Connecting structure between prefabricated wall and prefabricated bottom plate

By using an inverted U-shaped outward-extending steel bar and a transverse steel bar connection structure, combined with ultra-high performance concrete and pre-embedded bolt legs, the problem of excessively long steel bars in precast walls has been solved, thereby improving construction efficiency and economic benefits.

CN221941680UActive Publication Date: 2024-11-01SHANGHAI URBAN CONSTRUCTION DESIGN & RESEARCH INSTITUTE (GROUP) CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420024563.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-05
Publication Date
2024-11-01
Estimated Expiration
2034-01-05

AI Technical Summary

Technical Problem

In existing technologies, the length of the reinforcing bars extending into the joint area of ​​precast walls is relatively long, resulting in low construction efficiency, difficulty in ensuring quality, large amount of post-cast concrete, long construction period, and high construction risk.

Method used

The connection structure of inverted U-shaped outward reinforcing bars and transverse reinforcing bars is adopted, combined with ultra-high performance concrete and pre-embedded screw support structure to reduce the length of reinforcing bars extending into the node, and precast base plate is used instead of post-cast ordinary concrete.

Benefits of technology

This effectively reduced the length of the reinforcing bars extending into the joint, decreased the amount of post-poured concrete, shortened the construction period, reduced construction risks, and improved construction efficiency and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941680U_ABST
    Figure CN221941680U_ABST
Patent Text Reader

Abstract

The utility model discloses a connecting structure between a prefabricated wall and a prefabricated bottom plate, which is characterized in that two connecting surfaces of the prefabricated wall and the prefabricated bottom plate are both provided with a plurality of inverted U-shaped overhanging steel bars which are the same in number and interval and are lapped with each other, and ultra-high performance concrete is poured in a range formed by the projection of the side surface of the prefabricated wall to the prefabricated bottom plate to form a post-cast strip; a plurality of embedded screws which are grouped and vertically arranged are arranged on the connecting surface of the prefabricated bottom plate; t-shaped supporting leg structures are arranged at the positions, corresponding to each set of embedded screws, of the connecting face of the prefabricated wall. Each supporting leg structure comprises a sectional material main body and a connecting plate; each connecting plate is provided with a mounting hole corresponding to each embedded screw rod at the corresponding position; and corresponding embedded screws penetrate into the mounting holes and are fastened by nuts. During construction, the perpendicularity of the prefabricated wall meets the requirement by adjusting the positions of the nuts. According to the utility model, the length of the prefabricated wall steel bar extending into the node is effectively reduced, the post-pouring concrete volume is reduced, and the project construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prefabricated component connection, in particular to a connection structure between a prefabricated wall and a prefabricated bottom plate. Background Art

[0002] Prefabricated concrete structures are assembled from prefabricated components through safe and reliable connection nodes. They include prefabricated monolithic concrete structures and fully prefabricated concrete structures. Among them, prefabricated monolithic concrete frame structures are an important component and typical representative of my country's building industrialization structural system. Studies have shown that the performance of prefabricated concrete structure connection nodes has an important impact on the performance of the entire prefabricated concrete structure.

[0003] The current status of the prior art in this field is as follows:

[0004] The existing construction method of the wall and bottom plate nodes is mainly to pour concrete in the node area and the bottom plate as a whole. The specific steps are as follows:

[0005] 1) Install the prefabricated wall in place and fix it;

[0006] 2) Install the bottom plate steel bars and tie them up;

[0007] 3) Cast the node area and the bottom plate together with ordinary concrete;

[0008] 4) Post-pour concrete curing.

[0009] The defects are as follows:

[0010] Under the premise of meeting the current mandatory standards, the existing technical solutions have a long length of steel bars extending into the node area of ​​the prefabricated wall, and the steel bars in the node area are crowded, resulting in low construction efficiency and difficulty in ensuring quality; the verticality adjustment of the prefabricated wall is more troublesome; in addition, the amount of post-poured concrete is large and the construction period is long.

[0011] Therefore, how to effectively reduce the length of prefabricated wall reinforcement extending into the node, reduce the volume of post-poured concrete, shorten the project construction period, reduce construction risks, and improve social and economic benefits has become a technical problem that technical personnel in this field urgently need to solve. Utility Model Content

[0012] In view of the above-mentioned defects of the prior art, the utility model provides a connection structure between a prefabricated wall and a prefabricated base plate, the purpose of which is to effectively reduce the length of the prefabricated wall reinforcement extending into the node, reduce the volume of post-poured concrete, thereby shortening the project construction period, reducing construction risks, and improving social and economic benefits.

[0013] To achieve the above-mentioned purpose, the utility model discloses a connection structure between a prefabricated wall and a prefabricated bottom plate, comprising a prefabricated wall and a prefabricated bottom plate.

[0014] Wherein, the two connecting surfaces where the prefabricated wall and the prefabricated bottom plate are connected are provided with a plurality of inverted U-shaped protruding steel bars of the same number and spacing and overlapped with each other, and ultra-high performance concrete is poured in the range formed by the projection of the prefabricated bottom plate on the side of the prefabricated wall to form a post-cast strip;

[0015] A plurality of transverse steel bars are arranged in the ring structure formed by all the overlapping inverted U-shaped outwardly extending steel bars;

[0016] Each of the transverse steel bars is arranged parallel to the two connecting surfaces and is closely attached to the inner side of each of the vertical sections of the inverted U-shaped protruding steel bars;

[0017] The end of each inverted U-shaped outwardly extending steel bar opening is embedded in the corresponding prefabricated wall or the corresponding prefabricated bottom plate, and the arc-shaped part is suspended in the air;

[0018] The connection surface of the prefabricated base plate is provided with a plurality of vertically arranged embedded screws;

[0019] The plurality of embedded screws are divided into at least two groups;

[0020] Each group of embedded screws is arranged between any two adjacent inverted U-shaped outwardly extending steel bars of the prefabricated bottom plate;

[0021] The connection surface of the prefabricated wall is provided with a T-shaped leg structure at the position corresponding to each group of embedded screws;

[0022] Each of the leg structures comprises a profile body and a connecting plate;

[0023] Each of the profile bodies is in the shape of a strip, one end of which is pre-buried in the prefabricated wall and perpendicular to the connection surface, and the other end of which extends to the outside of all the inverted U-shaped protruding steel bars of the prefabricated wall and is provided with a corresponding connection plate;

[0024] Each of the connecting plates is larger than the outer contour of the cross section of the corresponding profile body, and its width is smaller than the distance between each two adjacent inverted U-shaped outwardly extending steel bars of the prefabricated bottom plate, and each of the embedded screws at the corresponding position is provided with a mounting hole;

[0025] All the mounting holes of the connecting plates of all the leg structures are penetrated with corresponding embedded screws and fastened with nuts.

[0026] Preferably, the profile body of each of the leg structures is an I-beam.

[0027] Preferably, a bolt is provided at one end of the profile body of each leg structure that is embedded in the prefabricated wall.

[0028] Preferably, the overlapping length l of all the inverted U-shaped outwardly extending steel bars of the prefabricated wall and the prefabricated bottom plate is l The calculation formula is as follows:

[0029]

[0030] Among them, l is the correction factor for the lap length of longitudinal tensile reinforcement; a is the anchorage length correction factor; α is the shape factor of the inverted U-shaped protruding steel bar; f y f is the design value of yield strength of inverted U-shaped outrigger reinforcement; t is the design value of the axial tensile strength of ultra-high performance concrete; d is the nominal diameter of the inverted U-shaped protruding steel bar.

[0031] Preferably, the four embedded screws are divided into two groups; the two groups of embedded screws are respectively arranged between the first and second of the multiple inverted U-shaped protruding steel bars of the prefabricated base plate, and between the last one and the last second.

[0032] Beneficial effects of the utility model:

[0033] This technology uses post-cast ultra-high performance concrete instead of post-cast ordinary concrete, which can effectively reduce the length of the precast wall reinforcement extending into the node; changing the post-cast base plate to a precast plate can reduce the volume of post-cast concrete, thereby shortening the project construction period, reducing construction risks, and has good social and economic benefits.

[0034] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 A schematic diagram of the structure of the connecting member on one side of a post-cast node in one embodiment of the utility model is shown.

[0036] Figure 2 A schematic diagram of the structure of the connecting member on the other side of the post-cast node in one embodiment of the utility model is shown.

[0037] Figure 3 A schematic diagram of the structure of the connection components of a prefabricated wall and a corresponding connection surface on one side in an embodiment of the utility model is shown.

[0038] Figure 4 A schematic diagram of the structure of the prefabricated wall and the connecting member on the other side of the corresponding connecting surface in one embodiment of the utility model is shown.

[0039] Figure 5 A schematic diagram of the structure of the connection components of a prefabricated bottom plate and a corresponding connection surface on one side in an embodiment of the utility model is shown.

[0040] Figure 6 A schematic diagram of the structure of the prefabricated bottom plate and the connecting member on the other side of the corresponding connecting surface in one embodiment of the utility model is shown.

[0041] Figure 7 A structural schematic diagram of a leg structure in an embodiment of the utility model is shown.

[0042] Figure 8 A structural schematic diagram showing a cross section of a profile body in an embodiment of the utility model.

[0043] Fig. 9 A schematic structural diagram of a connecting plate in an embodiment of the utility model is shown.

[0044] Fig.10 The schematic diagram shows the state after the prefabricated wall and the prefabricated bottom plate are put in place and temporary supports are set during construction in one embodiment of the utility model.

[0045] Fig.11 A schematic diagram showing a state in which the transverse reinforcement arrangement is completed during construction in one embodiment of the utility model.

[0046] Fig.12 A schematic diagram showing the state of pouring of a back-cast node after construction in one embodiment of the utility model is completed.

[0047] Fig.13 A schematic diagram showing a state in which temporary supports are removed after construction is completed in one embodiment of the utility model. DETAILED DESCRIPTION

[0048] Example

[0049] like Figures 1 to 9 ,as well as Fig.12 and Fig.13 As shown, the connection structure between the prefabricated wall and the prefabricated bottom plate includes a prefabricated wall 1 and a prefabricated bottom plate 2.

[0050] The two connecting surfaces where the precast wall 1 and the precast bottom plate 2 meet are both provided with a plurality of inverted U-shaped outwardly extending steel bars 3 of the same number and spacing and overlapped with each other, and ultra-high performance concrete is poured in the area formed by the projection of the precast bottom plate 2 on the side of the precast wall 1 to form a post-cast strip 7;

[0051] A plurality of transverse steel bars 4 are arranged in a ring structure formed by all the overlapping inverted U-shaped outwardly extending steel bars 3;

[0052] Each transverse steel bar 4 is arranged parallel to the two connection surfaces and is closely attached to the inner side of the vertical section of each inverted U-shaped outwardly extending steel bar 3;

[0053] The open end of each inverted U-shaped outwardly extending steel bar 3 is buried in the corresponding prefabricated wall 1 or the corresponding prefabricated bottom plate 2, and the arc-shaped part is suspended in the air;

[0054] The connection surface of the prefabricated base plate 2 is provided with a plurality of vertically arranged embedded screws 5;

[0055] The plurality of embedded screw rods 5 are divided into at least two groups;

[0056] Each set of embedded screws 5 is arranged between any two adjacent inverted U-shaped outwardly extending steel bars 3 of the prefabricated bottom plate 2;

[0057] The connection surface of the prefabricated wall 1 is provided with a T-shaped leg structure 6 at the position corresponding to each group of embedded screws 5;

[0058] Each leg structure 6 includes a profile body 61 and a connecting plate 62;

[0059] Each profile body 61 is in strip shape, one end of which is embedded in the prefabricated wall 1 and is perpendicular to the connection surface, and the other end of which extends to the outside of all inverted U-shaped protruding steel bars 3 of the prefabricated wall 1 and is provided with a corresponding connection plate 62;

[0060] Each connecting plate 62 is larger than the outer contour of the cross section of the corresponding profile body 61, and its width is smaller than the distance between each two adjacent inverted U-shaped outrigger steel bars 3 of the prefabricated bottom plate 2, and each embedded screw 5 at the corresponding position is provided with a mounting hole 64;

[0061] All the mounting holes 64 of the connecting plates 62 of all the leg structures 6 are penetrated with corresponding embedded screws 5 and fastened with nuts 51 .

[0062] The utility model creatively uses post-cast ultra-high performance concrete instead of post-cast ordinary concrete to form a post-cast strip 7, which can effectively reduce the length of the inverted U-shaped protruding steel bars 3 extending into the node; the prefabricated wall 1 is provided with a leg structure 6, which is convenient for adjusting the verticality and is conducive to improving construction efficiency; the inverted U-shaped protruding steel bars 3 and the transverse steel bars 4 are provided to enhance the node anchor connection strength; the post-cast base plate in the prior art is changed to a prefabricated base plate 2, which can reduce the volume of post-cast concrete, thereby shortening the project construction period, reducing construction risks, and having good social and economic benefits.

[0063] In some embodiments, the profile body 61 of each leg structure 6 is an I-beam.

[0064] In some embodiments, a bolt 63 is provided at one end of the profile body 61 of each leg structure 6 that is embedded in the prefabricated wall 1 .

[0065] In some embodiments, the overlapping length l of all the inverted U-shaped outriggers 3 of the prefabricated wall 1 and the prefabricated bottom plate 2 is l The calculation formula is as follows:

[0066]

[0067] Among them, l is the correction factor for the lap length of longitudinal tensile reinforcement; a is the anchorage length correction factor; α is the shape coefficient of the inverted U-shaped protruding steel bar 3; f y f is the design value of yield strength of inverted U-shaped outrigger reinforcement 3; t is the design value of the axial tensile strength of ultra-high performance concrete; d is the nominal diameter of the inverted U-shaped protruding steel bar 3.

[0068] In some embodiments, the four embedded screws 5 are divided into two groups; the two groups of embedded screws 5 are respectively arranged between the first and second of the multiple inverted U-shaped protruding steel bars 3 of the prefabricated base plate 2, and between the last one and the last second.

[0069] like Figures 10 to 13 As shown, the utility model also provides a construction method for the connection structure between the prefabricated wall and the prefabricated bottom plate, comprising the following steps:

[0070] Step 1, manufacturing a prefabricated wall 1 with the required inverted U-shaped protruding steel bars 3 and the leg structure 6, and a prefabricated base plate 2 with the required inverted U-shaped protruding steel bars 3 and the embedded screws 5;

[0071] Step 2: Install the prefabricated wall 1 and the prefabricated base plate 2 in place, insert all embedded screws 5 into the corresponding mounting holes 64 and set nuts 51, adjust the positions of all nuts 51 to make the verticality of the prefabricated wall 1 meet the requirements, and install temporary supports 8;

[0072] Step 3: Install all transverse steel bars 4 and tie them up;

[0073] Step 4, pouring ultra-high performance concrete to form a post-casting strip 7;

[0074] Step 5: Curing the post-cast strip 7 and removing the temporary support 8 after reaching the required strength.

[0075] The preferred specific embodiments of the utility model are described in detail above. It should be understood that ordinary technicians in this field can make many modifications and changes based on the concept of the utility model without creative work. Therefore, all technical solutions that can be obtained by technicians in this technical field based on the concept of the utility model through logical analysis, reasoning or limited experiments on the basis of the existing technology should be within the scope of protection determined by the claims.

Claims

1. A connection structure between a prefabricated wall and a prefabricated base plate, comprising a prefabricated wall (1) and a prefabricated base plate (2); It is characterized in that The two connecting surfaces where the prefabricated wall (1) and the prefabricated bottom plate (2) are connected are both provided with a plurality of inverted U-shaped protruding steel bars (3) of the same number and spacing and overlapped with each other, and ultra-high performance concrete is poured in the area formed by the projection of the side surface of the prefabricated wall (1) toward the prefabricated bottom plate (2) to form a post-cast strip (7); A plurality of transverse steel bars (4) are arranged in a ring structure formed by all the overlapping inverted U-shaped outwardly extending steel bars (3); Each of the transverse steel bars (4) is arranged parallel to the two connecting surfaces and is closely attached to the inner side of the vertical section of each of the inverted U-shaped protruding steel bars (3); The open end of each inverted U-shaped protruding steel bar (3) is buried in the corresponding prefabricated wall (1) or the corresponding prefabricated bottom plate (2), and the arc-shaped part is suspended in the air; The connection surface of the prefabricated base plate (2) is provided with a plurality of vertically arranged embedded screws (5); The plurality of embedded screw rods (5) are divided into at least two groups; Each group of the embedded screw rods (5) is arranged between any two adjacent inverted U-shaped outwardly extending steel bars (3) of the prefabricated base plate (2); The connection surface of the prefabricated wall (1) is provided with a T-shaped leg structure (6) at a position corresponding to each group of embedded screws (5); Each of the leg structures (6) comprises a profile body (61) and a connecting plate (62); Each of the profile bodies (61) is in the shape of a strip, one end of which is pre-buried in the prefabricated wall (1) and perpendicular to the connection surface, and the other end of which extends to the outside of all the inverted U-shaped protruding steel bars (3) of the prefabricated wall (1) and is provided with a corresponding connection plate (62); Each of the connecting plates (62) is larger than the outer contour of the cross section of the corresponding profile body (61), and its width is smaller than the distance between each two adjacent inverted U-shaped outwardly extending steel bars (3) of the prefabricated bottom plate (2), and each of the embedded screws (5) at the corresponding position is provided with a mounting hole (64); All the mounting holes (64) of the connecting plates (62) of all the leg structures (6) are penetrated by corresponding embedded screws (5) and fastened with nuts (51).

2. The connection structure between the prefabricated wall and the prefabricated bottom plate according to claim 1, It is characterized in that The profile body (61) of each of the leg structures (6) is an I-beam.

3. The connection structure between the prefabricated wall and the prefabricated bottom plate according to claim 1, It is characterized in that One end of the profile body (61) of each leg structure (6) pre-buried in the prefabricated wall (1) is provided with a bolt (63).

4. The connection structure between the prefabricated wall and the prefabricated bottom plate according to claim 1, It is characterized in that The overlapping length l of all the inverted U-shaped outwardly extending steel bars (3) of the prefabricated wall (1) and the prefabricated bottom plate (2) is l The calculation formula is as follows: Among them, l is the correction factor for the lap length of longitudinal tensile reinforcement; a is the anchorage length correction factor; α is the shape factor of the inverted U-shaped protruding steel bar (3); f y is the design value of yield strength of the inverted U-shaped outrigger steel bar (3); t is the design value of the axial tensile strength of ultra-high performance concrete; d is the nominal diameter of the inverted U-shaped protruding steel bar (3).

5. The connection structure between the prefabricated wall and the prefabricated bottom plate according to claim 1, It is characterized in that The four embedded screw rods (5) are divided into two groups; the two groups of embedded screw rods (5) are respectively arranged between the first and second of the plurality of inverted U-shaped protruding steel bars (3) of the prefabricated base plate (2), and between the last and the second last.

Citation Information

Cited By

  • Connecting structure between prefabricated wall and prefabricated bottom plate and construction method thereof

    CN117684683A