Efficient-operation construction device for underground diaphragm wall
By using a combination device of steel cage, conduit, inner pipe and steel frame in underground continuous wall construction, the problems of low efficiency and waste of materials in traditional construction are solved, and efficient underground continuous wall construction and structural strength improvement are achieved, reducing the Construction cost.
Patent Information
- Application Number
- CN202323467102.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2033-12-19
AI Technical Summary
Traditional underground continuous wall construction has problems such as large burial depth of impermeable layers, low construction efficiency of ground-connected walls, waste of materials and inconvenient foundation pit construction, and cannot effectively solve the problems of high construction costs and low efficiency in underground space development.
A construction device including a steel cage, a conduit, an inner pipe and a steel frame is designed. An inner pipe and a bottom plate are provided in the inner pipe, and a steel frame is provided in the inner pipe. The conduit and the inner pipe are connected through a C-shaped plate and a overlapping plate. A support table is formed, and the steel frame is used to enhance structural strength and to enable rapid installation and adjustment using rolling and fixed components.
It improves the construction efficiency and structural strength of underground continuous walls, reduces material waste, ensures the load-bearing capacity and construction convenience of ground-connected walls, and has good economic benefits.
Smart Images

Figure CN221941343U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering construction, in particular to a construction device for an underground continuous wall with high efficiency. Background Art
[0002] With the rapid development of urban underground space development in my country, underground continuous walls have become a common structure for urban deep underground space development. The main feature is that underground continuous walls can be used as both temporary support structures and permanent structures. These advantages have been proven in the process of urban underground space development. Underground continuous walls have the functions of water interception, anti-seepage, load bearing, and water retaining, and have the advantages of good integrity and fast construction speed, and are widely used. Traditional underground continuous walls have good water interception and anti-seepage functions, but if the bottom of the traditional underground continuous wall is not embedded with an impermeable layer, its water interception and anti-seepage effects are poor. Therefore, the traditional underground continuous wall is often cast at a large depth, which often results in material waste.
[0003] Chinese patent document CN 114382073 A records an underground continuous wall system and its construction method for protecting springs or groundwater. This system cannot solve the problem of deep burial of the impermeable layer and low construction efficiency of the ground-connected wall, which ultimately leads to inconvenience in foundation pit construction; Chinese patent document CN 109024645 A records an integrated water-stop curtain, a sponge city water circulation system and method. This system also has the above-mentioned problems, has defects in use, and needs to be improved. Utility Model Content
[0004] The utility model provides an underground continuous wall construction device with high efficiency, which solves the problems that the underground continuous wall cannot adapt to the soil structure well, the overall construction cost is high, and the construction efficiency of the inner foundation pit is greatly affected.
[0005] In order to solve the above technical problems, the technical solution adopted by the utility model is: a construction device for an underground continuous wall with high efficiency, including a steel cage arranged in the ground continuous wall, a conduit passing through the steel cage, a detachable inner tube being provided on the inner side of the conduit, a detachable bottom plate being provided on the lower part of the conduit, a steel frame being provided in the inner tube, and the steel frame being used to enhance the structural strength of the conduit.
[0006] In a preferred solution, there are multiple conduits, two adjacent conduits are connected via a fixing assembly, and the inner side of the conduit is connected to the inner tube via multiple C-shaped plates and lap plates.
[0007] In the preferred solution, multiple notches are provided at both ends of the conduit along the circumferential direction, and the two connected conduits are plugged in. The fixing assembly includes two semi-ring plates arranged opposite to each other, the semi-ring plates are attached to the outside of the conduit, and ear plates are provided on both sides of the semi-ring plates. The two semi-ring plates are connected by screws and nuts.
[0008] In a preferred solution, an annular groove is provided on one side of the notch, two convex strips are provided in parallel on the inner side of the semi-ring plate, the convex strips are located in the annular groove, and the screws are passed through the ear plate.
[0009] In the preferred embodiment, a plurality of empty grooves are provided circumferentially through the conduit, a C-shaped plate is arranged on the inner side opposite to the empty groove, the lap plate includes an L-shaped plate, side plates are provided on both sides of the L-shaped plate, the L-shaped plate and the side plates are attached to the C-shaped plate, the C-shaped plate includes a first arc and a second arc, the first arc is attached to the inner side of the conduit, the second arc is attached to the outer side of the L-shaped plate, a shaping protrusion is provided on the middle part of the lower side of the L-shaped plate, the lap plate and the C-shaped plate cooperate to form a support platform for accommodating concrete, a groove is provided on the support platform, a steel frame is overlapped on the groove, and support platforms of different heights are arranged in a spiral manner with sufficient gaps between their projections at the bottom.
[0010] In the preferred scheme, the steel frame includes straight bars, a plurality of sleeves are sleeved on the straight bars, a plurality of alignment bars are circumferentially provided on the sleeves, one side of the alignment bar is located in the groove, a first step and a second step are respectively provided on both sides of the inner tube, an internal thread and an external thread are respectively provided on the first step and the second step, two adjacent inner tubes are threadedly connected, an L-shaped plate is fixed to the outside of the lap plate, and an installation number and an installation alignment mark are also provided on the outside of the inner tube.
[0011] In a preferred solution, a rolling assembly is detachably provided on the upper portion of the lap plate. The rolling assembly includes a ball bearing, and the ball bearing is slidably connected to the inner side of the conduit.
[0012] In the preferred solution, two first threaded holes are symmetrically provided on the upper part of the lap plate, a support and a T-plate are provided on the rolling assembly, the T-plate is connected to the lap plate through fixing nails, the fixing nails are passed through the T-plate and the first threaded holes, and the ball is arranged in the support.
[0013] In the preferred solution, a constraint hole and a second threaded hole are provided in the support, a threaded column is detachably provided in the second threaded hole, a constraint groove is provided on one side of the threaded column, the constraint hole and the constraint groove cooperate to form a movement space for the ball, and the ball can be rolled in the support.
[0014] In the preferred solution, a buffer hole is provided in the middle of the threaded column, a spring is provided in the buffer hole, the spring rests on the ball, a rotating disk is also provided at the end of the threaded column, and a plurality of friction-enhancing grooves are provided circumferentially on the outer side of the rotating disk.
[0015] The beneficial effects of the utility model are as follows: a conduit is arranged in the steel cage of the ground-connected wall, and the conduit is used as the water suction port of the precipitation well for rapid construction. At the same time, an inner pipe is arranged in the conduit, and the inner pipe is connected to the conduit through a C-shaped plate and a lap plate, so as to cooperate to form a support platform during the initial pouring of the ground-connected wall. When the precipitation is completed, the conduit needs to be blocked. At this time, the inner pipe and the lap plate are taken out of the inner pipe, and the steel frame is put into the inner pipe and cooperates with the support platform to pour concrete in the conduit. The support platform is used as a structural extension of the concrete that has reached the strength. It is connected between the steel frame and the post-poured concrete to ensure the structural strength of the inner core of the ground-connected wall, thereby ensuring the overall bearing capacity. The construction is convenient and has good economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The utility model is further described below in conjunction with the accompanying drawings and embodiments:
[0017] Figure 1 It is the schematic diagram state 1 of the utility model;
[0018] Figure 2 It is the schematic diagram state 2 of the utility model;
[0019] Figure 3 It is the schematic diagram state three of the utility model;
[0020] Figure 4 It is the schematic diagram state 4 of the utility model;
[0021] Figure 5 It is the schematic diagram state five of the utility model;
[0022] Figure 6 It is the schematic diagram state six of the utility model;
[0023] Figure 7 It is the schematic diagram state seven of the utility model;
[0024] Figure 8 It is the schematic diagram state eight of the utility model;
[0025] Fig. 9 It is the schematic diagram state nine of the utility model;
[0026] Fig.10 This is a schematic diagram of the installation structure of the conduit and the inner tube of the utility model in state 1;
[0027] Fig.11 This is the schematic diagram of the installation structure of the conduit and the inner tube of the utility model in state 2;
[0028] Fig.12 This is the third state of the schematic diagram of the installation structure of the conduit and the inner tube of the utility model;
[0029] Fig.13 yes Fig.12 Schematic diagram of steel frame structure;
[0030] Fig.14 yes Fig.13 Schematic diagram of the explosion structure;
[0031] Fig.15 This is a schematic diagram of the installation structure of the conduit and the inner tube of the utility model in state 4;
[0032] Fig.16 yes Fig.15 A bottom view schematic diagram of
[0033] Fig.17 yes Fig.15 A front view schematic diagram of
[0034] Fig.18 yes Fig.17 AA sectional view of FIG.
[0035] Fig.19 yes Fig.15 Schematic diagram of explosion structure state 1;
[0036] Fig. 20 yes Fig.15 Schematic diagram of the explosion structure in state 2;
[0037] Fig.21 yes Fig.15 Schematic diagram of the local structure;
[0038] Fig. 22 yes Fig.15 Schematic diagram of the C-type plate structure for duct installation;
[0039] Fig.23 yes Fig. 22 Schematic diagram of the explosion structure;
[0040] Fig.24 yes Fig. 22 Schematic diagram of installing the lap plate structure;
[0041] Fig.25 yes Fig.24 Schematic diagram of top view;
[0042] Fig.26 yes Fig.25 BB-direction cross-sectional schematic diagram;
[0043] Fig. 27 yes Fig.24 Schematic diagram of installing the inner tube structure;
[0044] Fig.28 yes Fig. 27 Schematic diagram of top view;
[0045] Fig.29 yes Fig. 27 A front view schematic diagram of
[0046] Fig.30 yes Fig. 27 Schematic diagram of the explosion structure;
[0047] Fig.31 yes Fig.30 A schematic diagram of the enlarged structure at C;
[0048] Fig.32 This is a schematic diagram of the connection state of the C-type plate, the lap plate and the rolling assembly of the utility model;
[0049] Fig.33 yes Fig.32 A right side schematic diagram of
[0050] Fig.34 yes Fig.32 A front view schematic diagram of
[0051] Fig.35 This is the second state of the schematic diagram of the connection between the C-type plate, the lap plate and the rolling assembly of the utility model;
[0052] Fig.36 yes Fig.32 Schematic diagram of explosion structure state 1;
[0053] Fig.37 yes Fig.32 Schematic diagram of the explosion structure in state two.
[0054] In the figure: ground-connected wall 1; area to be excavated 2; steel cage 3; conduit 4; empty groove 401; notch 402; annular groove 403; first water level 5; second water level 6; concrete 7; foundation pit 8; bottom cover 9; inner pipe 10; first step 1001; internal thread 1002; second step 1003; external thread 1004; installation number 1005; installation alignment mark 1006; fixing assembly 11; semi-ring plate 1101; convex strip 1102; ear plate 1103; screw 1104; nut 1105; bottom plate 12; steel frame 13; straight bar 1301; sleeve 1302; alignment rib 1303; support platform 14; groove 15; C-shaped plate 16; first arc 1601; second arc 1602; lap plate 17; L-shaped plate 1701; side plate 1702; shaping protrusion 1703; first threaded hole 1704; fixing pin 18; rolling assembly 19; support 1901; ball 1902; rotating disk 1903; increased friction groove 1904; T-shaped plate 1905; restraint hole 1906; second threaded hole 1907; threaded column 1908; restraint groove 1909; buffer hole 1910; spring 20. DETAILED DESCRIPTION
[0055] like Figure 1-9In the invention, a construction device for underground continuous wall with high efficiency is provided, comprising a steel cage 3 arranged in the ground-connected wall 1, a guide tube 4 is passed through the steel cage 3, an inner tube 10 is detachably provided on the inner side of the guide tube 4, a bottom plate 12 is detachably provided on the lower part of the guide tube 4, a steel frame 13 is provided in the inner tube 10, and the steel frame 13 is used to enhance the structural strength of the guide tube 4. After the construction of the ground-connected wall 1 is completed, it is necessary to carry out excavation work of the foundation pit 8 in the area to be excavated 2 inside the ground-connected wall 1. However, due to the different soil environment conditions in different regions, the buried depth of the impermeable layer is uncontrollable. When carrying out the foundation pit 8 operation, it is necessary to lower the first water level 5 outside the ground-connected wall 1 and the second water level 6 inside the foundation pit 8, so as to avoid the water body from damaging the construction environment and the stability of the structure. After the construction of the foundation pit 8 is completed, the bottom sealing 9 is carried out at the bottom of the foundation pit 8, so as to form an overall closed foundation support structure, which is convenient for the subsequent work process. With this structure, the inner tube 10 and the conduit 4 cooperate with each other, and the inner tube 10 provides a stable working environment for the hole-making equipment, and the hole-making equipment and the conduit 4 are spaced to ensure the structural safety of the conduit 4. At the same time, after the construction of the hole-making equipment is completed, the inner tube 10 is taken out, and the steel frame 13 is connected to the conduit 4. The steel frame 13 is overlapped on the inner side of the conduit 4. At this time, concrete 7 is poured into the conduit 4 again, and the first cast structure and the later cast structure can be connected, thereby forming an overall structure with better stability, thereby ensuring the bearing capacity of the ground-connected wall 1.
[0056] like Figure 10-12 In the preferred solution, there are multiple conduits 4, two adjacent conduits 4 are connected by a fixing assembly 11, and the inner side of the conduit 4 is connected to the inner tube 10 by multiple C-shaped plates 16 and lap plates 17. With this structure, the overall manufacturing is convenient and can be adjusted according to the construction needs on site. The C-shaped plates 16 and the lap plates 17 cooperate with each other to ensure the convenience of installation and removal of the inner tube 10.
[0057] like Figure 15-20 In the preferred solution, a plurality of notches 402 are provided at both ends of the conduit 4 along the circumferential direction, and two connected conduits 4 are plugged in, and the fixing assembly 11 comprises two semi-ring plates 1101 arranged opposite to each other, the semi-ring plates 1101 are attached to the outside of the conduit 4, and ear plates 1103 are provided on both sides of the semi-ring plates 1101, and the two semi-ring plates 1101 are connected by screws 1104 and nuts 1105. With this structure, the notches 402 on the two adjacent conduits 4 cooperate with each other, and can be quickly aligned and plugged in, and the semi-ring plates 1101 can better fix the two conduits 4, and the locking effect is good.
[0058] like Figure 21-31In the preferred solution, a ring groove 403 is provided on one side of the notch 402, two convex strips 1102 are provided in parallel on the inner side of the semi-ring plate 1101, the convex strips 1102 are located in the ring groove 403, and the screws 1104 are passed through the ear plate 1103. With this structure, the contact effect between the semi-ring plate 1101 and the conduit 4 is better, the conduit 4 is more fully fixed, and the conduit 4 is prevented from moving in the axial direction, and the ring sleeve 403 plays the role of alignment and limiting.
[0059] In the preferred embodiment, a plurality of empty grooves 401 are provided circumferentially through the conduit 4, the C-shaped plate 16 is arranged on the inner side opposite to the empty grooves 401, the lap plate 17 includes an L-shaped plate 1701, side plates 1702 are provided on both sides of the L-shaped plate 1701, the L-shaped plate 1701 and the side plates 1702 are attached to the C-shaped plate 16, the C-shaped plate 16 includes a first arc 1601 and a second arc 1602, the first arc 1601 is attached to the inner side of the conduit 4, the second arc 1602 is attached to the outer side of the L-shaped plate 1701, a shaping protrusion 1703 is provided in the middle part of the lower side of the L-shaped plate 1701, the lap plate 17 and the C-shaped plate 16 cooperate to form a support platform 14 for accommodating concrete 7, the support platform 14 is provided with a groove 15, the steel frame 13 is overlapped on the groove 15, and the support platforms 14 of different heights are arranged in a spiral manner with sufficient gaps between their projections at the bottom. With this structure, the empty groove 401 provides an overflow channel for the concrete 7. The concrete 7 enters the cavity formed by the C-shaped plate 16 and the lap plate 17 through the empty groove 401, and finally solidifies under the structure of the C-shaped plate 16 and the lap plate 17 to form a support platform 14 with a groove 15. The support platform 14 is convenient for the subsequent positioning and locking of the steel frame 13. When in use, a release agent is applied to the inner side of the lap plate 17 to facilitate the subsequent removal of the inner tube 10 from the C-shaped plate 16.
[0060] like Figure 13-14In the preferred scheme, the steel frame 13 includes a straight rib 1301, a plurality of sleeves 1302 are sleeved on the straight rib 1301, a plurality of alignment ribs 1303 are circumferentially provided on the sleeve 1302, one side of the alignment rib 1303 is located in the groove 15, a first step 1001 and a second step 1003 are respectively provided on both sides of the inner tube 10, an internal thread 1002 and an external thread 1004 are respectively provided on the first step 1001 and the second step 1003, two adjacent inner tubes 10 are threadedly connected, an L-shaped plate 1701 is fixed to the outer side of the lap plate 17, and an installation number 1005 and an installation alignment mark 1006 are also provided on the outer side of the inner tube 10. With this structure, the position of the sleeve 1302 and the alignment rib 1303 can be flexibly adjusted according to the position of the support platform 14, ensuring high construction accuracy. After the positioning is completed, the sleeve 1302 is welded to the straight rib 1301. The alignment rib 1303 can also play a role in correcting the straight rib 1301 to ensure that it is located in the center of the conduit 4, so that the overall installation accuracy is high and the effect is good. The installation of the inner tube 10 adopts the form of threaded connection, which has a good overall sealing effect, a large adjustment range, and a high strength of the connection structure. During installation, the lowermost conduit 4 and the inner tube 10 are first fixed. After the inner tube 10 is adjusted to the designed position, a long wooden square with a cross-sectional size that matches the internal size of the empty slot 401 can be inserted into the empty slot 401 and locked. , the end of the long wooden square is against the inner side of the lap plate 17, and then the new conduit 4 is continued to be installed on the upper part of the conduit 4. After the two conduits 4 are fully locked, the new inner tube 10 is placed in the new conduit 4 until it is adjusted to the appropriate position, and then the long wooden square is continued to be used for locking. The above steps are repeated until the installation of all conduits 4 and inner tubes 10 is completed. After all the installation is completed, multiple holes are drilled on the uppermost conduit 4 and inner tube 10, and the multiple holes are evenly arranged. Then, bolts and nuts are inserted for limit locking. Lifting ears are set on the bolts to facilitate subsequent lifting. When the conduit 4 and the inner tube 10 are installed, in order to facilitate operation, the conduit 4 and the inner tube 10 can be placed horizontally on a relatively flat ground to avoid the inconvenience of operation in the height direction.
[0061] like Figure 32-37 In the preferred solution, the upper part of the lap plate 17 is detachably provided with a rolling assembly 19, which includes a ball 1902, and the ball 1902 is slidably connected to the inner side of the conduit 4. With this structure, during the adjustment process of the inner tube 10, the plurality of balls 1902 cooperate to play a self-centering role, and when in contact with the conduit 4, the friction force is small, and the rotation is stable and smooth.
[0062] In the preferred solution, two first threaded holes 1704 are symmetrically arranged on the upper part of the lap plate 17, a support 1901 and a T-shaped plate 1905 are arranged on the rolling assembly 19, the T-shaped plate 1905 is connected to the lap plate 17 through a fixing nail 18, the fixing nail 18 is inserted into the T-shaped plate 1905 and the first threaded hole 1704, and the ball 1902 is arranged in the support 1901. With this structure, the lap plate 17 and the support 1901 are convenient to connect, and when maintenance is required, they can be quickly replaced and adjusted, and the ball 1902 can rotate freely in the support 1901, so that it can adapt to different angles and different heights of direction adjustment when in contact with the conduit 4, within the overall adjustment range.
[0063] In the preferred solution, a restraining hole 1906 and a second threaded hole 1907 are provided in the support 1901, a threaded column 1908 is detachably provided in the second threaded hole 1907, a restraining groove 1909 is provided on one side of the threaded column 1908, and the restraining hole 1906 and the restraining groove 1909 cooperate to form a movement space for the ball 1902, and the ball 1902 can be rolled in the support 1901. With this structure, the ball 1902 can rotate in the restraining hole 1906 and the restraining groove 1909, and the stud 1908 can quickly lock the restraining hole 1906, which is easy to manufacture and flexible to install and disassemble.
[0064] In the preferred solution, a buffer hole 1910 is provided in the middle of the threaded column 1908, a spring 20 is provided in the buffer hole 1910, the spring 20 abuts against the ball 1902, and a rotating disk 1903 is also provided at the end of the threaded column 1908, and a plurality of friction grooves 1904 are provided along the circumferential direction on the outer side of the rotating disk 1903. With this structure, when the conduit 4 is squeezed and deformed by the concrete 7 on one side, the ball 1902 can adjust its position under the expansion and contraction of the spring 20, and the overall adaptability is better. When operating the threaded column 1908, the rotating disk 1903 is adjusted, and the friction grooves 1904 are increased to facilitate manual holding operation.
[0065] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A highly efficient underground continuous wall construction device, characterized by: The invention comprises a steel cage (3) arranged in a ground-connected wall (1), a guide tube (4) passing through the steel cage (3), a detachable inner tube (10) provided on the inner side of the guide tube (4), a detachable bottom plate (12) provided on the lower part of the guide tube (4), a steel frame (13) provided in the inner tube (10), and the steel frame (13) used to enhance the structural strength of the guide tube (4).
2. The construction device for an underground continuous wall with high efficiency according to claim 1, characterized in that: There are multiple conduits (4), two adjacent conduits (4) are connected via a fixing assembly (11), and the inner side of the conduit (4) is connected to the inner tube (10) via multiple C-shaped plates (16) and a lap plate (17).
3. The construction device for an underground continuous wall with high efficiency according to claim 2, characterized in that: A plurality of notches (402) are provided at both ends of the conduit (4) along the circumferential direction, and the two connected conduits (4) are plugged in. The fixing assembly (11) comprises two semi-annular plates (1101) arranged opposite to each other, the semi-annular plates (1101) being fitted on the outside of the conduit (4), and ear plates (1103) being provided on both sides of the semi-annular plates (1101), and the two semi-annular plates (1101) being connected by screws (1104) and nuts (1105).
4. The construction device for an underground continuous wall with high efficiency according to claim 3, characterized in that: An annular groove (403) is provided on one side of the notch (402), two convex strips (1102) are provided in parallel on the inner side of the semi-annular plate (1101), the convex strips (1102) are located in the annular groove (403), and the screws (1104) are passed through the ear plate (1103).
5. The construction device for an underground continuous wall with high efficiency according to claim 2, characterized in that: The conduit (4) is provided with a plurality of empty slots (401) along the circumferential direction, the C-shaped plate (16) is provided on the inner side of the empty slots (401), the lap plate (17) includes an L-shaped plate (1701), and side plates (1702) are provided on both sides of the L-shaped plate (1701), the L-shaped plate (1701) and the side plates (1702) are attached to the C-shaped plate (16), and the C-shaped plate (16) includes a first arc (1601) and a second arc (1602), the first arc (1601) is attached to the conduit (4 ) on the inner side, the second arc (1602) is fitted on the outer side of the L-shaped plate (1701), and a shaping protrusion (1703) is provided in the middle of the lower side of the L-shaped plate (1701). The lap plate (17) and the C-shaped plate (16) cooperate to form a support platform (14) for accommodating the concrete (7). A groove (15) is provided on the support platform (14), and the steel frame (13) is overlapped on the groove (15). The support platforms (14) of different heights are arranged in a spiral manner, and there is sufficient gap between their projections at the bottom.
6. The highly efficient underground continuous wall construction device according to claim 5, characterized in that: The steel frame (13) includes straight bars (1301), a plurality of sleeves (1302) are provided on the straight bars (1301), and a plurality of alignment bars (1303) are provided on the sleeves (1302) along the circumferential direction. One side of the alignment bar (1303) is located in the groove (15). A first step (1001) and a second step (1003) are provided on both sides of the inner tube (10), respectively. The first step (1001) and the second step (1003) are provided with an internal thread (1002) and an external thread (1004), respectively. Two adjacent inner tubes (10) are threadedly connected. An L-shaped plate (1701) is fixed to the outside of the lap plate (17). The outside of the inner tube (10) is also provided with an installation number (1005) and an installation alignment mark (1006).
7. The highly efficient construction device for underground continuous walls according to claim 1, characterized in that: The upper portion of the lap plate (17) is detachably provided with a rolling assembly (19), which includes a ball (1902) that is slidably connected to the inner side of the conduit (4).
8. The highly efficient underground continuous wall construction device according to claim 7, characterized in that: Two first threaded holes (1704) are symmetrically provided on the upper portion of the lap plate (17), a support (1901) and a T-shaped plate (1905) are provided on the rolling assembly (19), the T-shaped plate (1905) is connected to the lap plate (17) via a fixing nail (18), the fixing nail (18) is passed through the T-shaped plate (1905) and the first threaded holes (1704), and the ball (1902) is arranged in the support (1901).
9. The highly efficient construction device for underground continuous walls according to claim 8, characterized in that: A restraining hole (1906) and a second threaded hole (1907) are provided in the support (1901); a threaded column (1908) is detachably provided in the second threaded hole (1907); a restraining groove (1909) is provided on one side of the threaded column (1908); the restraining hole (1906) and the restraining groove (1909) cooperate to form a movement space for the ball (1902); and the ball (1902) is rollably provided in the support (1901).
10. The highly efficient underground continuous wall construction device according to claim 9, characterized in that: A buffer hole (1910) is provided in the middle of the threaded column (1908), a spring (20) is provided in the buffer hole (1910), and the spring (20) rests on the ball (1902). A rotating disk (1903) is also provided at the end of the threaded column (1908), and a plurality of friction-enhancing grooves (1904) are provided on the outer side of the rotating disk (1903) along the circumferential direction.