Powder treatment structure for settling chamber of waste heat electric kiln head

By designing the vacuum suction tube, dust removal room and sedimentation tank structure in the sedimentation chamber of the waste heat kiln head, efficient dust cleaning and secondary use of sewage are achieved, the problem of low efficiency of manual dust cleaning is solved, and the working efficiency is improved.

CN221933505UActive Publication Date: 2024-11-01XING TAI WAN FU XIN PU SHUI NI YOU XIAN GONG SI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420226440.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-11-01
Estimated Expiration
2034-01-30

AI Technical Summary

Technical Problem

In the prior art, the powder treatment of waste heat kiln head settlement chamber relies on manual cleaning, resulting in low work efficiency and increasing labor costs.

Method used

A structure including a vacuum suction pipe, a dust removal room, a drain pipe and a first- and second-level sedimentation tank was designed. The dust was transferred to the dust removal room through the vacuum suction equipment, spraying and cleaning the dust, and the sewage with the dust passed through the sedimentation tank. Secondary precipitation realizes the recycling and utilization of sewage, and is used for spraying and cleaning of dust, replacing manual cleaning.

Benefits of technology

This greatly improves the efficiency of dust cleaning, and realizes the recycling of sewage through secondary precipitation, reduces the need for manual cleaning, and improves work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221933505U_ABST
    Figure CN221933505U_ABST
Patent Text Reader

Abstract

The utility model relates to a powder treatment structure for a settling chamber of a waste heat electric kiln head. The powder treatment structure comprises a dust suction pipe, a dust removal room, a water drainage pipe and a primary settling pond, the dust collection device is driven to work, the dust collection device transfers dust in a settling chamber into a dust removal room through a dust collection pipe, a plurality of sprayers are driven to work, and the sprayers spray water, so that the dust in the dust removal room is cleaned, and sewage with dust flows into a primary settling pond through a drainage pipe for primary settling; the sewage further flows into the secondary sedimentation tank for secondary sedimentation, secondary recycling of the sewage is realized through two times of sewage sedimentation, the sewage is used for spraying, manual cleaning of dust in the sedimentation chamber is replaced through the structure, and the dust cleaning efficiency is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of dust removal, in particular to a powder material processing structure in a settling chamber of a waste heat electric kiln head. Background Art

[0002] A large amount of powder will appear in the settling chamber of the waste heat power kiln, which is generally caused by the following reasons: 1. Since the kiln head flue gas of the cement production line contains clinker particles, these dusts have the characteristics of high temperature drying, high density, coarse dust particle size, large hardness, and good fluidity, which are easy to cause wear on equipment and pipelines, resulting in a large amount of powder accumulated in the settling chamber; 2. The unstable feeding amount of the cement kiln and the fluctuating output may cause the AQC furnace to fail to operate normally, thereby affecting the dust removal effect of the settling chamber; 3. After the waste heat power generation is put into operation, the system resistance increases. If the performance parameters of the kiln head fan are not adjusted according to the actual situation, it may cause insufficient air volume, affecting the dust removal efficiency of the settling chamber; 4. The kiln head boiler over-temperature operation, excessive air volume or long-term low air volume operation may cause the fin tube bundle to wear and leak, thereby causing dust accumulation and scaling, further affecting the normal operation of the settling chamber. When a large amount of powder appears in the settling chamber of the waste heat power kiln head, the existing technology generally uses manual methods to clean the dust, which is inefficient and increases labor costs. Utility Model Content

[0003] The main purpose of the utility model is to provide a powder material processing structure in a settling chamber of a waste heat electric kiln head, so as to solve the problem of low working efficiency in manual dust cleaning.

[0004] In order to achieve the above-mentioned purpose, the utility model provides a waste heat electric kiln head sedimentation chamber powder processing structure, including a dust suction pipe, a dust removal room, a drainage pipe and a primary sedimentation tank;

[0005] The air inlet of the dust suction pipe penetrates into the settling chamber and is connected to the dust collecting hood, which is located just above the kiln head. Dust suction equipment is arranged along the dust suction pipe.

[0006] Multiple sprays are arranged in a matrix on the top of the dust removal room, and the air outlet of the dust suction pipe penetrates into the dust removal room and is located directly below the sprays;

[0007] The water inlet of the drain pipe is located at the inner bottom of the dust removal room, and the water outlet of the drain pipe passes through the dust removal room;

[0008] The primary sedimentation tank is located directly below the outlet of the drain pipe. The upper part of the primary sedimentation tank is connected to the water flow pipe, and one end of the water flow pipe away from the primary sedimentation tank is connected to the secondary sedimentation tank.

[0009] A preferred solution is that the powder material processing structure of the waste heat electric kiln head settling chamber also includes a main pipe, one end of which is arranged in the secondary sedimentation tank, and the other end of which penetrates into the dust removal room and is connected to multiple branch pipes in parallel, and each main pipe is connected to multiple sprays in sequence;

[0010] Among them, water pumps are installed along the main pipeline.

[0011] A preferred solution is that the air outlet of the dust suction pipe faces the inner bottom of the dust removal room.

[0012] A preferred solution is that the inner bottom of the dust removal room has an inclined surface, and the downstream end of the inclined surface is located at the water inlet of the drain pipe.

[0013] A preferred solution is that a filter screen is fixedly arranged at the flared end of the dust collecting hood.

[0014] The beneficial effects of the above scheme are:

[0015] The vacuuming equipment is driven to work, and the vacuuming equipment transfers the dust in the sedimentation chamber to the dust removal room through the vacuum pipe, and multiple sprays are driven to work. The sprays spray water, so that the dust in the dust removal room is cleaned, and the sewage with dust flows into the primary sedimentation tank through the drain pipe for the first sedimentation. The upper connecting water pipe of the primary sedimentation tank is set, so that the sewage further flows into the secondary sedimentation tank for the second sedimentation. Through the two sewage sedimentations, the secondary recycling of sewage is realized, and the sewage is used for spraying. Such a structure replaces the manual cleaning of dust in the sedimentation chamber, and greatly improves the efficiency of dust cleaning. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0017] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0018] Figure 2 It is a schematic diagram of the structure of a partial cross-section state of the utility model.

[0019] Description of Reference Numerals

[0020] 10. Dust collection pipe; 11. Dust collection hood; 12. Dust collection equipment;

[0021] 20. Dust removal room; 21. Spraying; 200. Inclined surface;

[0022] 30. Drain pipe;

[0023] 40. Primary sedimentation tank; 41. Water pipe; 42. Secondary sedimentation tank;

[0024] 50. Main pipe; 51. Branch pipe; 52. Water pump. DETAILED DESCRIPTION

[0025] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings in the embodiments of the present invention. In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention can also be implemented in other ways different from those described herein, and those skilled in the art can make similar generalizations without violating the connotation of the present invention, so the present invention is not limited by the specific embodiments disclosed below.

[0026] Example:

[0027] like Figure 1 , Figure 2 As shown, this embodiment provides a powder material processing structure in a waste heat electric kiln head settling chamber, including a dust suction pipe 10 , a dust removal room 20 , a drainage pipe 30 and a primary sedimentation tank 40 .

[0028] The air inlet of the dust suction pipe 10 penetrates into the sedimentation chamber and is connected to the dust collecting hood 11. The dust collecting hood 11 is located just above the kiln head. A filter screen (not shown) is fixedly arranged at the flared end of the dust collecting hood 11. The main purpose of designing the filter screen is to prevent larger debris from entering the dust suction pipe 10. A dust suction device 12 is arranged along the dust suction pipe 10. The dust suction device 12 is a prior art, so it will not be described in detail. You can choose a 220V workshop industrial vacuum cleaner, a Chigo 3500W and 4800W industrial vacuum cleaner, a Yangtze 3500W industrial vacuum cleaner, or a Bocher 3600W commercial industrial vacuum cleaner. Figure 2 As shown, a plurality of sprays 21 are arranged in a matrix at the top of the dust removal room 20, and the air outlet of the dust suction pipe 10 penetrates into the dust removal room 20, and the air outlet of the dust suction pipe 10 faces the inner bottom of the dust removal room 20. And the air outlet of the dust suction pipe 10 is located directly below the spray 21. The powder material processing structure of the waste heat electric kiln head sedimentation chamber also includes a main pipe 50, one end of which is arranged in the secondary sedimentation tank 42, and is close to the middle and upper part of the secondary sedimentation tank 42. The other end of the main pipe 50 penetrates into the dust removal room 20 and is connected to a plurality of branch pipes 51 in parallel, and each main pipe 50 is connected to a plurality of sprays 21 in sequence. Among them, a water pump 52 is arranged along the main pipe 50. The water inlet of the drain pipe 30 is located at the inner bottom of the dust removal room 20, and the water outlet of the drain pipe 30 passes through the dust removal room 20. The primary sedimentation tank 40 is located directly below the water outlet of the drain pipe 30 , the upper part of the primary sedimentation tank 40 is connected to a water flow pipe 41 , and one end of the water flow pipe 41 away from the primary sedimentation tank 40 is connected to a secondary sedimentation tank 42 , wherein the water flow pipe 41 is located in the upper middle part of the primary sedimentation tank 40 or the secondary sedimentation tank 42 .

[0029] The dust collecting device 12 is driven to work, and the dust collecting device 12 transfers the dust in the sedimentation chamber to the dust removal chamber 20 through the dust collecting pipe 10, and drives multiple sprays 21 to work. The sprays 21 spray water, so that the dust in the dust removal chamber 20 is cleaned, and the sewage with dust flows into the primary sedimentation tank 40 through the drain pipe 30 for the first sedimentation, and the upper connecting water pipe 41 of the primary sedimentation tank 40 is set, so that the sewage further flows into the secondary sedimentation tank 42 for the second sedimentation. Through the two sewage sedimentations, the secondary recycling of sewage is realized, and the sewage is used for the spray 21. Such a structure replaces the manual cleaning of dust in the sedimentation chamber, and greatly improves the efficiency of dust cleaning.

[0030] The inner bottom of the dust removal room 20 has an inclined surface 200, and the downstream end of the inclined surface 200 is located at the water inlet of the drain pipe 30. The setting of the inclined surface 200 allows sewage to flow to the drain pipe 30. In addition, the spray 21 water can flush the inclined surface 200 to prevent dust from settling on the inner bottom of the dust removal room 20.

[0031] Obviously, the described embodiments are only some embodiments of the utility model, not all embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

Claims

1. A powder material processing structure in the sedimentation chamber of a waste heat electric kiln, characterized in that: include: A dust suction pipe, the air inlet of which penetrates into the settling chamber and is connected to a dust collecting hood, the dust collecting hood is located just above the kiln head, and dust suction equipment is arranged along the dust suction pipe; A dust removal room, wherein a plurality of spray showers are arranged in a matrix on the top of the dust removal room, and an air outlet of the dust suction pipe penetrates into the dust removal room and is located directly below the spray showers; A drainage pipe, wherein the water inlet of the drainage pipe is located at the inner bottom of the dust removal room, and the water outlet of the drainage pipe passes through the dust removal room; A primary sedimentation tank is located directly below the water outlet of the drainage pipe, the upper part of the primary sedimentation tank is connected to a water flow pipe, and one end of the water flow pipe away from the primary sedimentation tank is connected to a secondary sedimentation tank.

2. The powder material processing structure of the waste heat electric kiln head settling chamber according to claim 1 is characterized in that: It also includes a main pipe, one end of which is arranged in the secondary sedimentation tank, and the other end of which penetrates into the dust removal room and is connected to a plurality of branch pipes in parallel, and each main pipe is connected to a plurality of the sprays in sequence; Wherein, a water pump is arranged along the main pipe.

3. The powder material processing structure of the waste heat electric kiln head settling chamber according to claim 1 or 2 is characterized in that: The air outlet of the dust suction pipe faces the inner bottom of the dust removal room.

4. The powder material processing structure of the waste heat electric kiln head settling chamber according to claim 1 is characterized in that: The inner bottom of the dust removal room has an inclined surface, and the downstream end of the inclined surface is located at the water inlet of the drainage pipe.

5. The powder material processing structure of the waste heat electric kiln head settling chamber according to claim 1 is characterized in that: A filter screen is fixedly arranged at the flared end of the dust collecting hood.