Terminal power utilization monitoring device
The end-point power monitoring device, which uses three circuit boards connected in an H-shape and filled with polyurethane potting compound, solves the installation problem in small installation environments, achieving miniaturization and high safety, and possessing good insulation and anti-interference performance.
Patent Information
- Application Number
- CN202322975333.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-03
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-11-03
AI Technical Summary
Existing end-point power monitoring devices cannot be installed when the installation environment is reduced in size, and their structure is complex.
The device employs a three-circuit board assembly scheme, with the circuit boards connected in an H-shape. The outer casing is secured with clips, and the inner diameter of the wire hole is greater than 16mm². Polyurethane potting compound is used to fill the gaps, achieving miniaturization and insulation of the device.
It enables stable installation of the device in small installation environments, has good insulation performance and anti-interference ability, can accommodate 16mm² wires, and has high safety.
Smart Images

Figure CN221977002U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a monitoring device, in particular to a terminal electricity monitoring device. Background Art
[0002] There are two main types of terminal power monitoring device structures commonly used in the market: the first is that a main MCU board and another circuit board are connected vertically to each other; the second is that a main MCU board and another circuit board are connected in parallel through pins. Both structures can be installed and used normally when the installation environment is large, but they cannot be installed when the installation environment is reduced in size.
[0003] After searching, application publication number CN111736031A discloses an electricity consumption monitoring device and an electricity consumption monitoring method, which specifically discloses: The present invention relates to an electricity consumption monitoring device and an electricity consumption monitoring method, the electricity consumption monitoring device includes a shell, a circuit board and a connecting component, the circuit board includes an electrical parameter measurement circuit, a signal processing circuit and a power supply circuit, the electrical parameter measurement circuit and the signal processing circuit are electrically connected to the power supply circuit respectively, the electrical parameter measurement circuit is used to detect the electrical parameters of the circuit to be monitored, the signal processing circuit is electrically connected to the electrical parameter measurement circuit, the electrical parameter measurement circuit transmits the acquired electrical parameters to the signal processing circuit for processing, the connecting component includes a fixed vertical plate for inserting the open terminal of the circuit to be monitored, and the power supply circuit is electrically connected to the connecting component.
[0004] However, the structure of the device in the application is relatively complex. Therefore, how to design a power consumption monitoring device with a small volume and simple structure while ensuring the function is a technical problem that needs to be solved. Utility Model Content
[0005] The purpose of the utility model is to provide a terminal electricity consumption monitoring device in order to overcome the defects of the prior art such as large size and complex device.
[0006] The purpose of the utility model can be achieved through the following technical solutions:
[0007] According to one aspect of the utility model, there is provided a terminal electricity consumption monitoring device, including a shell, a circuit board, a threading hole, a current transformer and potting glue; a cavity is formed inside the shell, the circuit board is at least two pieces, which are assembled and installed inside the shell, the threading hole passes through the shell, the current transformer is installed inside the shell and sleeved on the outer surface of the threading hole, and the potting glue fills the cavity.
[0008] As a preferred technical solution, there are three circuit boards in total, which are connected to each other in an H shape.
[0009] As a preferred technical solution, the circuit board includes a power circuit board, an EMC circuit board and an MCU circuit board; the power circuit board and the EMC circuit board are parallel to each other; the MCU circuit board is located between the power circuit board and the EMC circuit board and is perpendicular to the power circuit board and the EMC circuit board respectively.
[0010] As a preferred technical solution, the threading hole passes through the MCU circuit board.
[0011] As a preferred technical solution, the shell includes a bottom surface and side surfaces.
[0012] As a preferred technical solution, the power circuit board is horizontally installed on the bottom surface of the housing.
[0013] As a preferred technical solution, a buckle is provided inside the shell, and the buckle is used to fix the circuit board.
[0014] As a preferred technical solution, the threading hole is fixedly connected to the shell.
[0015] As a preferred technical solution, the inner diameter of the threading hole is greater than 16mm 2 Wire diameter.
[0016] As a preferred technical solution, the filling glue is polyurethane.
[0017] Compared with the prior art, the utility model has the following beneficial effects:
[0018] 1) The utility model adopts a circuit board assembly solution, fully utilizing the space inside the housing and reducing the overall volume of the device;
[0019] 2) The utility model has strong safety performance, and the use of potting glue ensures good insulation performance between components, and even if 220V AC power supply is used, safe operation can be guaranteed;
[0020] 3) The utility model has strong anti-interference performance, the fast pulse group can reach ±4000V, the surge can reach ±4000V, and the electrostatic air discharge can reach 15000V;
[0021] 4) The three circuit boards of the utility model are connected to each other in an H-shaped manner, which is stable and can further reduce the size of the device;
[0022] 5) The utility model has a buckle inside the housing to fix the circuit board, making it easy to install and use;
[0023] 6) The inner diameter of the threading hole of the utility model is relatively large, which can be 16mm 2 Wires can pass through without any obstruction. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a three-dimensional cross-sectional view of an implementation method of the utility model;
[0025] Figure 1 As shown in the bid number:
[0026] 1. Shell, 10. Buckle, 20. Power circuit board, 21. EMC circuit board, 22. MCU circuit board, 3. Wire threading hole, 4. Current transformer, 5. Potting glue. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of them. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the utility model.
[0028] like Figure 1 As shown, the utility model provides a terminal electricity consumption monitoring device, including a housing 1, a circuit board, a threading hole 3, a current transformer 4 and a potting glue 5.
[0029] The housing 1 can be designed as a cuboid, including a bottom surface and four side surfaces, with a cavity formed inside for accommodating other components; a buckle 10 is provided on the inner surface thereof for fixing the circuit board.
[0030] The circuit board includes a power circuit board 20, an EMC circuit board 21 and an MCU circuit board 22. The power circuit board 20 and the EMC circuit board 21 are parallel to each other. The MCU circuit board 22 is located between the power circuit board 20 and the EMC circuit board 21 and is perpendicular to the power circuit board 20 and the EMC circuit board 21 respectively. After the three circuit boards are assembled, the whole is in an H shape. During installation, the power circuit board 20 is horizontally installed on the bottom surface of the housing 1.
[0031] The threading hole 3 can be designed as a hollow cylinder, which passes through the housing 1, one end is fixedly connected to the bottom surface of the housing 1, and the other end passes through the MCU circuit board 22. The part overlapping the bottom surface of the housing 1 and the inner cavity of the threading hole 3 is dug out, so that when the wire passes through the threading hole 3, it can completely pass through the device. The inner diameter of the threading hole 3 is greater than 16mm 2 Wire diameter, can be set to 8.3mm, 16mm 2 The wires can be passed through smoothly.
[0032] The potting glue 5 can be made of polyurethane, which has good insulation performance. The potting glue 5 fills every gap in the cavity of the shell 1, which can effectively separate the components and ensure safe operation of the circuit.
[0033] The installation process of the utility model is:
[0034] First, place the current transformer 4 into the housing 1 and securely fit it on the threading hole 3; then assemble the power circuit board 20, the EMC circuit board 21 and the MCU circuit board 22 into an H shape and place them into the housing 1, and fix them with the buckle 10; finally, glue is poured into the entire housing 1, and the potting glue 5 is poured in to fill every gap in the cavity of the housing 1. After the potting glue 5 is cured, the overall installation of the device is completed.
[0035] The utility model has a wide range of applications and can still be used in small installation environments. When the installation volume is 18 mm in width, 44 mm in height, and 17 mm in thickness, the commonly used terminal power monitoring device cannot be installed due to its small volume, but the utility model can be installed smoothly.
[0036] The utility model has good insulation performance while achieving a smaller volume, and the anti-interference performance reaches level 3.
[0037] The above is only a specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the utility model, and these modifications or replacements should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.
Claims
1. A terminal power consumption monitoring device, characterized in that: The invention comprises a shell (1), a circuit board, a threading hole (3), a current transformer (4) and a potting glue (5); a cavity is formed inside the shell (1); the circuit board comprises at least two pieces, which are assembled and installed inside the shell (1); the threading hole (3) passes through the shell (1); the current transformer (4) is installed inside the shell (1) and sleeved on the outer surface of the threading hole (3); and the potting glue (5) is filled in the cavity.
2. A terminal power consumption monitoring device according to claim 1, characterized in that: There are three circuit boards in total, which are connected to each other in an H shape.
3. A terminal power consumption monitoring device according to claim 2, characterized in that: The circuit board comprises a power circuit board (20), an EMC circuit board (21) and an MCU circuit board (22); the power circuit board (20) and the EMC circuit board (21) are parallel to each other; the MCU circuit board (22) is located between the power circuit board (20) and the EMC circuit board (21) and is perpendicular to the power circuit board (20) and the EMC circuit board (21), respectively.
4. The terminal power consumption monitoring device according to claim 3 is characterized in that: The threading hole (3) passes through the MCU circuit board (22).
5. The terminal power consumption monitoring device according to claim 3, characterized in that: The housing (1) comprises a bottom surface and side surfaces.
6. A terminal power consumption monitoring device according to claim 5, characterized in that: The power supply circuit board (20) is horizontally mounted on the bottom surface of the housing (1).
7. The terminal power consumption monitoring device according to claim 1, characterized in that: A buckle (10) is provided inside the housing (1), and the buckle (10) is a buckle (10) used to fix a circuit board.
8. The terminal power consumption monitoring device according to claim 1, characterized in that: The threading hole (3) is fixedly connected to the outer shell (1).
9. The terminal power consumption monitoring device according to claim 1, characterized in that: The inner diameter of the threading hole (3) is greater than 16 mm. 2 Wire diameter.
10. The terminal power consumption monitoring device according to claim 1, characterized in that: The filling glue (5) is polyurethane.
Citation Information
Cited By
Electricity utilization monitoring device
CN224081759U