Prefabricated shear wall connecting structure
Through the prefabricated groove and prefabricated block structure, combined with the use of guides, the rapid positioning and casting of prefabricated shear walls are achieved, solving the problem of time-consuming positioning and formwork construction in traditional construction, and improving construction efficiency and stability of wall connections are improved sex.
Patent Information
- Application Number
- CN202420118088.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-17
AI Technical Summary
The construction of traditional prefabricated shear walls requires additional manual positioning and construction of casting forms, resulting in longer construction time and less efficiency.
The prefabricated groove and prefabricated block structure is adopted to achieve rapid positioning and precise positioning of the wall through guides, and concrete connections are directly poured into the prefabricated groove, eliminating the construction of casting forms, and steel bars are installed in the prefabricated blocks and grooves to improve the connection strength.
Improve construction efficiency, reduce lifting time, and enhance the stability of the wall through the steel bar connection after concrete solidification.
Smart Images

Figure CN221941682U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of prefabricated wall construction, and in particular to a prefabricated shear wall connection structure. Background Art
[0002] Traditional prefabricated shear wall construction requires on-site pouring of concrete, which takes a long time and is complex. In order to improve construction efficiency, prefabricated shear walls are usually used in the construction process. Prefabricated shear walls can be produced and processed in the factory and directly transported to the site for hoisting, which can greatly reduce the difficulty and time of construction.
[0003] The commonly used prefabricated shear wall construction method is: first hoist the wall. When the wall approaches the building floor, the staff guides and corrects the hoisted wall near the wall. After completing the hoisting of one wall, the other wall is hoisted to one side of the above wall, leaving a pouring gap between the two walls. Prefabricated steel bars are reserved in the gap of the two walls. A casting formwork is built at the gap, and concrete is filled into the formwork. After the concrete solidifies, the casting formwork is removed to achieve the connection between the two walls.
[0004] For the above-mentioned related technologies, additional manual work is required for positioning the wall during hoisting, and additional casting formwork needs to be built to connect two walls, resulting in a long construction time and low construction efficiency. Utility Model Content
[0005] In order to improve the problem of low construction efficiency, the present application provides a prefabricated shear wall connection structure.
[0006] The prefabricated shear wall connection structure provided in this application adopts the following technical solution:
[0007] A prefabricated shear wall connection structure comprises a wall body and a guide component, wherein the guide component is used to guide and position the wall body, a prefabricated groove is provided at one end of the wall body, and a prefabricated block is provided at the other end, and when two wall bodies are spliced, the prefabricated block is in the prefabricated groove, and a gap is left between the prefabricated block and the prefabricated groove.
[0008] By adopting the above technical solution, when installing the wall, the guide member guides the wall to facilitate the rapid positioning of the wall. After the hoisting of the two walls is completed, concrete is poured into the prefabricated groove to achieve the connection of the two walls. There is no need to build an additional casting template, thereby improving construction efficiency.
[0009] Optionally, a plurality of first accommodating grooves are formed on a side of the prefabricated block away from the wall, and a plurality of second accommodating grooves are formed on a side of the prefabricated groove close to the wall.
[0010] By adopting the above technical solution, when pouring concrete into the prefabricated groove, the concrete enters the first receiving groove and the second receiving groove. After the concrete solidifies, the solidified concrete in the first receiving groove and the second receiving groove can improve the connection strength of the two walls, thereby improving the stability of the walls after connection.
[0011] Optionally, a plurality of first prefabricated steel bars are provided on the prefabricated block, a plurality of second prefabricated steel bars are provided in the prefabricated groove, and the first prefabricated steel bars are transversely staggered with the second prefabricated steel bars.
[0012] By adopting the above technical solution, when pouring concrete into the precast groove, the concrete will adhere to the first precast steel bar and the second precast steel bar. After the concrete solidifies, it will be connected to the first precast steel bar and the second precast steel bar, further improving the stability of the wall connection; the first precast steel bar and the second precast steel bar are horizontally staggered, which can prevent the first precast steel bar and the second precast steel bar from interfering with each other when the wall is vertically hoisted.
[0013] Optionally, the guide assembly includes a side guide and an end guide, a plurality of prefabricated bolts are provided on the side of the wall, the prefabricated bolts are preset on the building base plate, the side guide is detachably connected to the prefabricated bolts, and the end guide is detachably connected to the side guide.
[0014] By adopting the above technical solution, when the wall is being hoisted, the side guides guide the two sides of the wall, and the end guides guide the two ends of the wall, thereby achieving comprehensive guidance of the wall, thereby accurately positioning the wall; the end guides are detachably connected to the side guides, so that the end guides can be removed easily after the wall is hoisted.
[0015] Optionally, the side guide member includes a first bottom plate, a first side plate and a first guide plate, the first bottom plate is connected to prefabricated bolts, two first side plates are provided, and are respectively connected to two ends of the first bottom plate, the first guide plate includes a first vertical portion and a first inclined portion, the bottom of the first vertical portion is connected to the first bottom plate, and the two sides are respectively connected to the two first side plates, the bottom of the first inclined portion is connected to the top of the first vertical portion, and the two sides are respectively connected to the top of the two first side plates, and the first inclined portion is inclined upward from close to the wall side to away from the wall side.
[0016] By adopting the above technical solution, before hoisting the wall, the first base plate of the side guide is matched with the prefabricated bolts on the building base plate to achieve precise positioning of the side guide, the first side plate connects the first base plate and the first guide plate, and the first inclined portion of the first guide plate guides the wall to the first vertical portion, so that the side of the wall is finally positioned between the two first vertical portions, thereby achieving precise positioning of the side of the wall.
[0017] Optionally, the end face guide member includes a second base plate, a second side plate and a second guide plate, the second base plate abuts against the building base plate, the second side plate is connected to both ends of the second base plate, the second guide plate includes a second vertical portion and a second inclined portion, the bottom of the second vertical portion is connected to the second base plate, and the two ends are respectively connected to the two second side plates, the second vertical portion is detachably connected to the first side plate, the bottom of the second inclined portion is connected to the top of the second vertical portion, and the two ends are respectively connected to the two second side plates, and the second inclined portion is inclined upward from close to the wall end face to away from the wall end face.
[0018] By adopting the above technical solution, after the installation of the side guide is completed, the second vertical portion is connected to the first side plate to realize the positioning and fixation of the end face guide, the second base plate is abutted against the building base plate to improve the stability of the end face guide, the second side plate connects the second base plate and the second guide plate, and the second inclined portion of the second guide plate guides the wall to the second vertical portion, so that the two end faces of the wall are finally positioned between the two second vertical portions, thereby realizing precise positioning of the end faces of the wall.
[0019] Optionally, a plurality of first reinforcing ribs are provided between the first inclined portion and the first bottom plate, and a plurality of second reinforcing ribs are provided between the second inclined portion and the second bottom plate.
[0020] By adopting the above technical solution, the first reinforcing rib and the second reinforcing rib reinforce the side guide member and the end guide member respectively, thereby improving the deformation resistance of the first guide plate and the second guide plate to improve the strength of the guide assembly.
[0021] Optionally, the bottom of the prefabricated groove and the bottom of the prefabricated block are both higher than the height of the guide assembly.
[0022] By adopting the above technical solution, the prefabricated grooves and prefabricated blocks are arranged above the guide assembly, so that the prefabricated grooves and prefabricated blocks can be placed to prevent the negative impact of the guide assembly on the guide wall, thereby facilitating the installation of the wall.
[0023] In summary, the present application includes at least one of the following beneficial technical effects:
[0024] 1. By setting up prefabricated grooves and prefabricated blocks, when connecting two walls, the prefabricated blocks are located inside the prefabricated grooves, and a casting gap is left between the prefabricated blocks and the prefabricated grooves, which is convenient for pouring concrete into the prefabricated grooves, and no additional casting templates are needed to achieve the connection of the two walls, thereby improving the casting efficiency; a first receiving groove and a first prefabricated steel bar are set on the prefabricated block, and a second receiving groove and a second prefabricated steel bar are set in the prefabricated groove, which can improve the strength of the connection between the concrete and the two walls, thereby improving the stability of the wall
[0025] 2. By providing side guides and end guides, when hoisting the wall, the side guides guide the sides of the wall, and the end guides guide the end faces of the wall, so that the wall can be accurately positioned, the hoisting time of the wall is reduced, and the construction efficiency is further improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0027] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application;
[0028] Figure 2 is a schematic diagram of the overall structure of an embodiment of the present application from another perspective;
[0029] Figure 3 is a top view of two walls of an embodiment of the present application;
[0030] Figure 4 It is a schematic diagram of the structure of the connection component of an embodiment of the present application.
[0031] Figure numerals: 1. wall; 11. prefabricated block; 111. first accommodating groove; 112. first prefabricated steel bar; 12. prefabricated groove; 121. second accommodating groove; 122. second prefabricated steel bar; 2. guide assembly; 21. side guide; 211. first bottom plate; 212. first side plate; 213. first guide plate; 2131. first inclined portion; 2132. first vertical portion; 22. end face guide; 221. second bottom plate; 222. second side plate; 223. second guide plate; 2231. second inclined portion; 2232. second vertical portion; 3. prefabricated bolt; 4. first reinforcing rib; 5. second reinforcing rib. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1-4 This application is described in further detail.
[0033] The present application embodiment discloses a prefabricated shear wall connection structure. Figure 1The prefabricated shear wall connection structure includes a wall 1 and a guide assembly 2. The guide assembly 2 is fixed to the building base plate (not shown in the figure). The guide assembly 2 is located at the bottom of the wall 1. The guide assembly 2 guides the wall 1 so that the wall 1 can be quickly and accurately positioned during hoisting. A prefabricated block 11 is provided at one end of the wall 1, and a prefabricated groove 12 is provided at the other end. The prefabricated block 11 is integrally formed with the wall 1. The prefabricated block 11 is a rectangular block, and the prefabricated groove 12 is a rectangular groove. The heights of the prefabricated block 11 and the prefabricated groove 12 are the same.
[0034] When installing the wall 1, the guide assembly 2 guides and positions the wall 1, the end faces of two adjacent walls 1 are fitted together, the precast block 11 is located inside the precast groove 12, and casting gaps are left between the three sides of the precast block 11 away from the wall 1 and the precast groove 12; when connecting two walls 1, concrete is poured into the precast groove 12, and the precast block 11 and the precast groove 12 are connected by concrete, thereby realizing the connection of the walls 1, without the need for additional personnel to guide the hoisting of the wall 1, and without the need to set up additional casting templates, thereby improving construction efficiency.
[0035] Reference Figure 1 The prefabricated block 11 is provided with a plurality of first receiving grooves 111 and a plurality of first prefabricated steel bars 112. The first receiving grooves 111 are provided on the side of the prefabricated block 11 away from the wall 1. The first receiving grooves 111 are rectangular grooves. The plurality of first receiving grooves 111 are arranged at equal intervals along the height direction of the wall 1. The first prefabricated steel bars 112 are arranged on both sides of the prefabricated block 11 parallel to the side of the wall 1. The first prefabricated steel bars 112 are U-shaped as a whole, and the arc end is arranged away from the prefabricated block 11. The plurality of first prefabricated steel bars 112 are arranged at equal intervals along the height direction of the wall 1.
[0036] Reference Figure 2 A plurality of second receiving grooves 121 are provided on the inner wall of the precast groove 12 near the wall 1. The second receiving grooves 121 are rectangular grooves. The plurality of second receiving grooves 121 are arranged at equal intervals along the height direction of the wall 1. A plurality of second precast steel bars 122 are arranged on both sides of the precast groove 12 parallel to the end surface of the wall 1. The second precast steel bars 122 are U-shaped as a whole, and the arc end is arranged near the center of the precast groove 12. The plurality of second precast steel bars 122 are arranged at equal intervals along the height direction of the wall 1.
[0037] When connecting two walls 1, concrete is poured into the precast groove 12 between the two walls 1. During the pouring process, the concrete gradually fills the first receiving groove 111 and the second receiving groove 121, and part of the concrete will adhere to the first precast steel bars 112 and the second precast steel bars 122. After the concrete solidifies, the concrete in the first receiving groove 111 and the second receiving groove 121, and the concrete adhered to the first precast steel bars 112 and the second precast steel bars 122 can improve the connection strength of the two walls 1, thereby improving the stability of the wall 1.
[0038] Reference Figure 3 The first precast steel bar 112 and the second precast steel bar 122 are staggered in the transverse direction. Specifically, the second precast steel bar 122 is located on the side of the first precast steel bar 112 close to the wall 1 where the first precast steel bar 112 is located. When the wall 1 is hoisted, the staggered first precast steel bar 112 and the second precast steel bar 122 can avoid interference between the two walls 1, thereby facilitating the installation of the wall 1.
[0039] Reference Figure 4 The guide assembly 2 includes a side guide 21 and an end guide 22. The side guide 21 is fixedly connected to the building base plate through the precast bolts 3, and the end guide 22 is connected to the side guide 21. The side guide 21 includes a first base plate 211, a first side plate 212 and a first guide plate 213. The first base plate 211 is a rectangular plate, and its length is the same as that of the wall 1. A plurality of clearance holes are provided on the first base plate 211. The diameter of the clearance holes is the same as that of the precast bolts 3. The cooperation between the clearance holes and the precast bolts 3 facilitates the fixing of the first base plate 211. The first side plate 212 is provided with two pieces, and is welded to the two ends of the first base plate 211 respectively. The first side plate 212 is a trapezoidal plate and is arranged vertically. The hypotenuse of the first side plate 212 faces upward, and the end of the first side plate 212 away from the wall 1 is higher than the end close to the wall 1. The first guide plate 213 includes a first inclined portion 2131 and a first vertical portion 2132. The first inclined portion 2131 and the first vertical portion 2132 are integrally formed. The first inclined portion 2131 is rectangular. The two ends of the first inclined portion 2131 are respectively welded to the two first side plates 212 and fit the top of the first side plates 212. The first vertical portion 2132 is disposed between the first inclined portion 2131 and the first bottom plate 211. The bottom of the first vertical portion 2132 is welded to the first bottom plate 211. A plurality of mounting holes are provided on the first side plate 212 to facilitate the connection of the two side guides 21 or the side guide 21 and the end guide 22.
[0040] Reference Figure 4The end face guide member 22 includes a second bottom plate 221, a second side plate 222 and a second guide plate 223. The second bottom plate 221 is a rectangular plate. The second bottom plate 221 is movably abutted against the building bottom plate. The second side plate 222 is provided with two pieces, and is respectively welded to the two ends of the second bottom plate 221. The second side plate 222 is a trapezoidal plate and is vertically arranged. The hypotenuse of the second side plate 222 faces upward, and the end of the second side plate 222 away from the wall 1 is higher than the end close to the wall 1. The second guide plate 223 includes a second inclined portion 2231 and a second vertical portion 2232. The second inclined portion 2231 and the second vertical portion 2232 are integrally formed. The second inclined portion 2231 is rectangular. The two ends of the second inclined portion 2231 are respectively welded to the two second side plates 222 and fit with the top of the second side plates 222. The second vertical portion 2232 is arranged between the second inclined portion 2231 and the second bottom plate 221. The bottom of the second vertical portion 2232 is welded to the second bottom plate 221. A plurality of mounting holes are provided on the second vertical portion 2232 to facilitate fixing the end face guide 22 and the side guide 21.
[0041] Before hoisting the wall 1, the two first bottom plates 211 are matched with the prefabricated bolts 3, and nuts are used to thread the prefabricated bolts 3 to press the first bottom plates 211 to achieve the positioning and fixation of the first bottom plates 211. After the installation of the two side guides 21 is completed, the second vertical portion 2232 is aligned with the installation hole on the first side plate 212, and the second vertical portion 2232 and the first side plate 212 are fixedly connected by bolts to achieve the connection between the end face guide 22 and the side face guide 21. After the two end face guides 22 are fixed, the wall 1 is hoisted to the inside of the guide assembly 2. After the hoisting of one wall 1 is completed, one of the end face guides 22 is removed, and another side face guide 21 is connected to the original two side guides 21, and the previously removed end face guide 22 is connected to the two newly added side guides 21, and another wall 1 is hoisted. According to this method, the number of walls 1 to be installed is determined according to the needs of the site.
[0042] Reference Figure 4 A plurality of first reinforcing ribs 4 are provided between the first inclined portion 2131 and the first bottom plate 211. The plurality of first reinforcing ribs 4 are arranged at equal intervals along the length direction of the first bottom plate 211, and the first reinforcing ribs 4 are welded to the first guide plate 213 and the first bottom plate 211. A plurality of second reinforcing ribs 5 are provided between the second inclined portion 2231 and the second bottom plate 221. The plurality of second reinforcing ribs 5 are arranged at equal intervals along the length direction of the second bottom plate 221, and the second reinforcing ribs 5 are welded to the second guide plate 223 and the second bottom plate 221.
[0043] By providing the first reinforcing rib 4 and the second reinforcing rib 5 , the bending resistance of the first guide plate 213 and the second guide plate 223 can be improved, thereby improving the strength of the side guide member 21 and the end guide member 22 .
[0044] The implementation principle of the prefabricated shear wall connection structure of the embodiment of the present application is as follows: when installing the wall 1, the side guide member 21 guides the side of the wall 1, and the end guide member 22 guides the end face of the wall 1, so that the wall 1 can be quickly positioned in the hanging device, reducing the time required for hanging the wall 1; when connecting two walls 1, concrete is poured into the prefabricated groove 12 between the two walls 1, and the first receiving groove 111 and the first prefabricated steel bar 112 on the prefabricated block 11, and the second receiving groove 121 and the second prefabricated steel bar 122 in the prefabricated groove 12 can improve the connection strength between the concrete and the two walls 1, thereby facilitating pouring while improving the connection strength of the two walls 1, thereby improving construction efficiency and quality.
[0045] Unless otherwise defined, the technical terms or scientific terms used in this application should be understood by people with ordinary skills in the field to which this application belongs. The words "first", "second", "third" and similar words used in the specification and claims of this application do not indicate any order, quantity or importance, but are only used to distinguish different components. "One" or "one" and similar words do not indicate a quantitative limit, but indicate that there is at least one. "Include" or "comprise" and similar words mean that the elements or objects appearing before "include" or "comprise" include the elements or objects listed after "include" or "comprise" and their equivalents, and do not exclude other elements or objects. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0046] The above are all optional embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A prefabricated shear wall connection structure, characterized by: The invention comprises a wall (1) and a guide assembly (2), wherein the guide assembly (2) is used to guide and position the wall (1), one end of the wall (1) is provided with a prefabricated groove (12), and the other end is provided with a prefabricated block (11), and when two wall bodies (1) are spliced together, the prefabricated block (11) is in the prefabricated groove (12), and a gap is left between the prefabricated block (11) and the prefabricated groove (12).
2. The prefabricated shear wall connection structure according to claim 1, characterized in that: A plurality of first accommodating grooves (111) are provided on a side of the prefabricated block (11) away from the wall (1), and a plurality of second accommodating grooves (121) are provided on a side of the prefabricated groove (12) close to the wall (1).
3. The prefabricated shear wall connection structure according to claim 2, characterized in that: A plurality of first prefabricated steel bars (112) are provided on the prefabricated block (11), a plurality of second prefabricated steel bars (122) are provided in the prefabricated groove (12), and the first prefabricated steel bars (112) and the second prefabricated steel bars (122) are transversely offset.
4. The prefabricated shear wall connection structure according to claim 1, characterized in that: The guide assembly (2) comprises a side guide (21) and an end guide (22); a plurality of prefabricated bolts (3) are provided on the side of the wall (1); the prefabricated bolts (3) are pre-set on the building base plate; the side guide (21) and the prefabricated bolts (3) are detachably connected; and the end guide (22) and the side guide (21) are detachably connected.
5. The prefabricated shear wall connection structure according to claim 4, characterized in that: The side guide member (21) includes a first bottom plate (211), a first side plate (212) and a first guide plate (213), wherein the first bottom plate (211) is connected to the prefabricated bolts (3), two first side plates (212) are provided, and are respectively connected to the two ends of the first bottom plate (211), and the first guide plate (213) includes a first vertical portion (2132) and a first inclined portion (2131), wherein the bottom of the first vertical portion (2132) is connected to the first bottom plate (211), and the two sides are respectively connected to the two first side plates (212), and the bottom of the first inclined portion (2131) is connected to the top of the first vertical portion (2132), and the two sides are respectively connected to the tops of the two first side plates (212), and the first inclined portion (2131) is inclined upward from the side close to the wall (1) to the side away from the wall (1).
6. The prefabricated shear wall connection structure according to claim 5, characterized in that: The end face guide member (22) comprises a second bottom plate (221), a second side plate (222) and a second guide plate (223); the second bottom plate (221) abuts against the building bottom plate; the second side plate (222) is connected to both ends of the second bottom plate (221); the second guide plate (223) comprises a second vertical portion (2232) and a second inclined portion (2231); the bottom of the second vertical portion (2232) is connected to the second bottom plate (221), and the two ends are respectively connected to the two second side plates (222); the second vertical portion (2232) is detachably connected to the first side plate (212); the bottom of the second inclined portion (2231) is connected to the top of the second vertical portion (2232), and the two ends are respectively connected to the two second side plates (222); the second inclined portion (2231) is inclined upward from the end face close to the wall (1) to the end face away from the wall (1).
7. The prefabricated shear wall connection structure according to claim 6, characterized in that: A plurality of first reinforcing ribs (4) are provided between the first inclined portion (2131) and the first bottom plate (211), and a plurality of second reinforcing ribs (5) are provided between the second inclined portion (2231) and the second bottom plate (221).
8. The prefabricated shear wall connection structure according to claim 3, characterized in that: The bottom of the prefabricated groove (12) and the bottom of the prefabricated block (11) are both higher than the height of the guide assembly (2).