Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

47 results about "Tidal river" patented technology

A tidal river is a river whose flow and level are influenced by tides. A section of a larger river affected by the tides is a tidal reach, although it may sometimes be considered a tidal river if it has been given a separate name.

Tidal reach water level prediction method, device, equipment and medium

The invention provides a tidal reach water level prediction method, device, equipment and medium, and the prediction method comprises the following steps: collecting historical data and current time period data, the historical data and the current time period data comprising actually measured runoff data, actually measured water level data and actually measured tidal range data; lagging adjustment is conducted on the actually measured runoff data and the actually measured tidal range data with the actually measured water level data as the benchmark through a cross-correlation analysis method; performing EEMD decomposition to obtain respective intrinsic mode functions and residual errors; and outputting the eigenmode function of the water level data of the analysis station in the future time period and the predicted value of the residual error through the LSTM model, and carrying out superposition to obtain the predicted value of the water level of the tidal reach. According to the method, the water level data, the runoff data and the tidal range data of the tidal reach are subjected to conjoint analysis, the problems of nonlinear signal processing and low precision of the water level of the tidal reach are effectively solved through EEMD decomposition and the LSTM model, and the prediction accuracy of the water level of the tidal reach is greatly improved.
Owner:TIANJIN PORT ENG INST LTD OF CCCC FIRST HARBOR ENG +2

Method for Assessing Water Supply Risk under Saltwater Intrusion in Tidal River Estuaries Based on Freshwater Storage and Diversion Scheduling

The present invention discloses a method, system, device and storage medium for evaluating the water supply risk under the saltwater intrusion in a tidal estuary area based on the fresh water storage and diversion scheduling. The method includes: obtaining the daily target site data and historical saltwater intrusion disaster simulation data in the same time series in the research area; training the historical saltwater intrusion disaster simulation model with the target site data, and inputting the historical saltwater intrusion disaster simulation data into the trained historical saltwater intrusion disaster simulation model to obtain the long-sequence historical salinity simulation values; generalizing the water supply system in the research area and constructing a comprehensive water supply risk evaluation index system based on the fresh water storage and diversion scheduling; calculating the comprehensive water supply risk index based on the long-sequence historical salinity simulation values according to the comprehensive water supply risk evaluation index system; performing frequency analysis on the comprehensive water supply risk index, and dividing the water supply risk level and early warning level based on the set water supply risk threshold. The present invention quantifies the comprehensive water supply risk index based on the fresh water storage and diversion scheduling, and scientifically divides the saltwater intrusion risk level and early warning level from the perspectives of the influence degree and occurrence frequency of the long-sequence historical saltwater intrusion disasters, providing an effective decision-making basis for the water supply safety judgment in the estuary and coastal areas relying on the tidal river section as the water source.
Owner:PEARL RIVER HYDRAULIC RES INST OF PEARL RIVER WATER RESOURCES COMMISSION

A multi-step flow prediction method based on a space-time dual attention long short-term memory network

PendingCN122654609AInformatizationAlgorithm
The application discloses a kind of multi-step flow prediction methods based on space-time dual attention long short-term memory network, belong to deep learning and water conservancy informatization technical field.The method includes: feature perception and data preprocessing, variable attention feature screening, LSTM time series dynamics coding, extract time series deep dependence and construct full-time domain dynamics memory bank;Dynamic retrieval and multi-dimensional feature fusion, introduce step condition embedding and time decay driven cross attention mechanism to realize on-demand retrieval of historical features, and fuse near-time physical evolution inertia to ensure trajectory continuity;Result mapping and trajectory output, generate multi-step flow prediction value in parallel.The application solves the problems of spatial driving weight static, phase lag, memory loss and trajectory discontinuity in tidal river network multi-step flow prediction, and improves the prediction accuracy and stability.
Owner:CHANGJIANG SPATIAL INFORMATION TECH ENG CO LTD (WUHAN)

Hydrodynamic reconstruction method of Tesla valve tidal river network based on plane and vertical combination

The present invention discloses a method for hydrodynamic reconstruction of a tidal river network based on a Tesla valve in a planar and vertical combination. The method comprises the following steps: first, in the planar form of the river channel, the main upstream seawater channel in the tidal river network is designed into a structural form of a Tesla valve; second, in the vertical direction of the river channel, a Tesla valve-like structure is also adopted, and a directional guide structure is set near the riverbed, so that the streamline is smooth when the water flows toward the ocean, and the water flow resistance is increased when the water flows upstream from the ocean to the river channel; the present invention achieves effective suppression of the upstream salt tide by installing a structure similar to a Tesla valve at the inflow and upstream between the ocean and the river channel without using movable components such as gates, while not cutting off the connectivity of the water body, having little impact on fish migration and the connectivity of the ecosystem, and more effectively blocking the high-concentration salt water body at the bottom, thereby promoting the unidirectional flow of water and the discharge of pollutants in the river channel of the tidal river network area.
Owner:HOHAI UNIV

River flow monitoring system and method based on ultra-high frequency side-scan radar

PendingCN122282023AHydrometryStream flow
This invention discloses a river flow monitoring system and method based on ultra-high frequency side-scan radar. The data acquisition module is deployed on the riverbank to acquire multi-channel raw echo data required for river hydrological parameter inversion. The river flow monitoring cloud platform processes, analyzes, displays, and stores the data acquired by the data acquisition module, and sends corresponding instructions to the data acquisition module. This solution uses a database to correlate and store hydrological data, meteorological data, cross-sectional geometric data, and comparative measurement data in a time series manner, providing a solid data foundation for in-depth data mining, model optimization, and trend prediction. Furthermore, the data analysis considers the impact of complex tidal dynamic modulation in tidal river sections on river flow calculation. A tidal phase correction term is introduced into the index velocity method model, effectively eliminating the systematic bias caused by tidal dynamic modulation in the calculation.
Owner:NANJING UNIV OF SCI & TECH

A method and system for modeling operation data of a tidal river network water gate and a terminal

The application discloses a kind of tidal river network sluice operation data model processing method, system and terminal, it is related to sluice operation analysis technical field, and its technical scheme main points are: initial outer river tidal level is carried out noise reduction pretreatment, and sliding average is carried out;Select the smooth result of the highest matching degree of rising and falling tide trend, and carry out abnormal fluctuation elimination processing;The rising and falling tide trend in standard smooth result is analyzed;Rising and falling tide trend result and water level difference threshold are loaded in Infoworks RTC module;Different water level difference threshold is tried, and the optimal water level difference threshold of sluice opening and closing is determined, to obtain final Infoworks RTC module.The application is carried out to the smooth processing of outer river tidal level data, and the outer river tidal drop process is judged, according to the inner and outer river tidal difference to control the opening and closing of sluice, reach water quality model operation working condition and actual engineering working condition consistent, provide strong support for later water power water quality model rating.
Owner:CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE

Plain tidal river network internal gate backflow time period determination method

The invention discloses a method for judging a backflow time period of a gate in a plain tidal river network. The method comprises the following steps: acquiring water gate upstream and downstream long-series observation water level, drainage basin rainfall and wind field data; astronomical tide and rainfall runoff decoupling is carried out on the downstream section water level, dynamic deformation characteristic parameters are extracted and corrected, and a downstream water level forecasting curve set is obtained; physically decomposing the observation water level of the upstream shallow lake, extracting the average water level and the wind-generated water level deviation, and calculating an upstream forecast curve set in combination with rainfall; combining the forecast curve set to construct a predicted water level difference sequence set; extracting a prediction error quantile based on a pre-constructed error condition distribution library, and performing lower bound calibration and minimum extraction on the difference sequence to obtain a partial safety fusion water level difference sequence; a backflow risk period is identified based on the fused sequence and a decision threshold. According to the method, time consumption of complex numerical solution is avoided, and timeliness and robustness of advanced early warning in the backflow risk time period are improved.
Owner:TAIHU BASIN ADMINISTRATION BUREAU OF HYDROLOGY (INFORMATION CENT)

A ship collision avoidance decision method for inland tidal river sections

This invention relates to a collision avoidance decision-making method for vessels in tidal inland waterways, belonging to the field of vessel collision avoidance technology. The method includes: acquiring tidal information and vessel navigation information of the tidal inland waterway, wherein the vessel navigation information includes the navigation information of the vessel itself and a target vessel with a collision risk; determining the encounter situation between the vessel and the target vessel based on the vessel navigation information; determining the current direction of the vessel and the target vessel based on the encounter situation and the tidal information; determining the vessel's collision avoidance responsibility based on the encounter situation and the current direction; and making a collision avoidance decision for the vessel based on its collision avoidance responsibility. This invention considers the tidal problem in tidal inland waterways, divides the collision avoidance responsibility of vessels in different encounter situations, and thereby provides reasonable collision avoidance schemes, achieving effective collision avoidance decision-making tailored to the characteristics of tidal inland waterways.
Owner:WUHAN UNIV OF TECH

A method for quantifying the flux of pollutant substances across a section of a tidal river

The application discloses a kind of quantitative tidal river section pollutant flux analysis method, comprising the following steps: S1, the equation of concentration variation of pollutant is established;S2, the water flux equation of river section at the time period to be studied is established;S3, based on water flux equation and the equation of concentration variation of pollutant at the section, the pollutant flux equation of river section at the time period to be studied is established;According to the pollutant flux equation, the hourly flux of pollutant at the section at the time period to be studied is calculated.The application can calculate the hourly variation process of pollutant concentration which sufficiently reflects the concentration oscillation caused by reciprocating flow by inputting tidal level and limited concentration data into the equation of concentration variation of pollutant, and based on the hourly variation data of pollutant concentration, the pollutant flux at the section at a certain time period in the future can be calculated hourly according to the pollutant flux equation, and finally the total pollutant flux at the section per day can be counted, which provides scientific support for water safety decision-making of city managers.
Owner:PEARL RIVER HYDRAULIC RES INST OF PEARL RIVER WATER RESOURCES COMMISSION

Urban drainage waterlogging prevention system treatment engineering system scheme library construction method

The invention discloses an urban drainage and waterlogging prevention system treatment engineering system scheme library construction method, which comprises the following three main steps of: firstly, carrying out current situation and problem evaluation on an urban drainage and waterlogging prevention system, and drawing up an evaluation index system of the urban drainage and waterlogging prevention system containing 19 indexes; four types of typical cities including mountainous regions, hills, plain river networks and tidal river networks are selected for investigation, and problems are accurately evaluated; secondly, on the basis of landform and hydrological characteristics, an urban drainage and waterlogging prevention system treatment engineering system scheme library is constructed, and three drainage system treatment schemes of'source, small drainage and large drainage 'and a standard exceeding emergency scheme are provided for each type of cities; and finally, making a specific treatment scheme according to the processes of current situation evaluation, treatment standard determination, drainage partition optimization and the like. The drainage and waterlogging prevention capacities of different types of cities are effectively improved, losses caused by waterlogging are remarkably reduced, and safe operation of the cities and life and property safety of residents are guaranteed.
Owner:YANGTZE ECOLOGY & ENVIRONMENT CO LTD

Device for stratified in-situ monitoring of water quality and dissolved oxygen of sediments in tidal river network region

A device for stratified in-situ monitoring of the water quality and dissolved oxygen of sediments in a tidal river network region includes a floating platform. Three take-up and pay-off assemblies are fixedly connected to the edge of a top surface of the floating platform. The device can provide high-density data of stratified dissolved oxygen, all monitoring units perform sampling and monitoring directly at the positions where they are located, samples do not need to be transferred, sediments will not be disturbed, and monitoring is performed in the field environment, such that researchers can obtain the long-term diurnal change of stratified dissolved oxygen and the continuous change process of dissolved oxygen in one and even multiple hydrologic years, and basic data is provided for study of the dissolved oxygen change mechanism and accurate control of the water environment in tidal river network regions.
Owner:SOUTH CHINA INST OF ENVIRONMENTAL SCI MEP

Flood prevention four-pre-treatment system for water embankment gate abutment of urban section in tidal river network area

The invention discloses a flood prevention four-pre-system for a'embankment abutment 'of an urban section in a tidal river network area, and provides an analog simulation system for a river network of the urban section in the tidal river network area, and a data base plate is built on the basis of water conservancy facility data, geographic space data and vector data of the urban section in the tidal river network area. A tidal river network hydrodynamic water quality model and a one-dimensional hydrodynamic visual model are taken as the core, and early warning indexes of water (water level station), dike (dike), gate (flood control gate) and platform (hydrophilic platform) are provided for dike facilities. Meanwhile, on the basis of urban flood prevention water conservancy facilities and equipment, geographic space data and water and rain condition forecast data, the real simulation of the water level change process of the urban crossing river is realized by combining analog simulation and grid rendering visualization technologies; the flood prevention four-pre whole process of rolling forecast of global water regimen, targeted early warning of risk targets, vivid rehearsal of pump gate scheduling and dynamic plan emergency measures is achieved, and decision support is provided for planning, design and flood prevention consultation of water conservancy projects.
Owner:YELLOW RIVER ENG CONSULTING CO LTD

System and method suitable for confirming bottom friction coefficient of ultra-shallow tidal reach and related equipment

The invention discloses an ultra-shallow tidal river reach bottom friction coefficient confirmation system and method and related equipment, according to the scheme, through innovatively improving a Zeer-Manning formula and carrying out quantitative assignment on a Manning roughness coefficient according to different water depth intervals, accurate calculation and determination of the bottom friction coefficient are realized, and the accuracy of the bottom friction coefficient is improved. And the accuracy and applicability of the calculation result are improved.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

A tidal river water level discharge relation analysis method based on tidal level harmonic analysis

The application discloses a kind of tidal river reach water level discharge relation analysis method based on tidal harmonic analysis, including collecting the measured water level data of research tidal river reach hydrological site, river basin river terrain and digital elevation data;Based on tidal harmonic analysis, the characteristic parameters of each tidal component of tidal river reach tidal level and the variation characteristics of water surface elevation are obtained, and then the independent tidal flow and river runoff flow are obtained;Establish one-dimensional hydrodynamic model of tidal river reach, analyze the flow variation process and water level discharge variation relation under different water level variation scenarios;The contribution degree of tidal flow and river runoff to actual flow size and variation process is analyzed using multiple regression analysis and path analysis method, and the variation characteristics of water level discharge relation of tidal river reach are obtained.The advantage is: the water level discharge relation of tidal river reach can be quickly analyzed, without complex estuary hydrodynamic process simulation, and it is also applicable when lacking measured flow data.
Owner:SUN YAT SEN UNIV

Method, device, equipment and medium for water level prediction of tidal river section

The application provides a tidal river reach water level prediction method, device, equipment and medium, wherein the prediction method comprises the following steps: collecting historical data and current period data, the historical data and the current period data both comprise measured runoff data, measured water level data and measured tidal range data; using cross-correlation analysis method to adjust the measured runoff data and the measured tidal range data with the measured water level data as the benchmark; performing EEMD decomposition to obtain respective intrinsic mode functions and residuals; outputting the prediction values of the intrinsic mode functions and the residuals of the water level data of the analysis station in the future period through the LSTM model and superimposing them to obtain the prediction value of the water level of the tidal river reach. The application carries out joint analysis on the water level data, runoff data and tidal range data of the tidal river reach, effectively solves the nonlinear signal processing problem and the low precision problem of the water level of the tidal river reach through EEMD decomposition and the LSTM model, and greatly improves the prediction accuracy of the water level of the tidal river reach.
Owner:TIANJIN PORT ENG INST LTD OF CCCC FIRST HARBOR ENG +2

Method for evaluating risk of micro-plastic and sea salt combined pollution ecological environment in tidal basin by using myriophyllum spicatum

The invention provides a method for evaluating the risk of combined pollution of micro-plastics and sea salt in a tidal basin to an ecological environment by using myriophyllum spicatum, and the method comprises the following steps: simulating a tidal section water body which comprises polystyrene micro-plastics and a sea salt solution; the method comprises the following steps: selecting myriophyllum spicatum as a test plant, pretreating the myriophyllum spicatum, transplanting the myriophyllum spicatum into a water body of a tidal section, and carrying out composite stress culture; sampling after culture is finished, measuring physiological and biochemical indexes of the myriophyllum spicatum, and evaluating the risk of combined pollution to the aquatic ecosystem. The method is suitable for a tidal basin which is a special transition zone where fresh water intersects with the ocean, can accurately identify the degree of harm of micro-plastic and sea salt combined pollution to an aquatic ecosystem, and provides technical support for combined pollution ecological risk management and control.
Owner:SOUTH CHINA UNIV OF TECH

A method for determining a tidal water supplementing threshold of a tidal river channel

The application discloses a tidal river tidal water intake threshold value determination method in the technical field of river regulation, carries out the collection and analysis of basic data such as hydrology, topography, water quality, pollutants and salinity of a river and an outer sea, determines a river control section and water quality improvement targets and salinity control targets, establishes a tidal river hydrodynamic water quality mathematical model, simulates and calculates hydrodynamic water quality results under different engineering regulation schemes, and counts tidal water intake Q, water quality concentration C and salinity P of the river control section under different regulation schemes. According to the tidal river tidal water intake threshold value determination method, the reasonable tidal water intake for improving the water environment of the tidal river by using tidal resources can be determined, key technical support for determining the tidal river engineering regulation task and scale is provided, and the problem that the increase of the tidal water intake causes the invasion of salt water and affects the safety of production and living water is avoided.
Owner:FUJIAN PROVINCIAL INVESTIGATION DESIGN & RES INST OF WATER CONSERVANCY & HYDROPOWER

A method and apparatus for recommending port entry and exit in tidal river sections based on ship fuel consumption.

ActiveCN116579452BAchieve fuel consumption optimizationAchieve energy saving and emission reductionForecastingMarine craft traffic controlMarine engineeringWater flow
This invention provides a method and apparatus for recommending port entry and exit in tidal river sections based on ship fuel consumption. It only considers the impact of tidal currents on the actual speed of ships. Specifically, it quantitatively analyzes tidal currents through predicted tides and directly analyzes the actual speed of ships during navigation by combining the tides and the water flow speed they affect. It calculates and accumulates fuel consumption using existing and relatively accurate relationships between speed and fuel consumption to estimate the fuel consumption of the entire route. This allows for the recommendation of time windows for construction ships to enter and exit ports, selecting time windows with lower fuel consumption to optimize fuel consumption for construction ships in tidal river sections, thereby achieving the goals of energy conservation, emission reduction, and reduced navigation costs.
Owner:CCCC GUANGZHOU DREDGING CO LTD +1

A multi-objective intelligent water control method for tidal river network water gate group

The application discloses a kind of tidal river network water gate group multi-objective intelligent water power regulation methods, steps are as follows: S1, obtains tidal river network historical detection data and hydrological data.S2, construct river network flow prediction model, water level prediction model, obtain river network key section hydrodynamic data.S3, based on multi-objective optimization idea, with water power regulation as the core target function, flow prediction model and water level prediction model are nested into improved optimization algorithm.S4, according to the multi-objective demand such as river network flood control, water resources, water environment and water ecology, based on optimization algorithm, the optimal gate opening is solved, and real-time dynamic water gate group joint regulation scheme is generated.The application combines optimization scheduling method and machine learning technology, proposes a tidal river network water gate group multi-objective intelligent water power regulation method, which can generate water gate group joint regulation scheme in real time, significantly enhance the flowability and self-purification capacity of river network water body, and provide important support for the systematic governance and intelligent management of tidal river network water problems.
Owner:HOHAI UNIV

Power distribution facility risk management and control scheduling method and system based on urban flood forecasting

The present application relates to the technical field of power system disaster prevention and reduction, and particularly relates to a power distribution facility risk management and control scheduling method and system based on urban flood forecasting. The method comprises the following steps: collecting multi-source static basic data of a target area, and constructing a flood risk ledger of power distribution facilities; integrating urban flood disaster-causing factors, coupling to form a flood forecasting mechanism model, and outputting a risk level; constructing a deep learning model, rolling forecasting short-term flood scenarios, and generating risk prediction results; obtaining Internet of Things monitoring data, identifying the water accumulation state of power distribution facilities, and forming facility monitoring results; using the risk prediction results and facility monitoring results to construct a risk list, and designing a scheduling scheme based on the risk list; mapping the scheduling scheme into scheduling instructions, and uploading to the management and control platform. The present application can effectively improve the disaster prevention and reduction level of power distribution facilities under extreme climate conditions, and provide technical support for the safe operation of power grids in typical tidal river network areas.
Owner:PEARL RIVER HYDRAULIC RES INST OF PEARL RIVER WATER RESOURCES COMMISSION

Methods, apparatus and electronic equipment for water quality compliance analysis in tidal river networks

This invention provides a method, apparatus, and electronic equipment for analyzing water quality compliance in tidal river networks, relating to the field of water environment data processing technology. It divides the target area into multiple independent sub-regions based on hydrodynamic characteristics and topographic structure. Then, combining the pollution load structure entering the river, it determines the baseline pollution carrying capacity of each sub-region during the slack tide period. Furthermore, using tidal rhythm as the core, it quantifies the bidirectional mass flux between sub-regions under the tidal rhythm, and determines the effective environmental capacity value for each. This allows for precise capture of the dynamic impact of tidal reciprocating flow on pollutant migration and diffusion, achieving a refined characterization of the hydrological-hydrodynamic-water quality coupling process. Furthermore, it constructs an environmental capacity map, which can intuitively present the spatiotemporal dynamic distribution of capacity, completely breaking through the limitations of traditional static capacity calculation. Water quality compliance analysis based on the map can provide precise spatiotemporal implementation guidance for treatment projects, avoiding one-size-fits-all treatment and significantly improving the effectiveness of engineering applications.
Owner:POWERCHINA HUADONG ENG CORP LTD

Anti-seepage structure based on tidal river and construction method

The invention relates to the field of anti-seepage engineering, in particular to an anti-seepage structure based on a tidal river and a construction method.The anti-seepage structure can still keep the anti-seepage effect under the tidal dynamic stress condition, the anti-seepage structure comprises an anti-seepage geomembrane layer, and the anti-seepage structure comprises a geotechnical bag layer, a plastic clay layer and an ecological planting soil layer; the anti-seepage structure is sequentially provided with a soil bag layer, an anti-seepage geomembrane layer, a plastic clay layer and an ecological planting soil layer in a stacked mode from bottom to top. The anti-seepage structure is particularly suitable for anti-seepage structures near tidal rivers.
Owner:CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE

Power distribution facility risk management and control scheduling method and system based on urban flood forecast

The invention relates to the technical field of disaster prevention and reduction of power systems, in particular to a power distribution facility risk management and control scheduling method and system based on urban flood forecast. The method comprises the following steps: collecting multi-source static basic data of a target area, and constructing a flood risk ledger of the power distribution facility; integrating the urban flood disaster-inducing factors, coupling to form a flood forecasting mechanism model, and outputting a risk level; constructing a deep learning model, performing rolling prediction on a short-time flood scene, and generating a risk prediction result; internet-of-things monitoring data are acquired, the power distribution facility ponding state is identified, and a facility monitoring result is formed; constructing a risk list by using the risk prediction result and the facility monitoring result, and designing a scheduling scheme based on the risk list; and mapping the scheduling scheme into a scheduling instruction, and uploading the scheduling instruction to a management and control platform. According to the invention, the disaster prevention and reduction level of power distribution facilities under extreme climate conditions can be effectively improved, and technical support is provided for safe operation of a power grid in a tidal river network typical area.
Owner:PEARL RIVER HYDRAULIC RES INST OF PEARL RIVER WATER RESOURCES COMMISSION

Ecological flow assessment method for fish tidal river network migration channel maintenance

The invention relates to an ecological flow assessment method for fish tidal river network migration channel maintenance. The method comprises the following steps: constructing a one-dimensional tidal river network hydrodynamic model by using river network data; setting different incoming water flows and tidal condition scenes, inputting a one-dimensional tidal river network hydrodynamic model, and outputting the flow velocity of each river channel of the river network; obtaining a flow velocity suitability curve of the target fishes, and substituting the flow velocity of each river channel of the river network into the flow velocity suitability curve to obtain a suitable migration river channel; according to the river network water flow direction, the water system circulation between the suitable migration rivers is calculated; calculating the adjusted total length of the suitable migration river channel by taking the water system connectivity as a weight; and determining the fish migration ecological flow according to the adjusted mapping relation between the total length of the suitable migration river channel and the incoming water flow. The method solves the problem that in the prior art, only the longest total length of the river channel suitable for fish migration is considered for the ecological flow, the connectivity between the river channels is not considered, and the local optimum problem is caused, so that the fish migration requirement is difficult to meet.
Owner:DONGGUAN UNIV OF TECH +1

Simple artificial fish habitat system suitable for tidal river channel

The utility model discloses a simple artificial fish habitat system suitable for a tidal river channel, which is characterized in that a pit is arranged on a riverbed of the tidal river channel as a main body, and a water inlet and a water outlet of the pit are respectively provided with a stepped retaining dam; compacting the bottoms of the pits, laying clay on the bottoms and side walls of the pits, and arranging natural stones on the surfaces of the clay; a water area corresponding to the bottom of the pit is a deep water area for planting submerged plants; the water area corresponding to the side wall of the pit is a shallow water area, and shallow water plants are planted; the cement block stone wall of the stepped retaining dam is vertically inserted into a riverbed to be fixed and is higher than the riverbed; the natural stones are arranged at the top end and on the two sides of the cement block stone wall, and the gravel is arranged between the natural stones. The device can effectively capture and store water during water recession, and ensures that aquatic organisms have enough inhabiting space during tidal variation.
Owner:POWERCHINA HUADONG ENG CORP LTD

A lateral water intake rectifying device for a tidal river

The application discloses a kind of lateral water intake rectifying device for tidal river section, the rectifying device is arranged in the lateral water intake position of river channel, the rectifying device includes: flow guide wall, the flow guide wall is arranged at water intake in vertical direction;Rotary mechanism, the rotary mechanism is installed in the bottom of flow guide wall, so that flow guide wall can rotate around axis line;Control system, the control system is connected with rotary mechanism, for controlling rotary mechanism, adjust the rotation angle and direction of flow guide wall, the present application improves the existing lateral water intake rectifying device, so that it can adjust the best water direction in situ according to the different direction of water flow, so as to realize the all-weather stable lateral water intake under tidal river section, by adopting this movable rectifying device, can effectively according to the water flow change of tidal river section, and provide more stable and uniform water intake condition.This has important significance for water resources management and river governance, help to improve water intake efficiency and the protection of water intake structure.
Owner:HOHAI UNIV

A device for hydromechanical amplification of DC power generated by photovoltaic converters

UndeterminedKZ12541UConvertersWater flow
Use: The utility model relates to the field of energy, in particular to renewable energy sources, and can find application in the combined use of solar energy and the water inflows of small rivers. Objective: To amplify the DC power generated by photovoltaic converters and simplify the generator design, with photovoltaic converters being installed near tidal rivers where the energy of the water flow can be used as primary mechanical energy for amplification. The essence of the utility model: A device for hydraulic amplification of direct current power generated by photoelectric converters, supplied to the excitation winding of a direct current generator of a transverse current field, i.e., an amplifier, receives primary mechanical energy from the kinetic energy of the water flow.
Owner:NON-PROFIT JOINT CO KAZAKH NAT AGRARIAN RES UNIV

Tidal reach salinity prediction method and system based on random forest and empirical mode decomposition

The embodiment of the invention provides a tidal reach salinity prediction method and system based on random forest and empirical mode decomposition, and belongs to the technical field of tidal reach salinity prediction. The dry season data can be obtained; according to the dry season data, mutual information under different delay time is obtained; establishing a tidal reach salinity prediction model according to the dry season data and the mutual information under different delay time; and according to the tidal reach salinity prediction model, obtaining tidal reach salinity prediction information. According to the method, the problems of multi-frequency components and delay time of complex signals can be effectively solved, and the stability and prediction precision of the model are improved.
Owner:SUN YAT SEN UNIV

A riprap ecological revetment system adaptive to water level recession

The present application relates to the field of ecological revetment in the field of hydraulic engineering, and particularly relates to a riprapping ecological revetment system suitable for water level drawdown. The system comprises an ecological soil base layer, a filter layer, a riprapping revetment, a simulated wood pile scour protection belt and a planting groove; the ecological soil base layer has a compaction degree of greater than or equal to 93%, providing a dense support; the filter layer ensures smooth seepage and prevents soil loss; the riprapping revetment is formed by stacking large-diameter block stones according to gradation, forming a rigid skeleton resistant to scour; the planting groove is fixed in the riprapping structure, providing space for vegetation and anchoring the surface riprapping. The present application forms a closed-loop protection system through the cooperation of the five, effectively solving the problems of traditional riprapping revetment, such as easy scouring and instability during water level drawdown, and high maintenance cost, and has the advantages of scour resistance, ecology and universality, and is suitable for water level rapid rise and fall scenes such as regulating and storing lakes, reservoir drawdown zones, tidal river shorelines and the like.
Owner:SINOHYDRO BUREAU 11 CO LTD

A multi-factor interaction-based multiple correction and prediction method for tidal river reaches

The present invention provides a multi-factor interaction tidal river section multiple correction and forecasting method, including: obtaining model construction data; superimposing background wind pressure meteorological data and gradient wind field according to weight coefficients to reconstruct model wind speed and pressure field; calculating the incoming flow propagation time according to upstream runoff influencing parameters, and estimating the model inlet flow under future conditions; obtaining the model open boundary tide level sequence based on the harmonic analysis method; constructing a two-dimensional hydrodynamic mathematical model according to various parameters; coupling and nesting the ensemble Kalman filter algorithm based on the correlation coefficient with the mathematical model, dynamically correcting the initial state of the mathematical model according to the measured tide level data of the tidal river section, and obtaining a forecast model after a correction; using the autoregressive method to correct the tide level forecast results of key stations in the tidal river section, and reconstructing the forecast tide level field of the forecast model, and secondarily correcting the model forecast results. The present invention can provide relatively accurate forecast results.
Owner:NANJING HYDRAULIC RES INST