By setting up a filtered drainage layer and permeable brick structure on the roof of the underground garage, combined with concave green space and drainage ditch, the connection and drainage problems of permeable bricks and roofs in the existing technology are solved, and a safe and applicable underground garage greening design is achieved. Simplified the construction process and has good economic benefits.

CN221941427UActive Publication Date: 2024-11-01HUAJIANG CONSTR OF CHINA CONSTR FIRST BUILDING GROUP CORP +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420044182.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-09
Publication Date
2024-11-01
Estimated Expiration
2034-01-09

AI Technical Summary

Technical Problem

In the greening design of the roof of the underground garage, it is difficult to effectively solve the problems of connection and drainage between permeable bricks and roofs, resulting in complex and unsafe construction.

Method used

Adopt a permeable brick structure including filter drainage layer, compacted backfill soil layer, sand and gravel rolling layer, sand-free large-pore concrete layer and dry hard cement mortar layer, and a concave green space and drainage ditches are installed in the middle to use pollution intercepting Hang baskets and rainwater grates for rainwater management.

Benefits of technology

It realizes effective waterproofing of the basement roof panel, ensures safety and applicability, simplifies the construction process, and has good promotion and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941427U_ABST
    Figure CN221941427U_ABST
Patent Text Reader

Abstract

A green belt on a top plate of an underground garage comprises permeable brick pavements on the two sides and a middle concave green land, and each permeable brick pavement comprises an original top plate of the underground garage and a permeable brick layer arranged on the original top plate of the underground garage. The original underground garage top plate comprises a waterproof reinforced concrete top plate, an extruded polystyrene board heat preservation layer, a DS mortar leveling layer, an SBS modified asphalt waterproof coiled material, a polyvinyl chloride plastic film isolation layer and a fine aggregate concrete protection layer which are sequentially arranged from bottom to top. The water permeable brick layer comprises a filtering drainage layer, a compaction backfill soil layer, a gravel rolling layer, a sand-free macroporous concrete layer, a dry and hard cement mortar layer and a water permeable brick layer which are arranged on the fine aggregate concrete protection layer. The planting soil is laid on the backfill soil for greening, the filtering drainage layer can be used for preventing rainwater from entering the basement roof, and the basement roof has the advantages of being safe, applicable and the like, has good popularization and practical value and can generate good economic benefits after being widely popularized and applied.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of building construction, and specifically to a green belt on the roof of an underground garage. Background Art

[0002] With the increase in underground garages, the greening of underground garage roofs has become an important part of community landscape design. Covering the underground garage roof with a permeable brick layer for normal pedestrian walking in the community, laying planting soil between the permeable bricks and on the underground roof for landscaping, and setting up small drainage ditches in the green area for road drainage are already a popular practice. This technology has high requirements on the waterproof construction structure of the basement roof and the connection technology between the permeable bricks and the basement roof. Utility Model Content

[0003] The utility model aims to provide a green belt on the roof of an underground garage, and provides a construction technology of a green belt on the roof of a basement with a simple structure and reasonable design.

[0004] A green belt on the roof of an underground garage, characterized in that it includes permeable brick pavement on both sides and a concave green space in the middle, the permeable brick pavement includes the original roof of the underground garage and a permeable brick layer arranged on the original roof of the underground garage, the original roof of the underground garage includes a waterproof reinforced concrete roof, an extruded polystyrene board insulation layer, a DS mortar leveling layer, an SBS modified asphalt waterproof membrane, a polyvinyl chloride plastic film isolation layer and a fine stone concrete protective layer arranged in sequence from bottom to top, the permeable brick layer includes a A filtration and drainage layer on the fine stone concrete protective layer, a compacted backfill soil layer, a sand and gravel rolling layer, a sandless macroporous concrete layer, a dry hard cement mortar layer and a permeable brick layer; the central sunken green space includes flat curbs on both sides and a sunken planting soil filled between the flat curbs on both sides, a drainage ditch is provided in the sunken part in the middle of the planting soil and along the extension direction of the green space, a sewage interception hanging basket is hung on the upper part of the drainage ditch, a rainwater grate is provided on the upper cover of the sewage interception hanging basket, and the top surface elevation of the rainwater grate is higher than the height of the planting soil on both sides.

[0005] Further preferably, the filtration and drainage layer includes PED14 polymer protective drainage special-shaped sheet self-adhesive geotextile and HXC siphon drainage trough.

[0006] Furthermore, the thickness of the compacted backfill soil layer is 1200-1800 mm, and the compaction coefficient is >0.93.

[0007] Furthermore, the thickness of the sand and gravel compaction layer is 30~32cm.

[0008] In addition, the thickness of the sandless macroporous concrete layer is 18~20cm.

[0009] More preferably, the dry hard cement mortar layer has a thickness of 3-4 cm; and the permeable brick layer has a thickness of 10 cm.

[0010] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0011] Compared with the prior art, the utility model has the following characteristics and beneficial effects:

[0012] The present application sequentially arranges a filtration and drainage layer, a compacted backfill soil layer, a sand and gravel rolling layer, a sandless macroporous concrete layer, and a dry hard cement mortar layer on the original underground top plate for laying permeable bricks, and lays planting soil on the backfill soil for greening. The filtration and drainage layer can be used to prevent rainwater from entering the basement top plate. The application has the characteristics of safety and applicability, has good promotion and practical value, and will produce good economic benefits after widespread promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the original underground garage roof and permeable brick layer structure involved in this application.

[0014] Figure 2 This is a schematic diagram of the structure of a green belt on the roof of an underground garage in this application;

[0015] Figure numerals: 11-waterproof reinforced concrete top plate; 12-extruded polystyrene board insulation layer; 13-DS mortar leveling layer; 14-SBS modified asphalt waterproof membrane; 15-polyvinyl chloride plastic film isolation layer; 16-fine stone concrete protective layer; 17-filtration and drainage layer; 18-compacted backfill soil layer; 19-sand and gravel rolling layer; 20-sandless macroporous concrete layer; 21-dry hard cement mortar layer; 22-permeable brick layer; 23-drainage ditch; 24-sewage interception hanging basket; 25-rainwater grate; 26-flat curb; 27-planting soil. DETAILED DESCRIPTION

[0016] In order to make the technical means, innovative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below.

[0017] The embodiments described herein are specific embodiments of the present invention, which are used to illustrate the concept of the present invention, are explanatory and exemplary, and should not be interpreted as limiting the embodiments of the present invention and the scope of the present invention. In addition to the embodiments described herein, those skilled in the art can also adopt other obvious technical solutions based on the claims and the contents disclosed in the specification of this application, including technical solutions that adopt any obvious replacement and modification of the embodiments described herein.

[0018] A green belt on the roof of an underground garage, such as Figure 1 and2 As shown, it includes permeable brick pavement on both sides and a sunken green space in the middle. The permeable brick pavement includes the original underground garage roof and a permeable brick layer arranged on the original underground garage roof. The original underground garage roof includes a waterproof reinforced concrete roof 11, a 60mmB1 grade extruded polystyrene board insulation layer 12, a 20mm thick DS mortar leveling layer 13, a 4mm thick SBS modified asphalt waterproof membrane 14, a 0.4mm thick polyvinyl chloride plastic film isolation layer 15 and a 70mm thick fine stone concrete protective layer 16 arranged in sequence from bottom to top. The permeable brick layer includes a 160mm thick fine stone concrete protective layer 16 arranged on the fine stone concrete A filtration and drainage layer 17, a compacted backfill soil layer 18, a sand and gravel rolling layer 19, a sandless macroporous concrete layer 20, a dry hard cement mortar layer 21 and a permeable brick layer 22 are provided on the soil protection layer 16; the central sunken green space includes flat curbs 26 on both sides and planting soil 27 that is sunken and filled between the flat curbs 26 on both sides, a drainage ditch 23 is provided in the sunken part in the middle of the planting soil 27 and along the extension direction of the green space, a sewage interception hanging basket 24 is hung on the upper part of the drainage ditch 23, and a rainwater grate 25 is provided on the upper cover of the sewage interception hanging basket 24, and the top surface elevation of the rainwater grate 25 is higher than the height of the planting soil 27 on both sides.

[0019] The filtration and drainage layer 17 includes PED14 polymer protective drainage special-shaped self-adhesive geotextile and HXC siphon drainage trough, the compacted backfill soil layer 18 is 1200~1800mm thick, the compaction coefficient is >0.93, the sand and gravel rolling layer 19 is 30~32cm thick, the sandless macroporous concrete layer 20 is 18~20cm thick, the dry hard cement mortar layer 21 is 3~4cm thick; the permeable brick layer 22 is 10cm thick.

[0020] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A green belt on the roof of an underground garage, characterized by: It comprises permeable brick pavement on both sides and a sunken green space in the middle, wherein the permeable brick pavement comprises an original underground garage roof and a permeable brick layer arranged on the original underground garage roof, wherein the original underground garage roof comprises a waterproof reinforced concrete roof (11), an extruded polystyrene board insulation layer (12), a DS mortar leveling layer (13), an SBS modified asphalt waterproofing membrane (14), a polyvinyl chloride plastic film isolation layer (15) and a fine stone concrete protective layer (16) arranged in sequence from bottom to top, and the permeable brick layer comprises a filtration and drainage layer (17) and a compacted backfill soil layer (18) arranged on the fine stone concrete protective layer (16). , a sand and gravel rolling layer (19), a sand-free macroporous concrete layer (20), a dry hard cement mortar layer (21) and a permeable brick layer (22); the central sunken green space comprises flat curbs (26) on both sides and a planting soil (27) that is sunken and filled between the flat curbs (26) on both sides; a drainage ditch (23) is provided in the sunken part of the planting soil (27) and along the extension direction of the green space; a sewage interception hanging basket (24) is hung on the upper part of the drainage ditch (23); a rainwater grate (25) is provided on the upper cover of the sewage interception hanging basket (24); and the top surface elevation of the rainwater grate (25) is higher than the height of the planting soil (27) on both sides.

2. The green belt on the roof of the underground garage as claimed in claim 1, characterized in that: The filtration and drainage layer (17) comprises PED14 polymer protective drainage special-shaped sheet self-adhesive geotextile and HXC siphon drainage trough.

3. The green belt on the roof of the underground garage as claimed in claim 1, characterized in that: The compacted backfill soil layer (18) has a thickness of 1200-1800 mm and a compaction coefficient of >0.

93.

4. The green belt on the roof of the underground garage as claimed in claim 1, characterized in that: The thickness of the sand and gravel rolling layer (19) is 30-32 cm.

5. The green belt on the roof of the underground garage as claimed in claim 1, characterized in that: The thickness of the sand-free macroporous concrete layer (20) is 18-20 cm.

6. The green belt on the roof of an underground garage as claimed in any one of claims 1 to 5, characterized in that: The dry hard cement mortar layer (21) has a thickness of 3-4 cm; the permeable brick layer (22) has a thickness of 10 cm.

Citation Information