Fabricated bridge prefabricated pier column formwork
By designing prefabricated pier column formwork for prefabricated bridges, the problems of pier column installation accuracy and slow speed in traditional construction are solved, efficient and safe pier column construction is achieved, and the later workload is reduced.
Patent Information
- Application Number
- CN202323406911.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-14
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-12-14
AI Technical Summary
In traditional bridge construction, the on-site binding, supporting and pouring process of pier columns has high environmental requirements, slow speed, high cost, and many unsafe factors are present.
Design a prefabricated pier column formwork for prefabricated bridges, including prefabricated pedestals, top plates, prefabricated pier column bottom molds, side molds, limit plates and spreaders, and achieve high efficiency of steel bars through bolt connections and multiple slurry inlets and outlets. Installation and grouting, a combined positioning and tightening method of tapered pin + M20 high-strength bolt + four-angle pull rod is adopted.
It improves the accuracy and efficiency of steel bar installation, saves installation time, realizes rapid and safe construction of pier columns of different heights, and reduces the work of later disassembly and grouting closure.
Smart Images

Figure CN221968389U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridges, in particular to an assembled bridge prefabricated pier column template. Background Art
[0002] The use of standardized prefabrication and assembly construction has become a trend. Prefabricated bridge piers have been widely used in the construction of various bridges due to their advantages of energy saving, environmental protection, reliable quality, and low labor requirements. Piers are the key parts of the bridge structure that connect the upper and lower parts. The traditional construction site binding, formwork, and pouring process has high requirements on the on-site environment, slow construction speed, high cost, and many unsafe factors in the construction process. Summary of the invention
[0003] In order to solve the above-mentioned deficiencies in the prior art, the utility model proposes an assembled bridge prefabricated pier column template.
[0004] In order to solve the above technical problems, the utility model adopts the following technical solutions: an assembled bridge prefabricated pier column template, comprising a prefabricated pedestal, a top plate is arranged on the prefabricated pedestal, and the prefabricated pedestal is connected to the top plate by bolts;
[0005] The top of the top plate is connected with a prefabricated pier column bottom mold, and the prefabricated pier column side mold is installed around the prefabricated pier column bottom mold. The prefabricated pier column side mold is fixedly connected with the prefabricated pier column bottom mold by bolts;
[0006] The prefabricated pier column side form is provided with a plurality of grout inlets and grout outlets for grouting construction of steel bar connection grouting sleeves;
[0007] A limiting plate is sleeved on the upper part of the prefabricated pier column side formwork, and wind rope ear plates are arranged at both ends of the limiting plate;
[0008] The top of the prefabricated pier column side form is connected with a hanger, and the hanger is tightly connected to the top of the prefabricated pier column side form and is used to cooperate with a crane to move the entire formwork.
[0009] Preferably, the prefabricated pier column side mold is also provided with a plurality of locking devices at the four corners of the mold for fixing the prefabricated pier column side mold.
[0010] Preferably, the limiting plate includes a frame, limiting bolts, and screw adjustment buckles. The frame is provided with lifting ears at four corners of a side facing the prefabricated pier column side form, and a plurality of limiting bolts are evenly arranged around the same side.
[0011] Compared with the prior art, the utility model has the following beneficial effects:
[0012] 1. The prefabricated pier column formwork with a flipping device can realize the production and installation of pier column reinforcement on a horizontal tire frame. It can improve the accuracy and efficiency of reinforcement installation. Compared with vertical prefabrication, each reinforcement skeleton installation can save about 5 hours, and the installation accuracy can be controlled to mm level.
[0013] 2. By designing prefabricated pier formwork with different segment lengths, piers of different heights can be prefabricated, and the formwork installation speed is fast and safe.
[0014] 3. The prefabricated pier column template is customized with convex blocks on the template according to the length of the grouting sleeve and the position of the inlet and outlet of the grouting sleeve to match the inlet and outlet of the grouting sleeve, so as to achieve accurate positioning of the grouting sleeve and save the work of removing the rubber plug after the pier column is prefabricated.
[0015] 4. By using a combination of tapered pins + M20 high-strength bolts + four-corner tie rods to position and fasten the formwork, the work of later disassembling the tie rods and grouting and sealing the tie rod holes can be eliminated. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the utility model.
[0017] Figure 2 It is a structural schematic diagram of the limiting plate.
[0018] Markings in the figure: 11--top plate, 12--prefabricated pedestal, 21--prefabricated pier bottom mold, 31--slurry inlet, 32--slurry outlet, 4--limiting plate, 41--frame, 45--limiting bolt, 47--screw adjustment buckle, 5--hanging device, 6--wind rope ear plate, 71--prefabricated pier side mold, 73--locking device at the four corners of the mold. DETAILED DESCRIPTION
[0019] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0020] The utility model is described in detail below with reference to the accompanying drawings and embodiments.
[0021] Example 1
[0022] like Figure 1-2 As shown, a prefabricated bridge pier template, the template height is designed to be 4.0 meters / segment, 3.5 meters / segment, and 0.2 meters / segment. The template combination of corresponding length is selected according to the pier height. The template panel is t=6mm, the vertical rib is #12 channel steel, the transverse rib is double #20 channel steel, and the surrounding edge flange is 16-18mm. The template connection is connected with M20 bolts, the positioning pin is positioned, and the four corner tie rods are made of Φ25 precision rolled threaded steel.
[0023] The limit plate 4 is provided with a Langfeng rope ear plate 6, which can be used for hoisting. The templates of other pier heights must be turned over and hoisted with a hoist. The Langfeng rope ear plate 6 and the hoist 5 are both set at the top and must not be reversed. Equip the corresponding segmental template according to the pier height, hoist the prefabricated pier bottom mold 21 into the matching workbench of the turning frame, and then assemble the prefabricated pier measuring molds 71 on both sides, adjust and level the overall template, hoist the steel cage into place, cover the upper section, and when closing the mold, align the entirety, level the plate surface, and then lock it with a cone pin positioning locking device, and use M20 high-strength bolts to strengthen the fastening.
[0024] After the prefabricated pedestal top plate 11 is leveled and adjusted, it is locked with bolts to the prefabricated pedestal 12. The steel bar limit plate is bolted to the rear bracket of the steel bar bracket. After the steel bar cage is tied, the upper end is covered with the steel bar limit plate 4. The steel bar limit plate 4 is hoisted to the assembly area with the steel bar cage for assembly. The steel bar limit plate 4 is adjusted and connected to the prefabricated pier column side mold 71. After adjustment, the four corners are put on the pull rod to fine-tune the parallelism of the lower bottom and the top surface and tighten them. Then the overall template and the steel bar cage are turned over and hoisted as a whole through the sling 5, and then hoisted into the casting area as a whole and connected to the lower bottom mold. After the whole is in place, the wind rope is pulled up by the wind rope ear plate 6 on the template. Then the operating table is stably in place and bolted to the reserved ear plate (not marked) on the limit plate 4. Connect the suspension rod to the upper end of the limit plate 4, insert the screw rod to connect with the steel bar limit plate 4, and adjust the upper steel bar limit plate 4 to the required height position of the pier column. Check the overall safety and stability of the formwork, tighten all connections and tie rod bolts, and only start concrete pouring after passing the inspection.
[0025] The above embodiments only express several implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the patent and protection scope of the utility model shall be subject to the attached claims.
Claims
1. An assembled bridge prefabricated pier formwork, characterized in that: It comprises a prefabricated pedestal (12), a top plate (11) is arranged on the prefabricated pedestal (12), and the prefabricated pedestal (12) is connected to the top plate (11) by bolts; The top of the top plate (11) is connected to a prefabricated pier column bottom mold (21), and a prefabricated pier column side mold (71) is installed around the prefabricated pier column bottom mold (21), and the prefabricated pier column side mold (71) is fixedly connected to the prefabricated pier column bottom mold (21) at a connection point by bolts; The prefabricated pier column side form (71) is provided with a plurality of grout inlets (31) and grout outlets (32) for grouting construction of steel bar connection grouting sleeves; A limiting plate (4) is sleeved on the upper part of the prefabricated pier column side form (71), and wind rope ear plates (6) are arranged at both ends of the limiting plate (4); The top of the prefabricated pier column side form (71) is connected to a hanger (5), and the hanger (5) is tightly connected to the top of the prefabricated pier column side form (71) and is used to cooperate with a crane to move the entire formwork.
2. The prefabricated bridge pier formwork according to claim 1, characterized in that: The prefabricated pier column side mold (71) is also provided with a plurality of mold-closing four-corner locking devices (73) for fixing the prefabricated pier column side mold (71).
3. The prefabricated bridge pier formwork according to claim 2, characterized in that: The limiting plate (4) comprises a frame (41), limiting bolts (45), and a screw adjustment buckle (47); the frame (41) is provided with lifting ears at four corners of a side facing the prefabricated pier column side form (71), and a plurality of limiting bolts (45) are evenly arranged around the same side.