High-rise building vertical component cut-off jacking inclination rectifying and overturning preventing device

By using the upper jacking platform, lower capping platform, elevated platform and anti-overturning device during the jacking process of high-rise buildings, combined with the connection of steel corbels and tie rods, the problem of insufficient overturning resistance after the vertical components are cut off is solved. problem, improving construction safety and jacking stability.

CN221919567UActive Publication Date: 2024-10-29HANGZHOU SHENGJI CONSTR SPECIAL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420360611.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-27
Publication Date
2024-10-29
Estimated Expiration
2034-02-27

AI Technical Summary

Technical Problem

During the jacking and tilting correction process of high-rise buildings, the vertical members have insufficient overturning resistance after being cut off, which can easily cause the structure to overturn and collapse under adverse weather conditions such as heavy rains and typhoons, causing potential safety hazards.

Method used

Design a device that includes lifting the upper platform, lifting the lower platform, raising platform, jack and anti-overturning device. It is connected through the upper and lower steel corbels and tie rods, and uses chemical anchors and concave and convex structures to achieve a stable connection to ensure vertical Sliding and overturning resistance.

Benefits of technology

It enhances the anti-overturning ability during the jacking and tilting correction process, improves construction safety, and avoids the risk of the structure overturning and collapse under adverse weather conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919567U_ABST
    Figure CN221919567U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-rise building vertical member cut-off jacking inclination rectification and overturn prevention device, and particularly relates to the field of building jacking inclination rectification, which comprises a building wall body, jacking lower bearing platforms are uniformly fixed at the bottoms of two sides of the building wall body, jacking upper bearing platforms are fixed on the building wall body above the jacking lower bearing platforms, and the jacking upper bearing platforms are fixed on the building wall body above the jacking lower bearing platforms. Heightening tables are arranged at the tops of the jacking lower bearing tables, and jacks are arranged at the top ends of the heightening tables. The steel corbels are installed in pairs up and down and connected through the pull rods, the lower ends of the pull rods are fixed to the lower steel corbels, the upper ends of the pull rods penetrate through the upper steel corbels and are locked through the nuts, the nuts are loosened step by step in the jacking process, vertical sliding is allowed, and the nuts are locked immediately after jacking of each step is completed; the situation that the upper structure overturns and collapses due to adverse factors such as rainstorm and typhoon weather in the jacking period can be avoided, the anti-overturning capacity of the whole jacking and inclination rectifying process is higher, and the construction safety is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of building jacking and tilt correction, and more specifically, to a device for cutting, jacking, tilt correction and anti-overturning of vertical components of high-rise buildings. Background Art

[0002] When a brick-concrete structure building tilts and the overall tilt exceeds the allowable value of the specification to form a dangerous point, the jacking and tilt correction method is usually used to straighten the building. The jacking and tilt correction process usually adopts the new concrete underpinning beam underpinning method, that is, the method of setting concrete underpinning beams by segmented broken walls. The new concrete underpinning beam underpinning method is to cut the wall of the building along a set horizontal plane and set reinforced concrete tray beams for jacking and underpinning. The building is lifted by arranging jacks at set intervals under the underpinning beams to achieve a construction method of correcting the tilt of the building.

[0003] At present, the vertical components of wall columns of high-rise buildings should be cut off and separated before jacking up to correct their tilt. The vertical force of the upper structure is all borne by the hinged jacks. After the vertical components are separated, the anti-overturning ability of the structure is weakened. If adverse factors such as heavy rain and typhoon weather occur during the jacking period, the upper structure may overturn and collapse, causing catastrophic consequences. Utility Model Content

[0004] In order to overcome the above-mentioned defects of the prior art, an embodiment of the utility model provides a device for cutting, lifting, correcting, and preventing overturning of vertical components of a high-rise building to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a device for cutting, lifting, correcting and preventing overturning of vertical components of high-rise buildings, comprising a building wall, the bottoms of both sides of the building wall are evenly fixed with lifting lower caps, the building wall above the lifting lower cap is fixed with a lifting upper cap, the top of the lifting lower cap is provided with a heightening platform, the top of the heightening platform is provided with a jack, and the top of the jack is connected to the bottom of the lifting upper cap;

[0006] An anti-overturning device is installed between the upper lifting platform and the lower lifting platform, and the anti-overturning device includes an upper steel corbel connected to the side wall of the upper lifting platform, a lower steel corbel connected to the side wall of the lower lifting platform, and a pull rod for connecting the upper steel corbel and the lower steel corbel.

[0007] Preferably, the lifting lower support platform and the heightening platform are engaged with each other through a concave-convex structure.

[0008] Preferably, at least two heightening platforms are stacked between the lifting lower support platform and the jack, and adjacent heightening platforms are interlocked via a concave-convex structure.

[0009] Preferably, the positions of the upper steel corbel and the lower steel corbel correspond one to one, and both the upper steel corbel and the lower steel corbel include a back plate, a web plate and a cover plate, and the back plate is provided with a screw through hole, and the screw through holes are penetrated by anchor bolts, which are anchored in the upper lifting platform or the lower lifting platform.

[0010] Preferably, the back plate and the cover plate are perpendicular to each other and form an "L"-shaped structure, and a web is welded between the back plate and the cover plate.

[0011] Preferably, sleeves are provided on both sides of the interior of the cover plate, the inner diameter of the sleeves is larger than the outer diameter of the pull rod, and the pull rod passes through the sleeves.

[0012] Preferably, the pull rod is a precision-rolled threaded steel bar, the bottom of the pull rod is connected to the lower steel corbel, and nuts matching the pull rods are threadedly connected to the pull rods above and below the upper steel corbel.

[0013] Technical effects and advantages of the utility model:

[0014] Compared with the prior art, the device for cutting off, jacking, correcting and anti-overturning of vertical components of high-rise buildings installs steel corbels in pairs in the wall, column-embracing-beam underpinning system around the house in the main axis direction. The steel corbels are anchored to the underpinning system through chemical anchors. The upper and lower steel corbels are connected by a tie rod. The lower end of the tie rod is fixed to the lower steel corbel, and the upper end passes through the upper steel corbel and is locked with a nut. The nuts are loosened in stages during jacking to allow vertical sliding. The nuts are locked immediately after each stage of jacking is completed. This can prevent the upper structure from overturning and collapsing due to adverse factors such as heavy rain and typhoon weather during jacking. The anti-overturning ability of the entire jacking and correcting process is stronger, and the construction safety is higher. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of the utility model.

[0016] Figure 2 It is a schematic diagram of the structure of the anti-overturning device of the utility model.

[0017] Figure 3 It is a schematic diagram of the upper steel bracket structure of the utility model.

[0018] Figure 4 It is a schematic diagram of the structure of the elevated platform of the utility model.

[0019] The accompanying drawings are marked as follows: 1. building wall; 2. upper lifting platform; 3. lower lifting platform; 301. slot; 4. anti-overturning device; 5. jack; 6. raising platform; 601. insert; 602. groove; 7. upper steel corbel; 701. back plate; 702. screw hole; 703. web; 704. cover plate; 8. lower steel corbel; 9. pull rod; 10. nut; 11. sleeve. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Embodiment 1

[0021] As attached Figure 1 The illustrated device for truncating, lifting, correcting and anti-overturning of vertical components of a high-rise building comprises a building wall 1, the bottom of both sides of the building wall 1 are evenly fixed with lifting lower caps 3, the building wall 1 above the lifting lower caps 3 is fixed with lifting upper caps 2, the top of the lifting lower caps 3 is provided with a heightening platform 6, the top of the heightening platform 6 is provided with a jack 5, and the top of the jack 5 is connected to the bottom of the lifting upper cap 2. An anti-overturning device 4 is installed between the lifting upper cap 2 and the lifting lower cap 3, and the anti-overturning device 4 comprises an upper steel corbel 7 connected to the side wall of the lifting upper cap 2, a lower steel corbel 8 connected to the side wall of the lifting lower cap 3, and a pull rod 9 for connecting the upper steel corbel 7 and the lower steel corbel 8.

[0022] Among them: when the jack 5 is used to lift the superstructure, the pull rod 9 can limit the building, which can avoid adverse factors such as heavy rain and typhoon weather during the lifting period, and the superstructure may not overturn or collapse. The anti-overturning ability of the entire lifting and tilting correction process is stronger, and the construction safety is higher. Embodiment 2

[0023] Based on the first embodiment, the solution in the first embodiment is further detailed in combination with the following specific working methods. Figures 1 to 4 As shown, see the following description for details:

[0024] As a preferred embodiment, the jacking upper support platform 2 is connected to the building wall 1 by means of roughening, planting reinforcement, stirrups, etc., and is integrated with the building wall 1 through concrete pouring; further, the integrated design of the jacking upper support platform 2 is more firmly connected to the building wall 1, and the building wall 1 is not easy to fall or shake during jacking, and the construction safety is higher.

[0025] As a preferred embodiment, a slot 301 is provided at the central position of the top of the lower lifting platform 3, an insertion strip 601 is fixed at the central position of the bottom of the heightening platform 6, and a groove 602 is provided at the middle position of the top of the heightening platform 6, and the shape of the insertion strip 601 is consistent with the internal shape of the groove 602 and the slot 301; further, after each level of lifting operation is completed, a heightening platform 6 is added to the bottom of the jack 5 so as to lift again, and the lower lifting platform 3 and the heightening platform 6 are fastened by the insertion of the insertion strip 601 and the slot 301, and the insertion strip 601 and the slot 301 form a concave-convex structure, and the adjacent heightening platforms 6 are fastened by the insertion of the insertion strip 601 and the groove 602, and the insertion strip 601 and the groove 602 also form a concave-convex structure. The design of the insertion strip 601, the slot 301 and the groove 602 makes the installation of the heightening platform 6 more stable, and it is not easy to be displaced during lifting, and the lifting stability is higher.

[0026] As a preferred embodiment, the positions of the upper steel corbel 7 and the lower steel corbel 8 correspond one to one, and both the upper steel corbel 7 and the lower steel corbel 8 include a back plate 701, a web 703 and a cover plate 704. A screw through hole 702 is opened on the back plate 701, and an anchor bolt penetrates through the screw through hole 702, and the anchor bolt is anchored in the upper lifting platform 2 or the lower lifting platform 3; further, the upper steel corbel 7 and the lower steel corbel 8 are anchored to the upper lifting platform 2 or the lower lifting platform 3 through the anchor bolt, so that the connection between the upper steel corbel 7 and the lower steel corbel 8 is more stable and not easy to fall off, and the anti-overturning ability is stronger.

[0027] As a preferred embodiment, the back plate 701 and the cover plate 704 are perpendicular to each other and form an "L" shaped structure, and a web 703 is welded between the back plate 701 and the cover plate 704; further, the back plate 701 is in contact with the upper lifting platform 2 or the lower lifting platform 3, and the cover plate 704 is used to limit the pull rod 9. The design of the web 703 makes the upper steel corbel 7 and the lower steel corbel 8 stronger, and it is not easy to bend between the back plate 701 and the cover plate 704, and the anti-overturning ability is stronger.

[0028] As a preferred embodiment, sleeves 11 are provided on both sides inside the cover plate 704, the inner diameter of the sleeve 11 is larger than the outer diameter of the pull rod 9, and the pull rod 9 passes through the sleeve 11; further, the sleeve 11 is designed to limit the pull rod 9, so that the upper steel corbel 7 can only move up and down along the pull rod 9 and cannot tilt or shift, the anti-overturning ability of the jacking and tilt correction process is stronger, and the construction safety is higher.

[0029] As a preferred embodiment, the pull rods 9 are all fine-rolled threaded steel bars, the bottom of the pull rods 9 is connected to the lower steel corbel 8, and nuts 10 matching them are threadedly connected to the pull rods 9 above and below the upper steel corbel 7; further, the lower end of the pull rods 9 is fixed to the lower steel corbel 8, and the upper end passes through the sleeve 11 on the upper steel corbel 7 and is locked with the nut 10. During jacking, the nuts 10 are loosened in stages to allow vertical sliding, and the nuts 10 are locked immediately after each stage of jacking is completed. This can prevent the upper structure from overturning and collapsing due to adverse factors such as heavy rain and typhoon weather during jacking.

[0030] The working process of the utility model is as follows:

[0031] During construction, first lift the lower cap 3, then fix the upper cap 2 by roughening, planting reinforcement, stirrups, etc., and cast the lower cap 3 and the building wall 1 together with concrete, then pass the anchor bolts through the screw holes 702 on the back plate 701, and anchor the anchor bolts into the upper cap 2 or the lower cap 3, install the upper steel bracket 7 and the lower steel bracket 8 on the upper cap 2 and the lower cap 3 one by one, and then put the jack 5 on the lower cap. Between the platform 3 and the jacking upper supporting platform 2, the lower end of the pull rod 9 is fixed on the lower steel corbel 8, and the upper end passes through the sleeve 11 on the upper steel corbel 7. The jack 5 lifts the jacking upper supporting platform 2. After the first level of jacking is completed, the upper and lower nuts 10 of the upper steel corbel 7 are locked, the jack 5 is removed, and inserted into the heightening platform 6. After the jack 5 is placed on the heightening platform 6, the nuts 10 are loosened in stages, allowing vertical sliding, and the above operations are repeated. The nuts 10 should be locked immediately after each level of jacking is completed.

[0032] Finally: The above are only preferred embodiments of the present utility model and are not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.

Claims

1. A device for cutting, lifting, correcting and preventing overturning of vertical components of a high-rise building, comprising a building wall (1), characterized in that: A lifting lower support (3) is evenly fixed to the bottom of both sides of the building wall (1), and a lifting upper support (2) is fixed to the building wall (1) above the lifting lower support (3). A heightening platform (6) is arranged on the top of the lifting lower support (3), and a jack (5) is arranged on the top of the heightening platform (6). The top of the jack (5) is connected to the bottom of the lifting upper support (2); An anti-tipping device (4) is installed between the upper lifting platform (2) and the lower lifting platform (3), and the anti-tipping device (4) comprises an upper steel corbel (7) connected to the side wall of the upper lifting platform (2), a lower steel corbel (8) connected to the side wall of the lower lifting platform (3), and a pull rod (9) for connecting the upper steel corbel (7) and the lower steel corbel (8).

2. The device for cutting, lifting, correcting and preventing overturning of vertical components of high-rise buildings according to claim 1 is characterized by: The lifting lower support platform (3) and the heightening platform (6) are engaged with each other via a concave-convex structure.

3. The device for cutting, lifting, correcting and preventing overturning of vertical components of high-rise buildings according to claim 1 is characterized by: At least two heightening platforms (6) are stacked between the lifting lower support platform (3) and the jack (5), and adjacent heightening platforms (6) are buckled together via a concave-convex structure.

4. The device for cutting, lifting, correcting and preventing overturning of vertical components of high-rise buildings according to claim 1 is characterized by: The upper steel corbel (7) and the lower steel corbel (8) are located in one-to-one correspondence, and both the upper steel corbel (7) and the lower steel corbel (8) comprise a back plate (701), a web plate (703) and a cover plate (704). The back plate (701) is provided with a screw through hole (702), and anchor bolts are inserted into the screw through hole (702), and the anchor bolts are anchored into the upper jacking platform (2) or the lower jacking platform (3).

5. The device for cutting, lifting, correcting and preventing overturning of vertical components of high-rise buildings according to claim 4 is characterized in that: The back plate (701) and the cover plate (704) are perpendicular to each other and form an "L"-shaped structure, and a web plate (703) is welded between the back plate (701) and the cover plate (704).

6. The device for cutting, lifting, correcting and preventing overturning of vertical components of high-rise buildings according to claim 4 is characterized by: Sleeves (11) are provided on both sides of the interior of the cover plate (704); the inner diameter of the sleeve (11) is greater than the outer diameter of the pull rod (9); and the pull rod (9) passes through the sleeve (11).

7. The device for cutting, lifting, correcting and preventing overturning of vertical components of high-rise buildings according to claim 1 is characterized by: The pull rod (9) is a precision-rolled threaded steel bar. The bottom of the pull rod (9) is connected to the lower steel bracket (8). The pull rods (9) above and below the upper steel bracket (7) are threadedly connected with nuts (10) that match them.