Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

851results about How to "Quick dismantling" patented technology

Receding construction method of cradle of continuous girder bridge made of prestressing concrete

The invention relates to a receding construction method of a cradle of a continuous girder bridge made of prestressing concrete, which is characterized in that the bridge surface of a bridge prefabricated by concrete is provided with a track and a door-shaped truss traveling device, and the width of a ceiling girder inside the door-shaped truss traveling device is wider than that of the bridge surface by 90cm-110cm; a front bottom cross beam and a rear bottom cross beam must extend to the outer side of an external mold by 45cm-55cm to form a main cradle truss, and an overhanging auxiliary door frame is additionally arranged outside the main cradle truss, after the construction of a closure segment of the bridge prefabricated by concrete is finished, and precise rolling deformed steel bars with the diameter of 32 outside a box girder positioned on the overhanging auxiliary door frame are connected with the rear bottom cross beam to disassemble a rear hanging strip; a bottom mold frame is separated from a beam body by utilizing a manual spiral type jack to loose the precise rolling deformed steel bars positioned on the door frame and the front bottom cross beam; a leading chain or a hoist are utilized to drive the main cradle truss so that the cradle recedes in a slideway to a first cast-in-situ segment; and a bottom mold and the external mold are fallen by the leading chain or the hoist to disassemble the main truss.
Owner:NO 1 ENG CO LTD OF CR11BG +1

Rapid construction method of arched pipe truss

InactiveCN110259145ASee the connectionAccurately determine the center of gravityGeometric CADBuilding material handlingRisk strokeRapid construction
The invention discloses a rapid construction method of an arched pipe truss. The rapid construction method comprises the following steps that (1) a BIM structural model of the arched pipe truss is established; (2) horizontal integrated pre-assembly and segment welding are performed in a factory for the pipe truss to form truss bodies to be transport to a site; (3) the truss bodies are assembled to form two main trusses; (4) in-span brackets are installed; (5) the two main trusses are lifted and welded to connect the two main trusses into the pipe truss; (6) the assembled pipe truss is lifted in place to complete installation of the pipe truss; (7) the steps 2-6 are repeated to form two pipe trusses, a secondary truss and a roof support are installed, so that the installed part forms a whole force system; and (8) the steps 2-7 are repeated until all pipe trusses are installed. According to the rapid construction method of the arched pipe truss, in-span vertical one-time splicing rapid construction of the arched pipe truss can be completed in the case of poor on-site site conditions, the risks of working at height are reduced, the construction period is ensured, the construction cost is saved, and multiple purposes are achieved at one stroke.
Owner:CHINA METALLURGICAL CONSTR ENG GRP

Hydraulic fabricated crossing structure

ActiveCN105529648ARealize self-elevating and self-descendingImprove impact resistanceApparatus for overhead lines/cablesSafety netEngineering
The invention discloses a hydraulic fabricated crossing structure, which comprises a structure body, a safety net device, rotating arm mechanisms and hydraulic jacking mechanisms, wherein the structure body comprises a plurality of upright posts and beam components; the safety net device comprises a carrying rope, a circulating rope, a safety net, insulating stay bars and sling members; each rotating arm mechanism comprises a rotating arm and a magnetic docking device; and each hydraulic jacking mechanism comprises an oil station, an oil cylinder and a jacking platform. Stabilization of the structure body is achieved through stay wires; each upright post is stabilized by upper and lower layers of stay wires; four stay wires are unevenly distributed on each layer; the upper layer of stay wires are located at the lower parts of rotary assemblies of the upright posts; and the lower layer of stay wires are located close to the center positions of the waists of the upright posts. According to the hydraulic fabricated crossing structure, the shock resistance of the crossing structure is improved by the measures of optimizing the overall structure of the crossing structure, adopting a high-strength steel material, adding a buffer force reliever, reasonably arranging the stay wires and the like; meanwhile, lightweight, fabricated and automatic design is carried out; and the 'hydraulic fabricated crossing structure' can meet the requirements of field construction.
Owner:STATE GRID CORP OF CHINA +2

Construction technology for long-spiral cast-in-place pile extruded into rock

The invention discloses a construction technology for a long-spiral cast-in-place pile extruded into rock. The construction technology comprises the following steps: 1) embedding a pile casing: embedding the pile casing in a pile position acquired by surveying and setting out; 2) drilling a hole: downward drilling by a long-spiral pile machine and acquiring a constructed and formed hole after drilling in place; 3) lifting a drill rod and protecting a wall with slurry: upward lifting the drill rod after drilling in place till taking the drill rod out of the formed hole, adopting a grouting device and pumping the wall-protecting slurry through the drill rod during the process of upward lifting the drill rod, and protecting the wall with the slurry for the formed hole; 4) putting down a reinforced bar cage; 5) grouting concrete: performing concrete grouting construction on the constructed long-spiral cast-in-place pile extruded into rock through a concrete pumping device and a grouting guide tube. The construction technology provided by the invention has the advantages of simple steps, convenience in realization, high hole quality, good construction effect and capability of effectively solving the problems of the present construction for the long-spiral cast-in-place pile extruded into rock that the hole wall is easy to collapse, the hole is repeatedly cleaned, the construction efficiency is low, and the like.
Owner:SHAANXI ZHUANGXIN CONSTR ENG

Manual type anorectal surgery magnetic ring anastomat

The invention discloses a manual type anorectal surgery magnetic ring anastomat which comprises an upper magnetic ring shell, an upper magnetic ring is embedded and fixed in a cavity of the upper magnetic ring shell, and a plurality of upper magnetic ring shell clamping grooves are formed in the ring wall of an inner hole of the upper magnetic ring shell. Each upper magnetic ring shell clamping groove can be connected with a correspondingly-arranged claw clamp in a clamped mode, and the claw clamps are commonly fixed to a clamping claw through claw petals. A notch is formed in the side wall of the lower end of the clamping claw, and a lower magnetic ring shell is oppositely arranged below the upper magnetic ring shell. A lower magnetic ring capable of being attracted to the upper magnetic ring is embedded and fixed in a cavity of the lower magnetic ring shell, and the lower magnetic ring shell is embedded in a groove in the upper end of a handle through transition fit. A push rod is arranged in the handle, an annular cutter is arranged at the upper end of the push rod, a driving shaft penetrates through a middle hole of the push rod, the top end of the driving shaft is fixedly connected with the bottom end of the clamping claw, the lower portion of the driving shaft is connected with a vertical driving mechanism, and the lower end of the push rod is connected with the handle. The manual type anorectal surgery magnetic ring anastomat is simple in structure and convenient to operate.
Owner:张林安

Integral hydraulic formwork applied to box culvert prefabrication

The invention belongs to the field of box culvert pouring, and provides an integral hydraulic formwork applied to box culvert prefabrication. The integral hydraulic formwork comprises an internal formwork component, a bottom formwork component, an external formwork component, an end formwork component and a retaining formwork component; the internal formwork component includes internal formworks and an internal top formwork; the internal formworks include the first internal formwork and the second internal formwork; the bottom formwork component includes a bottom formwork; the external formwork component includes external formworks; the external formworks include the first external formwork and the second external formwork; the retaining formwork component includes a first retaining formwork and a second retaining formwork; the end formwork component includes a convex end formwork and a concave end formwork; and the space enclosed by the first external formwork, the second external formwork, the first internal formwork, the second internal formwork, the internal top formwork, the bottom formwork, the first retaining formwork, the second retaining formwork, the convex end formwork and the concave end formwork is used for pouring concrete. By mean of the integral hydraulic formwork applied to box culvert prefabrication, the prefabrication quality is high and stable, the adopted set shaped steel formwork has high surface rigidity, is not prone to deforming, and has good flatness.
Owner:INNER MONGOLIA ROAD & BRIDGE

Temporary cofferdam applied to maintenance of urban tidal river concrete anti-flood wall and construction method thereof

The invention discloses a temporary cofferdam applied to maintenance of an urban tidal river concrete anti-flood wall and a construction method thereof. The temporary cofferdam is composed of an arched pipe bag, side reinforced belts, annular reinforced belts, impervious blankets, end reinforced and impervious curtains and anchoring components. A plurality of grouting openings and sealing plugs for water filling and draining are arranged on the upper portions of the facing-water sides of the pipe bags, the walls of the water facing sides and the land sides of the pipe bags are integrally combined with the high-strength reinforced belts to form the side reinforced belts, and the impervious blankets outwards extend out of the side reinforced belts on the water facing sides and are pressed by a row of small sand bags; the two ends of each pipe bag are provided with the annular reinforced belts which are integrated with the side reinforced belts, and the annular reinforced belts extend outwards to form the horn-shaped end reinforced impervious curtains to be connected with an original wall and anchored and sealed by the anchoring components; the end reinforced and impervious curtains and the impervious blankets are integrated to form a sealed water retaining structure with the arched pipe bags. The temporary cofferdam has the advantages of being simple in structure, safe, reliable, convenient to transport and store, quick to construct, capable of being repeatedly used, friendly to the environment, and the like.
Owner:HOHAI UNIV

Improved inner-pushing type clamping device for numerical control tube bending machine

The invention discloses an improved inner-pushing type clamping device for a numerical control tube bending machine and belongs to the field of numerical control tube bending machines. The improved inner-pushing type clamping device solves the problems that an oil cylinder of an existing clamping device for a numerical control tube bending machine is poor in rotation sealing in the autorotation process and is likely to leak oil, and the service life is short. The improved inner-pushing type clamping device comprises a flexible chuck, an oil cylinder and a component, wherein the flexible chuck and the oil cylinder are connected through the component. The component for connecting the flexible chuck and the oil cylinder comprises a chuck pushing bush and a rotating rod. The oil cylinder comprises a cylinder body and a piston rod arranged in the cylinder body, and the chuck pushing bush is arranged at the stretching-out end of the piston rod, is fixed relative to the piston rod in the axial direction and can relatively rotate around the axis. The rotating rod is arranged in the piston rod, and is connected with the chuck pushing bush in the connecting mode that the rotating rod and the chuck pushing bush can rotate synchronous and move relatively in the axial direction. The flexible chuck is arranged at one end of the rotating rod. By means of the improved inner-pushing type clamping device, the problem of oil leakage caused by poor rotation sealing of the oil cylinder can be solved, so that the working stability of the clamping device is improved, and the service life is prolonged.
Owner:ANHUI DEXI DHI TECH

Equipment base pre-reservation round anchor bolt hole die

The invention relates to a round hole die of an equipment base pre-reservation anchor bolt hole, in particular to an equipment base pre-reservation round anchor bolt hole die, which is characterized in that the equipment base pre-reservation round anchor bolt hole die comprises a center shaft, a first bracing and shrinking device, a second bracing and shrinking device, four templates and four joint sealing plates, wherein the four templates are all in an arc shape and uniformly distributed along a circumference, each joint sealing plate is inserted between two adjacent templates, the four templates and the four joint sealing plates enclose to form a cylindrical space, first template supports on the four templates are all articulated to the first bracing and shrinking device, second template supports on the four templates are all articulated to the second bracing and shrinking device, the lower part of the center shaft, the first bracing and shrinking device and the second bracing and shrinking device are all arranged in the cylindrical space enclosed by the four templates and the four joint sealing plates, the upper part of the center shaft is arranged above the cylindrical space and is provided with outside threads, and a handle is arranged at the upper end of the center shaft. The die is simple to operate and rapid to disassemble and can be used repeatedly.
Owner:CHINA FIRST METALLURGICAL GROUP

High-power container type diesel generating set

The invention discloses a high-power container type diesel generating set. The high-power container type diesel generating set comprises an auxiliary container, a power container and a connecting metal flexible pipe which is arranged between the auxiliary container and the power container, wherein the power container comprises a machine room and an electric appliance room, the machine room is internally provided with a diesel engine, a main generator, a starting motor, a storage battery and a charger, and the electric appliance room is internally provided with a high-voltage cabinet, a grounding cabinet and a control cabinet; the top part of the auxiliary container is in an open type, and a box door is in a shutter type; and the connecting metal flexible pipe comprises large-caliber steel wire braiding flexible pipes and small-caliber steel wire braiding flexible pipes, two large-caliber steel wire braiding flexible pipes are connected by adopting a movable flange, and two small-caliber steel wire braiding flexible pipes are connected by adopting a quick-change connector. According to the high-power container type diesel generating set disclosed by the invention, the generator and an auxiliary unit are respectively arranged in the two box bodies, the two box bodies are connected by adopting the steel wire braiding flexible pipes, and thus the high-power container type diesel generating set can effectively adapt to places with large environmental temperature difference and strong sandstorm and has the characteristics of noise reduction, shock absorption, easiness in disassembling and hoisting and the like.
Owner:SICHUAN CRRC YUCHAI ENGINE CO LTD

Current and surface pressure adjustable cable buffer layer ablation fault simulation device and method

ActiveCN111929544AGuaranteed Surface Pressure ParametersPrecise adjustment of current amplitudeTesting dielectric strengthWeather/light/corrosion resistanceVoltage loopUtility frequency
The invention discloses a current and surface pressure adjustable cable buffer layer ablation fault simulation device and method. The device comprises a power frequency voltage loop unit used for providing voltage applied to a buffer layer and a buffer layer ablation experiment unit connected to the power frequency voltage loop unit. The buffer layer ablation experiment unit comprises a sealed cavity, a fixing and clamping assembly arranged in the sealed cavity and used for fixing and clamping a buffer layer, an electrode assembly used for applying current to the buffer layer, a pressure adjusting piece used for applying surface pressure to the buffer layer and a self-weight adjusting assembly. By adjusting the amplitude of the externally applied voltage and the mass of the voltage regulating part, the ablation working condition simulation of the buffer layer under different currents and surface pressures is realized, the ablation characteristics of the buffer layer under the influenceof different current amplitudes and surface pressures are further researched, and a reliable experimental platform can be provided for the fault simulation analysis of the buffer layer of the high-voltage cable.
Owner:SICHUAN UNIV

Quick assembling and disassembling steel-structure pedestrian overpass

The invention provides a quick assembling and disassembling steel-structure pedestrian overpass which comprises piers, a bridge arranged on the piers and provided with a bridge deck, stairs arranged at two ends of the bridge, and guardrails arranged on two sides of the bridge and the stairs. The quick assembling and disassembling steel-structure pedestrian overpass is characterized in that the bridge is composed of a plurality of I-beams with through holes and connecting components; the connecting components include end plates, clamping plates and connecting plates, the end plates are arranged at the head and tail ends of each I-beam and provided with through holes, the clamping plates are arranged in grooves of the I-beams and provided with through holes, and each connecting plate provided with through holes is arranged between every two adjacent clamping plates, and bolts and nuts are arranged in the through holes. The pedestrian overpass can be assembled or disassembled quickly and conveniently, so that time for building or demolishing is shortened greatly, and road traffic pressure is relieved; furthermore, the disassembled pedestrian overpass is reusable, thus materials and cost are saved greatly. In addition, due to an assembled structure, assembly parts can be produced and transported in batches, and the pedestrian overpass is beneficial to large-scale and intensive production, transportation and assembly.
Owner:云南昆钢钢结构股份有限公司

Method for quickly changing rubber waterproof tape of bridge expansion joint

The invention belongs to the technical field of bridge expansion joints, and particularly relates to a method for quickly changing a rubber waterproof tape of a bridge expansion joint. The method comprises the steps that firstly, drawing mechanisms are symmetrically arranged at the two ends of the bridge expansion joint, digging ropes of the drawing mechanisms are connected with the front end and the rear end of a removal and installation mechanical arm respectively, the digging ropes are located at the horizontal axis of the expansion joint, and the left end and the right end of the removal and installation mechanical arm are arranged in grooves of beam body profiled bars and can slide back and forth along the expansion joint; secondly, the to-be-removed rubber waterproof tape and the removal and installation mechanical arm are fixed at the first drawing mechanism, and the second drawing mechanism is started to draw the removal and installation mechanical arm to strip the to-be-removed rubber waterproof tape away; thirdly, a to-be-installed rubber waterproof tape and the removal and installation mechanical arm are fixed at the second drawing mechanism, and the first drawing mechanism is started to draw the removal and installation mechanical arm to lay the to-be-installed rubber waterproof tape into the grooves of the beam body profiled bars; fourthly, the removal and installation mechanical arm is taken back, the drawing mechanisms are removed, and the work face of the bridge expansion joint is cleaned. The method has the advantages of being high in changing efficiency and good in installation quality.
Owner:HENGSHUI ZHONGTIEJIAN ENG RUBBER

Follow-up type high-efficiency water-stop and sand-hindrance precipitation complex system and its construction method

The invention relates to a follow-up type high-efficiency water-stop and sand-hindrance precipitation complex system and its construction method. The system is suitable for all unconfined aquifers andconfined aquifers. The complex system includes a precipitation well, an infiltration-filtration device arranged in a well pipe of the precipitation well, a sand filter layer which the outside of thewell pips is filled, a follow-up type moving water-stop heavy curtain, a waterway-drain seepage well and a settlement observation point; the precipitation well is arranged in an annular mode along theedge of a foundation pit, and the infiltration-filtration device is composed of plum-blossom shaped distribution holes and steel wire gauzes with which the outsides of the plum-blossom shaped distribution holes are coated; the follow-up type moving water-stop and sand-hindrance heavy curtain is placed on the inner side of the precipitation well in an annular mode; the waterway-drain seepage wellis formed on the inner side of the heavy curtain, and the settlement observation point is arranged on the edge of the foundation pit. According to the system and the construction method, foundation-pit precipitation, infiltration-filtration water collection, underground water stop, grit eroding and pipe gush prevention, and settlement prevention and control technology are integrated into a whole system, the structure is flexible, precipitation is high in efficiency, the collaborative linkage property is good, the building cost of projects is low, the application range is wide, and surface subsidence and other engineering hazards caused by grit eroding and pipe gush can be effectively prevented.
Owner:TONGJI UNIV

Cast-in-place concrete wall single-side formwork system

The invention provides a cast-in-place concrete wall single-side formwork system, belonging to the technical field of a cast-in-place concrete formwork. The cast-in-place concrete wall single-side formwork system comprises a support frame and a vertical formwork, wherein the support frame comprises a stand column and a horizontal support, and a height regulating mechanism is arranged on the standcolumn; the support frame is connected with an anchoring component; the formwork comprises a plurality of standard formworks connected in order and at least one regulating template connected with thestandard formworks; and a group of cross bam component is respectively connected between each stand formwork and the stand column and between each regulating formwork and the stand column. The cast-in-place concrete wall single-side formwork system has the advantages of simple structure of the support frame and less usage amount of steel products; the formwork is divided into multiple standard formworks and at least one regulating formwork, so that the formwork is convenient to realize quick installation and removal in the narrow space, and the working efficiency is improved; the standard formworks can be reused, and the cost is reduced; and the cross beam components are used for supporting the formwork and transferring the pressure of the formwork to the support frame.
Owner:中铁十七局集团第三工程有限公司

Vehicle-mounted building block-type emergency flyover

The invention relates to a combined vehicle-mounted building block-type emergency flyover comprising a middle bridge surface which is erected by paving steel cables and oblique bridge surfaces on both sides of the middle bridge surface; the middle bridge surface is supported by four hydraulic vertical columns, a symmetric plane can be formed along a road surface, and bottom leg supporting steel columns are connected between the the bottom ends of the oblique bridge surfaces and on the steel cables in the horizontal direction; rotary angle-shaped beams with changeable angles are spanned between the top ends of the hydraulic vertical columns on the oblique bridge surfaces and the steel columns on the steel cables; and rotary angle-shaped beams are spanned on the steel cables between the topends of all the hydraulic vertical columns on the middle bridge surface, cover plates are connected between the rotary angle-shaped beams, so that a smooth oblique surface and an upper surface are formed. The vehicle-mounted building block-type emergency flyover can be installed and removed quickly in a special time and an area as well as when in traffic jam which is caused by sudden events, so that a vehicle can quickly pass; and the flyover can be removed in a short time after the traffic jam is mitigated. The vehicle-mounted building block-type emergency flyover has the characteristics of simple structure, convenience and quickness in assembly, safety and reliability.
Owner:STATE GRID CORP OF CHINA +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products