Road barrier

By designing the fastening mechanism of thread sleeves and railing rings on the isolation piers, as well as the pre-embedding technology of cement filling plates and grooves, the problem of poor stability of the isolation piers after collision is solved, and secondary reinforcement and convenient handling are achieved, and extended service life.

CN221941199UInactive Publication Date: 2024-11-01HUNAN PROVINCIAL COMM CONSTR QUALITY & SAFETY SUPERVISION ADMINISTRATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420468752.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The isolation piers in the construction of trunk roads have poor overall stability after collision, making them difficult to re-reinforce and use, and are difficult to carry later, and cannot be re-used.

Method used

An isolation pier structure including cement piers, light-proof belts, plug-in rod rings, construction support rods, isolation pier assembly components, isolation pier filling components and isolation pier guardrail filling components were designed, and the threaded sleeves and railing rings were tightened. The solidification mechanism improves overall stability and achieves secondary reinforcement and pre-embedding through cement filling plates and cement filling grooves.

Benefits of technology

It improves the overall stability of the isolation piers for the construction of trunk roads, allows secondary reinforcement and use, and facilitates handling and secondary concrete pouring, extending the service life of the isolation piers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941199U_ABST
    Figure CN221941199U_ABST
Patent Text Reader

Abstract

The utility model relates to the related technical field of arterial highway construction isolation piers, in particular to an isolation pier which comprises a cement pier and a light-proof belt fixedly connected to the front end of the cement pier, an inserting rod ring is arranged at the inserting end opening of the cement pier, a construction supporting rod and an isolation pier assembling assembly penetrate through a ring hole in the middle of the inserting rod ring, and the construction supporting rod and the isolation pier assembling assembly are fixedly connected to the cement pier. The support is mounted on the cement pier; according to the isolation pier filling assembly, after the arterial highway construction isolation piers collide, the three cement piers can resist certain collision pressure through sleeving and fastening of the threaded sleeves and the handrail rings, secondary connection of the arterial highway construction isolation piers through the guardrails is facilitated, and the overall stability is improved; construction personnel can move the cement filling plates and the cement piers to the two sides of the arterial highway to serve as guardrails, cement filling is conducted through the cement filling grooves and the cement filling plates for solidification, the cement filling plates can be directly embedded, the arterial highway construction isolation piers are connected for use through the guardrails, and the overall stability of the cement filling grooves and the cement filling plates is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field related to isolation piers in trunk highway construction, in particular to an isolation pier. Background Art

[0002] All isolation pier units of the isolation pier body are placed closely in a straight line, and the railings are installed on the holes reserved above the isolation pier body to increase the height of the entire isolation pier and avoid damage caused by being in the blind spot of the car's field of vision. Fluorescent strips and warning colors are set on the isolation pier body, isolation pier ends and railings, which can reflect light when illuminated at night to warn car drivers, greatly improving safety. The isolation pier is prefabricated with concrete, with a low cost, saving cost, large size, heavy weight, not easy to be stolen, and environmentally friendly material.

[0003] At present, after the isolation piers of trunk highway construction are connected by guardrails, the overall stability is poor, which leads to the collapse of the guardrails of trunk highway construction after the isolation piers collide. The isolation piers of trunk highway construction are difficult to be reinforced for a second time and are not easy to transport in the later stage. After the construction of the trunk highway is completed, the isolation piers cannot be reused. Therefore, the isolation piers are not easy to be filled and embedded for a second time. Utility Model Content

[0004] The purpose of the utility model is to provide an isolation pier to solve the problems raised in the above background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] An isolation pier comprises a cement pier and a light-proof belt fixedly connected to the front end of the cement pier, a rod insertion ring is arranged at the insertion port of the cement pier, and a construction support rod is penetrated through the ring hole in the middle of the rod insertion ring.

[0007] An isolation pier assembly component is installed on the cement pier;

[0008] An isolation pier filling assembly is arranged on the cement pier and movably connected to the isolation pier assembly assembly, and is used for assembling the isolation pier on the isolation pier filling assembly;

[0009] The isolation pier guardrail filling assembly is installed on the rod insertion ring. A connecting ring is connected through one side of the cement pier. A through hole is opened at the inner connection of the connecting ring. A trunk highway guardrail is slidably connected to the inner side of the through hole, and the guardrail is slidably installed on the isolation pier assembly assembly.

[0010] The isolation pier as described above: the isolation pier assembly component includes a threaded sleeve movably installed on the connection point of the trunk highway guardrail, a guardrail ring is arranged on the outside of the threaded sleeve, the guardrail ring is sleeved on the connecting end of the trunk highway guardrail, the trunk highway guardrail passes through the cement pier and the through hole, the guardrail ring is embedded in the through hole, and is used to reinforce the isolation piers on the isolation pier filling component.

[0011] The isolation pier as described above: the isolation pier filling assembly includes a cement filling plate movably connected to the cement pier, and the cement filling plate has a cement groove fixedly opened in the middle thereof, and a penetrating cement column is fixedly connected in the cement groove.

[0012] The isolation pier as described above: the isolation pier filling assembly also includes a cement filling groove opened on the inner side of the cement column, the holes around the bottom of the cement pier are slidably inserted into the cement column, the cement filling groove is used for cement filling, and the cement filling plate can be pre-buried in the construction site of the trunk highway to reinforce the isolation pier and position it for highway construction on the isolation pier guardrail filling assembly.

[0013] The isolation pier as described above: the isolation pier guardrail filling assembly includes a plug-in ring movably installed at the installation position of the construction support rod, a connecting rod is provided at the threaded connection of the plug-in ring, the connecting rod passes through the inner side of the construction support rod, and the plug-in ring is threadedly buckled at the connection between the connecting rod and the construction support rod.

[0014] The isolation pier as described above: the isolation pier guardrail filling assembly also includes a cement cylinder threadedly connected to the bottom of the rod insertion ring, and the cement cylinder is fixedly connected to the inner side of the top of the cement pier.

[0015] The isolation pier as described above: after the construction support rod is inserted into the cement cylinder, the rod insertion ring thread is locked at the connection between the construction support rod and the cement cylinder, which is used for cement filling of the isolation pier guardrail.

[0016] Compared with the prior art, the utility model has the following beneficial effects: after the isolation piers of trunk highway construction collide, the three cement piers can withstand a certain collision pressure by being fastened by the threaded sleeve and the railing ring set, which is beneficial for the secondary connection of the isolation piers of trunk highway construction through the guardrail, thereby improving the overall stability; the construction personnel can move the cement filling plates and cement piers to both sides of the trunk highway as guardrails, and solidify the cement through the cement filling trough and cement filling plates; the cement filling plates can be directly pre-buried; the isolation piers of trunk highway construction are connected and used through the guardrail, thereby improving the overall stability of the cement filling trough and cement filling plates, and preventing the guardrails of trunk highway construction from tipping over after the isolation piers collide, and performing secondary reinforcement; after the construction of the trunk highway, the cement filling plates and cement piers that have not been filled can also be disassembled and transported, etc. The rod ring can prevent rainwater from corroding the concrete cement at the connection, thereby improving the overall height of the three cement piers, and facilitating the secondary concrete pouring of the isolation piers of trunk highway construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of the three-dimensional structure of the isolation pier.

[0018] Figure 2 For the isolation pier Figure 1 Enlarged structural diagram at A in the middle.

[0019] Figure 3 It is a schematic diagram of the structure of the isolation pier filling assembly in the isolation pier.

[0020] Figure 4 This is a schematic diagram of the structure of the isolation pier guardrail filling assembly in the isolation pier.

[0021] In the figure: 1. Cement pier; 2. Light-proof belt; 3. Construction support rod; 4. Rod insertion ring; 5. Trunk road guardrail; 6. Connecting ring; 7. Through hole; 8. Cement filling plate; 9. Railing ring; 10. Threaded sleeve; 11. Through cement column; 12. Cement filling trough; 13. Cement trough; 14. Connecting rod; 15. Insertion ring; 16. Cement cylinder. DETAILED DESCRIPTION

[0022] Various exemplary embodiments, features and aspects of the present application will be described in detail below with reference to the accompanying drawings. The same reference numerals in the accompanying drawings represent elements with the same or similar functions. Although various aspects of the embodiments are shown in the accompanying drawings, the drawings are not necessarily drawn to scale unless otherwise specified.

[0023] The word “exemplary” is used exclusively herein to mean “serving as an example, example, or illustration.” Any embodiment described herein as “exemplary” is not necessarily to be construed as preferred or advantageous over other embodiments.

[0024] In addition, in order to better illustrate the present application, numerous specific details are provided in the specific embodiments below. It should be understood by those skilled in the art that the present application can also be implemented without certain specific details. In some examples, methods, means, and elements well known to those skilled in the art are not described in detail in order to highlight the subject matter of the present application.

[0025] See also Figures 1 to 4 , proposed an isolation pier, see Figures 1 to 4 An isolation pier is proposed, including a cement pier 1, a light-proof belt 2, a construction support rod 3, a rod insertion ring 4, an isolation pier assembly component, an isolation pier filling component and an isolation pier guardrail filling component.

[0026] The cement pier 1 and the light-proof belt 2 fixedly connected to the front end of the cement pier 1, the cement pier 1 is provided with a rod ring 4 at the insertion port, and the middle ring hole of the rod ring 4 is penetrated by a construction support rod 3, an isolation pier assembly component is installed on the cement pier 1; an isolation pier filling component is provided on the cement pier 1, and is movably connected to the isolation pier assembly component, and is used for assembling the isolation pier on the isolation pier filling component; an isolation pier guardrail filling component is installed on the rod ring 4, and a connecting ring 6 is penetrated and connected on one side of the cement pier 1, and a through hole 7 is opened at the inner connection of the connecting ring 6, and a trunk road guardrail 5 is slidably connected to the inner side of the through hole 7, and the guardrail is slidably installed on the isolation pier assembly component.

[0027] In this embodiment, the trunk road guardrail 5 passes through the three cement piers 1 and the through hole 7, so that the connecting ring 6 is threadedly encapsulated in the through hole 7, and the trunk road construction isolation pier connection is carried out. The connection between the isolation pier and the trunk road guardrail 5 is clamped by the guardrail ring 9 and the threaded sleeve 10. The guardrail ring 9 and the threaded sleeve 10 can be threadedly reinforced at the connection between a single isolation pier and the trunk road guardrail 5, and multiple trunk road construction isolation piers are used for installation. The rod ring 4 is encapsulated in the cement cylinder 16 at the top of the three cement piers 1. After the construction support rod 3 is inserted into the cement cylinder 16, cement is filled into the cement cylinder 16. The rod ring 4 is reinforced and installed at the connection between the construction support rod 3 and the cement cylinder 16, which is convenient for the three cement piers 1 to be connected and assembled. The trunk road construction isolation pier is used for secondary reinforcement. The single cement-filled cement pier 1 can be transported and used later, and the cement filling plate 8 at the bottom of the cement pier 1 can be pre-buried for cement filling.

[0028] Please refer to Figure 1 and Figure 2 In this embodiment, the isolation pier assembly component includes a threaded sleeve 10 movably installed at the connection point of the trunk highway guardrail 5, and a guardrail ring 9 is arranged on the outside of the threaded sleeve 10. The guardrail ring 9 is sleeved on the connecting end of the trunk highway guardrail 5. The trunk highway guardrail 5 passes through the cement pier 1 and the through hole 7. The guardrail ring 9 is embedded in the through hole 7 and is used to reinforce the isolation piers on the isolation pier filling assembly.

[0029] The connection between a single isolation pier and the trunk highway guardrail 5 is threadedly buckled on the railing ring 9 through a threaded sleeve 10, and the railing ring 9 is mounted on the connecting end of the trunk highway guardrail 5. The threaded sleeve 10 and the railing ring 9 are assembled and fastened at the connection between the isolation pier and the trunk highway guardrail 5, and the single isolation pier can be connected and reinforced on both sides. Therefore, the three cement piers 1 are assembled and fastened by the threaded sleeve 10 and the railing ring 9 to form an integrated structure. After the isolation piers of the trunk highway construction collide, the three cement piers 1 are assembled and fastened by the threaded sleeve 10 and the railing ring 9 to withstand a certain collision pressure, which is beneficial to the secondary connection of the isolation piers of the trunk highway construction through the guardrail, thereby improving the overall stability.

[0030] Please refer to Figure 1 and Figure 3 In this embodiment, the isolation pier filling assembly includes a cement filling plate 8 movably connected to the cement pier 1, and a cement groove 13 is fixedly opened in the middle of the cement filling plate 8, and a penetrating cement column 11 is fixedly connected in the cement groove 13.

[0031] The cement troughs 13 are distributed on the cement filling plate 8, and the penetrating cement columns 11 are fixedly connected to the cement troughs 13. The cement filling plate 8 and the penetrating cement columns 11 are an integrated concrete structure.

[0032] Please refer to Figure 1 and Figure 3 In this embodiment, the isolation pier filling assembly also includes a cement filling groove 12 opened on the inner side of the cement column 11, and the holes around the bottom of the cement pier 1 are slidably inserted into the cement column 11. The cement filling groove 12 is used for cement filling. The cement filling plate 8 can be pre-buried at the construction site of the trunk highway and used for the isolation pier reinforcement to position the highway construction on the isolation pier guardrail filling assembly.

[0033] After the cement filling plate 8 and the through cement column 11 form an integrated concrete structure, the holes around the bottom of the cement pier 1 are slidably inserted into the through cement column 11, and the cement filling groove 12 is opened at the bottom of the cement pier 1. After the through cement column 11 and the holes around the bottom of the cement pier 1 are inserted and merged, cement can be poured into the cement filling groove 12. The cement filling plate 8 can be pre-buried on both sides of the highway construction. After the isolation pier is used, the construction personnel can move the cement filling plate 8 and the cement pier 1 to both sides of the trunk road as guardrails, and solidify the cement through the cement filling groove 12 and the cement filling plate 8. The cement filling plate 8 can be directly pre-buried, and the isolation pier of the trunk road construction is connected and used through the guardrail to improve the overall stability of the cement filling groove 12 and the cement filling plate 8, prevent the trunk road construction guardrail from tipping over after the isolation pier collides, and perform secondary reinforcement. After the trunk road is constructed, the unfilled cement filling plate 8 and cement pier 1 can also be disassembled and transported.

[0034] Please refer to Figure 1 and Figure 4 In this embodiment, the isolation pier guardrail filling assembly includes a plug-in ring 15 movably installed at the rod installation position of the construction support rod 3, and a connecting rod 14 is provided at the threaded connection of the plug-in ring 15. The connecting rod 14 passes through the inner side of the construction support rod 3, and the plug-in ring 15 is threadedly buckled at the connection between the connecting rod 14 and the construction support rod 3.

[0035] The rod ring 4 is encapsulated in the cement cylinder 16 at the top of the three cement piers 1. After the construction support rod 3 is inserted into the cement cylinder 16, cement is filled into the cement cylinder 16. The rod ring 4 is reinforced and installed at the connection between the construction support rod 3 and the cement cylinder 16. The connecting rod 14 can be inserted through the inner side of the construction support rod 3 for support. The plug-in ring 15 can be threaded and buckled on both sides of the opposing construction support rods 3 for reinforcement and limiting.

[0036] Please refer to Figure 1 and Figure 4 In this embodiment, the isolation pier guardrail filling assembly also includes a cement cylinder 16 threadedly connected to the bottom of the rod ring 4, and the cement cylinder 16 is fixedly connected to the inner side of the top of the cement pier 1.

[0037] The hollow cement cylinder 16 is fixedly connected to the top of the three cement piers 1. After the construction support rod 3 is inserted into the cement cylinder 16, cement is filled into the cement cylinder 16, and the construction support rod 3 can be solidified and erected.

[0038] Preferably, after the construction support rod 3 is inserted into the cement cylinder 16, the rod ring 4 is threadedly locked at the connection between the construction support rod 3 and the cement cylinder 16, which is used for cement filling of the isolation pier guardrail. The construction support rod 3 can be inserted into the cement cylinder 16 to inspect the cement filling and solidification. The rod ring 4 is threadedly wrapped at the connection between the construction support rod 3 and the cement cylinder 16. The rod ring 4 can prevent rainwater from corroding the concrete cement at the connection, thereby increasing the overall height of the three cement piers 1, which is convenient for secondary concrete pouring of isolation piers in trunk highway construction.

[0039] As can be seen from the above, the holes around the bottom of the cement pier 1 are slidably inserted into the cement column 11, and the cement filling groove 12 is opened at the bottom of the cement pier 1. After the cement column 11 and the holes around the bottom of the cement pier 1 are inserted and merged, cement can be poured into the cement filling groove 12. The cement filling plate 8 can be pre-buried on both sides of the highway construction. After the isolation pier is used, the construction personnel can move the cement filling plate 8 and the cement pier 1 to both sides of the trunk road as guardrails, and the cement is filled and solidified through the cement filling groove 12 and the cement filling plate 8.

[0040] The rod ring 4 is encapsulated in the cement cylinder 16 at the top of the three cement piers 1. After the construction support rod 3 is inserted into the cement cylinder 16, cement is filled into the cement cylinder 16. The rod ring 4 is reinforced and installed at the connection between the construction support rod 3 and the cement cylinder 16, which is convenient for the connection and assembly of the three cement piers 1.

[0041] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0042] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. An isolation pier, comprising a cement pier (1) and a light-proof belt (2) fixedly connected to the front end of the cement pier (1), a rod insertion ring (4) is provided at the insertion port of the cement pier (1), a construction support rod (3) is passed through the middle ring hole of the rod insertion ring (4), and the characteristics are: An isolation pier assembly component is installed on the cement pier (1); An isolation pier filling assembly is arranged on the cement pier (1) and is movably connected to the isolation pier assembly assembly, and is used for assembling the isolation pier on the isolation pier filling assembly; The isolation pier guardrail filling assembly is installed on the rod insertion ring (4), and a connecting ring (6) is connected through one side of the cement pier (1). A through hole (7) is opened at the inner connection of the connecting ring (6). A trunk road guardrail rod (5) is slidably connected to the inner side of the through hole (7), so that the guardrail rod can be slidably installed on the isolation pier assembly assembly.

2. The isolation pier according to claim 1, characterized in that: The isolation pier assembly component comprises a threaded sleeve (10) movably mounted on the connection point of the trunk road guardrail (5); a guardrail ring (9) is arranged on the outside of the threaded sleeve (10); the guardrail ring (9) is sleeved on the connection end of the trunk road guardrail (5); the trunk road guardrail (5) passes through the cement pier (1) and the through hole (7); the guardrail ring (9) is embedded in the through hole (7) and is used for reinforcing the isolation piers on the isolation pier filling component.

3. The isolation pier according to claim 2, characterized in that: The isolation pier filling assembly comprises a cement filling plate (8) movably connected to the cement pier (1), wherein a cement groove (13) is fixedly opened in the middle of the cement filling plate (8), and a penetrating cement column (11) is fixedly connected in the cement groove (13).

4. The isolation pier according to claim 3, characterized in that: The isolation pier filling assembly also includes a cement filling groove (12) arranged on the inner side of the through cement column (11); the holes around the bottom of the cement pier (1) are slidably inserted into the through cement column (11); the cement filling groove (12) is used for cement filling; the cement filling plate (8) can be pre-buried at the construction site of the trunk highway and used for the isolation pier reinforcement on the isolation pier guardrail filling assembly to perform highway construction positioning.

5. The isolation pier according to claim 4, characterized in that: The isolation pier guardrail filling assembly comprises a plug-in ring (15) movably mounted at the rod mounting position of the construction support rod (3); a connecting rod (14) is provided at the threaded connection position of the plug-in ring (15); the connecting rod (14) passes through the inner side of the construction support rod (3); and the plug-in ring (15) is threadedly buckled at the connection position between the connecting rod (14) and the construction support rod (3).

6. The isolation pier according to claim 5, characterized in that: The isolation pier guardrail filling assembly also includes a cement cylinder (16) threadedly connected below the rod inserting ring (4), and the cement cylinder (16) is fixedly connected to the inner side of the top end of the cement pier (1).

7. The isolation pier according to claim 6, characterized in that: After the construction support rod (3) is inserted into the cement cylinder (16), the rod insertion ring (4) is threadedly locked at the connection between the construction support rod (3) and the cement cylinder (16) for cement filling of the isolation pier guardrail.