Staircase finalization rapid turnover operation platform

By designing a simple structure stairwell operating platform, the problems of complex structures and safety risks in the existing technology are solved, rapid assembly and safe construction are achieved, and construction personnel are avoided injuries and damage to concrete structure beams are ensured, and construction progress is ensured.

CN221989848UActive Publication Date: 2024-11-12SHAANXI CONSTR ENG HUAXIN DINGYE ENG EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420547715.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2024-11-12
Estimated Expiration
2034-03-20

AI Technical Summary

Technical Problem

The existing stairwell operating platform has complex structure, cumbersome disassembly and high safety risks, construction personnel have difficulty passing up and down, and are easily subject to the risk of falling objects above during construction. The connection with concrete structure beams may cause damage, affecting the construction progress.

Method used

A stairwell fixed fast turnover operation platform including operating platform and adjustment support was designed. Through components such as frame columns, steps, adjustment rods, flip plates and guardrails, simple assembly and safety protection are achieved, and the concrete structural beams are avoided. Direct connection.

Benefits of technology

It achieves simple structure and convenient assembly and disassembly, reduces safety risks, avoids injuries to construction personnel, reduces damage to concrete structural beams, and ensures the convenience of construction progress and process interspersion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989848U_ABST
    Figure CN221989848U_ABST
Patent Text Reader

Abstract

The utility model discloses a staircase finalization rapid turnover operation platform, which comprises an operation platform and an adjusting support, the operation platform comprises four frame columns, an upper layer step and a lower layer step, and a first erecting turning plate erected on a third layer concrete structural beam is arranged at the bottom between a second frame column and a fourth frame column. A second erecting turning plate erected on a fourth-layer concrete structural beam is arranged in the middle of the position between the first frame column and the third frame column, and a third erecting turning plate erected on a fifth-layer concrete structural beam is arranged on the top of the position between the second frame column and the fourth frame column. A first protection turning plate and a second protection turning plate are arranged on the outer sides of the left and right sides of the four frame columns, and a cover plate supporting frame and a cover plate are arranged at the top of the operation platform. The structure is simple, assembly and disassembly are convenient, the safety protection function is achieved, safety risks are eliminated, the construction space is safe, erecting turning plates of all layers do not need to be tied or connected with concrete structural beams, and working procedure interpenetration and engineering construction progress are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of stairwell operating platforms, and in particular relates to a stairwell standardized fast-turnover operating platform. Background Art

[0002] At present, prefabricated buildings have been fully promoted, and the construction industry has made breakthrough progress. Now most residential stairwells use the model of prefabricated stairs combined with composite panels. In the stairwell of prefabricated stairs, the prefabricated stairs often need to be installed in layers, which makes the construction height of the side wall of the stairwell too high, making it difficult for construction workers to go up and down, and prone to safety accidents. Therefore, the use of stairwell operating platforms is essential. Most of the existing stairwell operating platforms have complex structures, cumbersome disassembly and assembly, and high safety risks; secondly, during the construction of the stairwell, small stones and other objects falling from above can easily injure construction workers under the frame; in addition, most of the existing stairwell operating platforms need to be tied or connected to the completed concrete structural beams, which causes certain damage to the completed concrete structural beams and needs to be repaired later, which has a certain impact on the interlacing of construction processes and the progress of engineering construction. Utility Model Content

[0003] The technical problem to be solved by the utility model is to provide a standardized fast-turnover operation platform for stairwells in view of the deficiencies in the above-mentioned prior art.

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: a standardized fast-turnover operating platform for stairwells, characterized in that it includes an operating platform and an adjustment support located at the bottom of the operating platform, the operating platform includes a first frame column, a second frame column, a third frame column, a fourth frame column, and upper steps and lower steps fixed in the four frame columns in an up-and-down staggered manner, the adjustment support includes a first support adjustment rod arranged at the bottom of the first frame column, a second support adjustment rod arranged at the bottom of the second frame column, and a third support adjustment rod arranged at the bottom of the third frame column, the bottom of the first support adjustment rod is arranged on a high-position step of the lower prefabricated stairs between the first-layer concrete structural beam and the second-layer concrete structural beam, the bottom of the second support adjustment rod is arranged on a low-position step of the lower prefabricated stairs, and the bottom of the third support adjustment rod is arranged on a low-position step of the upper prefabricated stairs between the second-layer concrete structural beam and the third-layer concrete structural beam. The bottom of the fourth frame column is arranged on a high step of the upper prefabricated stairs, a first connecting rod for installing a first erected flap is arranged at the bottom between the second frame column and the fourth frame column, the first erected flap is erected on the third-layer concrete structural beam, a second connecting rod for installing a second erected flap is arranged in the middle between the first frame column and the third frame column, the second erected flap is erected on the fourth-layer concrete structural beam, a third connecting rod for installing a third erected flap is arranged at the top between the second frame column and the fourth frame column, the third erected flap is erected on the fifth-layer concrete structural beam, a first upper beam is arranged at the top between the first frame column and the second frame column, the outer side of the first upper beam is connected with a first protective flap by a hinge, a second upper beam is arranged at the top between the third frame column and the fourth frame column, the outer side of the second upper beam is connected with a second protective flap by a hinge, a cover plate support frame is arranged at the top of the operating platform, and a cover plate is arranged at the top of the cover plate support frame.

[0005] The above-mentioned standardized fast-turnover operation platform in the stairwell is characterized in that lower side rails are arranged on both sides of the lower steps, upper side rails are arranged on both sides of the upper steps, and a top guardrail is arranged on the top of the operation platform and next to the upper side rails.

[0006] The above-mentioned standardized rapid turnover operation platform for stairwells is characterized in that: a first middle beam is arranged in the middle between the first frame column and the second frame column, a second middle beam is arranged in the middle between the third frame column and the fourth frame column, a third middle beam is arranged in the middle between the first frame column and the third frame column, a first corbel is arranged on the beam section of the third middle beam located beside the lower step, a second corbel is arranged on the second middle beam, a third corbel is arranged in the middle of the side wall of the fourth frame column facing the second frame column, and an operating panel is detachably installed on the top of the first corbel, the second corbel and the third corbel.

[0007] The above-mentioned standardized fast-turnover operating platform for stairwells is characterized in that: the operating panel is connected to the first corbel by a first bolt, the operating panel is connected to the second corbel by a second bolt, and the operating panel is connected to the third corbel by a third bolt.

[0008] The above-mentioned standardized fast-turnover operating platform for stairwells is characterized in that the first frame column and the first support adjustment rod, the second frame column and the second support adjustment rod, and the third frame column and the third support adjustment rod can all be detachably connected.

[0009] The above-mentioned standardized rapid turnover operating platform for stairwells is characterized in that the tops of the first support adjustment rod, the second support adjustment rod and the third support adjustment rod are all provided with clamping plates.

[0010] The above-mentioned standardized rapid turnover operation platform for stairwells is characterized in that the height of the cover plate support frame is 2m.

[0011] The above-mentioned standardized rapid turnover operation platform in the stairwell is characterized in that the width of the operation panel is equal to the width of the upper steps.

[0012] The beneficial effects of the utility model are that the design is novel and reasonable, the structure is simple, the assembly and disassembly are convenient, and the safety protection function is met to eliminate safety risks. A safe construction space is formed by the cover plate at the top center position and the first protective flap, the second protective flap, the first erection flap, the second erection flap, and the third erection flap to prevent small stones and other objects from falling from above and injuring construction workers under the frame during stair construction. In addition, the first erection flap, the second erection flap, and the third erection flap do not need to be tied or connected to the completed concrete structural beams, and there is no damage to the completed concrete structural beams. The problem of supporting the side wall formwork of the stairwell and the problem of difficulty in up and down movement of personnel are solved, the interlacing of work processes and the progress of engineering construction are guaranteed, and it is easy to promote and use.

[0013] The technical solution of the utility model is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a usage state diagram of the utility model.

[0015] Figure 2 for Figure 1 Right side view of the operating platform.

[0016] Description of reference numerals:

[0017] 1—concrete structural beam of the first floor; 2—concrete structural beam of the second floor;

[0018] 3—concrete structural beam of the third floor; 4—concrete structural beam of the fourth floor;

[0019] 5—concrete structural beams of the fifth floor; 6—precast stairs of the lower floor;

[0020] 7—upper prefabricated staircase; 8—first support adjustment rod; 9—second support adjustment rod;

[0021] 10—first frame column; 11—second frame column; 12—fourth frame column;

[0022] 13—first middle beam; 14—third middle beam; 15—first upper beam;

[0023] 16—first protective flap; 17—second protective flap; 18—first erection flap;

[0024] 19—Second erection flap; 20—Third erection flap; 21—Lower step;

[0025] 22—lower side rail; 23—upper step; 24—upper side rail;

[0026] 25—top guardrail; 26—cover support frame; 27—cover;

[0027] 28—first corbel; 29—third corbel; 30—first bolt;

[0028] 31—the third bolt; 32—the operating panel. DETAILED DESCRIPTION

[0029] like Figure 1 and Figure 2As shown, the utility model includes an operating platform and an adjustment support located at the bottom of the operating platform, the operating platform includes a first frame column 10, a second frame column 11, a third frame column, a fourth frame column 12, and an upper step 23 and a lower step 21 located in the four frame columns and fixed in an up-and-down staggered manner, the adjustment support includes a first support adjustment rod 8 arranged at the bottom of the first frame column 10, a second support adjustment rod 9 arranged at the bottom of the second frame column 11, and a third support adjustment rod arranged at the bottom of the third frame column, the bottom of the first support adjustment rod 8 is arranged on a high step of a lower prefabricated staircase 6 between a first-layer concrete structural beam 1 and a second-layer concrete structural beam 2, the bottom of the second support adjustment rod 9 is arranged on a low step of the lower prefabricated staircase 6, the bottom of the third support adjustment rod is arranged on a low step of an upper prefabricated staircase 7 between the second-layer concrete structural beam 2 and the third-layer concrete structural beam 3, and the bottom of the fourth frame column 12 is arranged on a high step of the upper prefabricated staircase 7 In the above steps, a first connecting rod for installing a first erected flap 18 is arranged at the bottom between the second frame column 11 and the fourth frame column 12, and the first erected flap 18 is erected on the third-layer concrete structural beam 3, a second connecting rod for installing a second erected flap 19 is arranged in the middle between the first frame column 10 and the third frame column, and the second erected flap 19 is erected on the fourth-layer concrete structural beam 4, a third connecting rod for installing a third erected flap 20 is arranged at the top between the second frame column 11 and the fourth frame column 12, and the third erected flap 20 is erected on the fifth-layer concrete structural beam 5, a first upper beam 15 is arranged at the top between the first frame column 10 and the second frame column 11, and the outer side of the first upper beam 15 is connected to the first protective flap 16 by a hinge, a second upper beam is arranged at the top between the third frame column and the fourth frame column 12, and the outer side of the second upper beam is connected to the second protective flap 17 by a hinge, a cover support frame 26 is arranged on the top of the operating platform, and a cover 27 is arranged on the top of the cover support frame 26.

[0030] It should be noted that the operating platform has a simple structure, is easy to assemble and disassemble, and meets the safety protection function to eliminate safety risks. A safe construction space is formed by the cover plate at the top center and the first protective flap, the second protective flap, the first erection flap, the second erection flap, and the third erection flap to prevent small stones and other objects from falling from above and injuring construction workers under the frame during stair construction. In addition, the first erection flap, the second erection flap, and the third erection flap do not need to be tied or connected to the completed concrete structural beams, and there is no damage to the completed concrete structural beams. This solves the problem of supporting the side wall formwork of the stairwell and the problem of difficulty in up and down movement of personnel, thereby ensuring the interweaving of work processes and the progress of the project construction.

[0031] In this embodiment, lower side rails 22 are provided on both sides of the lower step 21 , upper side rails 24 are provided on both sides of the upper step 23 , and a top guardrail 25 is provided on the top of the operating platform and beside the upper side rails 24 .

[0032] In this embodiment, a first middle beam 13 is provided in the middle between the first frame column 10 and the second frame column 11, a second middle beam is provided in the middle between the third frame column 12, a third middle beam 14 is provided in the middle between the first frame column 10 and the third frame column, a first corbel 28 is provided on the beam section of the third middle beam 14 located beside the lower step 21, a second corbel is provided on the second middle beam, and a third corbel 29 is provided in the middle of the side wall of the fourth frame column 12 facing the second frame column 11, and an operating panel 32 is detachably installed on the top of the first corbel 28, the second corbel and the third corbel 29.

[0033] It should be noted that the middle part of the operating platform is located beside the lower step 21 and below the upper step 23, and the height difference is too large. By installing a detachable operating panel 32, it is convenient for construction workers to construct at this position.

[0034] In this embodiment, the operating plate 32 is connected to the first corbel 28 via a first bolt 30 , the operating plate 32 is connected to the second corbel via a second bolt, and the operating plate 32 is connected to the third corbel 29 via a third bolt 31 .

[0035] In this embodiment, the first frame column 10 and the first support adjustment rod 8, the second frame column 11 and the second support adjustment rod 9, and the third frame column and the third support adjustment rod are all detachably connected.

[0036] In this embodiment, the tops of the first support adjustment rod 8 , the second support adjustment rod 9 and the third support adjustment rod are all provided with a clamping plate.

[0037] It should be noted that the tops of the first support adjustment rod 8 , the second support adjustment rod 9 and the third support adjustment rod are all provided with a clamping plate to increase the contact area between the support adjustment rod and the lower step 21 and the upper step 23 to maintain stability.

[0038] In this embodiment, the height of the cover plate support frame 26 is 2m.

[0039] It should be noted that the height of the cover plate support frame 26 is 2 m, which meets the standing height of construction workers.

[0040] In this embodiment, the width of the operating plate 32 is equal to the width of the upper step 23 .

[0041] The above is only a preferred embodiment of the present invention and does not constitute any limitation to the present invention. Any simple modification, change and equivalent structural change made to the above embodiments according to the technical essence of the present invention shall still fall within the protection scope of the technical solution of the present invention.

Claims

1. A standardized fast-turnaround operating platform for stairwells. Features: The invention comprises an operating platform and an adjustment support located at the bottom of the operating platform, wherein the operating platform comprises a first frame column (10), a second frame column (11), a third frame column, a fourth frame column (12), and an upper step (23) and a lower step (21) located in the four frame columns and fixed in an up-down offset manner, wherein the adjustment support comprises a first support adjustment rod (8) arranged at the bottom of the first frame column (10), a second support adjustment rod (9) arranged at the bottom of the second frame column (11), and a third support adjustment rod arranged at the bottom of the third frame column, wherein the first support adjustment rod The bottom of the section rod (8) is arranged on a high step of the lower prefabricated staircase (6) between the first concrete structural beam (1) and the second concrete structural beam (2), the bottom of the second support adjustment rod (9) is arranged on a low step of the lower prefabricated staircase (6), the bottom of the third support adjustment rod is arranged on a low step of the upper prefabricated staircase (7) between the second concrete structural beam (2) and the third concrete structural beam (3), the bottom of the fourth frame column (12) is arranged on a high step of the upper prefabricated staircase (7), and the second frame column (13) is arranged on a high step of the lower prefabricated staircase (6). A first connecting rod for installing a first erection flap (18) is arranged at the bottom between the first frame column (11) and the fourth frame column (12), and the first erection flap (18) is erected on the third-story concrete structure beam (3). A second connecting rod for installing a second erection flap (19) is arranged in the middle between the first frame column (10) and the third frame column, and the second erection flap (19) is erected on the fourth-story concrete structure beam (4). A third connecting rod for installing a third erection flap (20) is arranged at the top between the second frame column (11) and the fourth frame column (12). The third flap (20) is erected on the fifth-floor concrete structure beam (5); a first upper beam (15) is arranged at the top between the first frame column (10) and the second frame column (11); a first protective flap (16) is connected to the outer side of the first upper beam (15) via a hinge; a second upper beam is arranged at the top between the third frame column and the fourth frame column (12); a second protective flap (17) is connected to the outer side of the second upper beam via a hinge; a cover support frame (26) is arranged at the top of the operating platform; a cover (27) is arranged at the top of the cover support frame (26).

2. A standardized fast-turnaround operating platform for stairwells according to claim 1, Features: Lower side rails (22) are arranged on both sides of the lower step (21), upper side rails (24) are arranged on both sides of the upper step (23), and a top guardrail (25) is arranged on the top of the operating platform and beside the upper side rails (24).

3. A standardized fast-turnaround operating platform for stairwells according to claim 1, Features: A first middle beam (13) is arranged in the middle between the first frame column (10) and the second frame column (11), a second middle beam is arranged in the middle between the third frame column and the fourth frame column (12), a third middle beam (14) is arranged in the middle between the first frame column (10) and the third frame column, a first corbel (28) is arranged on the beam section of the third middle beam (14) located beside the lower step (21), a second corbel is arranged on the second middle beam, a third corbel (29) is arranged in the middle of the side wall of the fourth frame column (12) facing the second frame column (11), and an operating panel (32) is detachably mounted on the top of the first corbel (28), the second corbel and the third corbel (29).

4. A standardized fast-turnaround operating platform for stairwells according to claim 3, Features: The operating plate (32) is connected to the first bracket (28) via a first bolt (30), the operating plate (32) is connected to the second bracket via a second bolt, and the operating plate (32) is connected to the third bracket (29) via a third bolt (31).

5. According to the stairwell standardized rapid turnover operation platform as claimed in claim 1, Features: The first frame column (10) and the first support adjustment rod (8), the second frame column (11) and the second support adjustment rod (9), and the third frame column and the third support adjustment rod are all detachably connected.

6. According to the stairwell standardized rapid turnover operation platform as claimed in claim 1, Features: The tops of the first support adjustment rod (8), the second support adjustment rod (9) and the third support adjustment rod are all provided with a clamping plate.

7. According to the stairwell standardized rapid turnover operation platform as claimed in claim 1, Features: The height of the cover plate support frame (26) is 2m.

8. According to the stairwell standardized rapid turnover operation platform as claimed in claim 3, Features: The width of the operating plate (32) is equal to the width of the upper step (23).