Bridge open caisson foundation structure applied to permeable soft foundation
By layering the method of reinforcement of the foundation with bottom seal concrete and steel pipe sleeves, the problems of insufficient bearing capacity and construction difficulty of caisson foundations with weak permeability and large burial depth of the base rock are solved, and the stability of the caisson foundation and Construction efficiency ensures the safety of the main piers of the bridge.
Patent Information
- Application Number
- CN202420247624.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-01
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-02-01
AI Technical Summary
In the case of weak permeability foundations and underworld bedrocks, traditional caisson infrastructure design is difficult to meet the foundation bearing capacity requirements, and the construction is difficult, which affects construction safety and efficiency.
Layered cast bottom seal concrete and embedded steel pipe sleeves are used to reinforce the foundation by grouting vertical and inclined steel pipe piles, and reinforce the pipe piles with the foundation outside the well to improve the stability of the caisson body and avoid the difficulty of designing ultra-high caisson foundations. .
The problems of insufficient foundation bearing capacity and difficult construction are solved, the stability and construction efficiency of the bridge caisson foundation are improved, and the safety of the main piers of the bridge is ensured.
Smart Images

Figure CN221941409U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge foundation construction, in particular to a bridge caisson foundation structure applied to a permeable soft foundation. Background Art
[0002] In recent years, my country's highway infrastructure construction has developed rapidly, and the number of cross-river bridges has increased. If the bridge is located in a weak foundation and the underlying bedrock is buried deep, pile foundations are not suitable, and a separated caisson foundation must be used. In the production and construction of caisson technology, subject to the constraints of its design requirements and site conditions, caisson construction is a commonly used construction method when building deep foundations under soft soil geological conditions such as limited construction sites, high groundwater levels, large water inflows, or underground pressurized water. This method has the advantages of small footprint, small amount of excavation, simple construction equipment, and small impact on the surrounding environment. Its construction steps are roughly as follows: dig soil in the well, rely on its own gravity to overcome the friction resistance of the well wall and sink to the designed elevation, then seal the bottom with concrete and fill the well hole to make it the foundation of the bridge pier or other structure.
[0003] Applied research has found that the geological conditions for caisson construction are complex. If there are problems such as inconsiderate design and deviations in construction technology, it is easy to cause the surrounding ground to sink, shift or crack, which not only seriously affects the construction quality of the caisson, but also poses a threat to the safety of construction workers. In addition, the accuracy of the caisson sinking into place must be guaranteed to be within a certain range of values. The higher the design elevation of the caisson, the more complex and difficult the construction is, and the lower the sinking accuracy is. Therefore, in order to ensure construction safety and quality and improve construction efficiency, the design elevation of the caisson cannot be infinitely high. If the bridge is located on a permeable soft foundation and the underlying bedrock is buried deep, the use of traditional caisson foundation structures has exceeded the industry design limit, and the caisson foundation structure needs to be redesigned. Summary of the invention
[0004] The purpose of the utility model is to provide a bridge caisson foundation structure for use in a permeable soft foundation. The application of the bridge caisson foundation structure does not require the design of an ultra-high caisson foundation, and can solve the problems of insufficient foundation bearing capacity and great construction difficulty caused by the soft permeability of the foundation and the great depth of the underlying bedrock, thereby ensuring the stability and safety of the main pier foundation of the bridge.
[0005] The utility model is realized by the following technical solutions:
[0006] A bridge caisson foundation structure used in permeable soft foundation includes a caisson body, wherein bottom sealing concrete is poured at the bottom of the well chamber of the caisson body, foam concrete is filled in the well chamber above the bottom sealing concrete, and a reinforced concrete cover plate is poured on the top of the caisson body. The bottom sealing concrete is divided into an upper bottom sealing concrete and a lower bottom sealing concrete, that is, the conventional bottom sealing concrete layer is poured twice, and the upper bottom sealing concrete is constructed after the lower layer is poured and hardened, and a plurality of steel pipe sleeves are pre-embedded in the lower bottom sealing concrete, and vertical steel pipe piles and inclined steel pipe piles are placed extending downward in the steel pipe sleeves, and a plurality of slurry outlet holes are respectively provided on the pipe walls of the vertical steel pipe piles and the inclined steel pipe piles, and underwater concrete is poured in the vertical steel pipe piles and the inclined steel pipe piles, so that the foundation reinforcement grouting in the well is realized, and the construction flow of the foundation reinforcement grouting in the well is The process is: pour the lower bottom sealing concrete and embed the steel pipe sleeve in advance. The inside of the steel pipe sleeve is used as the pile hole. Use a down-the-hole drill to continue drilling downward in the steel pipe sleeve. According to the design, vertical steel pipe piles and inclined steel pipe piles are placed and grouting is performed in the appropriate steel pipe sleeves. Then the upper bottom sealing concrete is poured. The inclined steel pipe piles are inserted into the steel sleeves arranged outwardly on the side of the well wall in the well bin. The vertical steel pipe piles are inserted into the vertically arranged steel pipe sleeves in the entry bin. The lower ends of the vertical steel pipe piles and the inclined steel pipe piles are extended into the foundation at the bottom of the caisson body. The steel pipe piles close to the well wall are vertical steel pipe piles and inclined steel pipe piles arranged alternately. The inclination angle of the inclined steel pipe piles is 8°. The extension of the steel pipe piles strictly follows the relevant requirements of the "Steel Structure Welding Code" (GB50661-2011) and sleeve welding is adopted. In order to improve the stability of the caisson body, an outer foundation reinforcement pipe pile is arranged in the outer peripheral foundation of the caisson body. The pipe wall of the outer foundation reinforcement pipe pile is provided with multiple grouting holes, and high-pressure rotary jet grouting is adopted in the outer foundation reinforcement pipe pile.
[0007] Further preferred: the steel pipe sleeve is pre-embedded and installed by a positioning frame, the steel pipe sleeve is connected and fixed to the positioning frame, and before pouring the lower bottom sealing concrete, the steel pipe sleeve is first positioned and installed by the positioning frame, and then the lower bottom sealing concrete is poured. After the lower bottom sealing concrete reaches the hardening requirement, a steel pipe pile hole is drilled downward in the steel pipe sleeve.
[0008] Further preferably, the positioning frame comprises longitudinal bars and transverse bars, a plurality of longitudinal bars and a plurality of transverse bars are connected to form a grid-like bracket, the grid-like bracket is also connected and supported with vertical bars, and the height of the vertical bars is consistent with the height of the lower bottom sealing concrete.
[0009] Further preferably, the grid-like bracket is divided into two layers, the upper and lower layers of the grid-like bracket are connected in series through vertical rods.
[0010] The caisson foundation structure of the bridge applied in the permeable soft foundation is cleverly set up. The bottom concrete is poured in layers, a steel pipe sleeve is pre-buried in the lower bottom concrete, and then pile holes are drilled downward in the steel pipe sleeve, and then steel pipe piles are placed. High-pressure rotary jet grouting is performed in the steel pipe sleeve to improve the stability of the caisson foundation. There is no need to design an ultra-high caisson foundation in the permeable soft foundation, which can solve the problem of insufficient foundation bearing capacity caused by the soft permeability of the foundation and the deep burial depth of the underlying bedrock. It also avoids the problems of great construction difficulty and low construction efficiency caused by the construction of an ultra-high caisson foundation, and improves the efficiency of building bridge pier foundations in permeable soft foundations. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a structural schematic diagram of the bridge caisson foundation structure applied to permeable soft foundation;
[0012] Figure 2 yes Figure 1 Schematic diagram of top view;
[0013] Figure 3 yes Figure 1 Schematic diagram of the arrangement of the positioning frame at A in the middle;
[0014] Figure 4 yes Figure 3 A schematic diagram of the top view of the middle positioning frame;
[0015] The names corresponding to the numbers in the figure are:
[0016] 1. Pipe piles for reinforcing the foundation outside the well; 2. Caisson body; 3. Foam concrete; 4. Reinforced concrete cover plate; 5. Upper bottom concrete; 6. Lower bottom concrete; 7. Vertical steel pipe piles; 8. Inclined steel pipe piles; 9. Positioning frame. DETAILED DESCRIPTION
[0017] In order to describe the present technology more clearly, the present technology is further described in detail below with reference to the accompanying drawings and embodiments. Example
[0018] A bridge caisson foundation structure used in a permeable soft foundation comprises a caisson body 2, wherein a bottom seal concrete is poured at the bottom of the well chamber of the caisson body 2, a foam concrete 3 is filled in the well chamber above the bottom seal concrete, a reinforced concrete cover plate 4 is poured at the top of the caisson body 2, the bottom seal concrete is divided into an upper bottom seal concrete 5 and a lower bottom seal concrete 6, a plurality of steel pipe sleeves are pre-buried in the lower bottom seal concrete 6, vertical steel pipe piles 7 and inclined steel pipe piles 8 are placed extending downward in the steel pipe sleeves, a plurality of slurry outlet holes are respectively arranged on the pipe walls of the vertical steel pipe piles 7 and the inclined steel pipe piles 8, underwater concrete is poured in the vertical steel pipe piles 7 and the inclined steel pipe piles 8, and the well foundation reinforcement grouting is realized. The construction process of the well foundation reinforcement grouting is as follows: pouring the lower bottom seal concrete 6 and pre-buried the steel pipe sleeves , the steel pipe casing is used as a pile hole, and a down-the-hole drill is used to continue drilling downward in the steel pipe casing. According to the design, vertical steel pipe piles 7 and inclined steel pipe piles 8 are placed in the appropriate steel pipe casing and grouting is performed accordingly, and then the upper bottom sealing concrete 5 is poured. The inclined steel pipe piles 8 are inserted in the steel casing arranged outwardly on the side of the well wall in the well warehouse, and the vertical steel pipe piles 7 are inserted in the vertically arranged steel pipe casing in the warehouse. The lower ends of the vertical steel pipe piles 7 and the inclined steel pipe piles 8 are extended into the foundation at the bottom of the caisson body 2. The steel pipe piles close to the well wall are vertical steel pipe piles 7 and inclined steel pipe piles 8 arranged alternately. The inclination angle of the inclined steel pipe piles 8 is 8°. The extension of the steel pipe piles strictly follows the relevant requirements in the "Steel Structure Welding Code" (GB50661-2011) and casing welding is adopted. In order to improve the stability of the caisson body 2, an out-of-well foundation reinforcement pipe pile 1 is arranged in the outer peripheral foundation of the caisson body 2. The pipe wall of the out-of-well foundation reinforcement pipe pile 1 is provided with multiple grouting holes, and high-pressure rotary jet grouting is adopted in the out-of-well foundation reinforcement pipe pile 1.
[0019] Before excavation of the caisson construction site, the key construction procedures for site leveling and site excavation should be formulated, the general construction plan layout and the construction site earth excavation map should be drawn, the excavation route, base elevation, slope gradient, intercepting ditch, water collection well location and earthwork storage location should be determined, the measurement control network should be set up, the excavation line should be measured and laid out, and the excavation depth should be calculated according to the ground elevation. According to the geological survey data, before excavation of the construction site, various geological and topographic data of the caisson location should be collected. The geology within the construction scope of this technology is mainly muddy siltstone, and the groundwater permeability coefficient is large. In order to make the construction site excavation, the key construction procedures for site leveling and site excavation should be formulated, the general construction plan layout and the construction site earth excavation map should be drawn, the excavation route, base elevation, slope gradient, intercepting ditch, water collection well location and earthwork storage location should be determined, the measurement control network should be set up, the excavation line should be measured and laid out, and the excavation depth should be calculated according to the ground elevation. The caisson has the conditions for drainage, excavation, sinking and dry bottom sealing. To ensure the quality of the bottom sealing construction, it is necessary to take corresponding drainage measures inside and outside the caisson to reduce most of the groundwater to 4m below the blade foot elevation to ensure that the caisson is not affected by groundwater during the caisson process. The foundation pit is excavated by slope reduction. Due to the limitation of the site, the four directions are excavated at a slope ratio of 1:0.5 to the design elevation of 55m at the top of the caisson. The excavation size of the foundation pit bottom is controlled by 16.3m wide from the outer wall of the first section of the caisson, leaving sufficient working space. A 60×60cm soil ditch is excavated along the edge of the base, a 50cm broken platform is reserved at the bottom of the slope, and a 150×150×100cm water collection well soil pit is excavated at the four corners. After the excavation is completed, hollow bricks are used for masonry and mortar is used for plastering. There are six wells on the inner wall of the caisson. When the caisson reaches the design elevation, concrete bottom sealing should be carried out. When the caisson is about 2.0m away from the design elevation at the final sinking stage, the sinking speed should be slowed down, with the main focus on deviation correction, and any deviation must be corrected. The speed should be 0.2-0.5m / d. When it sinks to 1.5m away from the design elevation, stop sinking for 24 hours, observe the reserved settlement and continue sinking. When it is 50cm away from the design elevation, stop sinking and observe for 24 hours. According to the settlement obtained by continuous observation, strictly control the caisson sinking elevation so that the final sinking reaches the design elevation. Therefore, the underwater bottom seal of the caisson should be slightly higher than the design standard concrete. When the caisson sinks to 0.1m away from the design elevation, the excavation and pumping of water in the well should be stopped, so that it sinks to the design or close to the design elevation by its own weight, and then after 2-3d of sinking and stabilization, or after observation that the cumulative settlement within 8 hours is no more than 10mm, the caisson bottom seal can be carried out, and drainage bottom seal should be used as much as possible. After the bottom concrete is poured, when the concrete strength reaches 80% of the design strength, the bottom quality of the caisson is inspected. The bottom concrete of the caisson is deep underground, and it is difficult to measure the bottom quality of the caisson by general detection methods. Ground penetrating radar can be used to detect and inspect the quality of the bottom concrete.
[0020] Foam concrete 3 adopts FC A08-C3-W30-S-JG / T 266-2011 foam concrete. When pouring foam concrete in each compartment, a small eccentric load will be formed on the caisson foundation, and the hydration heat of large-volume pouring of foam concrete will have a certain influence on the quality of foam concrete. In order to reduce the influence of eccentric load formed by pouring foam concrete in compartments on the caisson foundation and ensure the construction quality of foam concrete, the compartment-by-compartment layered cast-in-place process is adopted.
[0021] The steel pipe sleeve is positioned and embedded by the positioning frame 9, and the steel pipe sleeve is connected and fixed to the positioning frame 9. Before pouring the lower bottom sealing concrete 6, the positioning frame 9 is used to position and install the steel pipe sleeve, and then the lower bottom sealing concrete 6 is poured. After the lower bottom sealing concrete 6 reaches the hardening requirement, the steel pipe pile hole is drilled downward in the steel pipe sleeve.
[0022] The positioning frame 9 includes a longitudinal rod and a transverse rod, and a plurality of longitudinal rods and a plurality of transverse rods are connected to form a grid-like bracket, and the grid-like bracket is also connected and supported with a vertical rod, and the height of the vertical rod is consistent with the height of the lower bottom sealing concrete 6. The grid-like bracket is divided into two layers, the upper and lower layers of the grid-like bracket are connected in series through the vertical rod.
[0023] The above description is not a limitation of the present application, and the present application is not limited to the above examples. Any changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present application should fall within the scope of protection of the present application.
Claims
1. A bridge caisson foundation structure applied to a permeable soft foundation, comprising a caisson body (2), wherein the bottom of the well chamber of the caisson body (2) is cast with bottom sealing concrete, the well chamber above the bottom sealing concrete is filled with foam concrete (3), and the top of the caisson body (2) is cast with a reinforced concrete cover plate (4), characterized in that: The bottom sealing concrete is divided into an upper bottom sealing concrete (5) and a lower bottom sealing concrete (6). A plurality of steel pipe sleeves are pre-buried in the lower bottom sealing concrete (6). Vertical steel pipe piles (7) and inclined steel pipe piles (8) are placed in the steel pipe sleeves extending downward. The pipe walls of the vertical steel pipe piles (7) and the inclined steel pipe piles (8) are respectively provided with a plurality of slurry outlet holes. The vertical steel pipe piles (7) and the inclined steel pipe piles (8) are both cast-in-place and pressure-filled with underwater concrete. The inclined steel pipe piles (8) are inserted into steel sleeves arranged outwardly and inclined from the side of the well wall in the well bin. The vertical steel pipe piles (7) are inserted into steel pipe sleeves arranged vertically in the entry bin. The lower ends of the vertical steel pipe piles (7) and the inclined steel pipe piles (8) extend into the foundation at the bottom of the caisson body (2).
2. The bridge caisson foundation structure applied to permeable soft foundation according to claim 1 is characterized by: The steel pipe sleeve is positioned and pre-buried and installed by means of a positioning frame (9), and the steel pipe sleeve is connected and fixed to the positioning frame (9).
3. The bridge caisson foundation structure applied to permeable soft foundation according to claim 2 is characterized by: The positioning frame (9) comprises longitudinal bars and transverse bars, wherein a plurality of longitudinal bars and a plurality of transverse bars are connected to form a grid-shaped bracket, and the grid-shaped bracket is also connected and supported by vertical bars, and the height of the vertical bars is consistent with the height of the lower bottom sealing concrete (6).
4. The bridge caisson foundation structure applied to permeable soft foundation according to claim 3 is characterized by: The grid-like bracket is divided into two layers, the upper and lower layers of the grid-like bracket are connected in series through vertical rods.