Receding construction method of cradle of continuous girder bridge made of prestressing concrete
A construction method and prestressing technology, applied to bridges, bridge construction, erection/assembly of bridges, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] The gantry truss walking device of the present invention is formed by adding an auxiliary gantry on the outside of the main truss beam, and the main truss includes upper and lower beams, front and rear oblique pull beams, columns or channel steel columns connected. Adding a sub-gantry on the outside is to make an extended sub-gantry; the extended sub-gantry is made of channel steel and angle steel.
[0046] In the construction equipment of the present invention, it mainly includes lengthening the front top crossbeam 2, the front bottom crossbeam 15 and the rear bottom crossbeam (20). ), beam pin seat, jack connection), hanging basket back and other steps.
[0047] In the implementation shown in Fig. 3, Fig. 4 and Fig. 5, when making the outstretched sub-gantry 25, at first utilize two 12 channel steels to be welded side by side to form the combination of the outstretched sub-gantry pole beams 27, and the two channel steels The spacing is 40mm--50mm, and the top of the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com