Hydrogen fuel cell stack testing device

By designing a movable hydrogen fuel cell stack test device, the problems of inconvenience in operation and waste of resources of existing devices are solved, flexible operation and efficient testing are achieved, labor and cost consumption are reduced, and flexible data analysis is supported.

CN221977981UActive Publication Date: 2024-11-08JIANGSU YAOYANG NEW ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323386195.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-11-08
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

The existing hydrogen fuel cell stack testing device is inconvenient to operate, is complicated to disassemble and assemble, consumes a lot of manpower and material resources, and has a large area of ​​high-power test bench, has low equipment utilization rate and high cost. The fixed data format is not conducive to the analysis of results.

Method used

A hydrogen fuel cell stack testing device including a movable cabinet is designed, with built-in air supply pipeline, hydrogen supply pipeline and cooling pipeline, equipped with controller, monitoring equipment and display screen, enabling rapid disassembly and assembly and flexible operation. And it is tested through air compressor, hydrogen circulation pump, heat exchanger and coolant circulation pipeline.

Benefits of technology

It improves the operational flexibility and convenience of hydrogen fuel cell stack testing, reduces manpower consumption, reduces equipment area and operating costs, and supports flexible data analysis and real-time monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221977981U_ABST
    Figure CN221977981U_ABST
Patent Text Reader

Abstract

The utility model discloses a hydrogen fuel cell stack testing device, which integrates testing pipelines in a cabinet body, and comprises an air supply pipeline, a hydrogen supply pipeline and a cooling pipeline, thereby realizing the air tightness and water soaking test of a hydrogen fuel cell. The air supply pipeline is connected with an air pile inlet and an air pile outlet of the test electric pile through an air compressor; the hydrogen supply pipeline is connected with a hydrogen interface and a nitrogen interface which are positioned on the cabinet body through a pipeline through gas inlet of the hydrogen circulating pump, and a hydrogen pile inlet and a hydrogen pile outlet are formed in the cabinet body through a pipeline through gas outlet of the hydrogen circulating pump; the cooling pipeline comprises a heat exchanger arranged in the cabinet body, and a cooling liquid pile inlet and a cooling liquid pile outlet are integrally formed in the cabinet body; the device further comprises a controller, and the controller is used for controlling electrical equipment including the air compressor and the hydrogen circulating pump.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the testing technology of hydrogen fuel cells, and specifically relates to a hydrogen fuel cell stack testing device. Background Art

[0002] With the gradual commercialization of fuel cell electric vehicles, issues such as the stable operation, fault diagnosis and service life of automotive fuel cells have attracted more and more attention. However, there is currently no systematic and mature commercial online technology for automotive fuel cell water fault diagnosis; therefore, water fault diagnosis research is of great research significance to the development of automotive fuel cells. A more commonly used water fault diagnosis method is gas pressure drop detection, which can be used to perform water fault diagnosis online; gas pressure drop detection is more sensitive to water flooding fault detection, has a wider diagnostic range, is simple to calculate, and can achieve water flooding monitoring and early warning; therefore, the development and research of hydrogen fuel cell water fault online diagnosis test equipment is of great research significance to the development of the hydrogen fuel cell industry.

[0003] Most of the existing hydrogen fuel cell stack test benches are of an integrated type, which is inconvenient to disassemble and assemble, and the disassembly and assembly time are long. The disassembly requires a lot of manpower and material resources, and the assembly steps are complicated. When the hydrogen fuel cell stack test bench performs a shell corrosion test on the hydrogen fuel cell stack, personnel are required to put the hydrogen fuel cell stack in and out of the test water tank. The user needs to be in contact with the test water for a long time, and the labor of the user is consumed. When the hydrogen fuel cell stack test bench performs a hydrogen fuel cell stack impact test, the impact device impacts the hydrogen fuel cell stack from a single direction, and personnel are required to manually rotate the hydrogen fuel cell stack to change the impacted part of the hydrogen fuel cell stack, which is extremely inconvenient to use.

[0004] During the production and research and development process, it is necessary to conduct necessary tests on the hydrogen fuel cell stack to ensure that the performance of the hydrogen fuel cell meets expectations. In the prior art, the test of the hydrogen fuel cell stack generally adopts a commercial stack test bench, and its volume increases with the demand for the test power of the stack. The high-power stack test bench occupies a large area in the test workshop, and because the production capacity of the high-power stack is low, the equipment utilization rate is not high, resulting in a waste of resources. Other shortcomings are: the system has high self-consumption and requires a new plant substation; in addition, due to the large size of the equipment, the startup speed is slow; the cost is high; the output data format cannot be modified, which is not conducive to the analysis of the results. Utility Model Content

[0005] Purpose of the utility model: The utility model provides a hydrogen fuel cell stack testing device, which is more flexible and convenient to operate.

[0006] Technical solution: A hydrogen fuel cell stack testing device, comprising a movable cabinet, wherein the cabinet comprises an air supply pipeline, a hydrogen supply pipeline and a cooling pipeline;

[0007] The air supply pipeline includes an air compressor arranged in the cabinet, and an air inlet and an air outlet for connecting the test stack are arranged on the cabinet;

[0008] The hydrogen supply pipeline includes a hydrogen circulation pump arranged in the cabinet, the air inlet of the hydrogen circulation pump is connected to the hydrogen interface and the nitrogen interface on the cabinet through a pipeline, and the air outlet of the hydrogen circulation pump is provided with a hydrogen inlet and a hydrogen outlet on the cabinet through a pipeline;

[0009] The cooling pipeline includes a heat exchanger in the cabinet, the heat exchanger is provided with a cold water inlet and a cold water outlet on the cabinet, another circulation pipeline connected to the heat exchanger is a circulation pipeline of the coolant, and the cabinet is provided with a coolant inlet and a coolant outlet;

[0010] The device also includes a controller, which is used to control electrical equipment including an air compressor and a hydrogen circulation pump.

[0011] Further, at least one of the air supply pipeline, the hydrogen supply pipeline and the cooling pipeline is provided with a monitoring device, and the monitoring device includes at least one of a temperature sensor, a humidity sensor, a pressure sensor, an electronic throttle, a solenoid valve, a liquid sensor and an air flow meter;

[0012] The monitoring device is electrically connected to the controller.

[0013] Furthermore, the external interfaces on the cabinet are all provided with control valves, and sealing covers are also provided to prevent dust from entering the interfaces.

[0014] The interfaces include an air inlet, an air outlet, a hydrogen interface, a nitrogen interface, a hydrogen inlet, a hydrogen outlet, a cold water inlet, a cold water outlet, a coolant inlet and a coolant outlet.

[0015] Furthermore, the device is provided with a warning light, and the warning light is connected to the controller.

[0016] Furthermore, the device is provided with a display screen on the cabinet, and the display screen is connected to the controller and is used to display the values ​​of the monitoring equipment obtained by the controller, including settings for controlling the control parameters of the battery stack test.

[0017] Furthermore, the bottom of the cabinet is provided with moving wheels.

[0018] Furthermore, a water storage tank is provided inside the cabinet for containing deionized water, and a deionized water filling port is provided on the cabinet.

[0019] In the air supply pipeline described in the device, the air outlet of the air compressor is provided with a bypass pipe connected to the air inlet of the air compressor, and the gas output by the air compressor is then divided into two paths, one of which is directly connected to the air inlet on the cabinet, and the other is connected to the air outlet after passing through the humidifier.

[0020] In the hydrogen supply pipeline, the hydrogen interface and the nitrogen interface are mixed through a pipeline and then connected to the ejector. The ejector is connected to the hydrogen inlet on the cabinet through a pipeline. The hydrogen outlet is divided into two paths through a pipeline, one of which returns to the air inlet of the ejector, and the other passes through a hydrogen circulation pump and is then connected to the hydrogen inlet.

[0021] In the cooling pipeline, the cold water inlet and the cold water outlet are connected to the heat exchanger, the coolant in the heat exchanger is connected to the coolant inlet and the coolant outlet through a pipeline, a heater is provided on the circulation pipeline connecting the coolant inlet and the coolant outlet, and a water tank is also provided on the pipeline for storing coolant. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 This is a schematic diagram of the device structure described in the utility model Figure 1 ;

[0023] Figure 2 This is a schematic diagram of the device structure described in the utility model Figure 2 ;

[0024] Figure 3 It is a structural schematic diagram of the air supply pipeline in the cabinet described in the utility model;

[0025] Figure 4 This is a schematic diagram of the structure of the hydrogen supply pipeline in the cabinet of the utility model;

[0026] Figure 5 It is a structural schematic diagram of the cooling pipeline in the cabinet of the utility model. DETAILED DESCRIPTION

[0027] In order to explain the technical solution disclosed by the utility model in detail, a further introduction is given below in conjunction with the drawings in the specification.

[0028] The utility model provides a test device for hydrogen fuel cell airtightness and water flooding, specifically a hydrogen fuel cell test device, the device adopts a movable cabinet 1 design, the size of the cabinet 1 is set to 1150*1400*1500 (mm) in this embodiment. Figure 1 and Figure 2As shown, a display screen 2 is provided on the side of the cabinet 1, a moving wheel 3 is provided at the bottom, and a warning light 4 is provided on the top. The cabinet is provided with an air inlet 12, an air outlet 11, a hydrogen inlet 21, a hydrogen outlet 22, a hydrogen interface 23, a nitrogen interface 24, a cooling inlet 31, a cooling outlet 32, a cold water inlet 33, a cold water outlet 34, and a deionized water filling port 35. When in use, the pipeline connection between the test stack and the test device is a quick-release sanitary chuck, which is convenient for the quick disassembly and replacement of the test stack. The connection method of the cold water inlet and outlet is a quick-release sanitary chuck, the connection method of nitrogen and hydrogen is a high-pressure ferrule joint, and the deionized water filling port is a PC quick connector.

[0029] Combination Figure 3-5 , further illustrating the pipeline structure inside the cabinet 1 of the utility model.

[0030] The structure of the air supply pipeline is as follows Figure 3 As shown, air is input into one end of the air filter 101, and the air is filtered through the air filter 101. According to the flow direction of the air input to the tested battery stack, an air flow meter 103, an air compressor 113 and an intercooler 106 are sequentially arranged, and then the air enters the humidifier 111. The air supply pipeline led out from the intercooler 106 flows back to the output end of the air flow meter 103 through the bypass valve 104, and is connected to the rear section of the electronic throttle valve 108 through the bypass valve 107. The electronic throttle valve 108 also controls the air outlet of the humidifier 111. After passing through the electronic throttle valve 108, the air enters the cathode of the tested battery stack. The air supply pipeline also includes leading the cathode air of the tested battery stack back to the humidifier 111. The humidifier 111 also includes a pipeline connected to the tail exhaust port. The electronic throttle valve 112 is provided on the connection management to realize the control of the discharge or recovery of the excess air. On the air supply pipeline, a temperature sensor 102 is provided at the air input end, a pressure sensor 105 is provided at the front end of the intercooler 106, a temperature and pressure sensor 109 and a humidity sensor 114 are provided after passing through an electronic throttle valve 108, and a temperature and pressure sensor 110 is also provided on the air supply pipeline of the return air of the tested fuel cell stack.

[0031] Figure 4The hydrogen supply pipeline structure shown is used to transport hydrogen to the anode of the tested stack. In the hydrogen supply pipeline, the intake source includes hydrogen and nitrogen mixed, and then enters the anode of the tested stack through the hydrogen cut-off valve 201, the hydrogen proportional valve 203 and the ejector 205 in sequence. The pipeline is provided with a hydrogen pressure sensor 1 202, a hydrogen pressure sensor 204, and a hydrogen temperature and pressure sensor 1 206. A pipeline connected to the tail exhaust port is provided at the outlet end of the ejector 205 through a safety valve 211, and the return air pipeline of the anode of the tested stack includes a hydrogen temperature and pressure sensor 207, and then is returned to the ejector 205 through a water-gas separator 208. The pipeline passing through the water-gas separator 208 is divided into two paths, one is gas and the other is water. Among them, the gas includes the gas returned to the ejector 208 and also includes the gas connected to the tail exhaust port after passing through the exhaust solenoid valve 204, and the water is connected to the tail exhaust port after passing through the drain solenoid valve 213.

[0032] Figure 5 The diagram shows a schematic diagram of the cooling pipeline structure. The cooling module includes a heat exchange plate 302, which includes a cooling circulation pipeline and a coolant circulation pipeline, and is provided with a cold water inlet and an outlet. The coolant comes from the tested battery stack. The coolant outflow end of the tested battery stack is provided with a coolant temperature and pressure sensor 305, and then one path is separated and refluxed to the water storage tank 310, which can be provided with a liquid level sensor, and the other path enters the electronic thermostat 306. The coolant passing through the water storage tank 310 is then connected to the water pump 303 through a pipeline, and then refluxed to the tested battery stack to take away heat, and is also connected to the heat exchange plate 302. A heater is provided on the pipeline from the electronic thermostat 307 to the water pump 303, and a conductivity sensor 308 and a hydrogen sensor 309 are also provided in the water storage tank 310.

[0033] A controller is also provided in the cabinet 1 of the device of the utility model, which is used for data collection and processing of various electronic components and electrical equipment in the above-mentioned pipelines. A processing unit can be set up separately, or an FCU battery controller can be used, and the display is displayed through the display screen 2. The controller includes a control working state for controlling the air compressor, hydrogen circulation pump, water pump and other internal equipment, such as adjusting the electronic throttle, solenoid valve (disc valve), etc. to control and adjust the air intake volume. The control method includes using a touch screen display screen, and also includes setting relevant control parameters accordingly to obtain the test results of the battery stack to be tested, and the function of detecting component abnormalities and hydrogen leakage can also be realized.

[0034] The utility model integrates the fuel cell test system into a cabinet, and the four facades of the cabinet are provided with three areas, namely, the stack interface area, the display control area and the auxiliary interface area. Figure 1-Figure 5 After completing the relevant interface connections, the fuel cell stack test can be carried out. The test principle and process are as follows:

[0035] Before the test starts, the device starts the water pump to add coolant to the fuel cell stack to be tested through the filling button on the display. After the coolant is filled, click the start test button, and the device will automatically complete the fuel cell stack test according to the set parameters. After the test is completed, click the purge button, and the device will automatically purge the stack to ensure that there is no hydrogen residue in the fuel cell stack.

Claims

1. A hydrogen fuel cell stack testing device, comprising a cabinet, characterized in that: The cabinet includes an air supply pipeline, a hydrogen supply pipeline and a cooling pipeline; The air supply pipeline includes an air compressor arranged in the cabinet, and an air inlet and an air outlet for connecting the test stack are arranged on the cabinet; The hydrogen supply pipeline includes a hydrogen circulation pump arranged in the cabinet, the air inlet of the hydrogen circulation pump is connected to the hydrogen interface and the nitrogen interface on the cabinet through a pipeline, and the air outlet of the hydrogen circulation pump is provided with a hydrogen inlet and a hydrogen outlet on the cabinet through a pipeline; The cooling pipeline includes a heat exchanger in the cabinet, the heat exchanger is provided with a cold water inlet and a cold water outlet on the cabinet, another circulation pipeline connected to the heat exchanger is a circulation pipeline of the coolant, and the cabinet is provided with a coolant inlet and a coolant outlet; The device also includes a controller, which is used to control electrical equipment including an air compressor and a hydrogen circulation pump.

2. The hydrogen fuel cell stack testing device according to claim 1, characterized in that: At least one of the air supply pipeline, hydrogen supply pipeline and cooling pipeline is provided with a monitoring device, and the monitoring device includes at least one of a temperature sensor, a humidity sensor, a pressure sensor, an electronic throttle, a solenoid valve, a liquid sensor and an air flow sensor; The monitoring device is electrically connected to the controller.

3. The hydrogen fuel cell stack testing device according to claim 1, characterized in that: The external interfaces on the cabinet are all provided with control valves, and sealing covers are also provided to prevent dust from entering the interfaces. The interfaces include an air inlet, an air outlet, a hydrogen interface, a nitrogen interface, a hydrogen inlet, a hydrogen outlet, a cold water inlet, a cold water outlet, a coolant inlet and a coolant outlet.

4. The hydrogen fuel cell stack testing device according to claim 1, characterized in that: The device is provided with a warning light, and the warning light is connected to the controller.

5. The hydrogen fuel cell stack testing device according to claim 1, characterized in that: The device is provided with a display screen on the cabinet, and the display screen is connected to the controller and is used to display the numerical values ​​of the monitoring equipment obtained by the controller, including the settings for controlling the control parameters of the battery stack test.

6. The hydrogen fuel cell stack testing device according to claim 1, characterized in that: The bottom of the cabinet is provided with moving wheels.

7. The hydrogen fuel cell stack testing device according to claim 1, characterized in that: A water storage tank is arranged inside the cabinet for containing deionized water, and a deionized water filling port is opened on the cabinet.

8. The hydrogen fuel cell stack testing device according to claim 1, characterized in that: In the air supply pipeline, the air outlet of the air compressor is provided with a bypass pipe connected to the air inlet of the air compressor. The gas output by the air compressor is then divided into two paths, one of which is directly connected to the air inlet on the cabinet, and the other is connected to the air outlet after passing through the humidifier.

9. The hydrogen fuel cell stack testing device according to claim 1, characterized in that: In the hydrogen supply pipeline, the hydrogen interface and the nitrogen interface are mixed through a pipeline and then connected to the ejector. The ejector is connected to the hydrogen inlet on the cabinet through a pipeline. The hydrogen outlet is divided into two paths through a pipeline, one of which returns to the air inlet of the ejector, and the other passes through a hydrogen circulation pump and is then connected to the hydrogen inlet.

10. The hydrogen fuel cell stack testing device according to claim 1, characterized in that: In the cooling pipeline, the cold water inlet and the cold water outlet are connected to the heat exchanger, the coolant in the heat exchanger is connected to the coolant inlet and the coolant outlet through a pipeline, a heater is provided on the circulation pipeline connecting the coolant inlet and the coolant outlet, and a water tank is also provided on the pipeline for storing coolant.