Foundation pit spoil embankment construction recycling device
By designing a reuse device for the construction and reuse of foundation pit abandoned embankments, using multi-layer separation screens and storage containers to achieve proportional distribution and transportation of soil, combined with mixing, testing and compacting equipment, the low efficiency and cost of traditional foundation pit abandoned soil treatment are solved. The high problem has achieved resource recycling and utilization and reduced road construction costs.
Patent Information
- Application Number
- CN202420528271.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-19
AI Technical Summary
The traditional foundation pit waste soil treatment method is inefficient and costly, and most of the waste soil is abandoned, causing energy waste. It is urgent to urgently need a foundation pit waste embankment construction and reuse device to make full use of resources.
A device including a first conveying mechanism, a separation mechanism, a material separation mechanism, a bearing platform, a second conveying mechanism and a waste transfer equipment is designed. The proportional distribution and transportation of soil materials are achieved through a multi-layer separation screen and a storage container to satisfy the Embankment construction needs, and mixing, testing and compacting equipment are equipped to improve construction quality.
It effectively reduces the amount of soil waste, makes full use of the foundation pit waste, realizes resource recycling, reduces road construction costs, and meets the needs of embankment construction.
Smart Images

Figure CN221941042U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of road construction, in particular to a foundation pit abandoned soil embankment construction recycling device. Background Art
[0002] During the construction of subway foundation pits, abandoned soil will be generated, which needs to be cleaned before the next construction step can be carried out.
[0003] The traditional method of handling foundation pit spoil is usually manual or mechanical removal, and the foundation pit spoil is transported to a designated location (such as a slag treatment plant) for treatment, which has low work efficiency and high investment costs. In addition, most of the foundation pit spoil is directly discarded, resulting in energy waste.
[0004] Therefore, there is an urgent need for a foundation pit abandoned soil embankment construction recycling device to solve the above problems. Utility Model Content
[0005] Based on the above problems, the purpose of the utility model is to provide a foundation pit abandoned soil embankment construction recycling device, which can make full use of the foundation pit abandoned soil and realize resource recycling, while meeting the needs of embankment construction and reducing road construction costs.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] Provided is a device for recycling foundation pit abandoned soil and embankment construction, comprising:
[0008] A first conveying mechanism, the feeding end of which is located in the foundation pit;
[0009] A separation mechanism is arranged below the discharge end of the first conveying mechanism, and the separation mechanism includes a plurality of separation screens, the plurality of separation screens are arranged in sequence from bottom to top, and the separation accuracy of the plurality of separation screens decreases in sequence from bottom to top;
[0010] A material distribution mechanism and a receiving platform, wherein the material distribution mechanism is configured to distribute the soil materials on the plurality of separation screens below the top separation screen to the receiving platform in proportion;
[0011] A second conveying mechanism, whose feeding end is located on the receiving platform, and whose discharging end extends above the embankment to be constructed, and is used to convey the soil material on the receiving platform to the embankment to be constructed;
[0012] The waste material transfer device is used to transfer the remaining soil material on the top separation screen.
[0013] As a preferred solution of the device for recycling foundation pit abandoned soil and embankment construction of the utility model, the material distribution mechanism includes:
[0014] A plurality of storage containers are provided, and the plurality of storage containers are arranged one by one corresponding to the plurality of separation screens below the top separation screen, and the storage containers are used to collect soil materials separated by the corresponding separation screens;
[0015] There are multiple weighing devices, and the multiple weighing devices are arranged in a one-to-one correspondence with the multiple storage containers; each weighing device includes a weighing base, a driving member and a weighing plate, the weighing plate is rotatably arranged on the weighing base, and is used to receive the soil material outputted from the corresponding storage container; the driving member is transmission-connected to the weighing plate, and is used to drive the weighing plate to move between a first position for receiving the soil material and a second position for flipping the soil material to the receiving platform.
[0016] As a preferred solution of the foundation pit abandoned soil embankment construction recycling device of the utility model, each of the separation screens is arranged at an angle, and the discharge port of each separation screen is provided with an inclined discharge channel, and the discharge channel extends to the soil inlet of the corresponding storage container or the corresponding waste transfer equipment.
[0017] As a preferred solution of the foundation pit abandoned soil embankment construction recycling device of the utility model, each of the storage containers is provided with a soil material output port, and the soil material output port is provided with a valve, and the valve is used to control the opening and closing of the soil material output port.
[0018] As a preferred solution of the device for recycling foundation pit abandoned soil embankment construction of the utility model, a stirring device is arranged on the receiving platform, and the stirring device is used to stir and mix the soil material on the receiving platform.
[0019] As a preferred embodiment of the device for recycling foundation pit abandoned soil embankment construction of the utility model, the device for recycling foundation pit abandoned soil embankment construction also includes a support frame erected on the embankment to be constructed, a mobile trolley is provided on the support frame, a flexible discharge pipe is connected to the discharge end of the second conveying mechanism, and the mobile trolley is connected to the flexible discharge pipe for driving the flexible discharge pipe to move so as to spread the soil on the embankment to be constructed.
[0020] As a preferred solution of the device for recycling foundation pit abandoned soil embankment construction of the utility model, a detection device is provided on the mobile vehicle, and the detection device is used to detect the thickness of the soil material laid on the embankment to be constructed.
[0021] As a preferred embodiment of the device for recycling foundation pit abandoned soil and embankment construction of the utility model, the device for recycling foundation pit abandoned soil and embankment construction also includes a compaction device, and the compaction device is used to compact the soil spread on the embankment to be constructed.
[0022] As a preferred solution of the foundation pit abandoned soil embankment construction recycling device of the utility model, the compaction equipment includes a winch and a compaction hammer arranged at the lifting end of the winch, and the winch is arranged on the support frame to drive the compaction hammer to rise and fall.
[0023] As a preferred solution of the device for recycling foundation pit abandoned soil and embankment construction of the utility model, the first conveying mechanism and the second conveying mechanism are both screw conveyors.
[0024] The beneficial effects of the utility model are:
[0025] The utility model provides a device for recycling abandoned soil from foundation pits for embankment construction. During construction, the abandoned soil in the foundation pit is continuously transported to the top of the separation mechanism via the first conveying mechanism, and the soil first falls into the topmost separation screen. Since the separation accuracy of multiple separation screens decreases from bottom to top, the soil with the largest particle size is retained in the topmost separation screen, and the soil with the smallest particle size flows through the middle separation screen in sequence and finally falls into the bottommost separation screen. That is, soil with different particle sizes is retained in the separation screens of different layers, and the soil on the topmost separation screen is transferred and processed by the waste transfer equipment, and the soil on other separation screens is proportionally distributed to the receiving platform under the action of the material distribution mechanism, and the distribution ratio is determined according to the design requirements of the embankment to be constructed (for example, when designing a road, there are corresponding requirements for the proportion of soil with different particle sizes according to the road bearing capacity). Then, the second conveying mechanism transports the well-proportioned soil on the receiving platform to the embankment to be constructed, and the embankment can be laid. The foundation pit abandoned soil embankment construction recycling device effectively reduces the amount of soil waste, fully utilizes the foundation pit abandoned soil, realizes resource recycling, and at the same time meets the needs of embankment construction and reduces road construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments of the present invention. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the contents of the embodiments of the present invention and these drawings without paying any creative work.
[0027] Figure 1 It is a structural schematic diagram of a device for reusing foundation pit abandoned soil for embankment construction provided by a specific implementation method of the utility model;
[0028] Figure 2 yes Figure 1 A first partial view of
[0029] Figure 3 yes Figure 1 Second partial view of .
[0030] In the figure:
[0031] 1-first conveying mechanism; 2-separation mechanism; 3-material distribution mechanism; 4-receiving platform; 5-second conveying mechanism;
[0032] 6-waste transfer equipment; 7-support frame;
[0033] 21-first separation screen; 22-second separation screen; 23-third separation screen; 24-fourth separation screen; 25-discharging
[0034] aisle;
[0035] 211-discharging port;
[0036] 31-storage container; 32-weighing device;
[0037] 311-soil material inlet; 312-soil material outlet;
[0038] 321-weighing base; 322-driving member; 323-weighing pan;
[0039] 51- flexible discharge pipe;
[0040] 71-mobile trolley;
[0041] 711-Detection device;
[0042] 81- winch; 82- compacting hammer;
[0043] 100-foundation pit; 200-embankment to be constructed. DETAILED DESCRIPTION
[0044] In order to make the technical problems solved by the utility model, the technical solutions adopted and the technical effects achieved clearer, the technical solutions of the embodiments of the utility model will be further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0045] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance. Among them, the terms "first position" and "second position" are two different positions.
[0046] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0047] like Figure 1 As shown, this embodiment provides a device for recycling foundation pit waste soil for embankment construction, which can make full use of foundation pit waste soil to achieve resource recycling, meet the needs of embankment construction, and reduce road construction costs. The device for recycling foundation pit waste soil for embankment construction includes a first conveying mechanism 1, a separation mechanism 2, a material dividing mechanism 3, a receiving platform 4, a second conveying mechanism 5 and a waste material transfer device 6.
[0048] Among them, see Figure 1 , Figure 2 and Figure 3 The feed end of the first conveying mechanism 1 is located in the foundation pit 100, and the separation mechanism 2 is arranged below the discharge end of the first conveying mechanism 1. The separation mechanism 2 includes a plurality of separation screens, which are arranged in sequence from bottom to top, and the separation accuracy of the plurality of separation screens decreases from bottom to top. The material distribution mechanism 3 is configured to distribute the soil materials on the plurality of separation screens below the top separation screen in proportion to the receiving platform 4, the feed end of the second conveying mechanism 5 is located on the receiving platform 4, and the discharge end of the second conveying mechanism 5 extends to the top of the embankment 200 to be constructed, and is used to transport the soil materials on the receiving platform 4 to the embankment 200 to be constructed; the waste transfer equipment 6 is used to transfer the remaining soil materials on the top separation screen.
[0049] The present embodiment provides a device for recycling the abandoned soil from the foundation pit for road embankment construction. During the specific construction, the abandoned soil in the foundation pit 100 is continuously transported to the top of the separation mechanism 2 via the first conveying mechanism 1, and the soil first falls into the topmost separation screen. Since the separation accuracy of the multiple separation screens decreases from bottom to top, the soil with the largest particle size is left in the topmost separation screen, and the soil with the smallest particle size flows through the middle separation screen in turn and finally falls into the bottommost separation screen. That is, soil with different particle sizes is left in the separation screens of different layers, and the soil on the topmost separation screen is transferred and processed by the waste transfer equipment, and the soil on other separation screens is proportionally distributed to the receiving platform 4 under the action of the material distribution mechanism 3, and the distribution ratio is determined according to the design requirements of the road embankment 200 to be constructed (for example, when designing a road, there are corresponding requirements for the proportion of soil with different particle sizes according to the road bearing capacity). Then, the second conveying mechanism 5 transports the well-proportioned soil on the receiving platform 4 to the road embankment to be constructed, and the road embankment can be laid. The foundation pit abandoned soil embankment construction recycling device effectively reduces the amount of soil waste, makes full use of the foundation pit abandoned soil, realizes resource recycling, and at the same time meets the needs of embankment construction and reduces the cost of road construction. The road here can be a city road or highway near the foundation pit 100.
[0050] like Figure 2 As shown, four separation screens are provided in this embodiment, namely, the first separation screen 21, the second separation screen 22, the third separation screen 23 and the fourth separation screen 24 from bottom to top. Among them, the first separation screen 21 is designed as a solid plate structure, which is used to receive soil materials with the smallest particle size; the second separation screen 22, the third separation screen 23 and the fourth separation screen 24 are all mesh structures, and the mesh size of the fourth separation screen 24 is the largest. The fourth separation screen 24 is mainly used to filter out large pieces of stones and other debris to prevent large pieces of debris from affecting the masonry density of the embankment. In other embodiments, the number of separation screens can be adaptively increased or decreased according to construction requirements.
[0051] For example, the first separation screen 21, the second separation screen 22, the third separation screen 23 and the fourth separation screen 24 are all vibrating separation screens, which separate soil materials of different particle sizes by vibration. The mesh sizes of the second separation screen 22, the third separation screen 23 and the fourth separation screen 24 are adaptively selected according to factors such as foundation pit spoil and embankment paving requirements.
[0052] In this embodiment, the first conveying mechanism 1 and the second conveying mechanism 5 are both screw machines, which are simple to operate, easy to maintain, highly reliable, economical and practical, and can further reduce construction costs.
[0053] Optionally, see Figure 1 and Figure 2The material distribution mechanism 3 includes a storage container 31 and a weighing device 32. There are multiple storage containers 31, and the multiple storage containers 31 are arranged one-to-one with the multiple separation screens below the top separation screen. The storage container 31 is used to collect the soil separated by the corresponding separation screen. There are multiple weighing devices 32, and the multiple weighing devices 32 are arranged one-to-one with the multiple storage containers 31; each weighing device 32 includes a weighing base 321, a driving member 322 and a weighing plate 323. The weighing plate 323 is rotatably arranged on the weighing base 321, and is used to receive the soil output from the corresponding storage container 31. The driving member 322 is connected to the weighing plate 323 in a transmission manner, and is used to drive the weighing plate 323 to move between a first position for receiving the soil and a second position for flipping the soil to the receiving platform 4.
[0054] Specifically, the soil materials remaining on the separation screen after separation by the separation screen are respectively entered into the corresponding storage containers 31 for storage, that is, the soil materials stored in each storage container 31 have different particle sizes. The soil materials in the storage container 31 are output respectively, and the soil materials fall into the weighing plate 323 (the weighing plate 323 is in the first position at this time). When the weight weighed by the weighing base 321 reaches the ratio value, the storage container 31 is controlled to stop discharging. Subsequently, the weighing plate 323 is controlled to flip to the second position by the driving member 322 to dump the soil materials onto the receiving platform 4. At this time, the second conveying mechanism 5 conveys the proportioned soil materials to the embankment 200 to be constructed for paving. The proportion of soil materials of different particle sizes is controlled by weighing to ensure the construction quality after the road is paved. Exemplarily, the driving member 322 is a motor.
[0055] Optionally, see Figure 2 Each separation screen is tilted, and each separation screen discharge port 211 is provided with a tilted discharge channel 25, and the discharge channel 25 extends to the soil material inlet 311 of the corresponding storage container 31 or the corresponding waste transfer device 6. The separation screen and the discharge channel 25 are tilted, so that the soil material can automatically slide toward the storage container 31 under its own gravity during the vibration of the separation screen, without the need for an additional driving mechanism, which can reduce construction costs. In this embodiment, Figure 2 As shown, the soil material inlet 311 is located at the top of the storage container 31 , the discharge end of the discharge channel 25 is aligned with the corresponding soil material inlet 311 , and the soil material on the separation screen automatically falls into the corresponding soil material inlet 311 along the discharge channel 25 .
[0056] In this embodiment, the waste transfer equipment is a transport vehicle, and the discharge channel 25 of the top-layer separation screen extends to the hopper of the transport vehicle 61. The transport vehicle 61 is used to transfer the soil left on the top-layer separation screen to a designated location for processing (such as a slag treatment plant), and further recycle the abandoned foundation pit waste soil.
[0057] Optionally, see Figure 2, each storage container 31 is provided with a soil material output port 312, and the soil material output port 312 is provided with a valve, and the valve is used to control the opening and closing of the soil material output port 312. The setting of the valve can more accurately control the output of the soil material, ensure that the soil material ratio meets the design requirements, and improve the quality of road construction. In this embodiment, the foundation pit abandoned soil embankment construction and recycling device also includes a control box, and the control box is communicatively connected with the first conveying mechanism 1, the valve of the storage container 31, the driving member 322 of the weighing device 32, and the second conveying mechanism 5, and the opening and closing of the above-mentioned mechanisms can be controlled through the control box. The control box can be set in a safe area of the embankment construction site to facilitate construction personnel to operate and control.
[0058] Optionally, a stirring device is provided on the receiving platform 4, and the stirring device is used to stir and mix the soil material on the receiving platform 4. The stirring device can mix the proportioned soil material evenly in advance, so that the soil material output by the discharge end of the second conveying mechanism 5 can be directly spread on the embankment 200 to be constructed, ensuring the construction quality. Exemplarily, the stirring device can be a paddle-type mixer, etc., and baffles are arranged around the receiving platform 4 to form a closed space. Multiple weighing pans 323 all turn the soil material into the closed space, which is convenient for the mixer to stir and mix the soil material.
[0059] Optionally, see Figure 1 and Figure 3 The foundation pit abandoned soil embankment construction and recycling device also includes a support frame 7 erected on the embankment to be constructed 200, a mobile trolley 71 is arranged on the support frame 7, a flexible discharge pipe 51 is connected to the discharge end of the second conveying mechanism 5, and the mobile trolley 71 is connected to the flexible discharge pipe 51, and is used to drive the flexible discharge pipe 51 to move, so as to spread the soil material on the embankment to be constructed 200. In this embodiment, the support frame 1 includes a crossbeam, and the crossbeam extends along the width direction of the embankment to be constructed 200. The mobile trolley 71 can move forward and backward along the crossbeam, so that the flexible discharge pipe 51 spreads the soil material to various positions in the width direction of the embankment to be constructed 200, and ensures that the soil material is spread evenly. Exemplarily, the flexible discharge 51 can be a retractable corrugated tube or a soft plastic tube to adapt to the movement of the mobile trolley 71.
[0060] Optionally, see Figure 3 The mobile trolley 71 is provided with a detection device 711, which is used to detect the thickness of the soil material laid on the embankment 200 to be constructed. The detection device 711 can be used to detect the thickness of the soil material laid at different positions to ensure that the laying thickness is uniform. Exemplarily, the detection device 711 is a rangefinder.
[0061] Optionally, the device for recycling foundation pit abandoned soil for embankment construction further includes a compaction device, which is used to compact the soil spread on the embankment 200 to be constructed to ensure the structural stability of the embankment after construction.
[0062] Optionally, see Figure 1 and Figure 3 The compaction equipment includes a winch 81 and a compaction hammer 82 disposed at the lifting end of the winch 81. The winch 81 is disposed on the support frame 7 and is used to drive the compaction hammer 82 to rise and fall. After the soil is spread, the winch 81 is used to control the compaction hammer 82 to continuously hit downward to compact the soil. In other embodiments, the compaction equipment can also be a road roller, etc., as long as it can achieve the purpose of compacting the soil.
[0063] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention is described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims
1. A device for recycling foundation pit abandoned soil and embankment construction, characterized in that: include: A first conveying mechanism (1), a feeding end of which is located in the foundation pit (100); A separation mechanism (2) is arranged below the discharge end of the first conveying mechanism (1), the separation mechanism (2) comprising a plurality of separation screens, the plurality of separation screens being arranged in sequence from bottom to top at intervals, and the separation accuracy of the plurality of separation screens decreasing in sequence from bottom to top; A material distribution mechanism (3) and a receiving platform (4), wherein the material distribution mechanism (3) is configured to distribute soil materials on a plurality of separation screens below the top separation screen to the receiving platform (4) in proportion; A second conveying mechanism (5), the feeding end of which is located on the receiving platform (4), and the discharging end of the second conveying mechanism (5) extends above the embankment (200) to be constructed, and is used to convey the soil material on the receiving platform (4) to the embankment (200) to be constructed; The waste material transfer device (6) is used to transfer the remaining soil material on the topmost separation screen.
2. The device for recycling foundation pit waste soil for embankment construction according to claim 1 is characterized in that: The material distribution mechanism (3) comprises: A plurality of storage containers (31) are provided, and the plurality of storage containers (31) are arranged one-to-one corresponding to the plurality of separation screens below the top separation screen, and the storage containers (31) are used to collect soil materials separated by the corresponding separation screens; A plurality of weighing devices (32) are provided, and the plurality of weighing devices (32) are arranged in one-to-one correspondence with the plurality of storage containers (31); each weighing device (32) comprises a weighing base (321), a driving member (322) and a weighing pan (323); the weighing pan (323) is rotatably arranged on the weighing base (321) and is used to receive soil outputted from the corresponding storage container (31); the driving member (322) is transmission-connected to the weighing pan (323) and is used to drive the weighing pan (323) to move between a first position for receiving soil and a second position for flipping the soil to the receiving platform (4).
3. The device for recycling foundation pit waste soil for embankment construction according to claim 2, characterized in that: Each of the separation screens is arranged at an angle, and a discharge port (211) of each of the separation screens is provided with an inclined discharge channel (25), wherein the discharge channel (25) extends to a soil material inlet (311) of a corresponding storage container (31) or to a corresponding waste transfer device (6).
4. The device for recycling foundation pit waste soil for embankment construction according to claim 2, characterized in that: Each storage container (31) is provided with a soil material output port (312), and the soil material output port (312) is provided with a valve, and the valve is used to control the opening and closing of the soil material output port (312).
5. The device for recycling foundation pit waste soil for embankment construction according to claim 1, characterized in that: The receiving platform (4) is provided with a stirring device, and the stirring device is used to stir and mix the soil material on the receiving platform (4).
6. The device for recycling foundation pit waste soil for embankment construction according to claim 1, characterized in that: The foundation pit abandoned soil embankment construction and recycling device also includes a support frame (7) erected on the embankment to be constructed (200), a movable trolley (71) is arranged on the support frame (7), a discharge end of the second conveying mechanism (5) is connected to a flexible discharge pipe (51), and the movable trolley (71) is connected to the flexible discharge pipe (51) for driving the flexible discharge pipe (51) to move so as to spread soil on the embankment to be constructed (200).
7. The device for recycling foundation pit waste soil for embankment construction according to claim 6, characterized in that: The mobile trolley (71) is provided with a detection device (711), and the detection device (711) is used to detect the thickness of the soil material laid on the embankment (200) to be constructed.
8. The device for recycling foundation pit waste soil for embankment construction according to claim 6, characterized in that: The device for recycling foundation pit abandoned soil for embankment construction also includes a compaction device, which is used to compact the soil material spread on the embankment (200) to be constructed.
9. The device for recycling foundation pit waste soil for embankment construction according to claim 8, characterized in that: The compacting equipment comprises a winch (81) and a compacting hammer (82) arranged at the lifting end of the winch (81); the winch (81) is arranged on the support frame (7) and is used to drive the compacting hammer (82) to rise and fall.
10. The device for recycling foundation pit waste soil for embankment construction according to any one of claims 1 to 9, characterized in that: The first conveying mechanism (1) and the second conveying mechanism (5) are both screw conveyors.