Air supply system of gas-fired boiler
By introducing flue gas return and air preheating technology of boiler primary energy-saving appliances into the gas boiler air supply system, ultra-low nitrogen combustion of flue gas external circulation is formed, and the problems of low thermal efficiency and high NOx emissions in the existing technology are solved, thus achieving the realization of The utilization of waste heat of flue gas and the control of NOx emissions are carried out.
Patent Information
- Application Number
- CN202420298405.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-02-18
AI Technical Summary
The existing gas boiler air supply system fails to effectively utilize the boiler flue gas waste heat, resulting in low thermal efficiency and high NOx emissions.
A gas boiler air supply system was designed. By introducing the first-level boiler energy-saving device into the air supply duct, the flue gas return at 120°C is formed, and the flue gas external circulation ultra-low nitrogen combustion technology is formed, and the flue gas waste heat is absorbed by air preheater. , after mixing, feed it into the burner to improve combustion efficiency and reduce NOx emissions.
It realizes the effective utilization of waste heat of flue gas, improves the boiler thermal efficiency, and controls NOx emissions to within 30mg/Nm3, achieving the effect of energy saving and pollution reduction.
Smart Images

Figure CN221944192U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gas boiler air supply, in particular to a gas boiler air supply system. Background Art
[0002] Gas boilers are widely used in modern industry to provide steam or hot water for production and manufacturing. The air supply of gas boilers is an important part of the boiler. The fan sends outside air into the gas boiler through the air supply duct to maintain the demand for oxygen content during fuel combustion, making the combustion more complete, improving combustion efficiency and heat output, and reducing combustion residues and carbon dioxide emissions. Reasonable production of air supply ducts is conducive to the delivery of air supply, ensuring the stability of air volume and air pressure parameters, and providing a strong guarantee for the efficient combustion of the boiler.
[0003] The current air supply system mainly generates the air supply required by the boiler, heats it to the required temperature through an air preheater and then sends it to the boiler, while the waste heat of the flue gas generated by the boiler is not reasonably utilized. Based on this, the utility model proposes a gas boiler air supply system that can recycle the boiler flue gas. Utility Model Content
[0004] In view of the above problems, the utility model provides an air supply system for a gas boiler. The air supply duct is used in conjunction with an air preheater and flue gas reflux, which can absorb the waste heat of the flue gas and reduce the exhaust temperature, thereby improving the thermal efficiency of the boiler. At the same time, about 10% of the flue gas at 120°C is refluxed after the boiler's first-level economizer, forming a flue gas external circulation ultra-low nitrogen combustion technology, thereby achieving the effect of energy saving and pollution reduction.
[0005] Specifically, the utility model is achieved as follows:
[0006] A gas boiler air supply system, comprising a fan and an air preheater, wherein the fan and the air preheater are connected via a front air duct, and the air preheater is connected to a burner of the gas boiler via a rear air duct; an air inlet pipe is provided at the inlet end of the fan, and a smoke return port and an air suction port are provided on the air inlet pipe, wherein the smoke return port is connected to the smoke discharge of the first-stage economizer of the boiler, and is used to draw smoke discharged from the first-stage economizer of the boiler, and the smoke and air are mixed in the front air duct and then enter the air preheater for preheating;
[0007] The rear air duct is laid in an air duct groove on the ground, and an air duct cover plate is arranged on the top of the air duct groove.
[0008] Furthermore, an air volume adjustment plate is provided on the air suction port.
[0009] Furthermore, the rear air duct includes: a rear air pipe and a thermal insulation layer, and the thermal insulation layer wraps the rear air duct.
[0010] Furthermore, the rear air duct is provided with reinforcing ribs.
[0011] Furthermore, one end of the rear air duct connected to the gas boiler burner is connected to a hose, and a flange is provided at the end of the connecting hose, and the flange is used to connect to the air inlet of the burner.
[0012] The working principle of this utility model:
[0013] The fan inhales air from the air inlet, and at the same time inhales part of the 120°C flue gas from the boiler's first-stage economizer through the smoke return port, fully mixes it with the air, and forms an ultra-low nitrogen combustion technology with flue gas external circulation. The mixed gas is sent to the air preheater for heating, and then sent to the rear air duct, and then sent to the gas boiler burner along the rear air duct to provide the required air supply for the gas boiler combustion. Due to the full mixing of air and flue gas, the oxygen concentration in the mixed gas per unit volume is reduced, but the temperature and flow rate of the mixed gas are increased. The increase in the flow rate of the mixed gas shortens the residence time of the mixed gas in the thermal reaction area during combustion, thereby reducing the flame temperature. The increase in the temperature of the mixed gas is ultimately conducive to the sufficiency of the fuel and reduces the generation of nitrogen oxides.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] The gas boiler air supply system provided by the utility model mixes the exhaust gas from the primary economizer with air as the air supply required for boiler combustion, forming an ultra-low nitrogen combustion technology with flue gas external circulation, which can control the NOx emission index of flue gas to 30mg / Nm 3 Within 100%, the effect of energy saving and pollution reduction is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the gas boiler air supply system in Example 1;
[0017] Figure 2 It is a structural schematic diagram of the fan in Example 1;
[0018] Figure 3 Schematic diagram of the rear air duct structure in Example 1;
[0019] Figure 4 This is a top view of the rear air duct in Example 1.
[0020] Reference numerals:
[0021] 1-fan; 2-air preheater; 31-inlet pipe; 311-air inlet; 312-smoke return port; 32-front air duct; 33-rear air duct; 331-rear air duct; 332-reinforcement rib; 333-connecting hose; 334-flange; 4-burner; 5-air duct groove; 51-air duct cover. DETAILED DESCRIPTION
[0022] The present invention is further described in detail below through specific implementation modes in conjunction with the accompanying drawings.
[0023] Example 1
[0024] like Figure 1 As shown, the utility model provides an air supply system for a gas boiler, including a fan 1, an air preheater 2 and a rear air duct 33. An air inlet pipe 31 is provided at the inlet end of the fan 1. A smoke return port 312 and an air suction port 311 are provided on the air inlet pipe 31. Air is sucked in from the air suction port 311. An electric air volume adjustment plate is provided on the air suction port 311 to adjust the air intake volume. The smoke return port 312 extends to the exhaust gas after the first-stage economizer of the boiler to suck part of the 120°C smoke after the first-stage economizer of the boiler.
[0025] The fan 1 and the air preheater 2 are connected through the front air duct 32. The flue gas and air are sucked into the fan 1, mixed, and sent to the air preheater 2 for preheating. Specifically, a hot water is distributed from the pipeline provided by the deaerator to the boiler feed water to enter the water side heat exchange tube of the air preheater 2 to preheat the supply air. The 104°C hot water of the deaerator is used to heat the supply air to form 80°C hot air. After the air and flue gas are fully mixed, the oxygen concentration in the air is reduced, the air flow rate is increased, and the retention time of the combustion gas in the thermal reaction area is shortened, thereby reducing the flame temperature, forming an ultra-low nitrogen combustion technology with flue gas external circulation, and controlling the NOx emission index of the flue gas to 30mg / Nm 3 To reduce the generation of nitrogen oxides.
[0026] The rear air duct 33 is composed of an above-ground part and an underground part. The above-ground part includes a front end and a rear end. The front end is connected to the air preheater 2. The hot air after the air preheater 2 enters the front end through a reducer pipe. The front end is connected to the rear air duct 331 of the underground part through an elbow. The rear end is composed of a connecting hose 333 and a flange 334. The flange 334 is connected to the flange at the air inlet at the bottom of the burner 4 to deliver the hot air to the burner 4. The underground part is located in the air duct trench 5 on the ground. The clearance size of the air duct trench is 1000mm×1080mm. The underground part includes the rear air duct 331 and an insulation layer. The rear air duct 331 is a 680×680mm straight pipe made of 316L stainless steel with a wall thickness of 6mm. The rear air duct 331 is wrapped with an insulation layer. The insulation layer is a 100mm thick composite aluminum silicate insulation cotton, and a 0.5mm thick stainless steel plate protective layer is provided on the outside. The rear air duct 331 is provided with reinforcing ribs 332 in sections. The reinforcing ribs 332 are made of 40×40mm angle steel and arranged around the rear air duct 331 to strengthen the strength of the rear air duct 331. The rear air duct 331 is made by direct burial and installed in the air duct trench 5. A 20mm thick air duct cover 51 is laid above the air duct trench 5 to install the rear air duct 331 underground, which not only reduces the floor space, but also effectively insulates the hot air to ensure the temperature of the hot air sent to the burner 4.
[0027] The above specific examples are used to illustrate the present invention, which are only used to help understand the present invention and are not intended to limit the present invention. For those skilled in the art of the present invention, some simple deductions, deformations or substitutions can be made based on the idea of the present invention.
Claims
1. A gas boiler air supply system, comprising a fan (1) and an air preheater (2), wherein the fan (1) and the air preheater (2) are connected via a front air duct (32), and the air preheater (2) is connected to a burner (4) of the gas boiler via a rear air duct (33); characterized in that: An air inlet pipe (31) is provided at the inlet end of the fan (1), and a smoke return port (312) and an air suction port (311) are provided on the air inlet pipe (31). The smoke return port (312) is connected to the smoke exhaust of the boiler's first-stage economizer and is used to draw smoke exhausted by the boiler's first-stage economizer. The smoke is mixed with air in the front air duct (32) and then enters the air preheater (2) for preheating. The rear air duct (33) is laid in an air duct groove (5) on the ground, and an air duct cover plate (51) is provided on the top of the air duct groove (5).
2. The gas boiler air supply system according to claim 1, characterized in that: The air suction port (311) is provided with an air volume adjustment plate.
3. The gas boiler air supply system according to claim 1, characterized in that: The rear air duct (33) comprises: a rear air pipe (331) and a thermal insulation layer, wherein the thermal insulation layer wraps the rear air pipe (331).
4. The gas boiler air supply system according to claim 3, characterized in that: The rear air duct (331) is provided with a reinforcing rib (332).
5. The gas boiler air supply system according to claim 1, characterized in that: One end of the rear air duct (33) connected to the burner (4) is connected to a connecting hose (333), and a flange (334) is provided at the end of the connecting hose (333), and the flange (334) is used to connect to the air inlet of the burner (4).