Water permeable road structure
By combining concrete curbs, permeable bricks, gravel layers, composite geotextile drainage plates and other components in the permeable road structure, the problems of large burden on cleaning personnel and insufficient support strength in the existing technology are solved, and efficient permeable roads are achieved The design improves the smoothness and aesthetics of the road.
Patent Information
- Application Number
- CN202420538773.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-20
AI Technical Summary
During the cleaning process, the existing permeable road structure has a large burden on staff, and the support strength is limited and uneven, which affects the beauty and pedestrian walking experience.
The combination design is adopted for concrete curbs, permeable bricks, permeable concrete prefabricated slabs, gravel layers, composite geotextile drainage slabs, prefabricated concrete slabs, drainage tanks, reinforced steel bars and permeable pipes to enhance support strength and cleaning convenience.
It has achieved the design of efficient and permeable road structure, improved support strength, convenient cleaning, beautiful appearance and does not affect pedestrian walking, and is suitable for promotion and use.
Smart Images

Figure CN221989012U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a water-permeable road structure, belonging to the technical field of municipal administration. Background Art
[0002] Municipal roads refer to the road structure layer that is laid on the top of the roadbed with building materials for vehicles to drive directly on. The road structure layer has the functions of bearing the weight of vehicles, resisting wheel wear and keeping the road surface flat. As a new type of environmentally friendly and ecological road, permeable roads are increasingly attracting attention from people, especially the industry.
[0003] Patent No.: CN216712615U, mentions a highly permeable structure for municipal roads, in which the rainwater on the side wall of the high plate in the device is arranged to facilitate the rainwater on the side wall of the elevated plate to flow into the arc groove through the arrangement of the drainage groove, and then flow into the water channel through the arc groove to be discharged, and the water channel is connected to the sewer under the road, and the rainwater flows away through the sewer. This makes it convenient for pedestrians to walk on the elevated plate, and when a large number of impurities such as fallen leaves accumulate in the arc groove, the staff manually rotates the rotating roller, and the cleaning brush rotates in the arc groove through the rotating roller, so as to clean out the fallen leaves and other impurities in the arc groove, but the municipal road is long, and the length of the rotating roller in the device is limited, and it needs to be used in large quantities. In this process, the cleaning staff needs to manually rotate the rotating roller one by one, which greatly increases their workload. At the same time, the supporting strength is limited, the road is uneven and not beautiful enough, and it will also affect pedestrians' walking, which is inconvenient to promote and use. Now a permeable road structure is urgently needed to solve the above problems. Utility Model Content
[0004] In view of the shortcomings of the prior art, the purpose of the utility model is to provide a permeable road structure to solve the problems raised in the above-mentioned background technology. The utility model has a reasonable structure and good practicality. A road structure with good permeability and supporting strength is designed to be easy to promote and use. At the same time, the road surface is flat, which is convenient for cleaning personnel to quickly clean the road. It is more beautiful and will not affect pedestrians.
[0005] In order to achieve the above-mentioned purpose, the utility model is realized through the following technical scheme: a permeable road structure, including a concrete curb, a permeable concrete precast slab, a composite geotextile drainage board, a precast concrete slab and a permeable pipe, wherein two concrete curbs are symmetrically arranged, and a plurality of precast concrete slabs are arranged at the inner lower ends of the two concrete curbs from front to back, and reinforcing steel bars are arranged at the upper and lower ends of the multiple precast concrete slabs, and permeable pipes are arranged transversely through the interiors of the multiple precast concrete slabs, and drainage grooves are opened at the upper ends of the multiple precast concrete slabs, and a plurality of spare drainage pipes are arranged at equal distances through the side surfaces of the two concrete curbs from front to back, and a plurality of permeable bricks are arranged on the left and right sides of the upper ends of the two concrete curbs from front to back, and a permeable concrete precast slab is laid between the multiple permeable bricks, and a gravel layer is arranged at the lower end of the permeable concrete precast slab, and a composite geotextile drainage board is laid at the lower end of the gravel layer.
[0006] Furthermore, a foundation stone layer is provided at the lower ends of the two concrete curbs.
[0007] Furthermore, the plurality of water-permeable pipes are respectively located below the plurality of drainage grooves, and the plurality of water-permeable pipes are respectively communicated with the plurality of drainage pipes.
[0008] Furthermore, the composite geotextile drainage board is located on the upper side of multiple precast concrete slabs.
[0009] Furthermore, the plurality of reinforcing steel bars on the upper side are located in a plurality of drainage grooves.
[0010] Furthermore, the composite geotextile drainage board is attached to a plurality of reinforcing steel bars on the upper side.
[0011] The beneficial effects of the utility model are as follows: a permeable road structure of the utility model, because the utility model adds concrete curbs, permeable bricks, permeable concrete prefabricated panels, gravel layers, composite geotextile drainage panels, prefabricated concrete panels, drainage grooves, reinforced steel bars, permeable pipes and spare drainage pipes, our design improvements and actual use have shown that the device has good practicality, and a road structure with good permeability and supporting strength is designed, which is easy to promote and use. At the same time, the road surface is flat, which is convenient for cleaning personnel to quickly clean the road, is more beautiful, and will not affect pedestrians. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
[0013] Figure 1 It is a three-dimensional schematic diagram of the overall structure of a permeable road structure of the utility model;
[0014] Figure 2It is a cross-sectional schematic diagram of a permeable road structure of the utility model;
[0015] Figure 3 It is a three-dimensional schematic diagram of a prefabricated concrete slab of a permeable road structure of the utility model;
[0016] In the figure: 1-concrete curb, 2-permeable brick, 3-permeable concrete precast slab, 4-gravel layer, 5-composite geotextile drainage board, 6-precast concrete slab, 61-drainage trough, 62-reinforced steel bar, 63-permeable pipe, 7-bedstone layer, 8-spare drainage pipe. DETAILED DESCRIPTION
[0017] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0018] See also Figure 1-Figure 3 The utility model provides a technical solution: a permeable road structure, including a concrete curb 1, a permeable concrete precast panel 3, a composite geotextile drainage board 5, a precast concrete panel 6 and a permeable pipe 63. Two concrete curbs 1 are symmetrically arranged, and a plurality of precast concrete panels 6 are arranged at the lower inner ends of the two concrete curbs 1 from front to back. Reinforced steel bars 62 are arranged at the upper and lower ends of the multiple precast concrete panels 6. Permeable pipes 63 are transversely penetrated inside the multiple precast concrete panels 6. Drainage grooves 61 are opened at the upper ends of the multiple precast concrete panels 6. A plurality of spare drainage pipes 8 are penetrated at equal distances from front to back on the side surfaces of the two concrete curbs 1. A plurality of permeable bricks 2 are arranged on the left and right sides of the upper ends of the two concrete curbs 1 from front to back. Permeable concrete precast panels 3 are laid between the multiple permeable bricks 2. A gravel layer 4 is arranged at the lower end of the permeable concrete precast panel 3. A composite geotextile drainage board 5 is laid at the lower end of the gravel layer 4. This design solves the problem that the original device is not practical and not beautiful enough.
[0019] As the first embodiment of the utility model: the lower ends of the two concrete curbs 1 are provided with a foundation stone layer 7, and the added foundation stone layer 7 facilitates the overall laying of the device. Multiple water-permeable pipes 63 are respectively located below multiple drainage grooves 61, and multiple water-permeable pipes 63 are respectively connected to multiple drainage pipes 8. The added multiple water-permeable pipes 63 are a new type of pipe with the function of reverse filtration and drainage. It overcomes many disadvantages of other drainage pipes. Due to its unique product design principle and excellent performance of the constituent materials, it has strong drainage and water seepage effects. It uses the "capillary" phenomenon and the "siphon" principle, and integrates water absorption, water permeation, and drainage in one go. It has the pressure resistance, water permeability, and reverse filtration that meet the requirements of engineering design. It does not break due to geological and geographical temperature changes.
[0020] The composite geotextile drainage board 5 is located on the upper side of the multiple precast concrete slabs 6. The added composite geotextile drainage board 5 can filter the rainwater that penetrates into the gravel layer 4 to prevent the gravel particles carried by it from clogging the permeable pipe 63. The multiple reinforcing steel bars 62 on the upper side are located in the multiple drainage grooves 61. The added multiple reinforcing steel bars 62 can improve the support strength of the precast concrete slabs 6, and can also support the composite geotextile drainage board 5 at the multiple drainage grooves 61. The composite geotextile drainage board 5 is attached to the multiple reinforcing steel bars 62 on the upper side.
[0021] As the second embodiment of the utility model: in actual use, rainwater penetrates downward into the gravel layer 4 through the permeable bricks 2 and the permeable concrete prefabricated panels 3, and then penetrates downward from the gravel layer 4 to the composite geotextile drainage board 5, and the composite geotextile drainage board 5 can filter the rainwater that penetrates into the gravel layer 4, so that the filtered rainwater will flow through the drainage trough 61 to multiple permeable pipes 63, and the added multiple permeable pipes 63 are a new type of pipe with a reverse filtering (draining) water function, which overcomes many disadvantages of other drainage pipes. Due to its unique product design principle and the excellent performance of its constituent materials, it has strong drainage and water infiltration effects, utilizes the "capillary" phenomenon and the "siphon" principle, and integrates water absorption, water permeability, and drainage in one go, and finally it will be discharged to the outside through multiple spare drainage pipes 8.
[0022] The above shows and describes the basic principles and main features of the utility model and the advantages of the utility model. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above exemplary embodiments, and can be implemented in other specific forms without departing from the spirit or basic features of the utility model. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the utility model is defined by the attached claims rather than the above description, and it is intended to include all changes within the meaning and scope of the equivalent elements of the claims. Any figure mark in the claims should not be regarded as limiting the claims involved.
[0023] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A permeable road structure, comprising a concrete curb (1), a permeable concrete prefabricated slab (3), a composite geotextile drainage board (5), a prefabricated concrete slab (6) and a permeable pipe (63), characterized in that: Two concrete curbs (1) are symmetrically arranged, and a plurality of precast concrete slabs (6) are arranged at the inner lower ends of the two concrete curbs (1) from front to back, and reinforcing steel bars (62) are arranged at the upper and lower ends of the plurality of precast concrete slabs (6), and water-permeable pipes (63) are arranged transversely through the interior of the plurality of precast concrete slabs (6), and drainage grooves (61) are arranged at the upper ends of the plurality of precast concrete slabs (6); A plurality of spare drainage pipes (8) are provided at equal distances from the front to the back on the side surfaces of the two concrete curbs (1); a plurality of permeable bricks (2) are provided on the left and right sides of the upper ends of the two concrete curbs (1) from the front to the back; a permeable concrete prefabricated slab (3) is laid between the plurality of permeable bricks (2); a gravel layer (4) is provided at the lower end of the permeable concrete prefabricated slab (3); and a composite geotextile drainage board (5) is laid at the lower end of the gravel layer (4).
2. A permeable road structure according to claim 1, characterized in that: A foundation stone layer (7) is provided at the lower ends of the two concrete curbs (1).
3. A permeable road structure according to claim 1, characterized in that: The plurality of water-permeable pipes (63) are respectively located below the plurality of drainage grooves (61), and the plurality of water-permeable pipes (63) are respectively connected to the plurality of drainage pipes (8).
4. A permeable road structure according to claim 1, characterized in that: The composite geotextile drainage board (5) is located on the upper side of a plurality of prefabricated concrete slabs (6).
5. The permeable road structure according to claim 1, characterized in that: The plurality of reinforcing steel bars (62) on the upper side are located in the plurality of drainage grooves (61).
6. A permeable road structure according to claim 1, characterized in that: The composite geotextile drainage board (5) is attached to a plurality of reinforcing steel bars (62) on the upper side.