Foundation bolt positioning and mounting tool
By designing anchor bolt positioning and installation tools, using the vertical screw and nut connection of the bracket and positioning template, the problem of precision control of anchor bolt pre-embedded position is solved, efficient and precise installation is achieved, and construction efficiency and safety is improved.
Patent Information
- Application Number
- CN202420165087.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-23
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-01-23
AI Technical Summary
In construction, the accuracy control of the embedded position of anchor bolts is difficult to ensure, resulting in inaccurate installation and affecting construction quality and efficiency.
A anchor bolt positioning and installation tool is designed, including brackets and positioning templates. The positioning template is adjusted through vertical screws and nuts, ensuring the elevation and horizontal installation accuracy of anchor bolts, and through the retractable rod and The chute is adjusted to adapt to different foundation pit sizes.
It improves the accuracy and efficiency of anchor bolt installation, reduces welding operations, reduces labor intensity, improves construction safety, and significantly shortens construction period and labor costs in actual projects.
Smart Images

Figure CN221973056U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction auxiliary tools, in particular to a foundation bolt positioning and installation tool. Background Art
[0002] Anchor bolts are widely used in construction. Since anchor bolts and foundation structures are cast together, they are very stable. Therefore, anchor bolts are often used to fix some large construction equipment or as a fixing tool for steel columns in steel structure buildings. When used as a fixing tool for steel columns, the precision control of the embedded position of anchor bolts is the key and difficulty of construction.
[0003] However, the anchor bolts used in the project are large in size, which makes positioning difficult and installation accuracy difficult to ensure. In addition, the bolts are connected to the foundation steel bars or formwork, and the vibrating process of pouring concrete is prone to secondary displacement. Imprecise installation of pre-buried anchor bolts will cause great difficulties to structural construction. Summary of the invention
[0004] The purpose of the utility model is to provide a foundation bolt positioning and installation tool in view of the above problems. The positioning and installation tool is convenient for adjusting the foundation bolt installation process, has high adjustment accuracy, shortens the installation period, ensures construction accuracy, and improves work efficiency.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:
[0006] A foundation bolt positioning and installation tool comprises a bracket, a positioning template is provided below the bracket, a casting hole is provided in the middle of the positioning template, connecting holes are provided at both ends of the positioning template, a screw rod is passed through the connecting hole, the bracket and the positioning template are fixedly connected by the screw rod and the nut on the screw rod; a bolt positioning hole is also provided on the positioning template between the casting hole and the connecting hole, so that two groups of bolt positioning holes are provided on the positioning template.
[0007] In the utility model, further, the bracket includes two rods arranged at intervals, the two rods are connected by two sliding grooves arranged at intervals, the sliding groove is located directly above the connecting hole, and the screw rod is passed through the sliding groove.
[0008] In the utility model, further, the slide groove is vertically arranged to the rod, and the axial direction of the rod is parallel to the axial direction of the positioning template.
[0009] In the utility model, further, each group of the bolt positioning holes includes eight positioning holes which are spaced apart and arranged in a circle.
[0010] In the present invention, further, the diameter of the screw rod is 42 mm.
[0011] In the utility model, further, the screw rod is provided with scale lines.
[0012] In the utility model, further, the rod is a telescopic rod.
[0013] In the utility model, further, the material of the rod is No. 18 channel steel, and the material of the slide groove is No. 16 channel steel.
[0014] Due to the adoption of the above technical solution, the utility model has the following beneficial effects:
[0015] The utility model sets a positioning template on the bracket, and connects the positioning template to the bracket through a screw rod perpendicular to the positioning template, so that the utility model can locate the installation elevation of the anchor bolt by adjusting the screw rod in the vertical direction of the positioning template and the nut on the screw rod, thereby ensuring the precision control of the elevation during the installation process. And by setting the bracket to include two rods arranged at intervals, the two rods are firmly connected through two slide grooves arranged at intervals, so that the horizontal axis of the positioning template can be adjusted through the slide groove to meet the construction requirements. Therefore, the utility model facilitates the adjustment of the installation process of the anchor bolt, has high adjustment accuracy, shortens the installation period, ensures construction accuracy, and improves work efficiency. And the use of the utility model to position the anchor bolt can reduce welding operations, reduce labor intensity, and improve construction safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a structural schematic diagram of a foundation bolt positioning and installation tool of the utility model;
[0017] Figure 2 This is a schematic diagram of the structure of a bracket in a foundation bolt positioning and installation tool of the utility model;
[0018] Figure 3 The utility model is a structural schematic diagram of a positioning template in a foundation bolt positioning installation tool.
[0019] The reference numbers in the figure are: 1- bracket, 11- rod, 12- slide groove, 2- positioning template, 21- pouring hole, 22- connecting hole, 23- bolt positioning hole, 3- screw rod, 4- anchor bolt. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] It should be noted that when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may also be a component centered. When a component is considered to be "connected to" another component, it may be directly connected to the other component or there may also be a component centered. When a component is considered to be "set on" another component, it may be directly set on the other component or there may also be a component centered. The terms "vertical", "horizontal", "first", "second" and similar expressions used herein are for illustrative purposes only.
[0022] Example 1
[0023] See also Figures 1 to 3 A foundation bolt positioning and installation tool comprises a bracket 1, a positioning template 2 is provided below the bracket 1, a casting hole 21 is provided in the middle of the positioning template 2, connecting holes 22 are provided at both ends of the positioning template 2, a screw rod 3 is passed through the connecting hole 22, the bracket 1 and the positioning template 2 are fixedly connected by the screw rod 3 and the nut on the screw rod 3; a bolt positioning hole 23 is also provided on the positioning template 2 between the casting hole 21 and the connecting hole 22, so that two groups of bolt positioning holes 23 are provided on the positioning template 2.
[0024] As a further specific technical solution, in this embodiment, the bracket 1 includes two rods 11 arranged at intervals, and the two rods 11 are connected by two slide grooves 12 arranged at intervals, and the slide groove 12 is located directly above the connecting hole 22, so that the screw rod 3 is vertically penetrated through the connecting hole 22 on the slide groove 12, and the screw rod 3 is fixedly connected to the slide groove 12 by tightening a nut on the screw rod 3. Through the setting of the slide groove 12, the horizontal axis of the positioning template 2 can be adjusted to meet the construction requirements.
[0025] As a further specific technical solution, in this embodiment, the slide groove 12 is arranged vertically to the rod 11, and the axial direction of the rod 11 is parallel to the axial direction of the positioning template 2, so that the slide groove 12 and the rod 11 are more firmly connected, and after the rod 11 is fixed on the foundation pit, the positioning template 2 can be arranged along the axial direction of the foundation pit, which is more convenient for the stable installation of the anchor bolts.
[0026] As a further specific technical solution, in this embodiment, each group of bolt positioning holes 23 includes eight positioning holes spaced in a circle. Since the long product warehouse building is currently constructed with an independent foundation, each independent foundation has two groups of anchor bolts 4, and each group of anchor bolts 4 includes eight anchor bolts 4, so this setting can fully apply the utility model to the installation of the anchor bolts 4 of the independent foundation. Of course, in other embodiments, a corresponding number of bolt positioning holes 23 can also be set according to construction needs.
[0027] In this embodiment, the screw rod 3 is a full-thread screw rod. By adjusting the full-thread screw rod and the nut on the full-thread screw rod in the vertical direction of the positioning template 2, the installation elevation of the anchor bolt 4 can be located to ensure the precision control of the elevation during the installation process. The screw rod 3 is selected to have a diameter of 42 mm to fully ensure the service life of the screw rod 3.
[0028] As a further specific technical solution, in this embodiment, the rod 11 is made of No. 18 channel steel, and the slide groove 12 is made of No. 16 channel steel. The material source is wide and the service life of the bracket can be guaranteed.
[0029] Example 2
[0030] See also Figures 1 to 3 A foundation bolt positioning and installation tool comprises a bracket 1, a positioning template 2 is provided below the bracket 1, a casting hole 21 is provided in the middle of the positioning template 2, connecting holes 22 are provided at both ends of the positioning template 2, a screw rod 3 is passed through the connecting hole 22, the bracket 1 and the positioning template 2 are fixedly connected by the screw rod 3 and the nut on the screw rod 3; a bolt positioning hole 23 is also provided on the positioning template 2 between the casting hole 21 and the connecting hole 22, so that two groups of bolt positioning holes 23 are provided on the positioning template 2.
[0031] As a further specific technical solution, in this embodiment, the bracket 1 includes two rods 11 arranged at intervals, and the two rods 11 are connected by two slide grooves 12 arranged at intervals, and the slide groove 12 is located directly above the connecting hole 22, so that the screw rod 3 is vertically penetrated through the connecting hole 22 on the slide groove 12, and the screw rod 3 is fixedly connected to the slide groove 12 by tightening a nut on the screw rod 3. Through the setting of the slide groove 12, the horizontal axis of the positioning template 2 can be adjusted to meet the construction requirements.
[0032] As a further specific technical solution, in this embodiment, the slide groove 12 is arranged vertically to the rod 11, and the axial direction of the rod 11 is parallel to the axial direction of the positioning template 2, so that the slide groove 12 and the rod 11 are more firmly connected, and after the rod 11 is fixed on the foundation pit, the positioning template 2 can be arranged along the axial direction of the foundation pit, which is more convenient for the stable installation of the anchor bolts.
[0033] As a further specific technical solution, in this embodiment, each group of bolt positioning holes 23 includes eight positioning holes spaced in a circle. Since the long product warehouse building is currently constructed with an independent foundation, each independent foundation has two groups of anchor bolts 4, and each group of anchor bolts 4 includes eight anchor bolts 4, so this setting can fully apply the utility model to the installation of the anchor bolts 4 of the independent foundation. Of course, in other embodiments, a corresponding number of bolt positioning holes 23 can also be set according to construction needs.
[0034] In this embodiment, the screw rod 3 is a full-thread screw rod. By adjusting the full-thread screw rod and the nut on the full-thread screw rod in the vertical direction of the positioning template 2, the installation elevation of the anchor bolt 4 can be located to ensure the precision control of the elevation during the installation process. The screw rod 3 is selected to have a diameter of 42 mm to fully ensure the service life of the screw rod 3.
[0035] As a further specific technical solution, in this embodiment, the screw rod 3 is provided with scale lines (not shown in the figure), and the adjusted elevation height can be checked through the scale lines.
[0036] As a further specific technical solution, in this embodiment, the rod 11 is a telescopic rod. Since there are different sizes of foundation pits during construction, the telescopic setting of the rod 11 allows the length of the rod 11 to be adjusted according to the size of the foundation pit. If the foundation pit is large, the rod 11 is extended.
[0037] As a further specific technical solution, in this embodiment, the rod 11 is made of No. 18 channel steel, and the slide groove 12 is made of No. 16 channel steel. The material source is wide and the service life of the bracket can be guaranteed.
[0038] The use process of the utility model is: after fixing the rod 11 of the bracket 1 (same as the existing fixing method, generally fixed by screws and pressure plates), the position of the positioning template 2 is adjusted through the horizontal slide 12 and the vertical screw 3, so as to realize the positioning installation of the anchor bolt 4. The construction personnel can use the installation positioning tool of the utility model to locate all the anchor bolts at one time, and continuously fix the anchor bolts during the pouring, which ensures the construction accuracy and improves the work efficiency.
[0039] In summary, the utility model sets a positioning template 2 on the bracket 1, and connects the positioning template 2 to the bracket 1 through a screw rod 3 perpendicular to the positioning template 2, so that the utility model can locate the installation elevation of the anchor bolt 4 by adjusting the screw rod 3 in the vertical direction of the positioning template 2 and the nut on the screw rod 3, thereby ensuring the precision control of the elevation during the installation process. And by setting the bracket 1 to include two rods 11 arranged at intervals, the two rods 11 are firmly connected through two slide grooves 12 arranged at intervals, so that the horizontal axis of the positioning template 2 can be adjusted through the slide groove 12 to meet the construction requirements. Therefore, the utility model is convenient for adjustment during the installation process, has high adjustment accuracy, shortens the installation period, ensures construction accuracy, and improves work efficiency. And by using the utility model to position the anchor bolt, welding operations can be reduced, labor intensity is reduced, and construction safety is improved.
[0040] The utility model was successfully applied in the long product warehouse project of the long product system of Fangchenggang Steel Base Project (Phase I) - the automobile transfer warehouse and train shipping warehouse project. A total of 227 foundations and 454 sets of bolts were constructed in the project. Normally, a group of three people can install four sets of bolts a day. After using the positioning installation tool, a group of three people can install 10 sets of bolts a day. The work efficiency has been greatly improved, the construction period has been greatly shortened, and the labor cost has been reduced. During the period, no safety and quality construction accidents occurred, which has a good social and economic effect.
[0041] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
Claims
1. A foundation bolt positioning and installation tool, Features: It includes a bracket, a positioning template is provided under the bracket, a casting hole is opened in the middle of the positioning template, connecting holes are opened at both ends of the positioning template, screw rods are passed through the connecting holes, and the bracket and the positioning template are fixedly connected by the screw rods and nuts on the screw rods; bolt positioning holes are also opened on the positioning template between the casting hole and the connecting hole, so that two groups of bolt positioning holes are opened on the positioning template.
2. A foundation bolt positioning and installation tool as claimed in claim 1, Features: The bracket includes two rods arranged at intervals, and the two rods are connected by two sliding grooves arranged at intervals. The sliding groove is located directly above the connecting hole, and the screw rod is passed through the sliding groove.
3. A foundation bolt positioning and installation tool as claimed in claim 2, Features: The slide groove is arranged perpendicularly to the rod, and the axial direction of the rod is parallel to the axial direction of the positioning template.
4. A foundation bolt positioning and installation tool as claimed in claim 1, Features: Each group of bolt locating holes includes eight locating holes that are spaced apart and arranged in a circle.
5. The anchor bolt positioning and installation tool according to claim 1, Features: The diameter of the screw rod is 42 mm.
6. A foundation bolt positioning and installation tool as claimed in claim 2, Features: The screw rod is provided with scale lines.
7. A foundation bolt positioning and installation tool as claimed in claim 2, Features: The rod is a telescopic rod.
8. The anchor bolt positioning and installation tool as claimed in claim 2, Features: The rod is made of No. 18 channel steel, and the slide is made of No. 16 channel steel.
