Shallow-buried bias small-distance tunnel surrounding rock deformation monitoring linkage device

By using a combination of reflective tapes and observation targets in shallow tunnels, combined with point monitoring and area monitoring, the problem of difficulty in laying out surrounding rock monitoring devices and low accuracy in the existing technology is solved, achieving more efficient monitoring of surrounding rock deformation and ensuring Construction safety and quality.

CN221924991UActive Publication Date: 2024-10-29SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420313909.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-10-29
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

In existing shallow tunnel construction, surrounding rock monitoring devices are difficult to lay out, are costly, and have a single monitoring method, resulting in low accuracy and inability to effectively monitor surrounding rock deformation, affecting construction safety and quality.

Method used

Design a linkage device for monitoring the surrounding rock deformation of shallow-buried bias-pressure small-clearance tunnels. Through the combination of reflective tapes and observation targets, and the use of steel bar insertion and cement nail fixation, point monitoring and area monitoring are combined to enhance monitoring accuracy.

Benefits of technology

It improves the accuracy of surrounding rock deformation monitoring, ensures the safety and quality of construction, and has the advantages of stable structure, fast construction speed, convenient transportation, and simple structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221924991U_ABST
    Figure CN221924991U_ABST
Patent Text Reader

Abstract

The utility model discloses a surrounding rock deformation monitoring linkage device for a shallow-buried unsymmetrical-pressure small-clear-distance tunnel. Comprising a reflective tape, observation marks and a fixing device, the reflective tape is fixed on the section of the surrounding rock through the fixing device, and the observation marks are installed on the vault, the haunch and the arch feet of the surrounding rock by using reinforcing steel bars in a punching and inserting mode. The fixing devices comprise backing rings and cement nails, the fixing devices are arranged at intervals of 40 cm, and the reflective tape is fixed in surrounding rock sprayed concrete. Through combination of the observation mark and the reflective tape, a mode of combining point monitoring and surface monitoring is realized, and the accuracy of surrounding rock deformation monitoring is improved, so that the surrounding rock deformation monitoring device has the advantages of stable and reliable structure, high construction speed, convenience in transportation, simple structure and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of surrounding rock deformation monitoring of tunnel engineering, and more specifically to a surrounding rock deformation monitoring device for shallowly buried, biased, and small-clearance tunnels. Background Art

[0002] In the process of highway construction in my country, tunnel surrounding rock monitoring is an important means to predict the instability and damage of tunnel surrounding rock and evaluate the effectiveness of support methods and parameters. When shallow buried small clearance tunnels are affected by bias pressure, the surrounding rock is very likely to become unstable and damaged, which seriously affects the safety and quality of tunnel construction. By monitoring the deformation of the surrounding rock, the stability of the surrounding rock can be grasped in time to ensure construction safety.

[0003] At present, the common surrounding rock monitoring devices for shallow buried tunnel construction mostly use pressure sensors for monitoring, which are difficult to deploy and have high costs. In addition, they mostly use one method for monitoring, with a relatively single monitoring method and low accuracy. Utility Model Content

[0004] Therefore, in order to solve the above-described problems and ensure that the monitoring device is sufficiently convenient and practical, the utility model specially provides a tunnel surrounding rock deformation monitoring device with simple structure, convenient construction, safety and reliability.

[0005] The utility model is implemented in this way, constructing a shallow buried bias pressure small clearance tunnel surrounding rock deformation monitoring linkage device, characterized in that it includes a reflective belt, an observation mark, and a fixing device, the reflective belt is fixed on the surrounding rock section by the fixing device, and the observation mark is installed at the surrounding rock arch top, arch waist and arch foot position by using steel bars through inserting.

[0006] Furthermore, the fixing device includes a gasket and a cement nail, and a fixing device is arranged every 40cm to fix the reflective tape in the surrounding rock sprayed concrete.

[0007] Furthermore, the observation mark is buried into the surrounding rock using steel bars, a steel sheet is set at the end, and a reflective cross mark is attached to the steel sheet. Five observation marks are usually set.

[0008] Furthermore, the reflective tape connects the five observation marks together, and the detection tape is attached to the primary surrounding rock.

[0009] Furthermore, the reflective tape is fixed with cement nails, and the installation method is to arrange it in a circumferential direction on the same section, with the cement nails spaced 50cm apart.

[0010] The utility model has the following advantages: the application realizes the combination of point monitoring and surface monitoring by combining observation marks with reflective tapes, thereby improving the accuracy of surrounding rock deformation monitoring. Therefore, the patent has the advantages of stable and reliable structure, fast construction speed, convenient transportation, and simple structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a structural diagram for implementing this application;

[0012] Figure 2 It is the observation diagram in this application;

[0013] Figure 3 This is a large-scale drawing of the reflective tape installation.

[0014] Including: reflective tape 1, observation mark 2, pad ring 3, concrete nail 4. DETAILED DESCRIPTION

[0015] The following will be combined with the attached Figure 1-Figure 3 The utility model is described in detail, and the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0016] The utility model provides a shallow-buried biased small-clearance tunnel surrounding rock deformation monitoring linkage device, comprising a reflective tape 1, an observation mark 2, and a fixing device. The reflective tape is fixed on the surrounding rock section by the fixing device, and the observation mark is installed at the surrounding rock arch top, arch waist and arch foot by using steel bars through insertion.

[0017] The fixing device comprises a gasket 3 and a cement nail 4, and a fixing device is arranged at intervals of 40 cm to fix the reflective tape in the sprayed concrete of the surrounding rock.

[0018] The observation mark is buried into the surrounding rock using steel bars, a steel sheet is set at the end, and a reflective cross mark is attached to the steel sheet. Five observation marks are usually set. After the linkage device is laid out, a theodolite and a cross-section scanner are used to compare and analyze the displacement of the reflective stickers in the linkage device and the observation mark, so as to compare and monitor the settlement condition of the tunnel surrounding rock.

[0019] In this application, the detection points are generally divided into 5 places, and the spacing between them can be adjusted; the detection tape connects the 5 points together, and the detection tape is attached to the primary supporting surrounding rock; the reflective tape 1 is fixed with cement nails, and the installation method is a circumferential arrangement on the same section surface, with the cement nails spaced 50cm apart.

[0020] The advantages and beneficial effects of the present application are as follows: by combining the observation mark with the reflective tape, a combination of point monitoring and surface monitoring is achieved, thereby improving the accuracy of surrounding rock deformation monitoring. Therefore, the present patent has the advantages of stable and reliable structure, fast construction speed, convenient transportation, and simple structure.

[0021] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A linkage device for monitoring surrounding rock deformation of shallow-buried bias-pressure tunnels with small clearance, characterized in that; The invention comprises a reflective tape (1), an observation mark (2), and a fixing device, wherein the reflective tape (1) is fixed on the surrounding rock section by the fixing device, and the observation mark is installed at the positions of the surrounding rock arch crown, arch waist and arch foot by means of steel bars through insertion.

2. According to claim 1, a shallow buried bias pressure small clearance tunnel surrounding rock deformation monitoring linkage device is characterized in that; The fixing device comprises a gasket (3) and a cement nail (4), and a fixing device is arranged at intervals of 40 cm to fix the reflective tape (1) in the surrounding rock sprayed concrete.

3. According to claim 1, a shallow buried bias pressure small clearance tunnel surrounding rock deformation monitoring linkage device is characterized in that; The observation mark (2) is embedded in the surrounding rock using steel bars, with a steel sheet set at the end, and a reflective cross mark attached to the steel sheet. Five observation marks are set.

4. According to claim 1, a shallow buried bias pressure small clearance tunnel surrounding rock deformation monitoring linkage device is characterized in that; The reflective tape (1) connects the five observation marks (2) together, and the detection tape is attached to the primary supporting rock.

5. According to claim 1, a shallow buried bias pressure small clearance tunnel surrounding rock deformation monitoring linkage device is characterized in that; The reflective tape (1) is fixed with cement nails. The installation method is to arrange it in a circumferential direction on the same section, with the cement nails spaced 50 cm apart.