on the left side of the top of the vacuum tank 204, a first valve 206 is movably installed at the front end of the first exhaust pipe 205, a first connecting nut 301 is movably installed at the top of the first exhaust pipe 205, and the first connecting nut 301 is movably installed on the outside of the first connecting screw barrel 203.
[0025] Through the above scheme, the first connecting nut is movably installed on the outside of the first connecting barrel, so that the vacuum tank and the vacuum pump can be connected through the first exhaust pipe and the exhaust pipe, so that the vacuum pump can draw a vacuum from the vacuum tank when pumping air, and the opening and closing of the first exhaust pipe can be controlled by the first valve.
[0026] In this embodiment, preferably, a pressure gauge 302 is fixedly installed on the front side of the top of the vacuum tank 204, a first air intake pipe 303 is fixedly installed on the right side of the top of the vacuum tank 204, a second valve 304 is movably installed on the front end of the first air intake pipe 303, and a second connecting nut 305 is movably installed on the upper right end of the first air intake pipe 303.
[0027] Through the above scheme, by observing the scale of the pressure gauge, when the scale returns to zero during gas replacement, it means that the air in the gas tank has been extracted, and then it means that the gas tank is full of carbon dioxide, and the opening and closing of the first intake pipe can be controlled by the second valve.
[0028] In this embodiment, preferably, the gas storage mechanism 103 includes a gas tank 306, and the gas tank 306 is fixedly installed on the right side of the top of the base plate 104. A second exhaust pipe 401 is fixedly installed on the left side of the top of the gas tank 306. A second connecting screw barrel 402 is fixedly installed on the left end of the second exhaust pipe 401, and a second connecting nut 305 is movably installed on the outer side of the second connecting screw barrel 402.
[0029] Through the above scheme, a second connecting nut is movably installed on the outside of the second connecting screw barrel, so that the vacuum tank and the gas storage tank can be connected through the first air inlet pipe and the second exhaust pipe, so that the air in the gas storage tank can be extracted by the pressure of the vacuum tube.
[0030] In this embodiment, preferably, a third exhaust pipe 403 is fixedly installed on the right side of the top of the gas storage tank 306 , a third valve 404 is fixedly installed on the front end of the third exhaust pipe 403 , and a third connecting nut 405 is fixedly installed on the right end of the third exhaust pipe 403 .
[0031] Through the above solution, the opening and closing of the third exhaust pipe can be controlled by the third valve, and the gas storage tank and the dry ice processing equipment can be connected through the third exhaust pipe and the third connecting nut.
[0032] In this embodiment, preferably, a second air intake pipe 406 is fixedly installed on the lower side of the front end of the air storage tank 306 , a fourth connecting nut 501 is fixedly installed on the right end of the second air intake pipe 406 , and a fourth valve 502 is fixedly installed on the top end of the second air intake pipe 406 .
[0033] Through the above solution, the opening and closing of the second air inlet pipe can be controlled by the third valve, and the gas storage tank and the gas production equipment can be connected through the second air inlet pipe and the fourth connecting nut.
[0034] When using a gas replacement device for dry ice production according to the present embodiment, the user movably installs the first connecting nut 301 on the outside of the first connecting screw barrel 203, so that the vacuum tank 204 and the vacuum pump 201 are connected through the first exhaust pipe 205 and the exhaust pipe 202, and the second connecting nut 305 is movably installed on the outside of the second connecting screw barrel 402, so that the vacuum tank 204 and the gas storage tank 306 are connected through the first air inlet pipe 303 and the second exhaust pipe 401, and then the third connecting nut 405 is used to connect the gas storage tank 306 to the dry ice processing equipment through the third exhaust pipe 403, and the fourth connecting nut 501 is used to connect the gas storage tank 306 to the gas production equipment through the second air inlet pipe 406. After the connection combination is completed, the first valve 304 is opened and the second valve 304 is closed, and the vacuum pump 201 is started to extract the gas in the vacuum tank 204 into a vacuum. After the vacuum is formed, the vacuum pump 201 and the first valve 206 are closed, and then the fourth valve 502 and the second valve 304 are opened to allow the carbon dioxide produced by the gas production equipment to enter the gas storage tank 306 through the second air inlet pipe 406. Based on the principle that carbon dioxide is heavier than air, carbon dioxide pushes the air into the top of the tank body. At the same time, due to the pressure in the vacuum tank 204, the air at the top of the gas storage tank 306 is sucked into the vacuum tank 204. When the vacuum tank 204 is taking in air, by observing the scale of the pressure gauge 302, when the scale returns to zero, it indicates that the air in the gas storage tank 306 has been completely extracted, thereby indicating that the gas storage tank 306 is already full of carbon dioxide, thereby completing the gas replacement in the gas storage tank 306. After the gas in the gas storage tank 306 is full, the second valve 304 is closed and the third valve 404 is opened, so that the carbon dioxide can enter the dry ice processing equipment through the third exhaust pipe 403.
[0035] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. A gas replacement device for dry ice production, characterized in that: The invention comprises a support mechanism (101), a ventilation mechanism (102) and an air storage mechanism (103), wherein the ventilation mechanism (102) is located in the middle of the support mechanism (101), and the air storage mechanism (103) is located in the middle right of the support mechanism (101); the support mechanism (101) comprises a bottom plate (104), a support column (105) is fixedly mounted on the left side of the bottom end of the bottom plate (104), a support plate (106) is fixedly mounted on the top end of the support column (105), an air pump (201) is fixedly mounted on the top end of the support plate (106), an air pump (201) is fixedly mounted on the front end of the air pump (201), and the front end of the air pump (202) passes through the support plate (106) and is movably mounted on the first connecting screw cylinder (203).
2. A gas replacement device for dry ice production according to claim 1, characterized in that: The ventilation mechanism (102) comprises a vacuum tank (204), the vacuum tank (204) being fixedly mounted on the left side of the top end of the bottom plate (104), a first exhaust pipe (205) being fixedly mounted on the left side of the top end of the vacuum tank (204), a first valve (206) being movably mounted on the front end of the first exhaust pipe (205), a first connecting nut (301) being movably mounted on the top end of the first exhaust pipe (205), and the first connecting nut (301) being movably mounted on the outside of the first connecting screw barrel (203).
3. A gas replacement device for dry ice production according to claim 2, characterized in that: A pressure gauge (302) is fixedly mounted on the front side of the top of the vacuum tank (204); a first air intake pipe (303) is fixedly mounted on the right side of the top of the vacuum tank (204); a second valve (304) is movably mounted on the front end of the first air intake pipe (303); and a second connecting nut (305) is movably mounted on the upper right end of the first air intake pipe (303).
4. A gas replacement device for dry ice production according to claim 1, characterized in that: The gas storage mechanism (103) comprises a gas storage tank (306), the gas storage tank (306) is fixedly mounted on the right side of the top end of the bottom plate (104), a second exhaust pipe (401) is fixedly mounted on the left side of the top end of the gas storage tank (306), a second connecting screw barrel (402) is fixedly mounted on the left end of the second exhaust pipe (401), and a second connecting nut (305) is movably mounted on the outer side of the second connecting screw barrel (402).
5. A gas replacement device for dry ice production according to claim 4, characterized in that: A third exhaust pipe (403) is fixedly installed on the right side of the top end of the gas storage tank (306), a third valve (404) is fixedly installed on the front end of the third exhaust pipe (403), and a third connecting nut (405) is fixedly installed on the right end of the third exhaust pipe (403).
6. A gas replacement device for dry ice production according to claim 5, characterized in that: A second air intake pipe (406) is fixedly mounted on the lower front end of the air storage tank (306), a fourth connecting nut (501) is fixedly mounted on the right end of the second air intake pipe (406), and a fourth valve (502) is fixedly mounted on the top end of the second air intake pipe (406).