Construction method for hoisting steel-structure box girder to cross original high racks

A construction method and steel structure technology, which is applied in the hoisting construction of steel structure box girders, and in the hoisting construction field of steel structure box girders spanning the original elevated, can solve the problem that there is no construction precedent, the steel structure box girder cannot be hoisted in place, and the newly built elevated Or ramp construction difficulties and other issues

Inactive Publication Date: 2010-10-20
SHANGHAI CONSTR NO 1 GRP
View PDF0 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the existence of the original viaduct, it brings difficulties to the construction of the new viaduct or ramp, especially the steel structure box girder, as an important construction component, needs to be hoisted to the construction position of the viaduct. Due to the obstruction of the original viaduct, the steel structure cannot be directly The box girder is hoisted in place, so far there is no construction precedent

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for hoisting steel-structure box girder to cross original high racks
  • Construction method for hoisting steel-structure box girder to cross original high racks

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0012] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0013] Such as figure 1 As shown, it is a construction status diagram of an elevated project. In the figure, A is the existing elevated, and B is the new construction ramp, because the B ramp needs to cross the existing elevated for construction.

[0014] The hoisting construction method of the steel structure box girder spanning the original elevated structure of the present invention comprises the following steps:

[0015] (1) Analyze the construction conditions and put the car cranes in place: respectively place the first car crane 1 and the second car crane 2 on the same side of the intersection of the new ramp B and the original elevated A, and the first car crane 1 is set on the side near the original elevated A, and the second car crane 2 is set on the side near the new ramp B. The third automobile crane 3 is placed on the other side opposite t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method for hoisting of a steel-structure box girder to cross an original high racks, which comprises the following steps: (1) analyzing construction condition and taking steam cranes in proper positions; (2) arriving at the designated positions for steel beam transporters and hoisting the box girders to a first position by a first crane and a second steam crane at the same side and then delivering the box girders to a second proper position over two high racks; and (3) catching the box girders in air by utilizing a third steam crane at the opposite side to vortically place the box girders in a new ramp installation position and carrying out welding for fixing. In construction process of hoisting the steel-structure box girders to cross the original high racks, the invention uses coordination hoisting of three steam cranes and hoisting in place for three times to successfully complete the steel beam hoisting construction under the premise of ensuring steel structure quality and hoisting safety, and does not greatly influence the high racks and transportation on ground level roads.

Description

technical field [0001] The invention belongs to the technical field of building construction, and in particular relates to a hoisting construction method of a steel structure box girder, in particular to a hoisting construction method of a steel structure box girder spanning an existing elevated bridge. Background technique [0002] With the development of urban construction, road traffic is becoming more and more busy, and the modern traffic mode is gradually shifting from plane traffic to three-dimensional traffic, and new elevated roads or ramps often cross the original elevated roads. Due to the existence of the original viaduct, it brings difficulties to the construction of the new viaduct or ramp, especially the steel structure box girder, as an important construction component, needs to be hoisted to the construction position of the viaduct. Due to the obstruction of the original viaduct, the steel structure cannot be directly There is no construction precedent for th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00
Inventor 郑磊陈炜宁刘懿彬陈志明
Owner SHANGHAI CONSTR NO 1 GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products