Pre-treatment device for wastewater treatment for engineering construction
By designing a pre-treatment device including a sedimentation tank and a water-oil separation unit, the problem of soil, mud, sand and oil pollutants in the construction wastewater is solved, effective sedimentation of wastewater and oil-water separation is achieved, and subsequent treatment efficiency is improved. .
Patent Information
- Application Number
- CN202420589742.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The soil, mud and sand content in the wastewater generated during the construction process is high, and oil pollutants may exist. It is difficult for the existing technology to effectively carry out pre-treatment, which affects the subsequent treatment efficiency.
A pretreatment device including a sedimentation tank and a water-oil separation unit is designed. The sedimentation tank is divided into multiple chambers by a movable partition plate and a fixed partition plate, and is combined with a sediment silt silt and a filter grid for precipitation and filtration. The water-oil separation unit uses hard pipes, hoses and floating plate oil suction ports to separate oil and water.
The sedimentation of wastewater and oil-water separation are achieved, the efficiency of subsequent treatment is improved, and the flexibility and treatment effect of the device are enhanced.
Smart Images

Figure CN221988295U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of wastewater treatment equipment, in particular to a pre-treatment device for wastewater treatment used in engineering construction. Background Art
[0002] A lot of wastewater will be generated during the construction process. With the increasing attention paid to environmental protection, these wastewaters need to be treated to provide green construction. Compared with other industrial wastewater, construction wastewater contains more soil, mud and sand, and needs to be pre-treated to avoid excessive sediment affecting subsequent treatment. In addition, there may be multiple types of wastewater on site, such as wastewater containing only sediment, and wastewater containing oil pollutants in addition to sediment. If all of them are mixed, it will not be conducive to subsequent treatment. Utility Model Content
[0003] The utility model aims to provide a pre-treatment device for wastewater treatment used in engineering construction to solve the problems existing in the prior art.
[0004] In order to achieve the above-mentioned purpose, the technical solution of the utility model provides a pre-treatment device for wastewater treatment for engineering construction, including a sedimentation tank and a water-oil separation unit; the sedimentation tank includes a tank body and a plurality of movable partition plates; the tank body is a cavity structure with an opening at the top, and a plurality of fixed partition plates are arranged inside the tank body, and their height is less than the height of the tank body; fixed protrusion grooves are arranged on the top surface of the fixed partition plate and on the inner side of the tank body above the side of the fixed partition plate, and the movable partition plate can be detachably inserted into the fixed protrusion groove; the water-oil separation unit includes a hard pipe, a hose, and a floating plate oil suction port, the hard pipe can be detachably connected to the side of the tank body, the bottom is connected to the hose, and the other end of the hose is connected to the floating plate oil suction port.
[0005] Preferably, the fixed protrusion groove is a channel steel; a rubber sealing layer is provided on the bottom and side surfaces of the movable partition plate, the rubber sealing layer is a C-shaped structure, a hard rubber sealing strip is provided at the lower part of the rubber sealing layer on the bottom surface of the movable partition plate, a discontinuity with a trapezoidal cross-section is provided in the center of the hard rubber sealing strip, and a trapezoidal protrusion with a shape similar to the discontinuity but a larger cross-sectional size than the discontinuity is provided in the center of the fixed protrusion groove on the top surface of the fixed partition plate at a position corresponding to the discontinuity.
[0006] Preferably, the hardness of the hard rubber sealing strip is greater than that of the rubber sealing layer, but its deformation ability is weaker than that of the rubber sealing layer.
[0007] Preferably, the sedimentation tank also includes a plurality of sediment bins, and a lifting rope is provided on the upper part of the sediment bin.
[0008] Preferably, a water pipe fixing portion is fixed on the side of the mud and sand bin, and the water pipe fixing portion is a tubular structure with a closed bottom, a plurality of through holes distributed in an array are arranged on the bottom side, and a limiting rod is arranged inside the upper part of the through hole.
[0009] Preferably, a filter grid is provided on the top of the sediment bin, and the filter grid is provided with a through hole for inserting a water pipe.
[0010] Preferably, the filter grid comprises an outer frame, and inclined partitions arranged in parallel are provided inside the outer frame. The partitions are divided into two groups, an upper group and an lower group, and the two groups are inclined in opposite directions and are arranged alternately.
[0011] The utility model provides a pre-treatment device for treating wastewater used in engineering construction, which is mainly used for sedimentation cement separation and oil-water separation of engineering wastewater. Part of the pre-treatment operations can be completed on site, which is beneficial to improve the efficiency of subsequent wastewater treatment. For the sedimentation tank, it can be conveniently divided into a plurality of sedimentation bin sections through the design of the partition, thereby improving the flexibility of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the overall solution of the utility model.
[0013] Figure 2 It is an enlarged schematic diagram of the connection area of the movable partition plate of the utility model.
[0014] Figure 3 It is a partially enlarged schematic diagram of the silt bin of the utility model.
[0015] Figure 4 It is a schematic diagram of another implementation of the silt bin of the utility model.
[0016] Figure 5 It is a partial cutaway schematic diagram of another implementation of the sediment bin filtering grid of the utility model.
[0017] Figure 6 It is a schematic diagram of the water-oil separation unit of the utility model. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] As attached Figure 1-6 As shown, the utility model relates to a pre-treatment device for treating engineering construction wastewater, which comprises a sedimentation tank a and a water-oil separation unit b.
[0020] As attached Figure 1 , 2 As shown, the sedimentation tank a includes a tank body 1, a plurality of movable partition plates 2, and a plurality of sediment bins 3.
[0021] The pool body 1 is a cavity structure with an upper opening, preferably a rectangular metal structure, which can be conveniently transported by vehicles. To provide its structural strength, reinforcing ribs can be provided on the outer surface, and its shape can also be specifically designed.
[0022] A plurality of fixed partition plates 11 are arranged inside the pool body 1, and the bottom and side surfaces of the fixed partition plates 11 are respectively fixedly connected to the bottom and side surfaces inside the pool body 1, and the height thereof is smaller than the height of the pool body, preferably 30%-60%, so as to divide the lower part of the pool body 1 into a plurality of chambers.
[0023] A fixed protrusion groove 12 is provided on the top surface of the fixed partition plate 11 and the inner side surface of the pool body 1 above the side surface of the fixed partition plate 11. The movable partition plate 2 can be detachably inserted into the fixed protrusion groove 12 and cooperates with the fixed partition plate 11 to divide the pool body 1 into a plurality of chambers that are not connected to each other.
[0024] The fixed protrusion groove 12 is a channel steel, which is welded to the top surface of the fixed partition plate 11 and the side surface of the fixed partition plate 11 .
[0025] In order to improve the water tightness of the connection between the movable partition plate 2 and the fixed protruding groove 12 , a rubber sealing layer 21 is provided on the bottom surface and the side surface of the movable partition plate 2 .
[0026] The rubber sealing layer 21 is a C-shaped structure, covers the bottom surface and side surfaces of the movable partition plate 2, and extends to the other two side edges.
[0027] Furthermore, a hard rubber sealing strip 22 is provided at the lower part of the rubber sealing layer 21 on the bottom surface of the movable partition plate 2, and a discontinuity 221 with a trapezoidal cross-section is provided in the center of the hard rubber sealing strip 22. At the corresponding position of the discontinuity, that is, in the center of the fixed protrusion groove 12 on the top surface of the fixed partition plate 11, a trapezoidal protrusion 222 with a shape similar to the discontinuity 221 but a larger cross-sectional size is provided.
[0028] When in use, after the movable partition plate 2 is inserted into the fixed protrusion groove 12, under the action of its own weight and the upper locking or pressing structure, the trapezoidal protrusion 222 will squeeze the hard rubber sealing strip 22, so that the hard rubber sealing strip 22 is pressed to both sides to the two sides of the fixed protrusion groove 12.
[0029] The hardness of the hard rubber sealing strip 22 is greater than that of the rubber sealing layer 21 , and the deformation ability is weaker than that of the rubber sealing layer 21 , so that the hard rubber sealing strip 22 moves outward under the action of the trapezoidal protrusion 222 .
[0030] As attached Figure 1 , 3 As shown in Figures 4 and 5, the sediment bin 3 has the same shape and size as the bottom chamber of the pool body 1 separated by the fixed partition plate 11, and a lifting rope 31 is provided on the upper part. After the sediment sedimentation is completed, the sediment bin 3 can be lifted out for processing.
[0031] Furthermore, a water pipe fixing part 32 is fixed on the side of the sediment bin 3. The water pipe fixing part 32 is a tubular structure with a closed bottom. A plurality of through holes 321 distributed in an array are arranged on the bottom side. A limiting rod 322 is arranged inside the upper part of the through hole. When in use, the water pipe is inserted into the water pipe fixing part 32. The wastewater forms a plurality of turbulent flows through the plurality of through holes 321, which is conducive to the stirring of the wastewater and the effect of the precipitation flocculant. The limiting rod 322 is used to prevent the water pipe from being inserted into the bottom of the water pipe fixing part 32 and covering the through hole 321. The edge of at least one of the covered through holes 321 coincides with the upper surface of the bottom sealing plate of the water pipe fixing part 32.
[0032] In another embodiment, a filter grid 33 is disposed on the top of the sediment bin 3 , and the filter grid 33 is provided with a through hole 331 for inserting a water pipe.
[0033] The filter mesh 33 can be a steel mesh, and different apertures can be selected according to needs.
[0034] In another embodiment, the filter grid 33 includes an outer frame 332, and parallel inclined partitions 333 are provided inside the outer frame 332. The partitions 333 are divided into two groups, an upper group and an lower group. The two groups are inclined in opposite directions and are arranged alternately. The height of the inclined partitions 333 in the vertical direction is greater than 50% of the height of the outer frame 332.
[0035] As attached Figure 6 As shown, the water-oil separation unit b includes a hard pipe b1, a soft pipe b2, and a floating plate oil suction port b3. The hard pipe b1 is detachably connected to the side of the pool body 1, and the bottom is connected to the soft pipe b2, and the other end of the soft pipe is connected to the floating plate oil suction port b3.
[0036] The floating plate oil suction port b3 includes a floating block b31 and a filter oil suction plate b32. The floating block b31 is a floating body and can be foam. The filter oil suction plate b32 is a disc-shaped structure with multiple groups of slots arranged on the side.
[0037] It should be noted that, unless otherwise clearly specified and limited, the terms such as "install", "connect", "connect", "fix", "set" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.
Claims
1. A pre-treatment device for wastewater treatment for engineering construction, characterized in that: It includes a sedimentation tank and a water-oil separation unit; the sedimentation tank includes a tank body and a plurality of movable partition plates; the tank body is a cavity structure with an opening at the top, and a plurality of fixed partition plates are arranged inside the tank body, and their height is less than the height of the tank body; fixed protruding grooves are arranged on the top surface of the fixed partition plates and on the inner side of the tank body above the side of the fixed partition plates, and the movable partition plates can be detachably inserted into the fixed protruding grooves; the water-oil separation unit includes a hard pipe, a soft pipe, and a floating plate oil suction port, the hard pipe can be detachably connected to the side of the tank body, the bottom is connected to the soft pipe, and the other end of the soft pipe is connected to the floating plate oil suction port.
2. A pre-treatment device for treating engineering construction wastewater according to claim 1, characterized in that: The fixed protrusion groove is a channel steel; a rubber sealing layer is provided on the bottom and side surfaces of the movable partition plate, the rubber sealing layer is a C-shaped structure, a hard rubber sealing strip is provided at the lower part of the rubber sealing layer on the bottom surface of the movable partition plate, a discontinuity with a trapezoidal cross-section is provided in the center of the hard rubber sealing strip, and a trapezoidal protrusion with a shape similar to the discontinuity but a cross-sectional size larger than the cross-sectional size of the discontinuity is provided in the center of the fixed protrusion groove on the top surface of the fixed partition plate at the position corresponding to the discontinuity.
3. A pre-treatment device for treating construction wastewater according to claim 2, characterized in that: The hardness of the hard rubber sealing strip is greater than that of the rubber sealing layer, but its deformation capacity is weaker than that of the rubber sealing layer.
4. The pre-treatment device for treating construction wastewater according to claim 1, characterized in that: The sedimentation tank also includes a plurality of sediment bins, and a hoisting rope is arranged on the upper part of the sediment bins.
5. A pre-treatment device for treating engineering construction wastewater according to claim 4, characterized in that: A water pipe fixing part is fixed on the side of the sediment bin. The water pipe fixing part is a tubular structure with a closed bottom. A plurality of through holes distributed in an array are arranged on the side of the bottom, and a limiting rod is arranged inside the upper part of the through hole.
6. A pre-treatment device for treating construction wastewater according to claim 4, characterized in that: A filter grid is arranged on the top of the sediment bin, and the filter grid is provided with a through hole for inserting a water pipe.
7. A pre-treatment device for treating engineering construction wastewater according to claim 6, characterized in that: The filter grid comprises an outer frame, and parallel inclined partitions are arranged inside the outer frame. The partitions are divided into two groups, an upper group and an lower group, and the two groups are inclined in opposite directions and are arranged alternately.