Installation method of truss pipeline penetrating through highway culvert

A pipeline installation and truss technology, which is applied in the direction of pipeline laying and maintenance, hoisting device, clockwork mechanism, etc., can solve the problems of inapplicability, large amount of construction, safety and quality hidden dangers, etc., so as to avoid damage and reduce installation difficulty , the effect of shortening the construction period

Inactive Publication Date: 2020-08-07
SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF5 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] For the installation of pipelines that need to run through high-speed culverts, the buried pipeline installation method can be used. This installation method has the disadvantages of large construction volume and long construction period, especially for construction sites with complex underground structures. safety and quality hazards
In the prior art, when using truss to install the pipeline, it needs to be hoisted by a crane, and for the construction site where the traffic is inconvenient and the crane cannot enter, the traditional truss pipeline installation method cannot be applied

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Installation method of truss pipeline penetrating through highway culvert
  • Installation method of truss pipeline penetrating through highway culvert
  • Installation method of truss pipeline penetrating through highway culvert

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] Below in conjunction with specific embodiment, further illustrate the present invention. It should be understood that these examples are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art may make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the appended claims of the present application.

[0023] A method for installing a truss pipe running through a high-speed culvert, using an independent truss installation, comprising the following steps:

[0024] (1) Level the site 2 at both ends of the axis of the pipeline 1. The height of the site 2 is slightly higher than the bottom elevation of the pipeline 1, and compact the foundations of the sites at both ends of the site 2 where the hoist 3 is installed.

[0025...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an installation method of a truss pipeline penetrating through a highway culvert. The installation method comprises the following steps that sites at the two ends of the axisof the pipeline are leveled; a winch is arranged on the axis of the pipeline; a truss is arranged in the culvert; the length of the pipe sections of the pipeline is controlled, so that the length of each pipe section is larger than the distance between any two horizontal supporting beams; a prefabricated bracket with rollers is placed on the horizontal supporting beams; the pipe sections are dragged and pulled in place through the winch; all the pipe sections are sequentially pulled in place according to the steps, and the adjacent pipe sections are welded to form an integral pipeline; after the pipeline is installed, the bracket is taken out, and fixed supports of the pipeline are welded; and the height of a stand column at the other side is increased, and a top beam is arranged at the tops of the stand columns. The installation method of the truss pipeline penetrating through the highway culvert can realize the installation of the truss pipeline into a highway culvert site which is complex in underground structure and inconvenient in transportation and cannot be entered by a crane, avoids the damage to a highway and an original culvert structure, reduces the installation difficulty of the truss pipeline into the highway culvert, and shortens the construction period.

Description

technical field [0001] The invention belongs to the technical field of installation of truss pipes, in particular to a method for installing truss pipes running through high-speed culverts. Background technique [0002] For the installation of pipelines that need to run through high-speed culverts, the buried pipeline installation method can be used. This installation method has the disadvantages of large construction volume and long construction period, especially for construction sites with complex underground structures. safety and quality hazards. However, in the prior art, when using trusses to install pipelines, a crane needs to be used for hoisting, and for construction sites where traffic is inconvenient and cranes cannot enter, the traditional truss pipeline installation method cannot be applied. Contents of the invention [0003] The technical problem to be solved by the present invention is to provide a method for installing truss pipes running through high-spe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F16L1/036F16L1/06B66D1/00
CPCB66D1/00F16L1/036F16L1/06
Inventor 罗运航李长保刘晓明蒋利军吴群航
Owner SHANGHAI ERSHIYE CONSTR CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products