Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

52results about How to "Traffic impact" patented technology

Receding construction method of cradle of continuous girder bridge made of prestressing concrete

The invention relates to a receding construction method of a cradle of a continuous girder bridge made of prestressing concrete, which is characterized in that the bridge surface of a bridge prefabricated by concrete is provided with a track and a door-shaped truss traveling device, and the width of a ceiling girder inside the door-shaped truss traveling device is wider than that of the bridge surface by 90cm-110cm; a front bottom cross beam and a rear bottom cross beam must extend to the outer side of an external mold by 45cm-55cm to form a main cradle truss, and an overhanging auxiliary door frame is additionally arranged outside the main cradle truss, after the construction of a closure segment of the bridge prefabricated by concrete is finished, and precise rolling deformed steel bars with the diameter of 32 outside a box girder positioned on the overhanging auxiliary door frame are connected with the rear bottom cross beam to disassemble a rear hanging strip; a bottom mold frame is separated from a beam body by utilizing a manual spiral type jack to loose the precise rolling deformed steel bars positioned on the door frame and the front bottom cross beam; a leading chain or a hoist are utilized to drive the main cradle truss so that the cradle recedes in a slideway to a first cast-in-situ segment; and a bottom mold and the external mold are fallen by the leading chain or the hoist to disassemble the main truss.
Owner:NO 1 ENG CO LTD OF CR11BG +1

Construction method for enabling shallowly buried and darkly excavated tunnel to pass through cottage area

The invention discloses a construction method for enabling a shallowly buried and darkly excavated tunnel to pass through a cottage area. The construction method comprises the following steps: excavating a tunnel hole of the constructed shallowly buried and darkly excavated tunnel from back to front through a step excavation process, and performing preliminary bracing on the tunnel hole formed by excavating from back to front in an excavating process, wherein the tunnel hole consists of an upper guide hole and a lower guide hole positioned right below the upper guide hole, the rear part of the tunnel hole is connected with a vertical well, the preliminary bracing structure of the tunnel hole comprises a plurality of grating steel frameworks for supporting the tunnel hole from back to front, a layer of bar-mat reinforcement suspended on the inner wall of the tunnel hole and a concrete layer jetted on the inner wall of the tunnel hole. The process for excavating the tunnel hole of the shallowly buried and darkly excavated tunnel comprises the following steps: I, excavating the initial segment of the upper guide hole; II, excavating the initial segment of the lower guide hole; III, synchronously excavating the upper and the lower guide holes. The construction method disclosed by the invention is simple in step, reasonable in design, convenient in construction, good in construction effect, capable of simply completing the construction process of the shallowly buried and darkly excavated tunnel that passes through the cottage area, and safe and reliable in a construction process.
Owner:CHINA RAILWAY 20 BUREAU GRP

Deformation monitoring method for shallow-buried excavation tunnel construction

The invention discloses a deformation monitoring method for shallow-buried excavation tunnel construction. The deformation monitoring method comprises the following steps: 1) digging a tunnel: digging a tunnel cavity for a constructed shallow-buried excavation tunnel from back to front, primarily supporting the dug tunnel cavity from back to front during the digging process, and forming a primary supporting structure, wherein the primary supporting structure comprises a plurality of grating steel frames for supporting the tunnel cavity from back to front, and each grating steel frame is composed of an arch supporting steel frame and left and right vertical supporting steel frames; 2) arranging monitoring points: arranging multiple sets of supporting state monitoring points on the primary supporting structure of the constructed tunnel cavity from back to front during the digging process, and meanwhile, arranging a plurality of ground surface settlement monitoring points in a construction area of the constructed shallow-buried excavation tunnel from back to front; 3) monitoring the deformation. The method provided by the invention has the advantages of simple steps, reasonable design, convenience in construction, good use effect and capability of effectively monitoring the stability of the constructed shallow-buried excavation tunnel and the ground surface settlement.
Owner:CHINA RAILWAY 20 BUREAU GRP

Hanging basket cantilever method construction method of large-span continuous rigid beam sidespan cast-in-place beam section

The invention relates to large-span continuous rigid beam construction crossing railways, roads, personal compact districts and steep construction terrains, in particular to a hanging basket cantilever method construction method of a large-span continuous rigid beam sidespan cast-in-place beam section, solving the problems of long construction, high cost and inconvenience for surrounding environment due to difficulty in building a bracket, large interference on travelling and large safety risk during construction crossing places of railways, roads, personal compact districts and steep construction terrains. The hanging basket cantilever method construction method of the large-span continuous rigid beam sidespan cast-in-place beam section comprises the following steps of: constructing cast-in-place sections 1# and 2#, releasing inner and outer slippage suspension points; integrally moving a hanging basket main member and a hanging basket bottom mould backwards; installing a bottom mould of a cast-in-place section 3#; and forwards moving the hanging basket main member to the cast-in-place section 2# and constructing the cast-in-place section 3#. The construction method in the invention is simple in operation, and is widely suitable for sidespan cast-in-place beam section construction of large-span continuous rigid beams.
Owner:THE 2ND ENG OF THE 12TH BUREAU GROUP OF CHINA RAILWAY

Intersection traffic stream modeling and self-adaption control method and system

The invention provides an intersection traffic stream modeling and a self-adaption control method and a system. The method comprise steps of perceiving driving-in and driving-out facts, driving-in and driving-out time, numbers of driving-in vehicles at all entrances, numbers of vehicles going straight at the entrances, driving-out and numbers of vehicles at left-handed turning exits of vehicles at all entrances and exits in a signal period; calculating average delay time of the vehicles passing the entrances and the exits of the intersection according to the driving-in and driving-out facts and time; calculating vehicle queuing length according to numbers of driving-in and driving-out vehicles; establishing a traffic stream digital module of the intersection by taking the average delay time of traffic streams in the entrance directions as discrete state variables, taking green time in corresponding direction as control variables, and taking queuing lengths in all directions as output variables; and performing real-time control for the traffic stream digital module by use of the self-adaption control method. The system corresponds to the method. The method and the system are advantaged by long service lifetime, easy maintenance and precise control of traffic signals.
Owner:DONGGUAN UNIV OF TECH

Concrete continuous box girder of corrugated steel web for curved bridge

ActiveCN102877407AClear forceImproved torsional and flexural bearing capacityBridgesShaped beamEngineering
The invention discloses a concrete continuous box girder of a corrugated steel web for a curved bridge. A curved corrugated steel web concrete continuous box girder is formed by a prefabricated linear corrugated steel web concrete I-shaped beam unit (1), namely the prefabricated linear corrugated steel web concrete I-shaped beam unit (1) is erected on a pier body (9) and a capping beam (8); the I-shaped beam is regarded as a supporting point to pour top and bottom board wet joint concrete (2) and top board cantilever section flange concrete (3) to form a box girder; a curved shape of the curved bridge is subjected to transverse width adjustment fit by using a flange cantilever section, and a single-hole box girder is constructed; and the continuous box girder is formed by pouring beam concrete (4) of each hole box girder. The concrete continuous box girder provided by the invention uses factory-like prefabrication and bracket-free construction, so as to be beneficial to ensuring and accelerating a construction progress. The standard factory-like construction of the corrugated steel web prefabricating component can effectively ensure the engineering quality, and has the advantages of simple structure, good economical efficiency and the like.
Owner:HENAN PROVINCIAL COMM PLANNING & DESIGN INST CO LTD

Multifunctional check valve capable of cleaning away and filtering impurities conveniently

The invention discloses a multifunctional check valve capable of cleaning away and filtering impurities conveniently. The multifunctional check valve comprises a valve body, an adjusting assembly, a motor and a limiting assembly. A mounting pipe and a water outlet pipe are arranged at the left end and the right end of the valve body correspondingly, a fixed ring is fixed to the right side of a movable rod, the motor is fixed to the right side of the valve body, the output end of the motor is connected with a lead screw, and trapezoidal blocks are slidably connected to the upper end and the lower end in the mounting pipe. The multifunctional check valve capable of cleaning away and filtering impurities conveniently is provided with a sliding groove and limiting blocks, impurities in fluid can be filtered through a filter screen in a water inlet pipe, blockage caused by impurity attachment is avoided, the water inlet pipe and a filter plate can be conveniently mounted in the mounting pipe through the sliding groove in the surface of the water inlet pipe, meanwhile, the water inlet pipe can be rotated to enable the limiting blocks at the two ends of the inner wall of the mounting pipe to be clamped into limiting grooves in the surface of the water inlet pipe, so that the water inlet pipe is limited, the water inlet pipe can be conveniently dismounted after long-time use to replace the filter plate, and practicability is improved.
Owner:江苏优特莫森机械有限公司

Intersection bridge

The invention relates to the field of urban traffic and particularly relates to an intersection bridge. The intersection bridge comprises a high level bridge and two arc-shaped bridges, which are arranged longitudinally, and a ground level road horizontally arranged below the high level bridge. An upper approach bridge and a lower approach bridge of each arc-shaped bridge are respectively arranged on the two sides of an approach bridge of the high level bridge, a main bridge of each arc-shaped bridge is arranged on a ground end of the approach bridge of the high level bridge, the upper approach bridge and the lower approach bridge of each arc-shaped bridge are both connected with the same side of the ground level road, high level bridge exits are respectively arranged at the junctions of the upper approach bridges of the arc-shaped bridges and the approach bridge of the high level bridge, and high level bridge entrances are respectively arranged at the junctions of the lower approach bridges of the arc-shaped bridges and the approach bridge of the high level bridge. According to the intersection bridge, automobiles at any intersection can run to the other three intersections, can turn around through a ring road, and only can run on one driving lane, so that a whole driving process is simplified, a driver cannot be confused, the transportation efficiency is further improved, and the road congestion problem can be solved.
Owner:张姝婧

Pre-bending construction method for steel-concrete combined girders

The invention discloses a pre-bending construction method for steel-concrete combined girders, and is applied to the technical field of bridge construction. The pre-bending construction method includes S10, mounting steel girders, arranging pre-bending girders below the steel girders along the vertical direction of bridge girders, and connecting two ends of the pre-bending girders to the steel girders through pre-bending and tensioning pieces directly or indirectly; S20, arranging pre-bending supports at midspan positions of the steel girders and on the pre-bending girders; S30, pre-bending the steel girders by tensioning the pre-bending and tensioning pieces and/or lifting the pre-bending supports; S40, pouring concrete on the steel girders to form concrete bridge faceplates. The pre-bending construction method has the advantages that the pre-bending girders are arranged below the bridge girders and are connected with the steel girders through the pre-bending and tensioning pieces, the pre-bending supports are arranged between pre-bending bridge spans and the steel girders, and pre-bending force is applied to the steel girders through the pre-bending and tensioning pieces at two ends of the pre-bending girders and/or pre-stressing force application pieces on the pre-bending supports, so that erection of temporary support frames (support piles) is avoided, passing of vehicles below bridges is not affected greatly, and great convenience is brought to construction.
Owner:GUANGZHOU MUNICIPAL ENG DESIGN & RES INST CO LTD

Trenchless buried type high voltage power cable bellows

The invention relates to a trenchless buried type high voltage power cable bellows which is characterized in that a raised ring part (3) is formed along the circumference of an outer wall (1) of the bellows, and a circumference formed by the closed raised ring part is concentric with that of a radial cross-section of the bellows; and a corresponding groove ring part (4) is formed on the inner wall (2) of the bellows along the shape of the raised ring part (3). According to the trenchless buried type high voltage power cable bellows provided by the invention, the ground is not needed to be excavated during buried construction, and the buried construction has no greater impact on city traffic and running. The trenchless buried type high voltage power cable bellows has favorable bendability and moderate ductility by adopting a gap formed between the raised ring part and the groove ring part and selecting a bellows body material. The trenchless buried type high voltage power cable bellows can be naturally bent to correspond to complicated and changeable paved lines under the condition that the paved lines are full of twists and turns. The coiled bellows occupies small area, which is beneficial to construction and transportation in a narrow environment. Meanwhile, welding points for connecting pipelines are not needed, and therefore, the entire quality of the pipelines is improved.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO +4

Urban road watering and dust removal system

The invention discloses an urban road watering and dust removal system. The urban road watering and dust removal system comprises a power supply system for providing electric energy for a dust removalsystem, a dust detector for detecting the road dust concentration information in real time, a central processing unit used for receiving and converting the dust concentration information into controlsignals, a watering system used for cleaning the urban road under control of the control signals, a water supply system for supplying water to the watering system under control of the control signals, and an alarm system for sending alarm signals under control of the control signals. The dust detector is used for detecting the urban road dust concentration, the central processing unit is used forcontrolling the watering system to clean the urban road, accordingly, the urban road dust content is reduced, and no influences are generated to the urban road traffic. The watering investment cost is reduced, and the situation that due to too many watering carts, the urban carbon emission is increased, and the environment is polluted is avoided; and through the alarm system, pedestrians can be reminded in time, and the situation that the watering system sprinkles water to the bodies of the pedestrians accidentally is avoided.
Owner:杭州浩蓝环境工程技术有限公司

Time varying interactive Kalman filtering heavy-haul freight car leveled rollover early warning method

The present invention relates to the technical field of heavy-haul freight car rollover early warning, and discloses a time varying interactive Kalman filtering heavy-haul freight car leveled rolloverearly warning method. A vehicle rigid model is taken as a physical model for analyzing freight car rollover threshold, a multi-modal sensor is employed to perform collection of index data of a vehicle travelling accelerated speed, angle deviation and road humidity, the collected data is concentrated on a main control chip, and a fusion data execution technology of time varying Kalman filtering and a quaternion algorithm is employed to complete data processing and perform mechanical analysis of the rigid model to obtain a rollover condition equation, namely a condition of determining freight car rollover. The time varying interactive Kalman filtering heavy-haul freight car leveled rollover early warning method can improve the heavy-haul freight car travelling safety and traveling stability, can achieve leveled early warning management of the traveling condition of the freight car, can provide more reliable data for the safe and optimized design for a freight car system, can remarkablyimprove the safety awareness of freight car drivers and can reduce the generation of traffic safety accidents.
Owner:HENAN POLYTECHNIC UNIV

a heating wire

The invention relates to a heating wire and belongs to the field of heating wire structures. The heating wire is characterized in that: a loop wire (1) is covered in a hollow of a first insulation layer (3); a first coiled heating material layer (4) is covered on an outer layer of the first insulation layer (3) and connected with the top end of the loop wire (1) to form a loop; a second insulation layer (5) is covered on an outer layer of the first heating material layer (4); a second protection seal spring is covered on an outer layer of the second insulation layer (5); the second protectionseal spring is divided into a second protection seal spring thick section (6) and a second protection seal spring thin section (7) which have different thicknesses; and the first heating material layer (4) correspondingly covered in the second protection seal spring thin section (7) has a straight structure. When the heating wire is used, the thick section is arranged in a filter cup, and the thin section is arranged in a pipe passage in the filter cup; and the heating material layer in the filter cup has a coiled structure and the heating material layer in the pipe passage in the filter cup has the straight structure, so the energy consumption can be reduced, and the heating wire can meet the requirements for saving energy and reducing emission.
Owner:山东宇升电子科技有限公司

Anti-settling base with high stability

The invention relates to the technical field of road infrastructure, and discloses an anti-settling base with high stability. The anti-settling base comprises a base body with a circular cross section, wherein the inner portion of the base body is provided with a through hole with a circular cross section, the annular outer side wall, close to the top, of the base body is fixedly connected with afixing block with an annular cross section, a plurality of T-shaped sliding grooves are evenly and equidistantly formed in the annular inner side wall of the base body and distributed in an annular matrix, the T-shaped sliding grooves are internally and slidably connected with T-shaped sliding blocks, and the ends, away from openings of the T-shaped sliding grooves, of the T-shaped sliding blockspenetrate through the corresponding openings of the T-shaped sliding grooves, extend to the outside and are jointly fixedly connected with a supporting block with an annular cross section. The anti-settling base with the high stability has the advantages that the force of a manhole cover is decomposed through the T-shaped sliding blocks, the force is consumed through two tension springs and two springs, and the settlement of the manhole cover is prevented under the premise of not affecting the road traffic.
Owner:JIAXING HUICHANG PLASTIC IND CO LTD

Receding construction method of cradle of continuous girder bridge made of prestressing concrete

The invention relates to a receding construction method of a cradle of a continuous girder bridge made of prestressing concrete, which is characterized in that the bridge surface of a bridge prefabricated by concrete is provided with a track and a door-shaped truss traveling device, and the width of a ceiling girder inside the door-shaped truss traveling device is wider than that of the bridge surface by 90cm-110cm; a front bottom cross beam and a rear bottom cross beam must extend to the outer side of an external mold by 45cm-55cm to form a main cradle truss, and an overhanging auxiliary doorframe is additionally arranged outside the main cradle truss, after the construction of a closure segment of the bridge prefabricated by concrete is finished, and precise rolling deformed steel barswith the diameter of 32 outside a box girder positioned on the overhanging auxiliary door frame are connected with the rear bottom cross beam to disassemble a rear hanging strip; a bottom mold frame is separated from a beam body by utilizing a manual spiral type jack to loose the precise rolling deformed steel bars positioned on the door frame and the front bottom cross beam; a leading chain or ahoist are utilized to drive the main cradle truss so that the cradle recedes in a slideway to a first cast-in-situ segment; and a bottom mold and the external mold are fallen by the leading chain or the hoist to disassemble the main truss.
Owner:NO 1 ENG CO LTD OF CR11BG +1

Intelligent roadside parking system

The invention discloses an intelligent roadside parking system, and the system comprises a sensing module which generates vehicle entering information when a vehicle is sensed to enter; a control module which is used for generating starting time and a limiting instruction according to the vehicle entering information; a mobile terminal which is used for sending a parking ending instruction to thecontrol module and also used for sending a payment success instruction to the control module when payment succeeds; the control module determines stop time according to the parking end instruction anddetermines payable fees according to the start time and the stop time; the control module generates parking information and a restriction removal instruction according to the payment success instruction, so that a user inquires the parking information through the mobile terminal; and the lifting module is used for ascending or descending according to the limiting instruction or the limiting releasing instruction to control in-out of the vehicle. According to the invention, intelligent management of parking is realized, manual work is not needed, a user can operate through a mobile terminal, parking information can be inquired, vehicles are limited, and an order evasion phenomenon does not occur.
Owner:湖南湘华优路交通科技有限公司

Installation method of truss pipeline penetrating through highway culvert

The invention relates to an installation method of a truss pipeline penetrating through a highway culvert. The installation method comprises the following steps that sites at the two ends of the axisof the pipeline are leveled; a winch is arranged on the axis of the pipeline; a truss is arranged in the culvert; the length of the pipe sections of the pipeline is controlled, so that the length of each pipe section is larger than the distance between any two horizontal supporting beams; a prefabricated bracket with rollers is placed on the horizontal supporting beams; the pipe sections are dragged and pulled in place through the winch; all the pipe sections are sequentially pulled in place according to the steps, and the adjacent pipe sections are welded to form an integral pipeline; after the pipeline is installed, the bracket is taken out, and fixed supports of the pipeline are welded; and the height of a stand column at the other side is increased, and a top beam is arranged at the tops of the stand columns. The installation method of the truss pipeline penetrating through the highway culvert can realize the installation of the truss pipeline into a highway culvert site which is complex in underground structure and inconvenient in transportation and cannot be entered by a crane, avoids the damage to a highway and an original culvert structure, reduces the installation difficulty of the truss pipeline into the highway culvert, and shortens the construction period.
Owner:SHANGHAI ERSHIYE CONSTR CO LTD +1

A construction method for shallow-buried underground excavation tunnels passing through bungalow areas

The invention discloses a construction method for enabling a shallowly buried and darkly excavated tunnel to pass through a cottage area. The construction method comprises the following steps: excavating a tunnel hole of the constructed shallowly buried and darkly excavated tunnel from back to front through a step excavation process, and performing preliminary bracing on the tunnel hole formed by excavating from back to front in an excavating process, wherein the tunnel hole consists of an upper guide hole and a lower guide hole positioned right below the upper guide hole, the rear part of the tunnel hole is connected with a vertical well, the preliminary bracing structure of the tunnel hole comprises a plurality of grating steel frameworks for supporting the tunnel hole from back to front, a layer of bar-mat reinforcement suspended on the inner wall of the tunnel hole and a concrete layer jetted on the inner wall of the tunnel hole. The process for excavating the tunnel hole of the shallowly buried and darkly excavated tunnel comprises the following steps: I, excavating the initial segment of the upper guide hole; II, excavating the initial segment of the lower guide hole; III, synchronously excavating the upper and the lower guide holes. The construction method disclosed by the invention is simple in step, reasonable in design, convenient in construction, good in construction effect, capable of simply completing the construction process of the shallowly buried and darkly excavated tunnel that passes through the cottage area, and safe and reliable in a construction process.
Owner:CHINA RAILWAY 20 BUREAU GRP CORP LTD

Fire hose laying device for remote water supply

The invention discloses a fire hose laying device for remote water supply. The fire hose laying device comprises a laying shell, a working cavity is formed in the laying shell, a through hole is formed in the inner wall of the right side of the working cavity and communicates with the outside, a ferrule releasing assembly is arranged in the working cavity, the ferrule releasing assembly comprisesa fixed support fixedly arranged on the inner wall of the front side of the working cavity, a sliding block arranged at the right end of the fixed support and capable of sliding front and back, a supporting sliding block arranged at the right end of the sliding block and capable of sliding up and down, a ferrule block placed at the upper end of the supporting sliding block, and ferrule tools fixedly arranged on the ferrule block and capable of extending out of the outside through the through hole. According to the fire hose laying device, the multiple ferrule tools are adopted, and the ferruletools are sequentially arranged on guardrail supporting columns along the way in a sleeving mode, so that during remote water supply, a water pipe is always close to a guardrail, and random running is prevented under the action of the guardrail supporting columns, and the influence on passing of other pedestrians and vehicles along the way is prevented.
Owner:瓯亚管业有限公司

A fire-fighting water pipe laying device for remote water supply

The invention discloses a fire hose laying device for remote water supply. The fire hose laying device comprises a laying shell, a working cavity is formed in the laying shell, a through hole is formed in the inner wall of the right side of the working cavity and communicates with the outside, a ferrule releasing assembly is arranged in the working cavity, the ferrule releasing assembly comprisesa fixed support fixedly arranged on the inner wall of the front side of the working cavity, a sliding block arranged at the right end of the fixed support and capable of sliding front and back, a supporting sliding block arranged at the right end of the sliding block and capable of sliding up and down, a ferrule block placed at the upper end of the supporting sliding block, and ferrule tools fixedly arranged on the ferrule block and capable of extending out of the outside through the through hole. According to the fire hose laying device, the multiple ferrule tools are adopted, and the ferruletools are sequentially arranged on guardrail supporting columns along the way in a sleeving mode, so that during remote water supply, a water pipe is always close to a guardrail, and random running is prevented under the action of the guardrail supporting columns, and the influence on passing of other pedestrians and vehicles along the way is prevented.
Owner:瓯亚管业有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products