Tunnel anti-upheaval structure capable of reducing unloading influence of upper foundation pit

By arranging the vault grouting ring and the vault bottom anti-floating anchor in the anti-uplift structure of the tunnel, combined with the grid steel frame and the molded secondary lining, the problem of tunnel floating caused by water buoyancy is solved, the construction risk is reduced, and it is suitable for ultra-high-speed tunnels. Shallow tunnel construction, especially when the covering soil thickness is insufficient during later foundation pit excavation.

CN221920986UActive Publication Date: 2024-10-29CHINA RAILWAY DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420684253.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-06
Publication Date
2024-10-29
Estimated Expiration
2034-04-06

AI Technical Summary

Technical Problem

During the construction of underground subway tunnels, water buoyancy causes the tunnel structure to shift upward, making the deformation difficult to control and causing greater construction risks. Especially during the later excavation of the foundation pit, the covering soil thickness is less than 0.5 times the diameter of the tunnel, making it difficult to meet the anti-uplift requirements.

Method used

A tunnel anti-uplift structure is designed, including an anti-uplift structure at the top and bottom of the vault. A grouting ring is set on the top of the vault, and an anti-floating anchor rod is set at the bottom of the vault. By increasing the structural weight and providing bottom tension, combined with the grid steel frame and molded secondary lining to form a reinforced main supporting structure to resist water buoyancy.

Benefits of technology

It effectively reduces the adverse impact of water buoyancy on the tunnel structure, prevents the tunnel from floating, and reduces construction risks. It is suitable for the construction of ultra-shallow tunnels, especially when the thickness of the covering soil is insufficient during later foundation pit excavation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221920986U_ABST
    Figure CN221920986U_ABST
Patent Text Reader

Abstract

The utility model discloses a tunnel anti-upheaval structure capable of reducing unloading influence of an upper foundation pit, which comprises a main body supporting structure of a tunnel, an arch crown anti-upheaval structure is arranged on the outer side of an arch crown of the main body supporting structure, and the arch crown anti-upheaval structure comprises an arch crown grouting ring. The inner side outline of the vault grouting ring is matched with a primary support of the main body support structure and is semicircular, and the outer side outline of the vault grouting ring is arc-shaped; an arch bottom anti-upheaval structure is arranged on the outer side of the arch bottom of the main body supporting structure and comprises anti-floating anchor rods, and the anti-floating anchor rods are annularly and evenly distributed at the initial supporting position of the arch bottom. The main body supporting structure is internally provided with an anti-uplift reinforced molded secondary lining, the molded secondary lining is a thickened secondary lining, and the shield tunneling machine guide table is located on the inner side of the arch bottom and is a part of the molded secondary lining. The water-rich stratum metro underground excavation tunnel construction can be achieved, the adverse effect of water buoyancy on the tunnel structure during construction can be reduced, the tunnel is effectively prevented from floating upwards, and the construction risk is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of tunnel construction, and in particular relates to a tunnel anti-uplift structure capable of reducing the influence of unloading of an upper foundation pit. Background Art

[0002] The construction of underground tunnels is easily affected by the buoyancy of groundwater, which may cause the tunnel structure to move upward, making the soil above the tunnel loose or flowing, thus affecting the service life and safety of the tunnel. Tunnel construction in water-rich strata is extremely risky and can easily cause casualties and property losses if not handled with caution.

[0003] In engineering practice, the anti-floating capacity of most tunnels is generally considered to be sufficient. However, in certain circumstances, this assumption may not apply. If excavation of the foundation pit may be carried out above the tunnel at a later stage, resulting in the thickness of the cover soil dropping to less than 0.5 times the tunnel diameter in the later stages of excavation, the anti-floating capacity of the tunnel may become a matter of concern. Therefore, when designing the tunnel structure, it is necessary to consider the influence of water buoyancy and take appropriate measures to prevent the tunnel from floating. During the tunnel construction process, it is also necessary to reasonably control and manage the water buoyancy and take appropriate measures to prevent it from having an adverse effect on the tunnel construction.

[0004] Studying a tunnel anti-uplift structure that reduces the impact of upper foundation pit unloading can realize the construction of the subway dark excavation tunnel section, reduce the adverse effect of water buoyancy on the tunnel structure during construction, effectively prevent the tunnel from floating, and reduce construction risks.

[0005] The utility model can solve practical problems such as large displacement due to water buoyancy, difficult to control deformation, and high construction risks during subway tunnel construction, and has great engineering innovation needs. Summary of the invention

[0006] The utility model is proposed to solve the problems existing in the prior art, and its purpose is to provide a tunnel anti-uplift structure which can reduce the influence of unloading of the upper foundation pit.

[0007] The technical solution of the utility model is: a tunnel anti-uplift structure for reducing the influence of unloading of an upper foundation pit, comprising a main supporting structure of the tunnel, an arch anti-uplift structure is arranged on the outer side of the arch crown of the main supporting structure, an arch bottom anti-uplift structure is arranged on the outer side of the arch bottom of the main supporting structure, and a molded secondary lining for anti-uplift reinforcement is arranged in the main supporting structure.

[0008] Furthermore, the arch anti-uplift structure is located outside the initial support of the arch position in the main supporting structure, and the arch anti-uplift structure achieves resistance to upward uplift by adding weight to the main supporting structure.

[0009] Furthermore, the arch bottom anti-uplift structure is located outside the initial support of the arch bottom position in the main supporting structure. The arch bottom anti-uplift structure is driven into the medium-weathered rock layer. The arch bottom anti-uplift structure provides bottom tension to the main supporting structure to achieve anti-upward uplift.

[0010] Furthermore, the vault anti-uplift structure includes a vault grouting ring, the inner contour of the vault grouting ring is adapted to the initial support of the main support structure and is semicircular; the outer contour of the vault grouting ring is arc-shaped.

[0011] Furthermore, the outer contour of the vault grouting ring is symmetrical along the tunnel centerline, and the arc diameter of the outer contour is gradually increasing from both sides to the middle.

[0012] Furthermore, the arch bottom anti-uplift structure includes anti-floating anchor rods, and the anti-floating anchor rods are evenly distributed in the circumferential direction at the initial support position of the arch bottom.

[0013] Furthermore, the free end of the anti-floating anchor rod diverges outwards, and the free end of the anti-floating anchor rod enters the medium-weathered rock layer by no less than 2.5 m.

[0014] Furthermore, the main support structure includes a grid steel frame, and locking anchor rods are arranged on the outer side of the grid steel frame.

[0015] The beneficial effects of the utility model are as follows:

[0016] The utility model provides a tunnel anti-uplift structure for reducing the influence of upper foundation pit unloading, which can realize the construction of ultra-shallow buried tunnels, especially tunnels with later foundation pit excavation above the tunnel, where the thickness of the covering soil in the later stage of the foundation pit excavation is less than 0.5 times the tunnel diameter, making it difficult to meet the anti-uplift requirements.

[0017] The utility model can reduce the adverse effect of water buoyancy on the tunnel structure during construction, effectively prevent the tunnel from floating up, and reduce construction risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of the utility model;

[0019] Figure 2 It is a schematic diagram of the steel frame for supporting the grille in the initial stage of dark excavation in the utility model;

[0020] Figure 3 This is a schematic diagram of the reinforcement of the second lining of the dark excavation in the utility model;

[0021] Figure 4 It is a construction flow chart of the utility model;

[0022] in:

[0023] 101 Advanced Large Pipe Shed 102 Shotcrete

[0024] 103 double-layer steel mesh 104 grid steel frame

[0025] 105 Shield machine outer contour 106 Shield machine guide platform

[0026] 107 embedded rail 108 anti-floating anchor

[0027] 109 Arch grouting ring 110 Locking foot anchor

[0028] 111 N1 steel frame 112 N2 steel frame

[0029] 113 N3 steel frame 114 N4 steel frame

[0030] 115 N5 steel frame 116 N6 steel frame

[0031] 117 N7 steel frame 118 N8 steel frame

[0032] 119 N9 steel frame 120 N10 steel frame

[0033] The upper left part of the 121 tunnel and the lower left part of the 122 tunnel

[0034] The upper right part of the 123 tunnel and the lower right part of the 124 tunnel

[0035] 125 Cast-in-place secondary lining 126 Second lining outer reinforcement N1

[0036] 127 Second lining inner reinforcement N2 128 Later excavation of foundation pit. DETAILED DESCRIPTION

[0037] Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and embodiments:

[0038] like Figures 1 to 4 As shown, a tunnel anti-uplift structure for reducing the influence of unloading of the upper foundation pit comprises a main supporting structure of the tunnel, wherein an arch anti-uplift structure is arranged on the outer side of the arch crown of the main supporting structure, an arch bottom anti-uplift structure is arranged on the outer side of the arch bottom of the main supporting structure, and a molded secondary lining 125 with anti-uplift reinforcement is arranged in the main supporting structure.

[0039] The arch anti-uplift structure is located outside the initial support of the arch position in the main supporting structure. The arch anti-uplift structure achieves resistance to upward uplift by adding weight to the main supporting structure.

[0040] The arch bottom anti-uplift structure is located outside the initial support of the arch bottom position in the main supporting structure. The arch bottom anti-uplift structure is driven into the medium weathered rock layer. The arch bottom anti-uplift structure provides bottom tension to the main supporting structure to achieve anti-upward uplift.

[0041] The vault anti-uplift structure includes a vault grouting ring 109. The inner contour of the vault grouting ring 109 is adapted to the initial support of the main support structure and is semicircular; the outer contour of the vault grouting ring 109 is arc-shaped.

[0042] The outer contour of the vault grouting ring 109 is symmetrical along the tunnel centerline, and the arc diameter of the outer contour is gradually increasing from both sides to the middle.

[0043] The arch bottom anti-uplift structure includes anti-floating anchor rods 108, and the anti-floating anchor rods 108 are evenly distributed in the circumferential direction at the initial support position of the arch bottom.

[0044] Furthermore, the free end of the anti-floating anchor rod 108 is outwardly divergent, and the free end of the anti-floating anchor rod 108 enters the medium-weathered rock layer by no less than 2.5 m.

[0045] The main support structure includes a grid steel frame 104 , and a locking anchor rod 110 is arranged on the outer side of the grid steel frame 104 .

[0046] Specifically, the main support structure includes an advanced large pipe shed 101, shotcrete 102, a double-layer steel mesh 103, a grid steel frame 104, and a cast secondary lining 125. The arch grouting ring 109 is located outside the arch position of the main support structure. By injecting slurry into the arch, the weight of the structure is increased to resist buoyancy. An anti-floating anchor rod 108 is provided at the arch bottom position of the main support structure. The length of the anti-floating anchor rod 108 entering the medium-weathered rock layer is not less than 2.5m, so as to better transfer force and achieve the anti-floating effect of the structure. The cast secondary lining 125 in the main support structure is a thickened secondary lining.

[0047] Specifically, the cast secondary lining 125 is in the shotcrete 102, the shield machine guide platform 106 is located on the inner side of the arch bottom, and the shield machine guide platform 106 is symmetrical along the center line of the tunnel, the upper end of the shield machine guide platform 106 is adapted to the outer contour 105 of the shield machine, and the shield machine guide platform 106 is a part of the subsequent cast secondary lining 125, that is, it is cast together with the cast concrete after the shield machine passes through, and the shield machine guide platform 106 is symmetrically provided with embedded rails 107.

[0048] Specifically, the temporary middle partition wall includes an N7 steel frame 117 and an N8 steel frame 118. The N7 steel frame 117 is located between the upper left soil 121 and the upper right soil 123 of the tunnel, and the N8 steel frame 118 is located between the lower left soil 122 and the lower right soil 124 of the tunnel.

[0049] Specifically, the temporary invert includes an N9 steel frame 119 and an N10 steel frame 120. The N9 steel frame 119 is located between an upper left soil body 121 and a lower left soil body 122 of the tunnel, and the N10 steel frame 120 is located between an upper right soil body 123 and a lower right soil body 124 of the tunnel.

[0050] Specifically, the grid steel frame 104 includes an N1 steel frame 111, an N2 steel frame 112, an N3 steel frame 113, an N4 steel frame 114, an N5 steel frame 115, and an N6 steel frame 116, and the N1 steel frame 111, the N2 steel frame 112, the N3 steel frame 113, the N4 steel frame 114, the N5 steel frame 115, and the N6 steel frame 116 are closed into a ring.

[0051] Specifically, the N1 steel frame 111 and the N2 steel frame 112 are located at the arch position, the N1 steel frame 111 corresponds to the soil 121 in the upper left part of the tunnel, and an N3 steel frame 113 is also erected at the soil 121 in the upper left part of the tunnel, and the N2 steel frame 112 corresponds to the soil 123 in the upper right part of the tunnel, and an N3 steel frame 113 is also erected at the soil 123 in the upper right part of the tunnel.

[0052] More specifically, a foot locking anchor rod 110 is disposed on the outer side of the N3 steel frame 113 .

[0053] Specifically, the N4 steel frame 114, the N5 steel frame 115, and the N6 steel frame 116 are located at the arch bottom, the N4 steel frame 114 corresponds to the lower left part of the soil of the tunnel, and the N5 steel frame 115 and the N6 steel frame 116 correspond to the lower right part of the soil of the tunnel.

[0054] Specifically, the outer side of the cast secondary lining 125 is provided with second lining outer steel bars N1126, and the inner side of the cast secondary lining 125 is provided with second lining inner steel bars N2127. The second lining outer steel bars N1126 and the second lining inner steel bars N2127 form a thickened cast secondary lining 125.

[0055] A construction method for a tunnel anti-uplift structure for reducing the influence of unloading of an upper foundation pit comprises the following steps:

[0056] A. Before tunnel excavation, a large pipe shed 101 is set up on the top of the tunnel;

[0057] B. Use CRD method to excavate the tunnel soil and provide support in the initial stage of construction;

[0058] C. Carry out tunnel vault grouting;

[0059] D. construct anti-floating anchor rods 108 in the tunnel arch bottom area;

[0060] E. Construction of shield machine guide platform and entry of shield machine for operation;

[0061] F. Carry out pouring of secondary lining invert concrete;

[0062] G. Pour the concrete of the secondary lining side wall to complete the construction of the anti-floating structure of the subway underground tunnel.

[0063] Specifically, in step A, a large pipe shed 101 is set up on the top of the tunnel before tunnel excavation. The specific process is as follows:

[0064] First, a large pipe shed 101 is installed along the arch excavation contour line within 180° of the tunnel top;

[0065] Then, the leading large pipe shed 101 is The advance large pipe shed 101 of t=10 is used for advance support.

[0066] Step B uses the CRD method to excavate the tunnel soil and provide support in the initial stage of construction. The specific process is as follows:

[0067] b1. Excavate the soil 121 in the upper left part of the tunnel, corresponding to the initial support of the construction;

[0068] b2. Excavate the soil 122 in the lower left part of the tunnel, corresponding to the initial support of the construction;

[0069] b3. Excavate the soil 123 in the upper right part of the tunnel, corresponding to the initial support of the construction;

[0070] b4. Excavate the soil 124 in the lower right part of the tunnel, corresponding to the initial support of the construction;

[0071] b5. Remove the temporary middle partition wall and temporary invert, and smooth the base surface.

[0072] More specifically, step b1 excavates the soil 121 of the upper left part of the tunnel, corresponding to the initial support of the construction, and the specific process is as follows:

[0073] First, the soil 121 of the upper left part of the tunnel is excavated, and the shotcrete 102 is initially sprayed, and the initial shotcrete 102 is 2-3 cm thick;

[0074] Then, erect N2 steel frame 112, N3 steel frame 113, and erect N7 steel frame 117;

[0075] Then, hang the double-layer steel mesh 103, which is

[0076] Afterwards, spray concrete 102 is sprayed again to a designed thickness of 400 mm. The spray concrete 102 is C25 and P6 concrete, and the bottom soil is removed;

[0077] Finally, the N9 steel frame 119 is erected, the locking foot anchor rods 110 are installed, and welded to the N3 steel frame 113, and closed by spraying concrete 102.

[0078] More specifically, step b2 excavates the soil 122 at the lower left part of the tunnel, corresponding to the initial support of the construction, and the specific process is as follows:

[0079] First, the soil 122 of the lower left part of the tunnel is excavated, and the shotcrete 102 is initially sprayed, and the shotcrete 102 is 2-3 cm thick;

[0080] Then, the N4 steel frame 114 is erected, and the N8 steel frame 118 is erected;

[0081] Then, hang the double-layer steel mesh 103, which is

[0082] Finally, the shotcrete 102 is sprayed again to a designed thickness of 400 mm, and the shotcrete 102 is C25 and P6 concrete.

[0083] More specifically, step b3 excavates the soil 123 of the upper right part of the tunnel, corresponding to the initial support of the construction, and the specific process is as follows:

[0084] First, the soil 123 of the upper right part of the tunnel is excavated, and the shotcrete 102 is initially sprayed, and the shotcrete 102 is 2-3 cm thick;

[0085] Then, erect the N1 steel frame 111 and the N3 steel frame 113;

[0086] Then, hang the double-layer steel mesh 103, which is

[0087] Afterwards, spray concrete 102 is sprayed again to a designed thickness of 400 mm. The spray concrete 102 is C25 and P6 concrete, and the bottom soil is removed;

[0088] Finally, the N10 steel frame 120 is erected, the locking foot anchor rods 110 are installed and welded to the N3 steel frame 113, and the frame is sealed by spraying concrete 102.

[0089] More specifically, step b4 excavates the soil 124 at the lower right part of the tunnel, corresponding to the initial support of the construction, and the specific process is as follows:

[0090] First, the soil 124 of the lower right part of the tunnel is excavated, and the shotcrete 102 is initially sprayed, and the shotcrete 102 is 2-3 cm thick;

[0091] Then, erect N6 steel frame 116 and N5 steel frame 115;

[0092] Then, hang the double-layer steel mesh 103, which is

[0093] Finally, the shotcrete 102 is sprayed again to a designed thickness of 400 mm, and the shotcrete 102 is C25 and P6 concrete.

[0094] More specifically, step b5 is to remove the temporary partition wall and temporary invert, and smooth the base surface. The specific process is as follows:

[0095] First, dismantle the N7 steel frame 117 and N8 steel frame 118 in the temporary middle partition;

[0096] Then, the N9 steel frame 119 and the N10 steel frame 120 in the temporary invert are dismantled;

[0097] Finally, the base surface is smoothed.

[0098] Specifically, step C is to perform tunnel vault grouting, and the specific process is as follows:

[0099] First, holes were drilled at designated locations on the tunnel vault, with the circumferential and longitudinal spacing of the holes set to 1.5m×2m;

[0100] Then, install the grouting pipe in the drilled hole, and use corrosion-resistant stainless steel pipe for the grouting pipe;

[0101] Then, grout is injected into the tunnel vault through the grouting pipe. After the grouting is completed, the borehole is closed;

[0102] Finally, cleaning and repair work is carried out to form a tunnel arch bottom grouting ring 109.

[0103] More specifically, the slurry adopts double-liquid slurry, including cement-based slurry and catalyst, and full-annular grouting is adopted during grouting, and the annular outward expansion width is controlled within 1 meter.

[0104] Specifically, step D is to construct the anti-floating anchor rod 108 in the tunnel arch bottom area, and the specific process is as follows:

[0105] First, C32 anti-floating anchors 108 were constructed in the tunnel arch bottom area;

[0106] Then, the circumferential and longitudinal spacings of the anti-floating anchor rods 108 are 1.0 m×0.5 m, and the length of the anti-floating anchor rods 108 entering the medium-weathered rock formation is not less than 2.5 m.

[0107] Specifically, step E constructs the shield machine guide platform, and the shield machine enters the site for operation. The specific process is as follows:

[0108] First, a shield machine guide platform 106 is made at the arch bottom. The circumferential angle of the shield machine guide platform 106 is set to 90°, and the thickness of the shield machine guide platform 106 is about 3m.

[0109] Then, when making the shield machine guide platform 106, the embedded rail 107 is laid. The embedded rail 107 is made of high-strength alloy steel, with a weight of 60kg / m and a track gauge of 2617mm;

[0110] Finally, the shield machine is pushed forward by the help of jacks.

[0111] Specifically, step F is to pour the secondary lining invert concrete, and the specific process is as follows:

[0112] First, construct the inverted arch waterproof board, set the cushion layer, and install the inner steel bars N2127 of the secondary lining;

[0113] Then, 800 mm thick secondary lining invert concrete (C35, P12) is poured to form a cast secondary lining 125 at the invert.

[0114] Specifically, step G is to pour the secondary lining side wall concrete to complete the construction of the anti-floating structure of the subway tunnel. The specific process is as follows:

[0115] First, construct the arch wall waterproofing board, tie the side wall and the outer side reinforcement N1126 of the second lining, and the inner side reinforcement N2127 of the second lining;

[0116] Then, the 650mm thick secondary lining side wall and arch concrete (C35, P12) were poured to form the cast secondary lining 125 at the side wall, completing the construction of the anti-floating structure of the subway tunnel.

[0117] The anti-uplift structure of the utility model is suitable for dark-dig tunnels, and multiple sets of repeated structures are adapted to the entire shield tunnel.

[0118] The utility model provides an early tunnel anti-uplift structure that can reduce the impact of later excavation of an overlying foundation pit 128, and can realize ultra-shallow buried tunnel construction, especially when there is a later foundation pit 128 excavation above the tunnel, so that the thickness of the covering soil in the later stage of the foundation pit excavation is less than 0.5 times the tunnel diameter, which makes it difficult to meet the anti-uplift requirements of the tunnel.

[0119] The utility model can reduce the adverse effect of water buoyancy on the tunnel structure during construction, effectively prevent the tunnel from floating up, and reduce construction risks.

Claims

1. A tunnel anti-uplift structure for reducing the effect of unloading of an upper foundation pit, comprising a main support structure of the tunnel, characterized in that: An arch anti-uplift structure is arranged on the outer side of the arch of the main supporting structure, an arch bottom anti-uplift structure is arranged on the outer side of the arch bottom of the main supporting structure, and an anti-uplift reinforced molded secondary lining (125) is arranged in the main supporting structure.

2. The tunnel anti-uplift structure for reducing the unloading effect of the upper foundation pit according to claim 1, characterized in that: The arch anti-uplift structure is located outside the initial support of the arch position in the main supporting structure. The arch anti-uplift structure achieves resistance to upward uplift by adding weight to the main supporting structure.

3. The tunnel anti-uplift structure for reducing the unloading effect of the upper foundation pit according to claim 1, characterized in that: The arch bottom anti-uplift structure is located outside the initial support of the arch bottom position in the main supporting structure. The arch bottom anti-uplift structure is driven into the medium weathered rock layer. The arch bottom anti-uplift structure provides bottom tension to the main supporting structure to achieve anti-upward uplift.

4. The tunnel anti-uplift structure for reducing the unloading effect of the upper foundation pit according to claim 2, characterized in that: The vault anti-uplift structure comprises a vault grouting ring (109); the inner contour of the vault grouting ring (109) is adapted to the initial support of the main support structure and is semicircular; the outer contour of the vault grouting ring (109) is arc-shaped.

5. The tunnel anti-uplift structure for reducing the unloading effect of the upper foundation pit according to claim 4, characterized in that: The outer contour of the vault grouting ring (109) is bilaterally symmetrical along the tunnel centerline, and the arc diameter of the outer contour is gradually increasing from both sides to the middle.

6. The tunnel anti-uplift structure for reducing the unloading effect of the upper foundation pit according to claim 3, characterized in that: The arch bottom anti-uplift structure comprises anti-floating anchor rods (108), and the anti-floating anchor rods (108) are evenly distributed in the circumferential direction at the initial support position of the arch bottom.

7. The tunnel anti-uplift structure for reducing the unloading effect of the upper foundation pit according to claim 6, characterized in that: The free end of the anti-floating anchor rod (108) is in an outward divergent shape, and the free end of the anti-floating anchor rod (108) enters the medium-weathered rock layer by no less than 2.5 m.

8. The tunnel anti-uplift structure for reducing the unloading effect of the upper foundation pit according to claim 1, characterized in that: The main support structure comprises a grid steel frame (104), and a locking anchor rod (110) is arranged outside the grid steel frame (104).