Integrated rapid pile-forming construction device for cast-in-situ bored pile

Through the integrated rapid pile formation device of drilling and casting piles, the hydraulic adjustment mechanism is used to realize the rapid assembly and removal of steel formwork, which solves the high time and economic cost caused by two pourings in traditional construction, and the bonding strength of pile body pile cap concrete. The problem of insufficient has significantly improved construction efficiency and quality.

CN221956719UActive Publication Date: 2024-11-05WUHAN SURVEYING GEOTECHN RES INST OF MCC
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420229755.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-11-05
Estimated Expiration
2034-01-30

AI Technical Summary

Technical Problem

The integrated pile construction of traditional drilling and cast-injected piles has problems such as high time cost, high economic cost, insufficient bonding strength of pile body and pile cap concrete, prone to cracks and time-consuming assembling and disassembly of steel formwork and safety hazards caused by two constructions.

Method used

Design a drilling and cast-injected pile integrated rapid pile forming device, including a support frame, a steel sleeve and a hydraulic adjustment mechanism, and realizes rapid assembly and removal of steel formwork through hydraulic arms and hydraulic power devices to ensure that the pile body and pile caps are poured at one time. , reduce intermediate links and improve construction efficiency and quality.

Benefits of technology

One-time pouring of pile body pile caps has been achieved, which improves the integrity of pile body, shortens construction time, reduces manpower and material consumption, avoids cracks at the junction of pile body pile caps, and improves construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956719U_ABST
    Figure CN221956719U_ABST
Patent Text Reader

Abstract

The utility model provides an integrated rapid pile-forming construction device for a cast-in-situ bored pile. The construction device comprises a supporting frame and a steel sleeve located in a hollow area of the supporting frame, and hydraulic supporting legs are arranged at the bottoms of vertical supporting rods of the supporting frame. The steel sleeve is of a cylinder structure formed by assembling and splicing a plurality of arc-shaped steel formworks, reinforcing ribs are arranged on the two splicing faces of each arc-shaped steel formwork respectively, a plurality of bolt connecting holes are formed in each reinforcing rib from top to bottom, and every two adjacent arc-shaped steel formworks are fixedly connected through connecting bolts after being in butt joint. Vertical supporting rods of the supporting frame are located at the butt joint position of every two adjacent arc-shaped steel formworks, each vertical supporting rod is provided with a hydraulic power device and two sets of hydraulic arms, and the piston ends of the two sets of hydraulic arms are connected with bolt connecting holes in the reinforcing ribs at the corresponding positions respectively. The integrated pile forming device can be repeatedly used, repeated assembly and disassembly are avoided, one-time pouring of the pile body and the pile cap can be achieved through the integrated pile forming device, and the integrality of the integrated pile forming device is remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of bored cast-in-place pile integrated pile construction, in particular to an bored cast-in-place pile integrated rapid pile forming device, which can realize the integrated rapid pile forming of a pile body and a pile cap. Background Art

[0002] In the practice of pile foundation construction, bored cast-in-place pile integration is widely used because of its mature construction technology, good pile quality, large pile diameter, high bearing capacity, and good pile body integrity. The traditional bored cast-in-place pile integration construction technology uses mud wall drilling operations. After the drilling is completed, the working surface is muddy. When the steel formwork of the upper pile cap is placed on the working plane with soft soil and high moisture content, uneven settlement and tilting will occur. After pouring concrete, the pile cap may have quality problems such as pile cap tilting, insufficient protective layer thickness, exposed reinforcement, and pile top elevation lower than the design elevation, which will affect the pile cap as a structural force performance. Therefore, in order to solve the above problems, the traditional bored cast-in-place pile integration construction process first pours the bored pile below the ground, and spreads the pile body over-cast concrete along the pile top horizontal plane as a cushion layer. After the cushion layer is manually smoothed for 24 hours and has the weight to support the upper pile cap steel formwork, the formwork pouring begins. Therefore, the entire bored pile construction must be completed in two times. This construction method has the following problems in the actual construction process:

[0003] First, the construction is divided into two parts. Generally, the underground pile body is constructed first. After the pile body reaches the initial strength, the steel formwork is erected on the ground. This process requires the splicing of steel formworks, and the use of total stations and spirit levels to measure and adjust the verticality and horizontality of the pile cap steel formwork. Each step requires the cooperation of multiple people and the whole process is time-consuming.

[0004] Second, because the construction of the entire bored pile in this method is completed in two times, the interval between the pouring is long, and there are high time and economic costs, which often lead to delays in the entire project schedule and a decrease in profit margins. Data show that the time cost and economic cost of excavating the soil around the pile are 10% and 15% higher than those of not excavating the soil around the pile. For projects with long periods and large investments, the above problems are more prominent.

[0005] Third, pouring is carried out in two times, with an interval equal to the initial setting time of the concrete. The pile body concrete is poured first to solidify and form early strength, resulting in insufficient bonding strength at the interface with the later poured pile cap concrete, resulting in poor integrity of the pile body and the pile cap, and prone to poor integrity of the pile body. Cracks are formed at the concrete interface, and the strength cannot be guaranteed, which has an adverse effect on the upper load transfer and normal use of the structure; especially in the cast-in-place pile foundation of the refinery plant, cracks will appear at the interface of the multiple pouring over time, and under the action of seawater chloride ions and freeze-thaw, the strength of the concrete at the multiple pouring interface of the cast-in-place piles will decrease, which will have an adverse effect on the safety of the upper structure and even affect the normal use of petrochemical equipment; moreover, petrochemical projects are generally located at the seaside, with large sea breeze loads, and various stress combinations will appear in the foundation piles. When there is strong wind, the above-mentioned quality defects can easily lead to failure of the plant structure, which in turn leads to safety problems.

[0006] Fourth, the steel cages of the pile body and pile cap of the existing integrated bored cast-in-place piles are connected by mechanical connection or welding, which is time-consuming and the connection quality is not easy to guarantee; and the traditional formwork removal method is that after the pile cap concrete is poured for 24 hours, when the concrete has early strength and the conditions for formwork removal are met, workers cooperate to remove the bolts between the steel formworks, and then hoist them to the next pile cap for use. Each assembly and disassembly of the pile cap steel formwork takes a long time and poses a safety hazard. Utility Model Content

[0007] The utility model aims to solve the problems existing in the above-mentioned background technology and provides a kind of integrated rapid pile forming equipment for bored cast-in-place piles. By relying on this device, the pile body and pile cap can be cast in one time, which reduces the time consumption of intermediate links and thus realizes rapid pile forming. It solves the problems of horizontal cracks in bored cast-in-place piles and poor casting quality of pile caps caused by insufficient bonding strength of pile body and pile cap concrete due to the casting of pile body and pile cap in two times in traditional construction technology, and the time-consuming repeated assembly and disassembly in traditional construction technology.

[0008] In order to solve the above technical problems, the utility model provides an integrated rapid pile construction device for bored cast-in-place piles, the construction device comprising a support frame, a steel sleeve and a hydraulic adjustment mechanism, the support frame comprising an upper frame, a lower frame and a vertical support rod connecting the upper and lower frames, and a hydraulic support leg is provided at the bottom of each vertical support rod; the steel sleeve is a cylindrical structure assembled by a plurality of arc-shaped steel templates, and the two splicing surfaces of each arc-shaped steel template are respectively reinforced with ribs, and each reinforcement rib is provided with a plurality of bolt connection holes from top to bottom, and two adjacent arc-shaped steel templates are fixedly connected by connecting bolts after being butted; the steel sleeve is located in the hollow area of ​​the support frame, the number of the vertical support rods is the same as the vertical direction of the arc-shaped steel template, and each vertical support rod is located at the butt joint of two adjacent arc-shaped steel templates, and a group of hydraulic adjustment mechanisms is installed on each vertical support rod, and each group of hydraulic adjustment mechanisms comprises a hydraulic power device and two groups of hydraulic arms, and the two groups of hydraulic arms are powered by the hydraulic power device, and the piston ends of the two groups of hydraulic arms are respectively connected with the bolt connection holes on the reinforcement ribs at the corresponding positions.

[0009] The better technical solution of the utility model is as follows: the support frame is a hollow square frame, including four vertical support rods, and the upper frame and the lower frame are both composed of four support rods; the steel sleeve is formed by splicing four 90° arc steel templates.

[0010] A better technical solution of the utility model: the bolt connection holes on the reinforcing rib are equidistantly arranged from top to bottom, the bolt connection holes in the upper area and the lower area of ​​the reinforcing rib are connected when the steel sleeve is spliced, and at least two bolt connection holes are connected in each area of ​​the upper area and the lower area; the hydraulic arm is connected to the bolt connection holes in the middle area of ​​the reinforcing rib, and the bolt connection holes connecting the two groups of hydraulic arms on the same vertical support rod are not adjacent.

[0011] The better technical solution of the utility model is as follows: the hydraulic legs are telescopic in the vertical direction to adjust the height of the vertical support rods, and a support base is provided at the bottom of the hydraulic legs.

[0012] The better technical solution of the utility model is as follows: the support rods on the same side of the upper frame and the lower frame are connected by an inclined rod; a support platform is provided above the upper frame, and a construction hole with a diameter larger than that of the steel sleeve is opened in the middle of the support platform.

[0013] Beneficial effects of the utility model:

[0014] (1) The horizontal hydraulic arm system of the utility model comprises a hydraulic power unit and a hydraulic arm, and the vertical hydraulic leg system comprises a vertical hydraulic power base arranged at the bottom of each vertical support rod. The hydraulic power unit is electrically driven and has a high degree of automation, which can realize the rapid assembly and disassembly of the steel formwork components and the rapid preliminary leveling of the equipment. The complete deployment of the equipment on a non-horizontal working surface can be achieved by adjusting the elevation of the vertical hydraulic power base of the vertical hydraulic leg system, which is suitable for deployment on a non-horizontal working surface.

[0015] (2) The utility model adjusts the relative position between the lower edge of the steel formwork assembly and the equipment, that is, adjusts the lowest position of the lower edge of the steel formwork assembly, so that the steel formwork assembly can be extended below the ground to prevent cement slurry from leaking from the joint between the ground and the steel formwork assembly during pouring, thereby ensuring construction quality and saving materials. The utility model can be applied to construction sites with loose soil at the pile mouth, and can prevent the loose soil at the original casing support position from collapsing during pouring, which may cause pile quality pouring problems.

[0016] (3) The support sleeve of the utility model is of assembled type. Support sleeves of different diameters can be designed according to the pile cap diameter requirements, and then connected to the outer support frame through a horizontal hydraulic arm. The position of the support sleeve can be adjusted by the hydraulic arm to ensure that the center of the support sleeve is aligned with the center of the pile body, thereby ensuring construction accuracy. The hydraulic arm of the utility model can remove the support sleeve within a few minutes, and can achieve rapid demolding. The demolding is convenient and time-saving.

[0017] (4) The four hydraulic legs of the equipment of the utility model adopt a method of expanding the base area to control the equipment pile cap template to reduce the pressure of the base on the soil, thereby controlling the problem of uneven settlement and tilt, ensuring verticality, and avoiding quality problems such as pile cap tilt, insufficient thickness of protective layer, exposed reinforcement, and pile top elevation lower than the design elevation. In addition, the equipment does not need to be reassembled and can be used multiple times after one assembly. When in use, it is only necessary to use a car crane or crawler crane to lift the equipment above the steel cage. After vertically passing through the steel cage, the center of the steel template and the center of the pile hole are made to coincide, and the equipment can be quickly positioned. The four vertical hydraulic power bases of the vertical hydraulic leg system can quickly realize the leveling of the entire equipment. The horizontal hydraulic power device and hydraulic arm of the horizontal hydraulic arm system can quickly realize the function of synthesizing the four steel template components into a cylinder with the same diameter as the pile. The equipment has a high degree of automation and can be assembled before pouring concrete. It can be carried out simultaneously with other construction. It has the characteristics of short assembly time and simple assembly.

[0018] (5) The device of the utility model can realize continuous pouring of the pile body and pile cap, and the pouring can be completed in one time, thereby ensuring the pouring integrity of the pile body. The pouring interval of the pile body and pile cap is short, and the pouring quality of the pile cap is good. Moreover, from the perspective of concrete pouring, there is no "pile body" and "pile cap", which avoids the situation in which the bonding strength of the pile body and pile cap at the junction is reduced in the traditional process. The integrity of the pile body is significantly improved compared with the traditional process, and the integrity of the pile body can be guaranteed.

[0019] In the utility model, due to the integrated construction of the pile body and pile cap, the steel cage in the present application is completed at one time, which ensures the integrity of the steel cage and avoids mechanical connection or welding of the pile body steel cage and the pile cap steel cage. While the integrity is better, it also greatly saves construction time. During the pouring of the pile body and pile cap of the utility model, the operator can stand on the top platform of the support frame to construct, and directly use the platform provided by the device as the operating platform, which ensures safety and improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model equipment;

[0021] Figure 2 It is a structural schematic diagram of the steel sleeve in the utility model;

[0022] Figure 3 It is a top view of the steel sleeve in the utility model.

[0023] In the figure: 1—steel sleeve, 100—arc-shaped steel template, 101—bolt connection hole, 102—strengthening rib,

[0024] 2—upper frame, 3—lower frame, 4—vertical support rod, 5—hydraulic outrigger, 500-support base, 6—hydraulic arm, 7—diagonal rod, 8—support platform, 800—construction hole, 9—hydraulic power unit. DETAILED DESCRIPTION

[0025] The utility model is further described below in conjunction with the accompanying drawings and embodiments. Figures 1 to 3 The drawings are all of embodiments, which are drawn in a simplified manner and are only used for the purpose of clearly and concisely illustrating the embodiments of the utility model. The following technical solutions shown in the drawings are specific solutions of the embodiments of the utility model and are not intended to limit the scope of the utility model to be protected. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] In the description of the present utility model, it should be understood that the terms "upper", "lower", "inner", "outer", "left", "right", etc. indicate the orientation or position relationship based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the utility model product is usually placed when in use, or the orientation or position relationship commonly understood by those skilled in the art, which is only for the convenience of describing the present utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0027] The embodiment provides a bored pile integrated rapid pile construction device, such as Figure 1 As shown, the construction device includes a support frame, a steel sleeve 1 and a hydraulic adjustment mechanism. The support frame is a hollow square frame, including an upper frame 2, a lower frame 3 and four vertical support rods 4 connecting the upper and lower frames. The upper frame 2 and the lower frame 3 are both composed of four support rods. A hydraulic leg 5 is provided at the bottom of each vertical support rod 4. The hydraulic leg 5 can provide hydraulic power in the vertical direction to adjust the height of the vertical support rod 4. A support base 500 is provided at the bottom of the hydraulic leg 5; the support base 500 is made of a steel plate with a size of 0.5m*0.5m*0.05m, and has the characteristics of large force area and high rigidity; the base height is controlled by four vertical hydraulic power bases (hydraulic legs 5) to control the height of the base and thus control the height of the entire equipment from the ground and adjust the verticality of the equipment. The support rods on the same side of the upper frame 2 and the lower frame 3 are connected by an inclined rod 7; the entire support frame has the characteristics of high rigidity and good load-bearing capacity, and is the skeleton of the entire equipment. A support platform 8 is provided above the upper frame 2, and a construction hole 800 having a diameter greater than that of the steel sleeve 1 is opened in the middle of the support platform 8. The support platform 8 can be a steel flat plate or a mesh platform, and is mainly used for construction workers to stand on the platform for operation.

[0028] The embodiment provides a bored pile integrated rapid pile construction device, such as Figures 1 to 3As shown, the steel sleeve 1 is a cylindrical structure formed by splicing four 90° arc-shaped steel templates 100, and the two splicing surfaces of each arc-shaped steel template 100 are respectively reinforced ribs 102, and each reinforcing rib 102 is provided with a plurality of bolt connection holes 101 equidistant from top to bottom. After the two adjacent arc-shaped steel templates 100 are butt-jointed, they are fixedly connected by connecting bolts; when the steel sleeve 1 is spliced, the bolt connection holes 101 in the upper area and the lower area of ​​the reinforcing rib 102 are connected, and at least two bolt connection holes 101 are connected in each area of ​​the upper area and the lower area. The steel sleeve 1 is located in the hollow area of ​​the support frame, and each vertical support rod 4 is located at the joint between two adjacent arc-shaped steel formworks 100. A group of hydraulic adjustment mechanisms is installed on each vertical support rod 4, and each group of hydraulic adjustment mechanisms includes a hydraulic power device 9 and two groups of hydraulic arms 6. The two groups of hydraulic arms 6 are powered by the hydraulic power device 9, and the piston ends of the two groups of hydraulic arms 6 are respectively connected to the bolt connection holes 101 on the corresponding reinforcing ribs 102 by bolts; the hydraulic arms 6 are connected to the bolt connection holes 101 in the middle area of ​​the reinforcing ribs 102, and the bolt connection holes 101 connecting the two groups of hydraulic arms 6 on the same vertical support rod 4 are not adjacent; the connection position of the hydraulic arm can select different bolt holes according to actual needs on site, thereby realizing the function of height adjustment of the steel formwork system. The hydraulic power unit 9 on each vertical support rod 4 provides power for the extension and retraction of the two sets of hydraulic arms 6. The two sets of hydraulic arms 6 are connected to the reinforcing ribs of the steel sleeve 1 through bolts to realize radial horizontal movement of the steel formwork assembly, thereby realizing the function of rapid assembly or disassembly of the steel formwork system under the action of the horizontal hydraulic arm system; the hydraulic power unit 9 is connected to an external power supply.

[0029] The process of using the utility model for integrated construction of bored cast-in-place piles is as follows: S1 construction preparation → S2 measurement and positioning and layout → S3 casing burying → S4 drilling rig in place → S5 hole forming → S6 first hole cleaning → S7 reinforcement engineering → S8 second hole cleaning → S9 casing removal → S10 installation of the device → S11 concrete pouring → S12 formwork removal → S13 end.

[0030] The above process steps S1 to S8 are the same as the traditional integrated pile construction process. The following is a detailed description of the unique construction steps S9 to S12 of the utility model process:

[0031] S9: Pull out the casing; after the second hole cleaning is completed, start pulling out the casing, use a steel wire rope to connect the casing to the crane lifting device through a U-bolt, and directly lift the casing vertically upward from the hole to facilitate the later concrete pouring;

[0032] S10: After pulling out the casing, set up the equipment; assemble the support frame and vertical hydraulic legs of the equipment in sequence. This process can be carried out in an open field and only needs to be assembled once. Compared with the traditional process, in the construction process of multiple cast-in-place piles, it saves the time of repeatedly assembling and disassembling the steel formwork components and building and disassembling the construction platform; after the above system is assembled, according to the actual project, a steel sleeve of a certain diameter is selected, and the four arc-shaped steel formworks 100 are connected to the hydraulic arm 6 in the hydraulic adjustment mechanism by bolts. The purpose of this step is to transmit the power of the hydraulic power device 9 of the hydraulic adjustment mechanism to the hydraulic arm 6, thereby realizing the rapid assembly and demolding of the steel formwork components; in this process, according to the needs of the site, 2 of the 15 bolt holes reserved on the reinforcing ribs of the arc-shaped steel formwork 100 can be selected to connect the hydraulic arm 6, and the steel sleeve 1 can be adjusted At the lowest position of the lower edge, the steel sleeve 1 can be extended below the ground, which is suitable for construction sites with loose soil at the pile mouth, and can prevent the loose soil at the original casing support position from collapsing during the pouring process, which can cause the pile quality pouring problem; the initial leveling of the equipment is achieved by adjusting the length of the four vertical hydraulic legs, and the inspection method is: place the equipment on the horizontal ground, and observe with the naked eye that the equipment is perpendicular to the ground, that is, the initial leveling is completed; after the site is leveled, the method of erecting the equipment is: use a steel wire rope to lift the equipment to the pile hole position through a U-bolt, and keep the center of the equipment steel template coincident with the center of the pile hole; place steel plates at the bottom of the four hydraulic legs 5 to reduce the pressure of the base on the site soil and prevent the entire equipment from tilting due to uneven settlement of the construction site; a calibrator can be set on the vertical support rod 4, and the vertical and horizontal levels of the support frame can be calibrated by the calibrator.

[0033] S11; Concrete pouring; The support platform 8 of this device can be used as an operating platform for construction personnel. There is an aisle on the top of the equipment for workers to pass. After the equipment is erected in step S10, the conduit is hoisted to the center of the steel sleeve of this equipment by a steel wire rope, and the conduit splicing and assembly are completed, so that the cumulative length of the conduit is greater than the sum of the length of the pile body and the height of the equipment from the ground, ensuring that the lower end of the conduit reaches the bottom of the hole, and finally connecting the funnel and the conduit. After the above preparations are completed, concrete pouring can begin; the concrete pouring process is the same as the traditional process. The poured height of the pile hole is calculated according to the volume of the poured concrete, and the conduit is lifted and removed in time to ensure that the lower end of the conduit is always in the poured concrete; when the concrete is poured to the height of the pile top, continue pouring. The purpose of over-pouring is to take away all the mud, sand and stones that fall into the pile hole and the diluted concrete from the pile body, ensuring the quality of the pile casting. After the pouring is completed, use clean water to rinse the outer wall of the steel sleeve of this equipment to prevent the over-pouring concrete and sand and stone soil from sticking to the outer wall of the steel formwork assembly, ensuring that the construction site and equipment are clean and tidy. The above process shows that during the pouring process, the integrity and integrity of the pile body and pile cap are guaranteed because the concrete is poured in one go; compared with the traditional process, the quality defect of cracks forming at the interface of the twice poured concrete caused by the pile body and pile cap being poured in two times is avoided.

[0034] S12: Dismantle the formwork. During the construction of the bored pile, the bored pile is not used as a load-bearing structure. Therefore, 24 hours after the pouring is completed, the bored pile has formed early strength. At this time, the steel sleeve 1 can be removed. The present equipment can be used to achieve rapid formwork removal. The hydraulic power device 9 of the hydraulic adjustment mechanism is started, and the four arc-shaped steel formworks 100 are driven to move away from the pile body by contracting the hydraulic arm 6, so that the formwork can be quickly disassembled.

[0035] In summary, the utility model uses a new device and a new construction method to cast the pile body and pile cap at one time, which significantly improves the integrity of the integrated pile and overcomes the shortcoming of poor pile body integrity caused by the traditional integrated pile casting in two times; at the same time, the equipment has the characteristics of "one-time assembly and multiple uses", avoids repeated assembly and disassembly, significantly shortens the construction time, saves manpower and material resources, and has obvious economic value.

Claims

1. An integrated rapid pile construction device for bored piles, characterized in that: The construction device comprises a support frame, a steel sleeve (1) and a hydraulic adjustment mechanism. The support frame comprises an upper frame (2), a lower frame (3) and a vertical support rod (4) connecting the upper and lower frames. The bottom of each vertical support rod (4) is provided with a hydraulic support leg (5). The steel sleeve (1) is a cylindrical structure assembled from a plurality of arc-shaped steel templates (100). The two joint surfaces of each arc-shaped steel template (100) are respectively provided with reinforcing ribs (102). Each reinforcing rib (102) is provided with a plurality of bolt connection holes (101) from top to bottom. After two adjacent arc-shaped steel templates (100) are butt-jointed, they are connected by connecting bolts. Fixed connection; the steel sleeve (1) is located in the hollow area of ​​the support frame, the number of the vertical support rods (4) is the same as the vertical direction of the arc-shaped steel formwork (100), and each vertical support rod (4) is located at the joint between two adjacent arc-shaped steel formworks (100), and a group of hydraulic adjustment mechanisms is installed on each vertical support rod (4), each group of hydraulic adjustment mechanisms includes a hydraulic power device (9) and two groups of hydraulic arms (6), both groups of hydraulic arms (6) are powered by the hydraulic power device (9), and the piston ends of the two groups of hydraulic arms (6) are respectively connected to the bolt connection holes (101) on the corresponding reinforcement ribs (102).

2. The integrated rapid pile construction device for bored piles according to claim 1, characterized in that: The support frame is a hollow square frame, comprising four vertical support rods (4), and the upper frame (2) and the lower frame (3) are both composed of four support rods; the steel sleeve (1) is formed by splicing four 90° arc-shaped steel templates (100).

3. The integrated rapid pile construction device for bored piles according to claim 1 or 2, characterized in that: The bolt connection holes (101) on the reinforcing rib (102) are arranged equidistantly from top to bottom, and the bolt connection holes (101) in the upper area and the lower area of ​​the reinforcing rib (102) are connected when the steel sleeve (1) is spliced, and at least two bolt connection holes (101) are connected in each area of ​​the upper area and the lower area; the hydraulic arm (6) is connected to the bolt connection holes (101) in the middle area of ​​the reinforcing rib (102), and the bolt connection holes (101) connecting the two groups of hydraulic arms (6) on the same vertical support rod (4) are not adjacent.

4. The integrated rapid pile construction device for bored piles according to claim 1 or 2, characterized in that: The hydraulic support leg (5) is telescopic in the vertical direction to adjust the height of the vertical support rod (4), and a support base (500) is provided at the bottom of the hydraulic support leg (5).

5. The integrated rapid pile construction device for bored piles according to claim 2 is characterized by: The support rods on the same side of the upper frame (2) and the lower frame (3) are connected via an inclined rod (7); a support platform (8) is provided above the upper frame (2), and a construction hole (800) having a diameter greater than that of the steel sleeve (1) is provided in the middle of the support platform (8).