The invention discloses a multi-layer sealing
cave wall structure of an underground high-pressure gas storage and a construction method. The sealing hole wall structure comprises surrounding rock located on the outer layer, a concrete lining layer used for transmitting air pressure in the high-pressure gas storage to the surrounding rock is attached to the inner side of the surrounding rock, an elastic
transition layer used for filling cracks of the concrete lining layer is sprayed to the inner side of the concrete lining layer, and an aluminum plate sealing layer is attached to the inner side of the elastic
transition layer; the adjacent aluminum plate sealing
layers are connected in a
lap joint mode, the
lap joint positions of the aluminum plate sealing
layers are bonded through
sealant and fixed through embedded bolts embedded in the concrete lining layer, and sealing gaskets are arranged between the
lap joint positions of the aluminum plate sealing
layers and the corresponding elastic transition layers. The sealing layer and the high-pressure bearing layer are separated, so that the extreme requirements under the operation condition of the gas storage are met, the reliability and the sealing performance of the
underground gas storage are ensured, the construction period is greatly shortened, and the construction difficulty is greatly reduced.