Bridge drain pipe dredging device

By designing a bridge drainage pipe dredging device, using the combination of pressurized water flow, water spray holes and dredging nozzles, the problem of incomplete cleaning in the existing technology is solved, the cleaning efficiency and effect of drainage pipes is improved, and the service life is extended.

CN221972652UActive Publication Date: 2024-11-08SHAANXI TRANSPORTATION CONTROL CONSTR INVESTMENT MANAGEMENT CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420575483.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-08
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

The cleaning of existing bridge drainage pipes is not thorough, resulting in silt and sand remaining on the pipe wall, which can easily cause reblocking and affect the service life of the bridge.

Method used

Design a bridge drainage pipe dredging device, including unblocking pipes, water-dividing sleeves, water spray holes, annular gates, handles and dredging nozzles, providing pressurized water flow through the water injection interface, and flushing the pipe wall and center with the water spray holes and dredging nozzles The blockage can be adjusted according to the blockage.

Benefits of technology

It improves the cleaning efficiency and effect of bridge drainage pipes, extends the normal working time of drainage pipes, can effectively clean up blockages in the pipe wall and center, and reduces the frequency of blockages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972652U_ABST
    Figure CN221972652U_ABST
Patent Text Reader

Abstract

The utility model discloses a bridge drainage pipe dredging device, and relates to the technical field of bridge ancillary facility maintenance. According to the technical scheme, the dredging device comprises a dredging pipeline, one side of the upper end of the dredging pipeline is connected with a water injection connector, the lower end of the dredging pipeline is connected with a water distribution sleeve, a plurality of water spraying holes are evenly formed in the peripheral side of the water distribution sleeve, and the lower end of the water distribution sleeve is connected with a dredging spray head; an annular flashboard is arranged on the inner side of the water diversion sleeve, and the upper side of the annular flashboard is connected with the inner wall of the dredging pipeline through an elastic assembly; and a handle is arranged at the upper port of the dredging pipeline and is connected with the annular flashboard through a traction unit. After the dredging pipeline penetrates from one end opening to the other end opening of the drainage pipe, blockages on the pipe wall and the center of the drainage pipe can be cleaned up together, compared with the prior art, the cleaning efficiency of the drainage pipe is improved, the cleaning effect of the drainage pipe is improved, and therefore the normal working time of the drainage pipe is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of bridge ancillary facility maintenance, and in particular to a bridge drainage pipe dredging device. Background Art

[0002] Bridges generally refer to structures erected over rivers, lakes, and seas to allow vehicles and pedestrians to pass smoothly. In order to adapt to the modern, rapidly developing transportation industry, bridges are also extended to buildings that are erected across mountain streams, poor geology, or to meet other transportation needs to make travel more convenient. Bridges are generally composed of superstructures, substructures, supports, and ancillary facilities. Bridge ancillary facilities usually include bridge deck pavement, drainage systems, railings, expansion joints, lighting, bridgehead planks, conical slope protection, etc. The drainage work of the bridge mainly relies on drainage pipes installed on the side of the bridge and extending under the bridge. Once these pipes are congested, rainwater will accumulate on the bridge, which will not only easily cause traffic accidents, but also affect the service life of the bridge deck pavement structure. Therefore, in order to ensure the smooth flow of the bridge's drainage system, prevent water accumulation on the bridge, and extend the service life of the bridge, workers are often required to regularly dredge the drainage pipes on the bridge. The blockages in the bridge drainage pipes are mostly granular materials such as soil, sand, and gravel, or domestic garbage such as plastic. The commonly used dredging tools are bamboo sticks. Generally, workers open the dust cover on the drainage pipe and use bamboo sticks to take out the accumulated materials in the pipe or push them out from the next sewage outlet of the drainage pipe. Although workers can clear the blockages in the drainage pipe in this way and restore the drainage function of the drainage pipe, the cleaning is not thorough. There will still be a lot of silt and sand on the wall of the drainage pipe. In the subsequent use of the drainage pipe, these residues on the wall of the drainage pipe can easily intercept dust and sand in the rainwater during the drainage process, thereby rapidly reducing the inner diameter of the drainage pipe, and the drainage pipe may be blocked again before the next maintenance time. Utility Model Content

[0003] The present application provides a bridge drainage pipe dredging device, which can effectively improve the cleaning effect of the inner wall of the bridge drainage pipe.

[0004] The above-mentioned purpose of the present application is achieved through the following technical solutions:

[0005] A bridge drainage pipe dredging device comprises a dredging pipe, the top of the dredging pipe is a closed structure, one side of the upper end of the dredging pipe is connected to a water injection interface, the lower end of the dredging pipe is connected to a water distribution sleeve, the circumference of the water distribution sleeve is evenly provided with a plurality of water spray holes, and the lower end of the water distribution sleeve is connected to a dredging nozzle;

[0006] An annular gate is provided on the inner side of the water distribution sleeve, and the upper side of the annular gate is connected to the inner wall of the dredging pipe through an elastic component. In a natural state, the elastic component can make the annular gate cover all the water spray holes;

[0007] A handle is provided at the upper end of the dredging pipe, and the handle is connected to the annular gate plate through a traction unit.

[0008] Furthermore, the traction unit includes a plurality of connecting rods and traction steel wires, the plurality of connecting rods are evenly arranged on the inner side of the water diversion sleeve, one ends of the plurality of connecting rods are close to each other and are fixedly connected to the lower end of the traction steel wire, the other ends of the plurality of connecting rods are fixedly connected to the inner wall of the water diversion sleeve, and the upper end of the traction steel wire passes through the center position of the top of the dredging pipe and is fixedly connected to the handle.

[0009] Furthermore, a rubber sealing plug is fixedly installed in the area above the connection point between the dredging pipe and the water injection interface, and the rubber sealing plug is movably mounted on the traction wire, and the traction wire can move freely up and down along the axis of the rubber sealing plug.

[0010] Furthermore, the elastic component includes multiple springs, the inner side of the water diversion sleeve is provided with an inwardly extending annular flange, the upper end of the spring is inserted into the annular flange and the two are fixedly connected, and the lower end of the spring is fixedly connected to the annular gate plate.

[0011] Furthermore, a water retaining sleeve is fixedly connected to the lower part of the annular flange near the center point thereof, and the lower end of the water retaining sleeve extends toward the annular gate plate.

[0012] Furthermore, a plurality of vertical pressure relief holes are evenly arranged on the plate body of the annular gate along the circumferential direction.

[0013] Furthermore, a plurality of metal hooks are provided on the outer side of the water outlet of the dredging nozzle, and a circular array of the plurality of metal hooks is arranged on the outer side of the dredging nozzle, and the upper ends of the plurality of metal hooks are fixedly connected to the outer side wall of the dredging nozzle.

[0014] Furthermore, the upper end of the water-dividing sleeve is threadedly connected to the lower end of the dredging pipe, and the lower end of the water-dividing sleeve is threadedly connected to the upper end of the dredging nozzle.

[0015] In summary, the present application includes at least one of the following beneficial technical effects:

[0016] When cleaning the bridge drainage pipe, the bridge maintenance workers can provide a certain pressure of water flow to the inside through the water injection interface on the dredging pipe. After the workers gradually put the dredging pipe into the drainage pipe to be cleaned, they can first pull up the annular gate plate through the handle to expose the water spray holes on the water distribution sleeve. At this time, the water in the dredging pipe will be sprayed out from multiple water spray holes and the dredging nozzles at the end at the same time. The water sprayed from the water spray holes can wash away the mud and sand attachments on the side walls of the drainage pipe, and the water flow at the dredging nozzle can deal with the blockages in the center of the pipe. In this way, when the workers pass the dredging pipe from one port of the drainage pipe to another port, the pipe wall and the blockages in the center of the drainage pipe can be cleaned together. Compared with the existing technology, not only the cleaning efficiency of the drainage pipe is improved, but also the cleaning effect of the drainage pipe is improved, thereby extending the normal working time of the drainage pipe. If the dredging nozzle encounters stubborn blockage during cleaning, the worker can loosen the handle to allow the annular gate to re-seal the water spray holes on the water distribution sleeve, thereby increasing the flow rate and pressure of the water flow at the dredging nozzle and improving the cleaning ability of the dredging nozzle. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0018] Figure 1 It is a schematic diagram of the overall structure of this application;

[0019] Figure 2 It is a cross-sectional view of the overall structure;

[0020] Figure 3 It is a schematic diagram of the structure after the dredging nozzle and the water distribution sleeve in the partial structure of the present application are separated;

[0021] Figure 4 It is a schematic structural diagram after the dredging nozzle in the partial structure of the present application is disassembled from the water diversion sleeve and the interior of the water diversion sleeve is further cut open.

[0022] Figure numerals: 1. dredging pipeline; 2. water injection interface; 3. water distribution sleeve; 4. water spray hole; 5. dredging nozzle; 6. annular gate; 7. elastic component; 8. handle; 9. traction unit; 91. connecting rod; 92. traction wire; 10. rubber sealing plug; 11. annular flange; 12. water retaining casing; 13. pressure relief hole; 14. metal hook. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application is clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work also fall within the scope of protection of the present application.

[0024] like Figure 1-Figure 4 As shown, a bridge drainage pipe dredging device disclosed in the present application includes a dredging pipe 1, the top of the dredging pipe 1 is a closed structure, one side of the upper end of the dredging pipe 1 is connected to a water injection interface 2, the lower end of the dredging pipe 1 is connected to a water distribution sleeve 3, a plurality of water spray holes 4 are evenly arranged on the circumference of the water distribution sleeve 3, and the lower end of the water distribution sleeve 3 is connected to a dredging nozzle 5; an annular gate plate 6 is provided on the inner side of the water distribution sleeve 3, and the upper side of the annular gate plate 6 is connected to the inner wall of the dredging pipe 1 through an elastic component 7, and the elastic component 7 can make the annular gate plate 6 cover all the water spray holes 4 in a natural state; a handle 8 is provided at the upper end of the dredging pipe 1, and the handle 8 and the annular gate plate 6 are connected through a traction unit 9.

[0025] In the above embodiments, the dredging pipe 1 of the present application is a metal armored hose, which not only ensures that it has a certain strength to move in the drainage pipe of the bridge, but also has a certain degree of flexibility, which is convenient for bending. The water injection interface 2 above the dredging pipe 1 can be connected to the water outlet pipe of the maintenance water truck, and the pressurized water generated by the maintenance water truck will flow into the dredging pipe through the water injection interface 2.

[0026] When cleaning the bridge drainage pipe, the bridge maintenance worker can first put one end of the dredging nozzle 5 on the dredging pipe 1 into the drainage pipe, and then start the maintenance water truck to provide a water flow with a certain pressure to the dredging pipe 1. Then the worker can first pull up the annular gate plate 6 by the traction unit 9 through the handle 8 to expose the water spray hole 4 on the water distribution sleeve 3. At this time, the water in the dredging pipe 1 will be sprayed out from multiple water spray holes 4 and the dredging nozzle 5 at the end at the same time. The water sprayed from the water spray hole 4 can wash away the mud and sand attachments on the side wall of the drainage pipe, and the water flow at the dredging nozzle 5 can deal with the blockage in the center of the pipe. In this way, when the worker passes the dredging pipe 1 from one port of the drainage pipe to another port, the pipe wall and the blockage in the center of the drainage pipe can be cleaned together. Compared with the prior art, not only the cleaning efficiency of the drainage pipe is improved, but also the cleaning effect of the drainage pipe is improved, thereby extending the normal working time of the drainage pipe.

[0027] If the movement of the dredging pipe 1 is blocked in the dredging pipe 1, that is, when the dredging nozzle 5 encounters a stubborn blockage during cleaning, the worker can loosen the handle 8 to allow the annular gate 6 to reset and re-seal the water spray hole 4 on the water diversion sleeve 3 under the elastic force of the elastic component 7, so that the water flow to the dredging nozzle 5 will increase. After the flow rate and pressure of the water flowing out of the dredging nozzle 5 increase, the cleaning ability of the dredging nozzle 5 can be effectively improved.

[0028] Furthermore, if Figure 2 and Figure 4 As shown, the traction unit 9 includes a plurality of connecting rods 91 and a traction wire 92. The plurality of connecting rods 91 are evenly arranged on the inner side of the water diversion sleeve 3. One ends of the plurality of connecting rods 91 are close to each other and are fixedly connected to the lower end of the traction wire 92. The other ends of the plurality of connecting rods 91 are fixedly connected to the inner wall of the water diversion sleeve 3. The upper end of the traction wire 92 passes through the center position of the top of the dredging pipe 1 and is fixedly connected to the handle 8.

[0029] In the above embodiment, the ends of the multiple connecting rods 91 close to each other are located in the axial direction of the annular gate plate 6, and the number of the connecting rods 91 is preferably more than three, so that when the traction wire 92 is pulled upward by the handle 8, the tension generated can be evenly applied to the annular gate plate 6, so that the annular gate plate 6 moves upward smoothly. The connection points between the upper ends of the multiple connecting rods 91 and the traction wire 92 are higher than the plane where the lower ends of the multiple connecting rods 91 are located, so that the multiple connecting rods 91 can form a conical structure, and when water flows through the multiple connecting rods 91, the force on the connecting rods 91 can be reduced.

[0030] Furthermore, if Figure 2 As shown, a rubber sealing plug 10 is fixedly installed in the area above the connection point between the dredging pipe 1 and the water injection interface 2, and the rubber sealing plug 10 is movably mounted on the traction wire 92, and the traction wire 92 can move freely up and down along the axis of the rubber sealing plug 10.

[0031] In the above embodiment, the rubber sealing plug 10 has a through hole for the traction wire 92 to pass through. The traction wire 92 can move freely in the vertical direction. The gap between the traction wire 92 and the rubber sealing plug 10 can be automatically sealed by the rubber sealing plug 10 using its elasticity, thereby preventing the water flow in the dredging pipe 1 from leaking from above.

[0032] Furthermore, if Figure 4 As shown, the elastic component 7 includes multiple springs, and an annular flange 11 extending inward is provided on the inner side of the water distribution sleeve 3. The upper end of the spring is inserted into the annular flange 11 and the two are fixedly connected, and the lower end of the spring is fixedly connected to the annular gate plate 6.

[0033] In the above embodiments, the annular flange 11 in the water diversion sleeve 3 can provide a suitable installation position for the spring, and a plurality of springs evenly arranged on the inner side of the annular gate plate 6 are used to form an elastic component 7 connecting the annular gate plate 6 and the annular flange 11, which not only has a low manufacturing cost but also has a stable use effect.

[0034] Furthermore, if Figure 3 and Figure 4 As shown, a water retaining sleeve 12 is fixedly connected to the lower part of the annular flange 11 near the center point thereof, and the lower end of the water retaining sleeve 12 extends toward the annular gate plate 6 .

[0035] In the above embodiment, the outer diameter of the water retaining sleeve 12 is close to the inner diameter of the annular gate plate 6, so that when the annular gate plate 6 moves in the vertical direction, the water retaining sleeve 12 can provide a certain guiding effect for the movement of the annular gate plate 6. In addition, since the dredging pipe 1 is filled with downwardly flowing water when in use, if these water flows directly contact the upper end of the annular gate plate 6 during the flow process, they will generate a certain downward force on the annular gate plate 6, which will hinder the workers from pulling up the annular gate plate 6 through the handle 8. The water retaining sleeve 12 provided on the inner side of the annular flange 11 of the present application can have a certain blocking effect on the water flow, making it difficult for the high-pressure water flow to directly act on the annular gate plate 6, so that when the workers pull the annular gate plate 6 through the handle 8, they only need to overcome the elastic force of the spring.

[0036] Furthermore, if Figure 3 As shown, a plurality of vertical pressure relief holes 13 are evenly arranged on the plate body of the annular gate plate 6 along the circumferential direction.

[0037] In the above embodiments, during the upward movement of the annular gate plate 6, the space between it and the water retaining casing 12 and the water diversion sleeve 3 will gradually decrease. If the gas or backflow in the space is not discharged in time, it may cause excessive pressure in the space, hindering the movement of the annular gate plate 6. The pressure relief hole 13 provided on the annular gate plate 6 in the present application can discharge the water flow or gas in the space above the annular gate plate 6 during the movement of the annular gate plate 6, thereby ensuring that the annular gate plate 6 can move smoothly.

[0038] Furthermore, if Figure 3 and Figure 4 As shown, a plurality of metal hooks 14 are provided on the outer side of the water outlet of the dredging nozzle 5 , and the plurality of metal hooks 14 are arranged in a circular array on the outer side of the dredging nozzle 5 , and the upper ends of the plurality of metal hooks 14 are fixedly connected to the outer side wall of the dredging nozzle 5 .

[0039] In the above embodiments, the metal hook 14 of the present application is shaped like the hook in the hoop rolling game, that is, the metal hook is composed of a vertical metal rod and a horizontal U-shaped hook. When workers need to take out blockages such as plastic bags in the drain pipe, they can rotate the dredging pipe 1 and use the metal hook 14 on the dredging nozzle 5 at its end to hook these blockages such as plastic bags, and then pull them out of the discharge pipe.

[0040] Furthermore, if Figure 3 and Figure 4 As shown, the upper end of the water-dividing sleeve 3 is threadedly connected to the lower end of the dredging pipeline 1 , and the lower end of the water-dividing sleeve 3 is threadedly connected to the upper end of the dredging nozzle 5 .

[0041] In the above embodiments, the water diversion sleeve 3 is movably connected to the dredging pipe 1 and the desilting nozzle 5 through threads, so that when a fault occurs inside the water diversion sleeve 3, the water diversion sleeve 3 can be quickly removed for inspection and maintenance.

[0042] The implementation principle of this embodiment is as follows: when the bridge maintenance worker needs to clean the bridge drainage pipe, he can first connect the water outlet pipe of the water sprinkler to the water injection interface 2, and then provide a certain pressure of water flow to the inside of the dredging pipe through the water injection interface 2 on the dredging pipe 1. In this way, the worker gradually puts the dredging pipe 1 into the drainage pipe to be cleaned, and then pulls the handle 8 upward. The annular gate plate 6 is pulled up by the traction wire 92 and the connecting rod 91 to expose the water spray holes 4 on the water distribution sleeve 3. At this time, the water in the dredging pipe 1 will be sprayed from multiple water spray holes 4 and the dredging nozzle 5 at the end at the same time. The water sprayed from the water spray holes 4 can wash away the mud and sand attachments on the side wall of the drainage pipe, and the water flow at the dredging nozzle 5 can deal with the blockage in the center of the pipe. In this way, when the worker passes the dredging pipe 1 from one port of the drainage pipe to another port, the pipe wall and the blockage in the center of the drainage pipe can be cleaned together. If the dredging nozzle 5 encounters stubborn blockage during cleaning, the worker can loosen the handle 8 to allow the annular gate plate 6 to re-block the water spray hole 4 on the water diversion sleeve 3, thereby increasing the flow rate and pressure of the water flow at the dredging nozzle 5 to improve the cleaning effect of stubborn stains in the bridge drainage pipe.

[0043] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, ordinary technicians in the field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

Claims

1. A bridge drainage pipe dredging device, comprising a dredging pipe (1), wherein the top of the dredging pipe (1) is a closed structure, Features: One side of the upper end of the dredging pipeline (1) is connected to a water injection interface (2), the lower end of the dredging pipeline (1) is connected to a water distribution sleeve (3), a plurality of water spray holes (4) are evenly arranged on the circumference of the water distribution sleeve (3), and the lower end of the water distribution sleeve (3) is connected to a dredging nozzle (5); An annular gate plate (6) is provided on the inner side of the water distribution sleeve (3), and the upper side of the annular gate plate (6) is connected to the inner wall of the dredging pipe (1) via an elastic component (7). In a natural state, the elastic component (7) can enable the annular gate plate (6) to cover all the water spray holes (4); A handle (8) is provided at the upper end of the dredging pipe (1), and the handle (8) is connected to the annular gate plate (6) via a traction unit (9).

2. The bridge drainage pipe dredging device according to claim 1, Features: The traction unit (9) comprises a plurality of connecting rods (91) and traction steel wires (92); the plurality of connecting rods (91) are evenly arranged on the inner side of the water diversion sleeve (3); one end of the plurality of connecting rods (91) is close to each other and fixedly connected to the lower end of the traction steel wire (92); the other end of the plurality of connecting rods (91) is fixedly connected to the inner wall of the water diversion sleeve (3); the upper end of the traction steel wire (92) passes through the center position of the top of the dredging pipe (1) and is fixedly connected to the handle (8).

3. The bridge drainage pipe dredging device according to claim 2, Features: A rubber sealing plug (10) is fixedly installed in the area above the connection point between the dredging pipe (1) and the water injection interface (2), and the rubber sealing plug (10) is movably mounted on the traction wire (92), and the traction wire (92) can freely move up and down along the axis of the rubber sealing plug (10).

4. The bridge drainage pipe dredging device according to any one of claims 1 to 3, Features: The elastic component (7) comprises a plurality of springs. An inwardly extending annular flange (11) is provided on the inner side of the water diversion sleeve (3). The upper end of the spring is inserted into the annular flange (11) and the two are fixedly connected. The lower end of the spring is fixedly connected to the annular gate plate (6).

5. The bridge drainage pipe dredging device according to claim 4, Features: A water retaining sleeve (12) is fixedly connected to the lower side of the annular flange (11) close to the center point thereof, and the lower end of the water retaining sleeve (12) extends toward the annular gate plate (6).

6. The bridge drainage pipe dredging device according to any one of claims 1 to 3, Features: A plurality of vertical pressure relief holes (13) are evenly arranged on the plate body of the annular gate plate (6) along the circumferential direction.

7. The bridge drainage pipe dredging device according to any one of claims 1 to 3, Features: A plurality of metal hooks (14) are provided on the outer side of the water outlet of the dredging nozzle (5); the plurality of metal hooks (14) are arranged in a circular array on the outer side of the dredging nozzle (5); and the upper ends of the plurality of metal hooks (14) are fixedly connected to the outer side wall of the dredging nozzle (5).

8. The bridge drainage pipe dredging device according to any one of claims 1 to 3, Features: The upper end of the water diversion sleeve (3) is threadedly connected to the lower end of the dredging pipeline (1), and the lower end of the water diversion sleeve (3) is threadedly connected to the upper end of the dredging nozzle (5).