Connecting structure for abutted seams of large prefabricated parts

By arranging tenon structures and blocking devices on the splicing surfaces of large prefabricated components, the problems of low fault tolerance and potential collision safety hazards in the joint connection of prefabricated components in water projects are solved, the quality and safety of the assembly are improved, and the construction cost is reduced. .

CN221919845UActive Publication Date: 2024-10-29SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323531272.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-10-29
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

The existing seam connections of prefabricated components in the field of water engineering have problems such as low fault tolerance and large cumulative errors, and prefabricated partition walls are prone to collisions during assembly, posing potential safety hazards.

Method used

A tenon structure is installed on the splicing surface of large prefabricated components to form a receiving cavity for secondary grouting. Sponge rods and jointing mortar are used as sealing devices, and micro-expansion mortar is filled to enhance connection stability and waterproof performance.

Benefits of technology

It improves the assembly quality and safety of large-scale prefabricated components, avoids collisions between prefabricated components, enhances the waterproof performance of the overall structure, shortens construction time and reduces installation costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919845U_ABST
    Figure CN221919845U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of prefabrication and assembly, in particular to a connecting structure for splicing seams of large prefabricated parts, tenon structures are arranged on splicing surfaces of the large prefabricated parts, and the tenon structures between the adjacent large prefabricated parts correspond to each other and are combined to form a containing cavity. Plugging devices are arranged at the two ends of the containing cavity respectively, and the containing cavity is filled with grouting materials. The utility model has the advantages that: 1) the construction technology is simple and convenient to operate, the collision between the prefabricated parts can be avoided, the waterproof performance of the whole structure is enhanced, and the hoisting quality of the prefabricated parts is greatly improved; and 2) the large prefabricated parts can be scientifically and reasonably connected, and the hoisting safety and efficiency of the prefabricated parts are improved, so that the construction time is indirectly shortened, and the installation cost of the prefabricated parts is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prefabrication and assembly, in particular to a connection structure for the joints of large prefabricated components. Background Art

[0002] With the acceleration of my country's urbanization process, the existing single cast-in-place structure construction technology can no longer meet the main construction needs. Prefabrication and assembly construction can effectively save manpower and financial resources. Compared with cast-in-place construction, prefabrication construction can not only improve construction quality and safety, but also help reduce carbon emissions. At present, prefabrication and assembly technology has not been widely promoted in the field of water engineering. Compared with other prefabrication and assembly projects, prefabrication and hoisting construction in the water field mainly has the characteristics of wide operating area, limited space, large component size and heavy weight.

[0003] The connection quality between prefabricated components is the main factor affecting the overall structural performance. The current connection form is mostly used for small-sized prefabricated components and cannot be applied to large-sized and large-tonnage prefabricated assembly projects in the water industry.

[0004] In addition, the existing prefabricated component joint connections in the field of water conservancy projects have the following problems:

[0005] The fault tolerance is low and the cumulative error is large;

[0006] Prefabricated partition walls are prone to collision during assembly, posing a safety hazard. Summary of the invention

[0007] The purpose of the utility model is to provide a connection structure for the joints of large prefabricated components in accordance with the above-mentioned deficiencies of the prior art, by arranging a convex tenon structure at the joint surfaces of adjacent large prefabricated components to form a secondary grouting accommodating cavity, so that the vertical joints of the large prefabricated components can be assembled into a whole through secondary grouting, thereby improving the overall assembly quality of the large prefabricated components.

[0008] The purpose of this utility model is achieved by the following technical solutions:

[0009] A connection structure for the joints of large prefabricated components, used for the vertical joints between adjacent large prefabricated components, characterized in that a mortise and tenon structure is provided at the joint surface of the large prefabricated components, the mortise and tenon structures between adjacent large prefabricated components correspond to each other and are combined to form a receiving cavity, sealing devices are respectively provided at both ends of the receiving cavity, and grouting material is filled in the receiving cavity.

[0010] The blocking device comprises a sponge rod and grouting mortar, both of which are located between the tenon structures of the adjacent large prefabricated components, and the grouting mortar is located on the outside of the sponge rod.

[0011] The surface of the tenon structure on the inner side of the large prefabricated component is an inclined surface, and the inclined surfaces on the tenon structures of adjacent large prefabricated components are opposite to each other.

[0012] The grouting material is micro-expansion mortar.

[0013] The advantages of the utility model are:

[0014] 1) The construction technology is simple and convenient to operate, which can avoid collision between prefabricated components, enhance the waterproof performance of the overall structure, and greatly improve the quality of prefabricated component hoisting.

[0015] 2) It can scientifically and reasonably connect large prefabricated components, improve the safety and efficiency of prefabricated component hoisting, thereby indirectly shortening the construction time and reducing the installation cost of prefabricated components. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the utility model. DETAILED DESCRIPTION

[0017] The following is a further detailed description of the features of the present invention and other related features through embodiments in conjunction with the accompanying drawings to facilitate understanding by technicians in the same industry:

[0018] like Figure 1 As shown, the marks 1-5 in the figure respectively represent: the tenon structure 1, the sponge rod 2, the grouting mortar 3, the secondary grouting body 4, and the prefabricated partition wall 5.

[0019] Example: Figure 1 As shown, the connection structure of the large prefabricated component joints in this embodiment is used for the joint connection between adjacent prefabricated partition walls 5. Both prefabricated partition walls 5 are prefabricated components. Figure 1 It is a top view of the two, and there is a vertical joint between the two extending along the height direction of the wall.

[0020] like Figure 1 As shown, the connection structure in this embodiment includes a tenon structure 1 arranged at the joint surface of two prefabricated partition walls 5. In this embodiment, each prefabricated partition wall 5 is respectively provided with a tenon structure 1 on both sides along the thickness direction of the wall, and the tenon structures 1 on both sides are symmetrically arranged; the tenon structure 1 can increase the fault tolerance of the joints of large prefabricated components and reduce the collision area between large prefabricated components.

[0021] In this embodiment, the positions of the tenon structures 1 of the two prefabricated partition walls 5 correspond to each other. A receiving cavity is formed between the two prefabricated partition walls 5 by the tenon structure 1. The side surface of the tenon structure 1 at the inner side of the prefabricated partition wall 5 is an inclined surface, and the inclined surfaces on the tenon structures 1 of the adjacent large prefabricated components are opposite to each other, thereby forming Figure 1The accommodating cavity structure shown is wider in the middle and narrower on both sides.

[0022] like Figure 1 As shown, a sponge bar 2 and a grouting mortar 3 are installed on both sides of the accommodating cavity, wherein the sponge bar 2 is located inside the grouting mortar 3. In this embodiment, the sponge bar 2 plays a buffering role on the one hand, and on the other hand, plays a blocking role for the accommodating cavity together with the grouting mortar 3; that is, before the two prefabricated partition walls 5 are butt-jointed and assembled, the sponge bar 2 is installed on both sides of the accommodating cavity and is at a certain distance from the edge of the tenon structure 1, so that the two prefabricated partition walls 5 are in flexible contact with the sponge bar 2 when in contact, achieving the purpose of buffering and completely avoiding collision damage between the prefabricated partition walls 5 due to direct contact. The grouting mortar 3 located outside the sponge bar 2 mainly plays a blocking role.

[0023] like Figure 1 As shown, a secondary grouting body 4 is filled in the accommodation cavity, and the secondary grouting body 4 completely fills the accommodation cavity and does not flow out under the blocking of the sponge rod 2 and the grouting mortar 3. At this time, since the side surface of the tenon structure 1 at the inner side of the prefabricated partition wall 5 is an inclined surface, the consolidated secondary grouting body 4 can play a role in lateral limitation of the prefabricated partition wall 5, and can also further improve the integrity of each prefabricated partition wall 5.

[0024] During construction, this embodiment includes the following steps:

[0025] 1) After the prefabrication is completed, the vertical joints between the prefabricated partition walls 5 are cleaned and moistened.

[0026] 2) Install the sponge rods 2 on the tenon structures 1 on both sides of the joints of the prefabricated partition wall 5, symmetrically arranged, and reserve a gap width. After completion, the prefabricated partition wall 5 is further moved and positioned.

[0027] 3) Use grouting mortar 3 to grout the outside of the sponge rod 2. The grouting operation needs to be completed in one go, and the time interval should not be too long.

[0028] 4) After the joint mortar 3 reaches a certain strength, a grouting material with a strength not less than that of the main structure concrete is used to fill the accommodation cavity formed between the tenon structures 1. The grouting material preferably has a mortar-water-to-material ratio of 0.11-0.14. The grouting material is pumped into the accommodation cavity through the top opening of the prefabricated partition wall 5 to inject the grouting material.

[0029] During the grouting process, the grouting should be continued at a constant speed to avoid the introduction of air pockets or bubble interlayers. The grouting process should be continuous and no midway stop should be made unless there is an unexpected situation. The grouting material should be used up within 30 minutes after adding water; the grouting site should not be disturbed within 24 hours after grouting.

[0030] In the specific implementation of this embodiment: the specification of the sponge rod 2 is φ25, which is completed before the grouting mortar 3, symmetrically installed on both sides of the joint, and 20mm to 30mm away from the edge of the tenon structure 1 of the edge of the prefabricated component.

[0031] The mortar joints 3 on both sides of the accommodating cavity should be operated symmetrically, and the width of the mortar joints 3 should be 20 to 30 mm.

[0032] The secondary grouting body 4 uses micro-expansion mortar, which is wet-mixed on site with an electric mixer. After being stirred evenly, it is left to stand for 2 minutes before grouting. During the grouting process, close attention should be paid to whether there is leakage around. If leakage occurs, the grouting operation should be suspended and the rapid sealing material should be used in time to seal it.

[0033] Although the above embodiments have described the concepts and embodiments of the purpose of the utility model in detail with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and modifications can still be made to the utility model without departing from the scope of the claims, so they are not described one by one here.

Claims

1. A connection structure for large prefabricated component joints, used for vertical joints between adjacent large prefabricated components. Features: A mortise and tenon structure is provided at the joint surface of the large prefabricated components, the mortise and tenon structures between adjacent large prefabricated components correspond to each other and are combined to form a receiving cavity, sealing devices are respectively provided at both ends of the receiving cavity, and grouting material is filled in the receiving cavity.

2. A connection structure for large prefabricated component joints according to claim 1, Features: The blocking device comprises a sponge rod and grouting mortar, both of which are located between the tenon structures of the adjacent large prefabricated components, and the grouting mortar is located on the outside of the sponge rod.

3. A connection structure for large prefabricated component joints according to claim 1, Features: The surface of the tenon structure on the inner side of the large prefabricated component is an inclined surface, and the inclined surfaces on the tenon structures of adjacent large prefabricated components are opposite to each other.

4. A connection structure for large prefabricated component joints according to claim 1, Features: The grouting material is micro-expansion mortar.