Electrified smelting device for blast furnace metallurgy
By using an electric heating device to heat the blower in the blast furnace metallurgy electrification smelting device, the problems of unstable hot air temperature and high coke consumption in traditional blast furnace iron smelting are solved, and the energy structure optimization of the iron smelting process and green iron smelting are achieved.
Patent Information
- Application Number
- CN202420639812.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-30
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-30
AI Technical Summary
In the traditional blast furnace ironmaking process, the blowing efficiency is low and the hot air temperature is unstable, resulting in increased coke consumption and high carbon emissions, which affects the gas balance of steel enterprises and the stability of blast furnace operation.
The blower is heated by an electric heating device to ensure the stability and consistency of the hot air temperature. The high-temperature blower and coal powder are burned through the composite air outlet device, forming a constant high-temperature hot air to reduce coke consumption and carbon emissions.
The stability of hot air temperature during blast furnace production is achieved, coke consumption and carbon emissions are reduced, the energy structure of iron smelting process is improved, the gas balance of steel enterprises is ensured, and green iron smelting is achieved under the conditions of lowering green electricity costs.
Smart Images

Figure CN221940534U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of ferrous metallurgy and relates to a device for electrification smelting of blast furnace metallurgy. Background Art
[0002] At present, 90% of the pig iron in the world is produced by the traditional blast furnace ironmaking process. In the traditional blast furnace ironmaking process, the main fuel is coke and pulverized coal. Iron-containing charge and coke are loaded from the top of the furnace, and hot air and pulverized coal are sprayed from the furnace tuyere. The hot air is sprayed using a regenerative hot blast furnace to burn the top gas for heat exchange and heating. The thermal efficiency is low and the greenhouse gas CO2 emission is high. Since the blast heating consumes a large amount of combustible gas, it causes heat loss, and the amount of external gas supply is also reduced to a certain extent, which has an adverse effect on the gas balance of the entire steel enterprise, especially in the winter in the north. This contradiction between gas supply and demand is prominent. At the same time, the hot blast furnace that heats the blast needs to switch between combustion and air supply in the later stage of air supply. The operation is frequent, and the hot air temperature in the later stage of air supply has a certain attenuation, and a constant hot air temperature cannot be maintained, which affects the stable and smooth operation of the blast furnace, further affects the reduction of the coke ratio, and increases the carbon emission of the blast furnace. Summary of the invention
[0003] In order to solve the problems of gas consumption in traditional blast furnace blast heating, frequent switching of the heating process and hot air temperature attenuation in the later stage of heating, stabilize the hot air temperature while maintaining the furnace condition smoothly, reduce coke and reduce carbon emissions, the utility model provides a device for blast furnace metallurgical electrification smelting.
[0004] The technical scheme adopted by the utility model is: a device for blast furnace metallurgical electrification smelting, comprising a metallurgical blast furnace, a charging device, a gas dust dehydration treatment device, a blast source device, an electric heating device, a blast temperature mixing device, a nitrogen source device, a coal injection device, an oxygen source device, a composite tuyere device, a blast device, a residual gas treatment device, the charging device is arranged on the top of the metallurgical blast furnace, the nitrogen source device is connected to the composite tuyere device through the coal injection device, the composite tuyere device is also connected to the oxygen source device, and the composite tuyere device is arranged at the lower part of the furnace of the metallurgical blast furnace; the top gas is connected to the residual gas treatment device through the gas dust dehydration treatment device; the lower part of the blast temperature mixing device is provided with an electric heating device, the blast source device is connected to the blast temperature mixing device through the electric heating device and the blast device, and the air outlet of the blast temperature mixing device is connected to the composite tuyere device through a pipeline.
[0005] Specifically, by using an electric heating device to heat the blast, the temperature stability and constancy of the hot air are ensured, the coke consumption in the blast furnace production process is reduced, the energy structure of the ironmaking process is improved, qualified molten iron and by-product slag are generated, and coal gas is generated at the same time, stabilizing the coal gas balance of the steel enterprise.
[0006] The beneficial effects of the utility model are as follows: the utility model provides heat for heating blast based on electric heating, and the temperature can reach 2000-10000°C. Moreover, under the condition of reduced green electricity cost, electric heating can completely use green electricity, thus realizing green ironmaking. BRIEF DESCRIPTION OF THE DRAWINGS
[0007] Figure 1 It is a schematic diagram of the process structure of the utility model;
[0008] Specific markings in the figure: 1-metallurgical blast furnace, 2-charging device, 3-coal gas dust dehydration treatment device, 4-blast source device, 5-electric heating device, 6-blast temperature mixing device, 7-nitrogen source device, 8-coal injection device, 9-oxygen source device, 10-compound tuyere device, 11-blast device, 12-residual coal gas treatment device. DETAILED DESCRIPTION
[0009] See also Figure 1 A device for electrification smelting of blast furnace metallurgy comprises a metallurgical blast furnace 1, a charging device 2, a gas dust dehydration treatment device 3, a blast source device 4, an electric heating device 5, a blast temperature mixing device 6, a nitrogen source device 7, a coal injection device 8, an oxygen source device 9, a composite tuyere device 10, a blast device 11, and a residual gas treatment device 12. The charging device 2 is arranged on the top of the metallurgical blast furnace 1, the nitrogen source device 7 is connected to the composite tuyere device 10 through the coal injection device 8, and the composite The tuyere device 10 is also connected to the oxygen source device 9. The composite tuyere device 10 is arranged at the lower part of the furnace of the metallurgical blast furnace 1; the top gas is connected to the residual gas treatment device 12 through the gas dust dehydration treatment device 3; the electric heating device 5 is arranged at the lower part of the blast temperature mixing device 6, and the blast source device 4 is connected to the blast temperature mixing device 6 through the electric heating device 5 and the blast device 11 respectively, and the air outlet of the blast temperature mixing device 6 is connected to the composite tuyere device 10 through a pipeline.
[0010] The utility model uses a blast furnace 1 as metallurgical equipment, and the charge is added into the furnace by the charging device 2 on the furnace top. The charge includes ore and coke. The composite tuyere 10 at the lower part of the furnace cylinder blows in the cold blast supplied by the blast source device 4 after being heated by the electric heating device 5. The blast furnace 1 has a temperature adjustment demand after the blast is heated. The cold blast supplied by the blast source device 4 is directly introduced into the blast temperature mixing device 6 without passing through the electric heating device 5 through the blast device 11 to mix and blend, so as to ensure that the blast entering the furnace meets the adjustment demand. The N2 provided by the nitrogen source device 7 conveys the pulverized coal provided by the coal injection device 8 using the composite The tuyere is sprayed into the furnace. At this time, the oxygen source device 9 provides oxygen with an oxygen content of 85-99% which can also be sprayed into the furnace using a composite tuyere. The composite tuyere has the function of multi-media input hole channel input. High-temperature blast burns with coal powder, coke and oxygen to generate heat and reducing gas. Redox reaction occurs in the furnace to generate reducing coal gas, which captures oxygen in the ore to generate qualified molten iron and by-product slag. At the same time, the generated coal gas is dedusted and dehydrated on the top of the furnace before entering the residual coal gas processing device 12. The residual coal gas processing device 12 includes a power generation device, a boiler, a gas tank and a gas storage device.
[0011] The utility model electric heating device heats the blast, thereby ensuring the temperature stability and constancy of the hot air, reducing the coke consumption in the blast furnace production process, improving the energy structure of the ironmaking process, generating qualified molten iron and by-product slag, and generating coal gas at the same time, thereby stabilizing the coal gas balance of the steel enterprise.
[0012] The utility model provides heat for heating blast based on electric heating, and the temperature can reach 2000-10000°C. Moreover, under the condition of reduced green electricity cost, electric heating can completely use green electricity, thus realizing green ironmaking.
Claims
1. A device for electrified smelting of blast furnace metallurgy, comprising a metallurgical blast furnace (1), a charging device (2), a gas dust dehydration treatment device (3), a blast source device (4), an electric heating device (5), a blast temperature mixing device (6), a nitrogen source device (7), a coal injection device (8), an oxygen source device (9), a composite tuyere device (10), a blast device (11), and a residual gas treatment device (12), wherein: The charging device (2) is arranged on the top of the metallurgical blast furnace (1); the nitrogen source device (7) is connected to the composite tuyere device (10) through the coal injection device (8); the composite tuyere device (10) is also connected to the oxygen source device (9); the composite tuyere device (10) is arranged at the lower part of the furnace of the metallurgical blast furnace (1); the top coal gas is connected to the residual coal gas treatment device (12) through the coal gas dust dehydration treatment device (3); the electric heating device (5) is arranged at the lower part of the blast temperature mixing device (6); the blast source device (4) is connected to the blast temperature mixing device (6) through the electric heating device (5) and the blast distribution device (11), and the air outlet of the blast temperature mixing device (6) is connected to the composite tuyere device (10) through a pipeline.