Rotational flow desilting device for water conservancy project
By installing an inclined ring net and baffle on the inner wall of the sand sinking tube of the cyclone sinking device, combined with the twisting dragon and stepping motor, the problem of sand and stone discharged with water during rotation is solved, and better sand sinking is achieved and separation effect.
Patent Information
- Application Number
- CN202420211093.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-29
AI Technical Summary
In water conservancy projects, during the rotation of the cyclone sand sinking device, some sand and stone will flow upward with the water and be discharged through the outlet pipe, affecting the sand sinking effect.
Install an inclined upper and lower ring nets above and below the inner wall of the sand sinker, and fix the ring baffle in the inner ring net. The sand and stones on the outside are blocked by centrifugal force to prevent them from flowing upward with water. Combined with a rotatable twisting dragon and a stepper motor for sand and stone delivery.
It effectively avoids the discharge of sand and stones with water flowing upward, improves the sand sinking and separation effect, and ensures higher sand sinking efficiency and separation effect.
Smart Images

Figure CN221955862U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sand removal devices, in particular to a cyclone sand settling device for water conservancy projects. Background Art
[0002] A water conservancy project is a project built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. It is also called a water project. Water is a valuable resource indispensable to human production and life, but its natural state does not fully meet human needs. Only by building water conservancy projects can we control water flow, prevent floods and waterlogging disasters, and regulate and distribute water to meet the people's needs for water resources in life and production.
[0003] A cyclone sedimentation device is needed in water conservancy projects. When water flows into the equipment, it will produce a rotational motion. Due to the different densities of water and sand, under the action of centrifugal force, the sand will sink to the bottom along the inner wall and then be lifted and discharged by the screw feeder. The water is discharged from the outlet to achieve separation.
[0004] During the rotation process, some sand and gravel will flow upward with the water flow, and finally some sand and gravel will be discharged from the outlet pipe, affecting the sedimentation effect. Therefore, we propose a cyclone sedimentation device for water conservancy projects. Utility Model Content
[0005] The purpose of the utility model is to provide a cyclone sedimentation device for water conservancy projects, by fixing an inclined upper ring net and a lower ring net around the upper and lower inner walls of a sedimentation cylinder, and also fixing an annular baffle plate inclined on the inner circle of the lower ring net below, in the process of water rotation, it has a blocking effect on sand and gravel thrown to the outside by centrifugal force, avoiding the sand and gravel flowing upward with the water flow and being discharged, having a better sedimentation and separation effect, and solving the problems raised in the background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a vortex sand settling device for water conservancy projects, comprising a sand settling barrel and a sand discharge pipe, the sand discharge pipe is obliquely connected to the bottom side of the sand settling barrel, a rotatable auger is installed inside the sand discharge pipe, and a sand outlet pipe connected to the interior of the sand discharge pipe is vertically connected below the high end of the sand discharge pipe; an inlet pipe connected to the interior of the sand settling barrel is connected above the side of the sand settling barrel, the end of the water inlet pipe is inclined toward the interior of the sand settling barrel, an inner wall surface of the sand settling barrel above the water inlet pipe and an inner wall surface below the sand settling barrel are respectively surrounded and fixed with an inclined upper ring net and an inclined lower ring net, the inner circle of the lower ring net is connected and fixed with an annular baffle perpendicular to it, and an outlet pipe connected to the interior of the sand settling barrel is connected to the middle position above the sand settling barrel.
[0007] By adopting the above technical solution, sand-containing water enters the sand settling drum and rotates inside the sand settling drum under the impact of the water flow. The centrifugal force is used to throw the sand and gravel to the inner wall of the sand settling drum and sink downward to separate. The upper and lower ring nets can prevent a small amount of sand and gravel from flowing upward with the water flow and being discharged with the water flow.
[0008] Optionally, the outer ring of the bottom of the sand settling tube is vertically supported by a first support leg, and a plurality of first support legs are provided.
[0009] By adopting the above technical solution, the first leg can achieve stable support for the sand settling tube.
[0010] Optionally, a second support leg is vertically supported at the middle position of the bottom of the sand discharge pipe, and the second support leg is supported at the front and rear ends of the middle part of the sand discharge pipe.
[0011] By adopting the above technical solution, the sand discharge pipe can be supported by the second support leg.
[0012] Optionally, a stepper motor is installed on the upper side of the sand discharge pipe, and the stepper motor is transmission-connected to the auger.
[0013] By adopting the above technical solution, the stepper motor drives the auger to rotate, so as to transport sand and gravel upwards.
[0014] Optionally, a through opening is opened on the side of the bottom of the sand settling tube, and the through opening connects the sand settling tube and the sand discharge pipe.
[0015] By adopting the above technical solution, the through opening achieves the purpose of connecting the bottom of the sand settling tube with the bottom of the sand discharge pipe.
[0016] Compared with the prior art, the technical solution of this application has the following beneficial effects:
[0017] 1. The technical solution of the present application is to fix an inclined upper ring net and a lower ring net around the upper and lower inner walls of the sand settling tube, and to fix an annular baffle inclined on the inner circle of the lower ring net below. During the rotation of water, it has a blocking effect on the sand and gravel thrown to the outside by the centrifugal force, preventing it from flowing upward with the water flow and being discharged, and has a good sand settling and separation effect.
[0018] 2. The technical solution of the present application has an inclined baffle fixed around the inner circle of the lower ring net, which has a higher blocking effect on more sand and gravel sinking to the bottom of the sand settling tube. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
[0020] Figure 1 This is a schematic diagram of the overall structure of the cyclone sedimentation device for water conservancy projects of the utility model;
[0021] Figure 2 The utility model is a schematic diagram of the cross-sectional structure of the sand settling tube of the cyclone sand settling device for water conservancy projects.
[0022] In the figure: 1. sand settling tube; 11. first leg; 12. water inlet pipe; 13. water outlet pipe; 14. upper ring net; 15. lower ring net; 151. baffle; 16. opening; 2. sand discharge pipe; 21. second leg; 22. sand outlet pipe; 23. auger; 231. stepping motor. DETAILED DESCRIPTION
[0023] See also Figure 1-2 The utility model provides a technical solution: a cyclone sedimentation device for water conservancy projects, comprising a sedimentation barrel 1 and a sand discharge pipe 2, a water inlet pipe 12 is connected to the upper side of the sedimentation barrel 1, the water inlet pipe 12 is communicated with the upper interior of the sedimentation barrel 1, and its end is inclined toward the interior of the sedimentation barrel 1, when sand-containing water enters from the water inlet pipe 12, it acts on the inner wall of the sedimentation barrel 1, and a rotating water flow is formed, so that the centrifugal force is used to throw the sand and stones to the inner wall of the sedimentation barrel 1, and then sink downward, a water outlet pipe 13 is connected to the upper middle position of the sedimentation barrel 1, and the water outlet pipe 13 is communicated with the interior of the sedimentation barrel 1, and the water after the sand is removed can be discharged to the outside.
[0024] The sand discharge pipe 2 is connected obliquely to the bottom side of the sand settling tube 1. The bottom outer circle of the sand settling tube 1 is vertically supported by a first support leg 11. The first support leg 11 is provided with a plurality of support legs to achieve a stable support for the sand settling tube 1. The middle position of the bottom of the sand discharge pipe 2 is vertically supported by a second support leg 21. The second support leg 21 is supported at the front and rear ends of the middle of the sand discharge pipe 2 to achieve a stable support for the middle position of the sand discharge pipe 2. A through hole 16 is opened on the bottom side of the sand settling tube 1. The through hole 16 connects the sand settling tube 1 and the sand discharge pipe 2, so that the sand and gravel that sink to the bottom can enter the sand discharge pipe through the through hole 16 2, a rotatable auger 23 is installed inside the sand discharge pipe 2, the outer ring of the auger 23 is tightly attached to the inner wall of the sand discharge pipe 2, a stepper motor 231 is installed on the upper side of the sand discharge pipe 2, the stepper motor 231 is transmission connected with the auger 23, when the auger 23 is driven to rotate, the separated sand and gravel are transmitted to the upper right side, and a sand outlet pipe 22 connected with the interior is vertically connected below the high end of the sand discharge pipe 2, and the height of the connection position between the sand outlet pipe 22 and the sand discharge pipe 2 is greater than the height of the sand settling tube 1, to ensure that when the sand and gravel are discharged from the sand outlet pipe 22, the water in the sand settling tube 1 will not be discharged.
[0025] An inclined upper ring net 14 is fixed around the inner wall surface of the sand settling drum 1 above the water inlet pipe 12, and an inclined lower ring net 15 is fixed around the inner wall surface below the sand settling drum 1. The upper ring net 14 and the lower ring net 15 can block sand and gravel to prevent the sand and gravel thrown outward by centrifugal force from moving upward along the inner wall and being discharged with the water flow. The inner circle of the lower ring net 15 is connected and fixed with a circular baffle 151 perpendicular to it. Since more sand and gravel are deposited at the bottom of the sand settling drum 1, the baffle 151 has a better blocking effect on the sand and gravel thrown outward.
[0026] When in use, the water inlet pipe 12 is connected to the conveying pipe of the sand-containing water, and the water outlet pipe 13 is connected to the drainage pipe. The stepper motor 231 is connected to the power supply and started to drive the auger 23 to rotate. The sand-containing water enters the sand settling drum 1 from the water inlet pipe 12, impacts the inner wall of the sand settling drum 1 and causes the water to rotate inside it. Under the action of centrifugal force, the sand and gravel are thrown to the inside of the sand settling drum 1 and sink downward, and finally enter the sand discharge pipe 2 through the opening 16, and are transmitted upward under the action of the rotating auger 23, and finally discharged from the sand outlet pipe 22, and the water separated from the sand and gravel is discharged to the outside from the water outlet pipe 13 in the middle position. During the rotation of the water, due to the blocking effect of the upper ring net 14 and the lower ring net 15, the sand and gravel thrown to the outside by the centrifugal force are prevented from moving upward along the inner wall, thereby preventing the sand and gravel from being discharged from the water outlet pipe 13 with the water flow.
Claims
1. A cyclone sedimentation device for water conservancy projects, comprising a sedimentation cylinder (1) and a sediment discharge pipe (2), characterized in that: The sand discharge pipe (2) is connected obliquely to the bottom side of the sand settling tube (1), a rotatable auger (23) is installed inside the sand discharge pipe (2), and a sand outlet pipe (22) communicating with the inside of the sand discharge pipe (2) is vertically connected below the high end of the sand discharge pipe (2); A water inlet pipe (12) communicating with the interior of the sand settling barrel (1) is connected to the upper side of the sand settling barrel (1), the end of the water inlet pipe (12) is inclined toward the interior of the sand settling barrel (1), the inner wall surface of the sand settling barrel (1) above the water inlet pipe (12) and the inner wall surface below the sand settling barrel (1) are respectively surrounded and fixed with an inclined upper ring net (14) and an inclined lower ring net (15), the inner circle of the lower ring net (15) is connected and fixed with a ring baffle (151) perpendicular to it, and the middle position above the sand settling barrel (1) is connected to a water outlet pipe (13) communicating with the interior of the sand settling barrel (1).
2. A cyclone sedimentation device for water conservancy projects according to claim 1, characterized in that: The outer ring of the bottom of the sand settling tube (1) is vertically supported by a first support leg (11), and a plurality of first support legs (11) are provided.
3. The cyclone sedimentation device for water conservancy projects according to claim 1 is characterized by: A second support leg (21) is vertically supported at the middle position of the bottom of the sand discharge pipe (2), and the second support leg (21) is supported at the front and rear ends of the middle part of the sand discharge pipe (2).
4. The cyclone sedimentation device for water conservancy projects according to claim 1, characterized in that: A stepping motor (231) is installed on the upper side of the sand discharge pipe (2), and the stepping motor (231) is transmission-connected to the auger (23).
5. The cyclone sedimentation device for water conservancy projects according to claim 1 is characterized by: A through opening (16) is provided on the side of the bottom of the sand settling barrel (1), and the through opening (16) is connected to the sand settling barrel (1) and the sand discharge pipe (2).