Ground filling precast block

By designing the matching part, cavity, mold release part and protection part of the prefabricated blocks on the ground, the problems of time and cost of the existing floor filling method are solved, and a fast, safe and flat filling effect is achieved, adapting to different floor shapes is achieved. and environment.

CN221941002UActive Publication Date: 2024-11-01NINGBO HUANYU INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420490009.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-11-01
Estimated Expiration
2034-03-13

AI Technical Summary

Technical Problem

Existing ground filling methods such as pouring methods take a long time and are costly, and they are prone to material accumulation during tunnel construction, delaying construction periods, and affecting construction progress.

Method used

A ground-filled prefabricated block is designed, including a main body, a mating part, a first cavity, a demolding part and a protective part. The mating part is fitted with the ground, and the first cavity accommodates a pipe, and the demolding part is convenient for molding and demolding, and protects it. It prevents collision damage and adapts to different ground shapes and environments.

Benefits of technology

It improves the efficiency and construction efficiency of ground filling, ensures the flatness of the ground after filling and the safety of pipelines, reduces labor and time costs, and shortens the construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941002U_ABST
    Figure CN221941002U_ABST
Patent Text Reader

Abstract

The utility model provides a ground filling precast block. The ground filling precast block comprises a main body and a plurality of reinforcing ribs, the matching part is arranged on the main body and is used for being matched with the ground, so that the main body is placed on the ground; the first cavity is formed in the main body, and the first cavity is used for containing a pipeline; the demolding part is arranged on the side, close to the first cavity, of the main body; and the protection part is arranged on one side, far away from the first cavity, of the main body. According to the utility model, ground filling is quicker and more convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prefabricated blocks, in particular to a ground filling prefabricated block. Background Art

[0002] With the development of science and technology, when filling gaps in the ground, methods that keep pace with the times are needed to meet current needs. At present, most of the gaps are filled by pouring, which is not only time-consuming and costly, but also requires the storage of pouring materials at the construction site, which is extremely inconvenient, especially for the field of tunnel construction. It is easy to cause material accumulation, delay the construction period, increase labor costs and time costs, and affect the overall construction progress. Utility Model Content

[0003] Therefore, the embodiment of the utility model provides a ground filling prefabricated block, which makes ground filling faster and more convenient.

[0004] In order to solve the above problems, the utility model provides a ground filling prefabricated block, which includes: a main body; a matching part, which is arranged on the main body and is used to match with the ground so that the main body is placed on the ground; a first cavity, which is arranged on the main body and is used to accommodate a pipe; a demoulding part, which is arranged on a side of the main body close to the first cavity; and a protecting part, which is arranged on a side of the main body away from the first cavity.

[0005] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: by setting the matching part on the main body, and by matching the ground with the matching part, the ground filling prefabricated block can be stably placed at the place where the ground needs to be filled, and by setting the matching part, the placement of the ground filling prefabricated block will not collide, which can be more suitable for the use of the current scene, and ensure the integrity and safety of the ground filling prefabricated block. At the same time, by setting the first cavity to accommodate the pipeline, the laying of the pipeline will not be affected by the ground filling prefabricated block, and the ground filling prefabricated block can reasonably protect the pipeline to ensure the safety of the pipeline. At the same time, the demoulding part can make the molding and demoulding of the ground filling prefabricated block more convenient, making the production and taking of the prefabricated block more convenient, thereby improving the efficiency of ground filling and speeding up construction. A protective part is also set to protect the prefabricated block, so that the edges and corners of the prefabricated block will not be broken due to collision when the prefabricated block is placed, which will lead to a decrease in filling effect and affect the construction period. The protective part can avoid collision and fragmentation.

[0006] In an example of the present invention, the shape of the joint between the matching portion and the ground matches the shape of the ground.

[0007] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: by setting the shape of the fitting part and the ground fitting part to adapt to the ground, the fitting part can help the placement of the prefabricated blocks filling the ground to be more convenient and quick, and the stability after placement is also better. At the same time, it can better adapt to the current placement environment and needs, thereby ensuring that the prefabricated blocks can better fill the ground, so that the ground flatness is better after filling, ensuring the use requirements, and at the same time, because the placement is more convenient and quick, it can also shorten the construction period and improve the construction efficiency.

[0008] In one example of the utility model, the mating part also includes: a first mating component, which is protruding toward the ground; a second mating component, which is arranged on a side away from the first mating component and protruding toward the ground; wherein, there is a first space between the first mating component and the second mating component.

[0009] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: by setting the first matching component to protrude toward the ground, and setting the second matching component to protrude toward the ground on the side away from the first matching component, the prefabricated blocks can better fill the ground, and at the same time, the area below can be vacated for the placement of pipelines or other facilities, which can better adapt to the current usage scenario, thereby expanding the use range of the ground-filling prefabricated blocks and making them more practical.

[0010] In an example of the present invention, the protrusion height of the second matching component is greater than the protrusion height of the first matching component; and the line connecting the contact surface between the first matching component and the ground and the contact surface between the second matching component and the ground are in the same plane.

[0011] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: by setting the protruding height of the second matching component to be greater than the protruding height of the first matching component, the prefabricated block can be suitable for slopes or arc-shaped ground, making its use range wider and being able to better meet the needs of different environments. At the same time, the connecting line between the fitting surface of the first matching component and the ground and the fitting surface of the second matching component and the ground are set to be on the same plane, so that when filling and placing an arc surface such as a tunnel surface, it can be more convenient and quick, and at the same time, it is more stable after placement and will not shake, and the ground after filling is made smoother, ensuring the normal progress of construction while improving construction efficiency and completion.

[0012] In an example of the present invention, the second matching component further includes: at least two first fixing members, the at least two first fixing members are relatively arranged on two sides of the main body, and the first cavity is connected between the at least two first fixing members.

[0013] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: by arranging two first fixing members on both sides of the main body, the placement effect of the ground filling prefabricated block is more stable, and at the same time, a first cavity is connected between the two first fixing members, so that the arrangement of the pipeline below is more convenient, and it can adapt to different environments, thereby making the use scope of the ground filling prefabricated block wider, and can better shorten the construction period, ensure construction efficiency, and thus achieve the purpose of cost saving.

[0014] In one example of the present invention, the demolding portion includes: a first demolding surface, which is arranged on a side of the first mating component close to the first cavity; a second demolding surface, which is arranged on a side of the second mating component close to the first cavity; and the first demolding surface and the second demolding surface are arranged opposite to each other.

[0015] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: by arranging the first demoulding surface and the second demoulding surface relative to each other, the demoulding of the ground filling prefabricated block is faster and smoother, thereby ensuring that the production process of the ground filling prefabricated block is faster. At the same time, the setting of the demoulding surface makes the internal first cavity more adaptable to different environments, thereby making the ground filling prefabricated block more adaptable.

[0016] In an example of the present invention, a surface perpendicular to the horizontal surface is defined as a vertical surface; the first demoulding surface and the vertical surface are arranged at a first angle; and the second demoulding surface and the vertical surface are arranged at a second angle.

[0017] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: by setting the first demoulding surface and the second demoulding surface at different angles to the vertical surface, the demoulding efficiency is higher and the demoulding process is smoother. By setting the angle, the overall demoulding time is reduced, thereby shortening the overall production time. At the same time, the main body will not be damaged during demoulding, thereby improving the integrity and safety. At the same time, the angle can also make the overall support stronger, ensuring stability and firmness during placement.

[0018] In an example of the present invention, the ground filling prefabricated block further includes: the ground filling prefabricated block is provided with a first plane; a reinforcement member, the reinforcement member is provided in the main body, and the reinforcement member is provided relatively parallel to the first plane.

[0019] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: by arranging the reinforcement inside the main body and arranging it relatively parallel to the first plane, the strength of the overall prefabricated block is improved through the arrangement of the reinforcement, thereby increasing the overall strength of the ground-filled prefabricated block after filling, thereby ensuring the stability and firmness of the filling.

[0020] In an example of the present invention, a first distance is set between the reinforcement member and the first plane; the first distance is in a first proportion to the height of the ground-filling prefabricated block.

[0021] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: by setting the setting depth of the reinforcement to be in a first proportion to the height of the ground filling prefabricated block, the reinforcement is most suitable for strengthening the strength of the overall ground filling prefabricated block, which can better ensure the filling strength of the ground filling prefabricated block and ensure the stability and firmness of the ground after filling.

[0022] In an example of the present invention, the ground-filling prefabricated block further includes: an extracting member, which is arranged on a side of the main body away from the first cavity, and is used to extract and transport the ground-filling prefabricated block.

[0023] Compared with the prior art, the technical effect achieved by adopting this technical solution is as follows: by arranging the extraction piece on the main body, it is more convenient to transport the prefabricated blocks for filling on the ground, thereby making the filling process of the prefabricated blocks smoother, reducing the burden of manual handling, and making the overall filling process faster and more convenient.

[0024] After adopting the technical solution of the utility model, the following technical effects can be achieved:

[0025] (1) By setting a matching part on the main body and matching the ground through the matching part, the ground filling prefabricated block can be stably placed at the place on the ground that needs to be filled, and by setting the matching part, the placement of the ground filling prefabricated block will not collide, which can be more suitable for the use of the current scene and ensure the integrity and safety of the ground filling prefabricated block. At the same time, by setting a first cavity to accommodate the pipeline, the laying of the pipeline will not be affected by the ground filling prefabricated block, and the ground filling prefabricated block can reasonably protect the pipeline to ensure the safe use of the pipeline. At the same time, the demoulding part is set to make the molding and demoulding of the ground filling prefabricated block more convenient, making the production and removal of the prefabricated block more convenient, thereby improving the efficiency of ground filling and speeding up construction. A protection part is also set to protect the prefabricated block, so that when the prefabricated block is placed, the edges and corners of the prefabricated block will not be broken due to collision, which will lead to a decrease in filling effect and affect the construction period. The protection part can avoid collision and fragmentation;

[0026] (2) By setting the protrusion height of the second matching component to be greater than the protrusion height of the first matching component, the prefabricated block can be adapted to a slope or arc-shaped ground, making it more widely used and better able to meet the needs of different environments. At the same time, the connecting line between the contact surface between the first matching component and the ground and the contact surface between the second matching component and the ground are set to be on the same plane, so that when filling and placing a curved surface such as a tunnel surface, it can be more convenient and quick, and at the same time, it is more stable after placement and will not shake, and the ground after filling is more flat, ensuring the normal progress of construction while improving construction efficiency and completion;

[0027] (3) By setting the first demoulding surface and the second demoulding surface at different angles to the vertical surface, the demoulding efficiency is higher and the demoulding process is smoother. By setting the angle, the overall demoulding time is reduced, thereby shortening the overall production time. At the same time, the main body will not be damaged during demoulding, thereby improving the integrity and safety. At the same time, the angle can also make the overall support stronger, ensuring stability and firmness during placement. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings to be used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0029] Figure 1 This is one of the structural schematic diagrams of a ground filling prefabricated block provided in an embodiment of the utility model.

[0030] Figure 2 The second structural schematic diagram of a ground filling prefabricated block provided in an embodiment of the utility model.

[0031] Description of reference numerals:

[0032] 100 is a ground filling prefabricated block; 110 is a main body; 120 is a matching part; 121 is a first matching component; 122 is a second matching component; 130 is a first cavity; 141 is a first demoulding surface; 142 is a second demoulding surface; 150 is a first plane; 160 is a reinforcement member; and 170 is a first distance. DETAILED DESCRIPTION

[0033] In order to make the above-mentioned purposes, features and advantages of the utility model more obvious and easy to understand, the technical solutions in the embodiments of the utility model are described clearly and completely. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0034] [First embodiment]

[0035] See also Figure 1-Figure 2 The utility model provides a ground filling prefabricated block 100, which includes: a main body 110; a matching part 120, which is arranged on the main body 110, and the matching part 120 is used to match with the ground so that the main body 110 is placed on the ground; a first cavity 130, which is arranged on the main body 110, and the first cavity 130 is used to accommodate a pipe; a demoulding part, which is arranged on a side of the main body 110 close to the first cavity 130; and a protecting part, which is arranged on a side of the main body 110 away from the first cavity 130.

[0036] Specifically, when using the ground filling prefabricated block 100, first determine the specific usage requirements of the current scene, and then use the corresponding prefabricated block according to the usage requirements. Taking the filling of a part of the area inside the tunnel as an example, since the tunnel wall is an arc, the two landing points of the ground filling prefabricated block 100 need to have a height difference, and the curvature of the two landing points needs to be on the same curvature, that is, the line connecting the fitting surface of the first matching component 121 and the ground and the fitting surface of the second matching component 122 and the ground recorded in this application are on the same plane.

[0037] Furthermore, after determining the type of prefabricated block, the prefabricated block is taken out by an extraction piece, which can be a steel bar, which is embedded in the main body 110 to form a hook for transportation. After transportation, the excess part can be manually cut off, or filling and pouring can be used to level the ground.

[0038] Furthermore, after placement is completed, a pipeline can be laid in the first cavity 130. When the prefabricated blocks are filled, two prefabricated blocks can be grouped together, that is, the second matching components 122 of the two prefabricated blocks are fitted together to achieve the filling of the pipeline.

[0039] Specifically, the protection part can be in the form of various rounded corners set on the main body 110, or a layer of special material wrapped around the outside of the main body 110, and other protective measures. The position and form of the protection part can be adjusted according to actual conditions, which will not be elaborated here.

[0040] Preferably, by setting the matching part 120 on the main body 110, and by matching the ground with the matching part 120, the ground filling prefabricated block 100 can be stably placed at the place where the ground needs to be filled, and by setting the matching part 120, the placement of the ground filling prefabricated block 100 will not collide, which can be more suitable for the use of the current scene, and ensure the integrity and safety of the ground filling prefabricated block 100. At the same time, by setting the first cavity 130 to accommodate the pipeline, the laying of the pipeline will not be affected by the ground filling prefabricated block 100, and the ground filling prefabricated block 100 can reasonably protect the pipeline to ensure the safety of the pipeline. At the same time, the demoulding part can make the molding and demoulding of the ground filling prefabricated block 100 more convenient, making the production and removal of the prefabricated block more convenient, thereby improving the efficiency of ground filling and speeding up construction. A protection part is also set to protect the prefabricated block, so that the prefabricated block will not be broken due to collision when placed, resulting in a decrease in filling effect and affecting the construction period. The collision and fragmentation can be avoided by the protection part.

[0041] Specifically, the shape of the contact point between the matching portion 120 and the ground matches the shape of the ground.

[0042] Preferably, the shape of the fitting part 120 and the ground is adapted to the ground, so that the fitting part 120 can help the ground-filling prefabricated block 100 to be placed more conveniently and quickly, and the stability after placement is also better. At the same time, it can also better adapt to the current placement environment and needs, thereby ensuring that the prefabricated block can better fill the ground, so that the ground flatness is better after filling, and the use requirements are guaranteed. At the same time, since the placement is more convenient and quick, the construction period can also be shortened and the construction efficiency can be improved.

[0043] Specifically, the mating portion 120 also includes: a first mating component 121, which is protruding toward the ground; a second mating component 122, which is arranged on a side away from the first mating component 121 and protruding toward the ground; wherein, there is a first space between the first mating component 121 and the second mating component 122.

[0044] Preferably, by arranging the first mating component 121 to protrude toward the ground, and arranging the second mating component 122 to protrude toward the ground on the side away from the first mating component 121, the prefabricated block can better fill the ground, while leaving the area below empty for the placement of pipelines or other facilities, thereby better adapting to the current usage scenario, thereby expanding the scope of use of the ground-filling prefabricated block 100 and making it more practical.

[0045] Specifically, the protrusion height of the second matching component 122 is greater than the protrusion height of the first matching component 121; and the line connecting the contact surface between the first matching component 121 and the ground and the line connecting the contact surface between the second matching component 122 and the ground are in the same plane.

[0046] Preferably, by setting the protrusion height of the second mating component 122 to be greater than the protrusion height of the first mating component 121, the prefabricated block can be suitable for slopes or arc-shaped ground, so that its use range is wider and can better meet the needs of different environments. At the same time, the connecting line between the fitting surface of the first mating component 121 and the ground and the fitting surface of the second mating component 122 and the ground are set to be on the same plane, so that when filling and placing the arc surface such as the tunnel surface, it can be more convenient and quick, and at the same time, it is more stable after placement and will not shake, and the ground after filling is smoother, ensuring the normal progress of construction while improving construction efficiency and completion.

[0047] Specifically, the second matching component 122 further includes: at least two first fixing members, which are disposed on two sides of the main body 110 opposite to each other, and the first cavity 130 is connected between the at least two first fixing members.

[0048] Preferably, by arranging two first fixing members on both sides of the main body 110, the placement effect of the ground filling prefabricated block 100 is made more stable. At the same time, a first cavity 130 is connected between the two first fixing members, so that the arrangement of the pipeline below is more convenient and can adapt to different environments. This makes the use scope of the ground filling prefabricated block 100 wider, and can better shorten the construction period and ensure construction efficiency, thereby achieving the purpose of cost saving.

[0049] Specifically, the demolding portion includes: a first demolding surface 141, which is arranged on a side of the first mating component 121 close to the first cavity 130; a second demolding surface 142, which is arranged on a side of the second mating component 122 close to the first cavity 130; and the first demolding surface 141 and the second demolding surface 142 are arranged opposite to each other.

[0050] Preferably, by arranging the first demoulding surface 141 and the second demoulding surface 142 relative to each other, the demoulding of the ground filling prefabricated block 100 is faster and smoother, thereby ensuring that the production process of the ground filling prefabricated block 100 is faster. At the same time, the setting of the demoulding surface makes the internal first cavity 130 more adaptable to different environments, thereby making the ground filling prefabricated block 100 more adaptable.

[0051] Specifically, a surface perpendicular to the horizontal surface is defined as a vertical surface; the first demoulding surface 141 is arranged at a first angle to the vertical surface; and the second demoulding surface 142 is arranged at a second angle to the vertical surface.

[0052] Specifically, the first angle and the second angle can be adjusted according to actual conditions, and are values ​​obtained from experiments. The specific values ​​are adjusted according to the placement area of ​​the filling block, and can normally be 5°.

[0053] Preferably, by setting the first demolding surface 141 and the second demolding surface 142 at different angles to the vertical plane, the demolding efficiency is higher and the demolding process is smoother. By setting the angle, the overall demolding time is reduced, thereby shortening the overall production time. At the same time, the main body will not be damaged during demolding, thereby improving the integrity and safety. At the same time, the angle can also make the overall support stronger, ensuring stability and firmness during placement.

[0054] Specifically, the ground filling prefabricated block 100 further includes: the ground filling prefabricated block 100 is provided with a first plane 150 ; a reinforcing member 160 , the reinforcing member 160 is provided in the main body 110 , and the reinforcing member 160 is relatively parallel to the first plane 150 .

[0055] Specifically, the reinforcement member 160 may be made of steel bar material.

[0056] Preferably, by arranging the reinforcement 160 in the main body 110 and relatively parallel to the first plane 150, the strength of the overall prefabricated block is improved through the arrangement of the reinforcement 160, thereby increasing the overall strength of the ground-filled prefabricated block 100 after filling, thereby ensuring the stability and firmness of the filling.

[0057] Specifically, a first distance 170 is provided between the reinforcement member 160 and the first plane 150 ; the first distance 170 is in a first proportion to the height of the ground-filling prefabricated block 100 .

[0058] Specifically, the first ratio formed between the first distance 170 and the height of the ground-filling prefabricated block 100 is a manually set value, which can be adjusted according to actual conditions, such as a ratio of one to ten.

[0059] Preferably, by setting the setting depth of the reinforcement 160 to be in a first proportion to the height of the ground filling prefabricated block 100, the reinforcement 160 is most suitable for reinforcing the strength of the overall ground filling prefabricated block 100, which can better ensure the filling strength of the ground filling prefabricated block 100 and ensure the stability and firmness of the ground after filling.

[0060] Specifically, the ground-filling prefabricated block 100 further includes: an extractor, which is disposed on a side of the main body 110 away from the first cavity 130 , and is used to extract and transport the ground-filling prefabricated block 100 .

[0061] Preferably, by arranging the extraction piece on the main body 110, it is more convenient to carry the prefabricated blocks 100 for ground filling, thereby making the filling process of the prefabricated blocks smoother, reducing the burden of manual handling, and making the overall filling process faster and more convenient.

[0062] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the utility model.

Claims

1. A prefabricated ground filling block, characterized in that: The ground filling prefabricated block comprises: Subject (110); a matching portion (120), the matching portion (120) being arranged on the main body (110), the matching portion (120) being used to match with the ground so that the main body (110) is placed on the ground; the shape of the contact portion between the matching portion (120) and the ground is adapted to the shape of the ground; A first cavity (130), the first cavity (130) being disposed in the main body (110), and the first cavity (130) being used to accommodate a pipeline; The matching portion (120) further includes: A first matching component (121), the first matching component (121) is arranged to protrude toward the ground; a second mating component (122), the second mating component (122) being arranged on a side away from the first mating component (121), and the second mating component (122) being arranged to protrude toward the ground; Wherein, the first cavity (130) is between the first mating component (121) and the second mating component (122); The protrusion height of the second matching component (122) is greater than the protrusion height of the first matching component (121); The connecting line between the contact surface between the first matching component (121) and the ground and the connecting line between the contact surface between the second matching component (122) and the ground are located in the same plane; a demoulding portion, the demoulding portion being arranged on a side of the main body (110) close to the first cavity (130); A protection portion, wherein the protection portion is arranged on a side of the main body (110) away from the first cavity (130).

2. The ground filling prefabricated block according to claim 1, characterized in that: The second mating component (122) further includes: At least two first fixing members are arranged opposite to each other on two sides of the main body (110), and the first cavity (130) is connected between the at least two first fixing members.

3. The ground filling prefabricated block according to claim 1, characterized in that: The demoulding part comprises: A first demoulding surface (141), the first demoulding surface (141) being disposed on a side of the first mating component (121) close to the first cavity (130); A second demolding surface (142), the second demolding surface (142) being disposed on a side of the second mating component (122) close to the first cavity (130); The first demoulding surface (141) and the second demoulding surface (142) are arranged opposite to each other.

4. The ground filling prefabricated block according to claim 3, characterized in that: Define the surface perpendicular to the horizontal surface as the vertical surface; The first demoulding surface (141) and the vertical surface are arranged at a first angle; The second demoulding surface (142) and the vertical surface are arranged at a second angle.

5. The ground filling prefabricated block according to claim 1, characterized in that: The ground filling prefabricated block also includes: The ground filling prefabricated block is provided with a first plane (150); A reinforcing member (160), wherein the reinforcing member (160) is disposed in the main body (110), and the reinforcing member (160) is disposed relatively parallel to the first plane (150).

6. The ground filling prefabricated block according to claim 5, characterized in that: A first distance (170) is provided between the reinforcement member (160) and the first plane (150); The first distance (170) is in a first proportion to the height of the precast ground-fill block.

7. The ground filling prefabricated block according to claim 1, characterized in that: The ground filling prefabricated block also includes: An extractor, the extractor being arranged on a side of the main body (110) away from the first cavity (130), the extractor being used for extracting and transporting the ground filling prefabricated block.