Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

68 results about "Tidal river" patented technology

A tidal river is a river whose flow and level are influenced by tides. A section of a larger river affected by the tides is a tidal reach, although it may sometimes be considered a tidal river if it has been given a separate name.

Tidal river reach storm surge rapid forecasting method based on deep learning and AI large model

The invention discloses a tidal river reach storm surge rapid forecasting method based on deep learning and an AI large model. The method comprises a data acquisition and preprocessing step, a meteorological element forecasting step, a typhoon path and flow forecasting step and a storm surge forecasting step. Multi-source data fusion is realized through a four-dimensional variational assimilation method and an adaptive weight fusion algorithm; a multi-model integrated system such as FourCatNet and the like is used for forecasting meteorological elements; an improved XLSTM-Transformer model is adopted to predict the flow and the typhoon path; and carrying out storm surge forecasting based on a three-layer nested model system and a multi-process coupling technology. According to the method, full-process automation from data acquisition to forecasting is realized, the forecasting timeliness is improved by 60%, the average absolute error is reduced by 45%, and a reliable basis is provided for disaster prevention and reduction decisions.
Owner:NANJING HYDRAULIC RES INST

Tidal reach tide level forecasting method and system based on combined model

The invention relates to a tidal reach tide level forecasting method and system based on a combined model. The method comprises the following steps: mining the average propagation time of upstream and downstream tide levels through a derivative dynamic time warping method; feature decomposition is conducted on the tide level multi-influence-factor data through set and empirical mode decomposition, and high-frequency component information and low-frequency component information are extracted; a combined model is constructed by combining a deep residual shrinkage network, a bidirectional long-short term memory network and an attention mechanism, and spatial-temporal features are mined. The tide level propagation time between upstream and downstream tide level stations is mined by using a derivative dynamic time warping method, and a more accurate time reference is provided for tide level forecasting; a set and empirical mode decomposition method is adopted to perform characteristic decomposition on tide level data, spatial characteristics and time characteristics are extracted through a combined model, and an attention mechanism is utilized to perform fusion, so that the mining and learning ability of the model on multi-scale nonlinear characteristics and non-stationary characteristics is improved, and the tide level forecasting precision is further improved. And the forecasting error in the storm surge period is reduced.
Owner:NANJING ZHONGYU SMART WATER CONSERVANCY RES INST CO LTD

Multi-target intelligent hydraulic regulation and control method for tidal river network sluice group

The invention discloses a multi-target intelligent hydraulic regulation and control method for a tidal river network sluice group. The method comprises the following steps: S1, acquiring historical detection data and hydrological data of a tidal river network; and S2, constructing a river network flow prediction model and a water level prediction model to obtain river network key section hydrodynamic data. And S3, based on a multi-objective optimization thought, nesting the flow prediction model and the water level prediction model into an improved optimization algorithm by using an objective function with hydrodynamic regulation as a core. S4, according to the multi-target requirements of river network flood control, water resources, water environment, water ecology and the like, the optimal gate opening degree is solved based on an optimization algorithm, and a real-time dynamic water gate group combined regulation and control scheme is generated. According to the multi-target intelligent hydraulic regulation and control method for the tidal river network sluice group, an optimal scheduling method and a machine learning technology are fused, a sluice group joint regulation and control scheme can be generated in real time, the river network water fluidity and the self-cleaning capacity are remarkably enhanced, and important support is provided for tidal river network water problem systematic treatment and intelligent management.
Owner:HOHAI UNIV

Tidal river reach water level and flow relation analysis method based on tidal level harmonic analysis

The invention discloses a tidal reach water level and flow relation analysis method based on tidal level harmonic analysis. The method comprises the steps of collecting actually measured water level data, basin river topography and digital elevation data of a tidal reach hydrologic station; characteristic parameters and water surface elevation change characteristics of all partial tides of the tide level of the tidal river reach are obtained on the basis of tide level harmonic analysis, and then independent tide flow and river runoff flow are obtained; establishing a tidal reach one-dimensional hydrodynamic model, and analyzing a flow change process and a water level flow change relation under different water level change scenes; and analyzing the contribution degree of the tidal flow and the river runoff to the actual flow and the change process by utilizing a multivariate regression analysis and drift diameter analysis method to obtain the change characteristics of the water level and flow relationship of the tidal reach. The method has the advantages that the water level and flow relation of the tidal reach can be rapidly analyzed, complex estuary hydrodynamic process simulation is not needed, and the method is also applicable when actually measured flow data is lacked.
Owner:SUN YAT SEN UNIV

Water supply risk assessment method under salt tide invasion in tidal estuary region based on fresh water prevailing and storage scheduling

The invention discloses a water supply risk assessment method, system and device for tidal estuary area salt tide invasion based on fresh water prevailing and storage, and a storage medium. The method comprises the following steps: acquiring day-by-day target site data and historical salt tide disaster simulation data of a research area in the same time sequence; training the historical salt tide disaster simulation model by using the target site data, and inputting the historical salt tide disaster simulation data into the trained historical salt tide disaster simulation model to obtain a long-sequence historical salinity simulation value; generalizing a water supply system of the research area, and constructing a water supply risk comprehensive evaluation index system based on fresh water grabbing and storage scheduling; based on the water supply risk comprehensive evaluation index system, calculating a comprehensive water supply risk index according to the long-sequence historical salinity simulation value; and performing frequency analysis on the comprehensive water supply risk index, and dividing a water supply risk degree and an early warning level based on a set water supply risk threshold. According to the method, the comprehensive water supply risk index is quantified based on fresh water preemptive storage scheduling, the salt tide risk degree and the early warning level are scientifically divided from the angles of the influence degree and the occurrence frequency of long-sequence historical salt tide disasters, and an effective decision basis is provided for water supply safety study and judgment of estuary coastal areas depending on tidal river reaches.
Owner:PEARL RIVER HYDRAULIC RES INST OF PEARL RIVER WATER RESOURCES COMMISSION

Tesla valve sensitive tidal river network hydrodynamic reconstruction method based on plane and vertical combination

The invention discloses a plane and vertical combination-based Tesla valve tidal river network hydrodynamic reconstruction method, which comprises the following steps of: 1, designing a main seawater upstream channel in a tidal river network into a Tesla valve structural form on the form of a river plane; secondly, in the vertical direction of the river channel, a Tesla valve-like structure is adopted, and a directional flow guide structure is arranged at the position close to a riverbed, so that when the water flow flows towards the ocean, the flow line is smooth, and when the water flow traces upwards from the ocean to the river channel, the water flow resistance is increased; structures similar to Tesla valves are installed at the inflow and upstream positions between the ocean and the river channel, movable assemblies such as gates are not used, salty tide upstream is effectively inhibited, meanwhile, water connectivity is not blocked, the influence on fish migration and ecosystem connectivity is small, and the method is suitable for large-scale popularization and application. High-concentration salt-containing water at the bottom is more effectively blocked, and one-way flow of water and pollutant discharge in a riverway of a tidal river network area are promoted.
Owner:HOHAI UNIV

Visual simulation method for reciprocating water level process of tidal river network under complex conditions

The invention discloses a visual analog simulation method for a tidal river network reciprocating water level process under a complex condition, which integrates knowledge and technologies in multiple fields such as a geographic information system, hydraulics numerical simulation and digital twinning, and is based on a numerical calculation result of a tidal river network hydrodynamic model. Visual rendering is carried out in a digital twinborn three-dimensional scene in a dimension raising mode, so that the change process of the water level, the flow direction and the flow velocity of a river channel caused by tide, flood and rainstorm can be accurately displayed, and the water flow movement change rule of a tidal river network area under various complex influence factors can be truly and objectively reflected. Related functions such as water flow velocity and water level information inquiry and distance inquiry between the water level and the dike top are provided, water level changes, flow states and the dike relation are displayed more visually and vividly, the method can be popularized to other tidal river network areas to be used, and decision support is provided for planning and design of water conservancy projects and flood prevention consultation.
Owner:YELLOW RIVER ENG CONSULTING CO LTD

Bridge main pier construction method suitable for complex embankment area of tidal river channel

The invention discloses a bridge main pier construction method suitable for a complex embankment area of a tidal river channel, which depends on a Larsen steel sheet pile cofferdam-soil retaining support pile composite body for construction operation and comprises the following steps: step 1, planning and determining the construction position of the cofferdam support composite body; step 2, constructing a trestle; thirdly, a Larsen steel sheet pile cofferdam-soil retaining support pile composite is constructed; 4, constructing a main pier bearing platform and a stand column; and 5, rebuilding the quay wall. By means of the bridge main pier construction method, the situation that soil around the flood control wall collapses towards the quay wall in the main pier construction operation process can be effectively prevented, the safety of main pier construction operation is ensured, and the economical efficiency of main pier construction operation is improved.
Owner:NINGBO MUNICIPAL ENG CONSTR GROUP

Tidal reach water level prediction method, device, equipment and medium

The invention provides a tidal reach water level prediction method, device, equipment and medium, and the prediction method comprises the following steps: collecting historical data and current time period data, the historical data and the current time period data comprising actually measured runoff data, actually measured water level data and actually measured tidal range data; lagging adjustment is conducted on the actually measured runoff data and the actually measured tidal range data with the actually measured water level data as the benchmark through a cross-correlation analysis method; performing EEMD decomposition to obtain respective intrinsic mode functions and residual errors; and outputting the eigenmode function of the water level data of the analysis station in the future time period and the predicted value of the residual error through the LSTM model, and carrying out superposition to obtain the predicted value of the water level of the tidal reach. According to the method, the water level data, the runoff data and the tidal range data of the tidal reach are subjected to conjoint analysis, the problems of nonlinear signal processing and low precision of the water level of the tidal reach are effectively solved through EEMD decomposition and the LSTM model, and the prediction accuracy of the water level of the tidal reach is greatly improved.
Owner:TIANJIN PORT ENG INST LTD OF CCCC FIRST HARBOR ENG +2

Method for Assessing Water Supply Risk under Saltwater Intrusion in Tidal River Estuaries Based on Freshwater Storage and Diversion Scheduling

The present invention discloses a method, system, device and storage medium for evaluating the water supply risk under the saltwater intrusion in a tidal estuary area based on the fresh water storage and diversion scheduling. The method includes: obtaining the daily target site data and historical saltwater intrusion disaster simulation data in the same time series in the research area; training the historical saltwater intrusion disaster simulation model with the target site data, and inputting the historical saltwater intrusion disaster simulation data into the trained historical saltwater intrusion disaster simulation model to obtain the long-sequence historical salinity simulation values; generalizing the water supply system in the research area and constructing a comprehensive water supply risk evaluation index system based on the fresh water storage and diversion scheduling; calculating the comprehensive water supply risk index based on the long-sequence historical salinity simulation values according to the comprehensive water supply risk evaluation index system; performing frequency analysis on the comprehensive water supply risk index, and dividing the water supply risk level and early warning level based on the set water supply risk threshold. The present invention quantifies the comprehensive water supply risk index based on the fresh water storage and diversion scheduling, and scientifically divides the saltwater intrusion risk level and early warning level from the perspectives of the influence degree and occurrence frequency of the long-sequence historical saltwater intrusion disasters, providing an effective decision-making basis for the water supply safety judgment in the estuary and coastal areas relying on the tidal river section as the water source.
Owner:PEARL RIVER HYDRAULIC RES INST OF PEARL RIVER WATER RESOURCES COMMISSION

A multi-step flow prediction method based on a space-time dual attention long short-term memory network

PendingCN122654609AInformatizationAlgorithm
The application discloses a kind of multi-step flow prediction methods based on space-time dual attention long short-term memory network, belong to deep learning and water conservancy informatization technical field.The method includes: feature perception and data preprocessing, variable attention feature screening, LSTM time series dynamics coding, extract time series deep dependence and construct full-time domain dynamics memory bank;Dynamic retrieval and multi-dimensional feature fusion, introduce step condition embedding and time decay driven cross attention mechanism to realize on-demand retrieval of historical features, and fuse near-time physical evolution inertia to ensure trajectory continuity;Result mapping and trajectory output, generate multi-step flow prediction value in parallel.The application solves the problems of spatial driving weight static, phase lag, memory loss and trajectory discontinuity in tidal river network multi-step flow prediction, and improves the prediction accuracy and stability.
Owner:CHANGJIANG SPATIAL INFORMATION TECH ENG CO LTD (WUHAN)

Corpse drift trajectory prediction method, system and device and medium

The invention discloses a corpse drift trajectory prediction method, system and device and a medium. The method comprises the steps of performing a dummy drift field test in a tidal river reach, obtaining position information and drift speed in a dummy drift process, and obtaining a test track of dummy drift based on the position information; collecting river topographic data of the tidal reach, and obtaining water level and flow data of upstream and downstream boundaries of the tidal reach; a hydrodynamic model of the tidal reach is constructed, and the flow field condition of the tidal reach is obtained; and establishing a regression model of the drift velocity of the dummy in the tidal reach by taking the surface flow in the flow field of the tidal reach as an independent variable and the drift velocity of the dummy as a dependent variable, so as to obtain a drift trajectory prediction model for predicting the drift trajectory of the corpse on the tidal reach. According to the invention, the drifting trajectory of the corpse in the river channel can be accurately predicted, a water alarm is helped to quickly and accurately determine the position of the corpse of a drowning person, and convenience is provided for corpse fishing work.
Owner:SOUTH CHINA UNIV OF TECH +1

Hydrodynamic reconstruction method of Tesla valve tidal river network based on plane and vertical combination

The present invention discloses a method for hydrodynamic reconstruction of a tidal river network based on a Tesla valve in a planar and vertical combination. The method comprises the following steps: first, in the planar form of the river channel, the main upstream seawater channel in the tidal river network is designed into a structural form of a Tesla valve; second, in the vertical direction of the river channel, a Tesla valve-like structure is also adopted, and a directional guide structure is set near the riverbed, so that the streamline is smooth when the water flows toward the ocean, and the water flow resistance is increased when the water flows upstream from the ocean to the river channel; the present invention achieves effective suppression of the upstream salt tide by installing a structure similar to a Tesla valve at the inflow and upstream between the ocean and the river channel without using movable components such as gates, while not cutting off the connectivity of the water body, having little impact on fish migration and the connectivity of the ecosystem, and more effectively blocking the high-concentration salt water body at the bottom, thereby promoting the unidirectional flow of water and the discharge of pollutants in the river channel of the tidal river network area.
Owner:HOHAI UNIV

Pier, machine and gate conjoined dam type tidal river surge fall type two-way hydroelectric power station structure

A pier, machine and gate conjoined dam type tidal river surge fall type two-way hydroelectric power station structure combines two cases, namely a first spiral worm type multi-stage type and a second spiral mixing type combined type, and is characterized by comprising a pier, machine and gate conjoined comprehensive dam; 2, one or more hydraulic turbine sets are arranged in the pier pit; 3, a water level fall type control system; 4, a spiral-worm-type inner shell, a blade-type rotating wheel and a spiral-worm-type single-stage or multi-stage hydraulic turbine set; the spiral-vortex and mixed double-wheel combination and vortex-mixed type combined hydraulic turbine set (5) and the various gates (6) are all novel lever balance type automatic opening and closing type gates and comprise forebay gates, flood discharge gates and overflow gates; 11,...; the structure utilizes, develops and generates power by utilizing the natural phenomena of rising and falling of the tide and the water source of the river, and utilizes the tide energy according to the fact that many rivers exist along the long coastlines and the rivers near the sea in China and the world, water flows into the rivers during rising of the tide and returns to the sea during falling of the tide. And efficient, safe, reliable, green, clean and regenerated electric power energy is provided.
Owner:梁文华

River flow monitoring system and method based on ultra-high frequency side-scan radar

PendingCN122282023AHydrometryStream flow
This invention discloses a river flow monitoring system and method based on ultra-high frequency side-scan radar. The data acquisition module is deployed on the riverbank to acquire multi-channel raw echo data required for river hydrological parameter inversion. The river flow monitoring cloud platform processes, analyzes, displays, and stores the data acquired by the data acquisition module, and sends corresponding instructions to the data acquisition module. This solution uses a database to correlate and store hydrological data, meteorological data, cross-sectional geometric data, and comparative measurement data in a time series manner, providing a solid data foundation for in-depth data mining, model optimization, and trend prediction. Furthermore, the data analysis considers the impact of complex tidal dynamic modulation in tidal river sections on river flow calculation. A tidal phase correction term is introduced into the index velocity method model, effectively eliminating the systematic bias caused by tidal dynamic modulation in the calculation.
Owner:NANJING UNIV OF SCI & TECH

A method and system for modeling operation data of a tidal river network water gate and a terminal

The application discloses a kind of tidal river network sluice operation data model processing method, system and terminal, it is related to sluice operation analysis technical field, and its technical scheme main points are: initial outer river tidal level is carried out noise reduction pretreatment, and sliding average is carried out;Select the smooth result of the highest matching degree of rising and falling tide trend, and carry out abnormal fluctuation elimination processing;The rising and falling tide trend in standard smooth result is analyzed;Rising and falling tide trend result and water level difference threshold are loaded in Infoworks RTC module;Different water level difference threshold is tried, and the optimal water level difference threshold of sluice opening and closing is determined, to obtain final Infoworks RTC module.The application is carried out to the smooth processing of outer river tidal level data, and the outer river tidal drop process is judged, according to the inner and outer river tidal difference to control the opening and closing of sluice, reach water quality model operation working condition and actual engineering working condition consistent, provide strong support for later water power water quality model rating.
Owner:CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE

A method, device, terminal and storage medium for predicting stratified flow velocity in tidal river sections

The present invention provides a method, device, terminal and storage medium for predicting stratified flow velocity in a tidal river section, wherein the method comprises obtaining the flow velocity data, water level data and upstream and downstream river topography data of the engineering site measured in previous years, and using a two-dimensional river digital model to estimate the flow process of the engineering site based on the flow velocity data, water level data and upstream and downstream river topography data of the engineering site measured in previous years, and obtaining the average flow velocity results of the engineering site measured in previous years. The method, device, terminal and storage medium for predicting stratified flow velocity in a tidal river section described in the present invention, in the process of estimation, a total of 3 types of machine learning models are nested and run, different parameters are solved at different stages, and finally the flow field distribution of the engineering site is predicted, which has the advantage of high accuracy, can accurately predict the stratified flow velocity in the tidal river section, and is conducive to improving the safety of construction ships.
Owner:TIANJIN PORT ENG INST LTD OF CCCC FIRST HARBOR ENG +2

Plain tidal river network internal gate backflow time period determination method

The invention discloses a method for judging a backflow time period of a gate in a plain tidal river network. The method comprises the following steps: acquiring water gate upstream and downstream long-series observation water level, drainage basin rainfall and wind field data; astronomical tide and rainfall runoff decoupling is carried out on the downstream section water level, dynamic deformation characteristic parameters are extracted and corrected, and a downstream water level forecasting curve set is obtained; physically decomposing the observation water level of the upstream shallow lake, extracting the average water level and the wind-generated water level deviation, and calculating an upstream forecast curve set in combination with rainfall; combining the forecast curve set to construct a predicted water level difference sequence set; extracting a prediction error quantile based on a pre-constructed error condition distribution library, and performing lower bound calibration and minimum extraction on the difference sequence to obtain a partial safety fusion water level difference sequence; a backflow risk period is identified based on the fused sequence and a decision threshold. According to the method, time consumption of complex numerical solution is avoided, and timeliness and robustness of advanced early warning in the backflow risk time period are improved.
Owner:TAIHU BASIN ADMINISTRATION BUREAU OF HYDROLOGY (INFORMATION CENT)

A ship collision avoidance decision method for inland tidal river sections

This invention relates to a collision avoidance decision-making method for vessels in tidal inland waterways, belonging to the field of vessel collision avoidance technology. The method includes: acquiring tidal information and vessel navigation information of the tidal inland waterway, wherein the vessel navigation information includes the navigation information of the vessel itself and a target vessel with a collision risk; determining the encounter situation between the vessel and the target vessel based on the vessel navigation information; determining the current direction of the vessel and the target vessel based on the encounter situation and the tidal information; determining the vessel's collision avoidance responsibility based on the encounter situation and the current direction; and making a collision avoidance decision for the vessel based on its collision avoidance responsibility. This invention considers the tidal problem in tidal inland waterways, divides the collision avoidance responsibility of vessels in different encounter situations, and thereby provides reasonable collision avoidance schemes, achieving effective collision avoidance decision-making tailored to the characteristics of tidal inland waterways.
Owner:WUHAN UNIV OF TECH

A method for quantifying the flux of pollutant substances across a section of a tidal river

The application discloses a kind of quantitative tidal river section pollutant flux analysis method, comprising the following steps: S1, the equation of concentration variation of pollutant is established;S2, the water flux equation of river section at the time period to be studied is established;S3, based on water flux equation and the equation of concentration variation of pollutant at the section, the pollutant flux equation of river section at the time period to be studied is established;According to the pollutant flux equation, the hourly flux of pollutant at the section at the time period to be studied is calculated.The application can calculate the hourly variation process of pollutant concentration which sufficiently reflects the concentration oscillation caused by reciprocating flow by inputting tidal level and limited concentration data into the equation of concentration variation of pollutant, and based on the hourly variation data of pollutant concentration, the pollutant flux at the section at a certain time period in the future can be calculated hourly according to the pollutant flux equation, and finally the total pollutant flux at the section per day can be counted, which provides scientific support for water safety decision-making of city managers.
Owner:PEARL RIVER HYDRAULIC RES INST OF PEARL RIVER WATER RESOURCES COMMISSION

Urban drainage waterlogging prevention system treatment engineering system scheme library construction method

The invention discloses an urban drainage and waterlogging prevention system treatment engineering system scheme library construction method, which comprises the following three main steps of: firstly, carrying out current situation and problem evaluation on an urban drainage and waterlogging prevention system, and drawing up an evaluation index system of the urban drainage and waterlogging prevention system containing 19 indexes; four types of typical cities including mountainous regions, hills, plain river networks and tidal river networks are selected for investigation, and problems are accurately evaluated; secondly, on the basis of landform and hydrological characteristics, an urban drainage and waterlogging prevention system treatment engineering system scheme library is constructed, and three drainage system treatment schemes of'source, small drainage and large drainage 'and a standard exceeding emergency scheme are provided for each type of cities; and finally, making a specific treatment scheme according to the processes of current situation evaluation, treatment standard determination, drainage partition optimization and the like. The drainage and waterlogging prevention capacities of different types of cities are effectively improved, losses caused by waterlogging are remarkably reduced, and safe operation of the cities and life and property safety of residents are guaranteed.
Owner:YANGTZE ECOLOGY & ENVIRONMENT CO LTD

Device for stratified in-situ monitoring of water quality and dissolved oxygen of sediments in tidal river network region

A device for stratified in-situ monitoring of the water quality and dissolved oxygen of sediments in a tidal river network region includes a floating platform. Three take-up and pay-off assemblies are fixedly connected to the edge of a top surface of the floating platform. The device can provide high-density data of stratified dissolved oxygen, all monitoring units perform sampling and monitoring directly at the positions where they are located, samples do not need to be transferred, sediments will not be disturbed, and monitoring is performed in the field environment, such that researchers can obtain the long-term diurnal change of stratified dissolved oxygen and the continuous change process of dissolved oxygen in one and even multiple hydrologic years, and basic data is provided for study of the dissolved oxygen change mechanism and accurate control of the water environment in tidal river network regions.
Owner:SOUTH CHINA INST OF ENVIRONMENTAL SCI MEP

Bagged sand dike for shallow tidal reach

The utility model provides a shallow tidal river reach bagged sand dike which comprises a bagged sand main body and a limiting mechanism arranged on the outer side of the bagged sand dike main body and used for limiting the bagged sand dike main body, when the bagged sand dike is constructed, firstly, a mounting plate is fixed on a dike surface, bagged sand is piled layer by layer, the bagged sand main body is arranged on the mounting plate, and the bagged sand main body is arranged on the mounting plate; the first positioning plate is connected with the mounting plate through the connecting piece, the second positioning plate is connected with the first positioning plate, the third positioning plate is connected with the second positioning plate, and the mounting plate, the first positioning plate, the second positioning plate and the third positioning plate are tightly attached to the surface of the bagged sand body. The stability of the bagged sand in the construction process can be guaranteed, the bagged sand is prevented from sliding or being separated under the action of water flow, the fixing effect is achieved by limiting movement of the bagged sand, and the overall stability and flood control effect of a dike are improved.
Owner:HUBEI SHANJIANG WEIYE CONSTR ENG CO LTD

Flood prevention four-pre-treatment system for water embankment gate abutment of urban section in tidal river network area

The invention discloses a flood prevention four-pre-system for a'embankment abutment 'of an urban section in a tidal river network area, and provides an analog simulation system for a river network of the urban section in the tidal river network area, and a data base plate is built on the basis of water conservancy facility data, geographic space data and vector data of the urban section in the tidal river network area. A tidal river network hydrodynamic water quality model and a one-dimensional hydrodynamic visual model are taken as the core, and early warning indexes of water (water level station), dike (dike), gate (flood control gate) and platform (hydrophilic platform) are provided for dike facilities. Meanwhile, on the basis of urban flood prevention water conservancy facilities and equipment, geographic space data and water and rain condition forecast data, the real simulation of the water level change process of the urban crossing river is realized by combining analog simulation and grid rendering visualization technologies; the flood prevention four-pre whole process of rolling forecast of global water regimen, targeted early warning of risk targets, vivid rehearsal of pump gate scheduling and dynamic plan emergency measures is achieved, and decision support is provided for planning, design and flood prevention consultation of water conservancy projects.
Owner:YELLOW RIVER ENG CONSULTING CO LTD

Intelligent hydraulic regulation methods and systems for tidal river networks for the treatment of impact pollution

ActiveCN122927947BRiver networkStream flow
This invention discloses a method and system for intelligent hydraulic regulation of tidal river networks for the treatment of impact pollution. The method includes: acquiring water environment monitoring data, boundary conditions, and scheduling analysis requirements of the target tidal river network; matching scheduling conditions from a pre-stored historical case database to form a candidate set based on the above conditions; filtering the candidate conditions according to pre-configured local control rules using red-line constraints to obtain a feasible set; quantifying the hydrodynamic supply flow and environmental water quality demand flow of the feasible set to obtain supply-demand mismatch characteristics; performing multi-criteria evaluation and ranking based on these characteristics, extracting recommended scheduling conditions, and outputting control commands. This invention, through historical case database matching and intelligent agent red-line filtering, facilitates rapid and safe decision-making response to complex river network regulation needs, enhancing decision resilience and water resource allocation efficiency for the treatment of impact pollution.
Owner:HOHAI UNIV

System and method suitable for confirming bottom friction coefficient of ultra-shallow tidal reach and related equipment

The invention discloses an ultra-shallow tidal river reach bottom friction coefficient confirmation system and method and related equipment, according to the scheme, through innovatively improving a Zeer-Manning formula and carrying out quantitative assignment on a Manning roughness coefficient according to different water depth intervals, accurate calculation and determination of the bottom friction coefficient are realized, and the accuracy of the bottom friction coefficient is improved. And the accuracy and applicability of the calculation result are improved.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

A method, system and device for predicting pollutants in a tidal river network

The application discloses a kind of tidal river network pollutant prediction method, system and equipment, it is related to water environment pollution detection technical field.The method comprises the following steps: based on tidal river network topology and boundary data, a hydrodynamic field mathematical model is constructed;Based on this, the convection-diffusion attenuation equation and the bifurcation mass conservation condition are established, and a pollutant coupling transport model is constructed;According to the spatial dispersion and time step analysis of pollution source parameters, the concentration space-time distribution is obtained;Key time indicators are analyzed and visualized to predict distribution. The technical problems that the simulation precision of the pollutant migration and diffusion process of the sudden water pollution accident in the complex tidal river network area of the prior art is low, the calculation speed is slow, it is difficult to quickly and accurately predict the influence time and range of pollutants on downstream sensitive targets, and cannot meet the emergency warning demand are solved, the technical effects of quickly and accurately simulating the pollutant transport of tidal river network are realized, and the pollutant front arrival time, peak concentration and over-standard duration are effectively predicted.
Owner:HYDROLOGICAL BUREAU OF PEARL RIVER WATER CONSERVANCY COMMISSION MINISTRY OF WATER RESOURCES

A tidal river water level discharge relation analysis method based on tidal level harmonic analysis

The application discloses a kind of tidal river reach water level discharge relation analysis method based on tidal harmonic analysis, including collecting the measured water level data of research tidal river reach hydrological site, river basin river terrain and digital elevation data;Based on tidal harmonic analysis, the characteristic parameters of each tidal component of tidal river reach tidal level and the variation characteristics of water surface elevation are obtained, and then the independent tidal flow and river runoff flow are obtained;Establish one-dimensional hydrodynamic model of tidal river reach, analyze the flow variation process and water level discharge variation relation under different water level variation scenarios;The contribution degree of tidal flow and river runoff to actual flow size and variation process is analyzed using multiple regression analysis and path analysis method, and the variation characteristics of water level discharge relation of tidal river reach are obtained.The advantage is: the water level discharge relation of tidal river reach can be quickly analyzed, without complex estuary hydrodynamic process simulation, and it is also applicable when lacking measured flow data.
Owner:SUN YAT SEN UNIV

Method, device, equipment and medium for water level prediction of tidal river section

The application provides a tidal river reach water level prediction method, device, equipment and medium, wherein the prediction method comprises the following steps: collecting historical data and current period data, the historical data and the current period data both comprise measured runoff data, measured water level data and measured tidal range data; using cross-correlation analysis method to adjust the measured runoff data and the measured tidal range data with the measured water level data as the benchmark; performing EEMD decomposition to obtain respective intrinsic mode functions and residuals; outputting the prediction values of the intrinsic mode functions and the residuals of the water level data of the analysis station in the future period through the LSTM model and superimposing them to obtain the prediction value of the water level of the tidal river reach. The application carries out joint analysis on the water level data, runoff data and tidal range data of the tidal river reach, effectively solves the nonlinear signal processing problem and the low precision problem of the water level of the tidal river reach through EEMD decomposition and the LSTM model, and greatly improves the prediction accuracy of the water level of the tidal river reach.
Owner:TIANJIN PORT ENG INST LTD OF CCCC FIRST HARBOR ENG +2

Deepwater composite cofferdam system suitable for complex embankment area of tidal river channel

The utility model discloses a deepwater composite cofferdam system suitable for a tidal river complex embankment area, which comprises a Larsen steel sheet pile cofferdam system, a cast-in-situ bored pile support system and a concrete steering block, and the Larsen steel sheet pile cofferdam system comprises U-shaped Larsen steel sheet piles and an inner support system; the cast-in-situ bored pile supporting system is arranged between the Larsen steel sheet pile cofferdam system and the flood control wall and is a pipe gallery composed of a plurality of soil retaining and supporting cast-in-situ bored piles. The end parts of two side arms of the U-shaped Larsen steel sheet pile are correspondingly sealed with the two ends of the cast-in-situ bored pile support system respectively; and the cast-in-situ bored pile supporting system is connected with the enclosing purlins into a whole through concrete steering blocks at the positions as high as the enclosing purlin supports. Therefore, the utility model can effectively prevent the surrounding soil body of the flood control wall from collapsing towards the quay wall in the main pier construction operation process, ensure the safety of the main pier construction operation, and improve the construction economy of the deepwater composite cofferdam system.
Owner:NINGBO MUNICIPAL ENG CONSTR GROUP