Scaffold steel pipe holding device
By designing a scaffolding steel pipe grip device, the steel pipe is clamped by the cooperation of threaded shafts and thread blocks, the problem of inconvenient steel pipe assembly is solved and the simplicity and efficiency of assembly is achieved.
Patent Information
- Application Number
- CN202420152692.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-22
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-01-22
AI Technical Summary
In construction, horizontal and vertical steel pipes are not convenient to assemble and fix together, resulting in a cumbersome and time-consuming and laborious assembly process.
A scaffolding steel pipe grip device is designed, including two rectangular fixing plates and ply plates. Through the cooperation of threaded shafts and threaded blocks, the handle is used to drive the threaded shaft to rotate. The ply plate can clamp the steel pipes, achieving simple fixation of horizontal and vertical steel pipes.
Through this device, the horizontal and vertical steel pipes can be assembled and fast and fast together, simplifying the assembly process and saving time and labor.
Smart Images

Figure CN221989868U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of scaffold erection, in particular to a scaffold steel pipe holding device. Background Art
[0002] With the development of society and the improvement of construction level, steel pipes are often used as supporting materials for building facilities such as scaffolding in the construction process. Steel pipes are steel with hollow cross-sections, and their length is much larger than their diameter or circumference. The cross-sectional shape of steel pipes is mostly circular. Current scaffolding needs to be assembled with steel pipes when in use. However, when assembling scaffolding with steel pipes, it is not convenient to assemble and fix the horizontal steel pipes and the vertical steel pipes together, and the assembly process is troublesome, time-consuming and labor-intensive.
[0003] Therefore, the known horizontal steel pipe and vertical steel pipe are not convenient to be assembled and fixed together, and there are the above-mentioned inconveniences and problems. Utility Model Content
[0004] The purpose of the utility model is to provide a safe and reliable scaffolding steel pipe holding device.
[0005] To achieve the above purpose, the technical solution of the utility model is:
[0006] A scaffolding steel pipe holding device comprises a first fixing plate and a second fixing plate, the first fixing plate and the second fixing plate have the same appearance and internal structure, the two fixing plates are rectangular blocks, one side of the two rectangular blocks are cross-intersected and fixed together, the other side of the two rectangular blocks is provided with a clamping plate movable in the groove through a groove, one end of the clamping plate is a semicircular shape for matching, and the other end of the clamping plate is a threaded block; the length of the two rectangular blocks is inserted into an adjustment rod for the movable clamping plate through a through hole toward the top, one end of the adjustment rod is a handle placed on the outside of the rectangular block, and the other end is accommodated in the internal cavity of the rectangular block, characterized in that: a second fixing plate is provided on the outside of the first fixing plate, the second fixing plate is fixedly connected to the first fixing plate, a first handle is provided on the first fixing plate, the first handle passes through the first fixing plate, and a second handle is provided on the second fixing plate, and the second handle passes through the first fixing plate;
[0007] The other end of the first handle is fixedly connected to the first threaded shaft, the other end of the first threaded shaft is provided with a first connecting shaft, the first connecting shaft is fixedly connected to the first threaded shaft, the other end of the first connecting shaft is provided with a second threaded shaft, the second threaded shaft is fixedly connected to the first connecting shaft, the outer sides of the first threaded shaft and the outer sides of the second threaded shaft are both spirally connected with the first threaded block, the outer side of the first threaded block is provided with a first clamping plate, the other end of the second handle is fixedly connected to the third threaded shaft, the other end of the third threaded shaft is provided with a second connecting shaft, the second connecting shaft is fixedly connected to the third threaded shaft, the other end of the second connecting shaft is provided with a fourth threaded shaft, the fourth threaded shaft is fixedly connected to the second connecting shaft, the outer sides of the third threaded shaft and the outer sides of the fourth threaded shaft are both spirally connected with the second threaded block, and the outer side of the second threaded block is provided with a second clamping plate.
[0008] The scaffolding steel pipe holding device of the present invention can also be further implemented by adopting the following technical measures.
[0009] In the aforementioned scaffolding steel pipe holding device, the thread direction of the first threaded shaft is opposite to the thread direction of the second threaded shaft, and the first threaded shaft and the second threaded shaft are symmetrically arranged.
[0010] The aforementioned scaffolding steel pipe holding device, wherein the first threaded block penetrates the first fixing plate, and the first threaded block is slidably connected to the first fixing plate.
[0011] The aforementioned scaffolding steel pipe holding device, wherein the first clamping plate is fixedly connected to the first threaded block, and the first clamping plate is slidably connected to the first fixed plate.
[0012] In the aforementioned scaffolding steel pipe holding device, the thread direction of the third threaded shaft is opposite to the thread direction of the fourth threaded shaft, and the third threaded shaft and the fourth threaded shaft are symmetrically arranged.
[0013] The aforementioned scaffolding steel pipe holding device, wherein the second threaded block penetrates the second fixing plate, and the second threaded block is slidably connected to the second fixing plate.
[0014] The aforementioned scaffolding steel pipe holding device, wherein the second clamping plate is fixedly connected to the second threaded block, and the second clamping plate is slidably connected to the second fixed plate.
[0015] The beneficial effects of the utility model are as follows: by setting the first fixed plate, the second fixed plate, the first handle, the first clamping plate, the second handle and the second clamping plate, during use, the vertical steel pipe is placed between the clamping plates of the first fixed plate, and then the first handle is rotated to drive the first threaded shaft to rotate, the first threaded shaft drives the second threaded shaft to rotate through the first connecting shaft, the first threaded shaft and the second threaded shaft respectively drive the first fixed plate to move through the first threaded block, the clamping plate movement of the first fixed plate can clamp the steel pipe, and then the horizontal steel pipe is placed between the clamping plates of the second fixed plate, the second handle is rotated to drive the third threaded shaft to rotate, the third threaded shaft drives the fourth threaded shaft to rotate through the second connecting shaft, the third threaded shaft and the fourth threaded shaft respectively drive the clamping plate movement of the second fixed plate through the second threaded block, and the steel pipe can be clamped, so that the horizontal steel pipe and the vertical steel pipe can be assembled and fixed together, and the assembly process is simple and convenient, saving time and effort. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the overall structure of the scaffolding steel pipe holding device according to an embodiment of the utility model;
[0017] Figure 2 This is a schematic diagram of the installation structure of the second connecting shaft of the scaffolding steel pipe holding device according to an embodiment of the utility model;
[0018] Figure 3 This is a schematic diagram of the installation structure of the first connecting shaft of the scaffolding steel pipe holding device according to an embodiment of the utility model;
[0019] Figure 4 yes Figure 3 Schematic diagram of the structure at point A in .
[0020] In the figure: 1. first fixing plate; 2. second fixing plate; 3. first handle; 4. first threaded shaft; 5. first connecting shaft; 6. second threaded shaft; 7. first threaded block; 8. first clamping plate; 9. second handle; 10. third threaded shaft; 11. second connecting shaft; 12. fourth threaded shaft; 13. second threaded block; 14. second clamping plate. DETAILED DESCRIPTION
[0021] The present invention is further described below in conjunction with the embodiments and the accompanying drawings.
[0022] Example 1
[0023] The scaffold steel pipe gripping device of the utility model comprises a first fixing plate 1 and a second fixing plate 2, and the first fixing plate and the second fixing plate have the same appearance and internal structure. The two fixing plates are rectangular blocks, one side of the two rectangular blocks are cross-intersected and fixed together, and the other side of the two rectangular blocks is provided with a clamping plate movable in the groove through a groove, one end of the clamping plate is a semicircular shape for matching, and the other end of the clamping plate is a threaded block; the length of the two rectangular blocks is inserted into the adjustment rod for the movable clamping plate through a through hole toward the top, one end of the adjustment rod is a handle placed outside the rectangular block, and the other end is accommodated in the internal cavity of the rectangular block.
[0024] Please refer to Figure 1-4 , the scaffolding steel pipe holding device of the utility model embodiment comprises a first fixing plate 1, a second fixing plate 2 is arranged on the outer side of the first fixing plate 1, the second fixing plate 2 is fixedly connected to the first fixing plate 1, a first handle 3 is arranged on the first fixing plate 1, the first handle 3 passes through the first fixing plate 1, a second handle 9 is arranged on the second fixing plate 2, the second handle 9 passes through the second fixing plate 2, the other end of the first handle 3 is fixedly connected to a first threaded shaft 4, the other end of the first threaded shaft 4 is provided with a first connecting shaft 5, the first connecting shaft 5 is fixedly connected to the first threaded shaft 4, the other end of the first connecting shaft 5 is provided with a second threaded shaft 6, the second threaded shaft 6 is fixedly connected to the first connecting shaft 5, the outer side of the first threaded shaft 4 and the outer side of the second threaded shaft 6 are both spirally connected with a first threaded block 7, a first clamping plate 8 is arranged on the outer side of the first threaded block 7, the other end of the second handle 9 is fixedly connected to a third threaded shaft 10, the other end of the third threaded shaft 10 is provided with a second connecting shaft 11, the second connecting shaft 11 is fixedly connected to the third threaded shaft 10, the other end of the second connecting shaft 11 is provided with a fourth threaded shaft 12, the fourth thread The corrugated shaft 12 is fixedly connected to the second connecting shaft 11, and the outer sides of the third threaded shaft 10 and the fourth threaded shaft 12 are both spirally connected with the second threaded block 13, and the outer side of the second threaded block 13 is provided with a second clamping plate 14. When the scaffold is assembled, the vertical steel pipe is placed between the first clamping plates 8, and then the first handle 3 is rotated to drive the first threaded shaft 4 to rotate, and the first threaded shaft 4 drives the second threaded shaft 6 to rotate through the first connecting shaft 5, and the first threaded shaft 4 and the second threaded shaft 6 respectively drive the first clamping plate 8 to move through the first threaded block 7, and the movement of the first clamping plate 8 can clamp the steel pipe and hold the steel pipe, and then the horizontal steel pipe is placed between the second clamping plates 14, and the third threaded shaft 10 is driven to rotate by rotating the second handle 9, and the third threaded shaft 10 drives the fourth threaded shaft 12 to rotate through the second connecting shaft 11, and the third threaded shaft 10 and the fourth threaded shaft 12 respectively drive the second clamping plate 14 to move through the second threaded block 13, which can clamp the steel pipe and hold the steel pipe, so that the horizontal steel pipe and the vertical steel pipe can be assembled and fixed together, and the assembly process is simple and convenient, saving time and effort.
[0025] The thread direction of the first threaded shaft 4 is opposite to that of the second threaded shaft 6 , and the first threaded shaft 4 and the second threaded shaft 6 are symmetrically arranged. This arrangement enables the movement directions of the two first threaded blocks 7 to be opposite.
[0026] The first threaded block 7 penetrates through the first fixing plate 1 , and the first threaded block 7 is slidably connected to the first fixing plate 1 . This arrangement can drive the first clamping plate 8 to move.
[0027] The first clamping plate 8 is fixedly connected to the first threaded block 7 , and the first clamping plate 8 is slidably connected to the first fixing plate 1 . This arrangement can clamp and hold the steel pipe.
[0028] The thread direction of the third threaded shaft 10 is opposite to that of the fourth threaded shaft 12 , and the third threaded shaft 10 and the fourth threaded shaft 12 are symmetrically arranged, which enables the movement directions of the two second threaded blocks 13 to be opposite.
[0029] The second threaded block 13 penetrates through the second fixing plate 2 , and the second threaded block 13 is slidably connected to the second fixing plate 2 . This arrangement can drive the second clamping plate 14 to move.
[0030] The second clamping plate 14 is fixedly connected to the second threaded block 13 , and the second clamping plate 14 is slidably connected to the second fixing plate 2 . This arrangement can clamp and hold the steel pipe.
[0031] When assembling the scaffolding, the vertical steel pipe is placed between the first clamping plates 8, and then the first handle 3 is rotated to drive the first threaded shaft 4 to rotate, and the first threaded shaft 4 drives the second threaded shaft 6 to rotate through the first connecting shaft 5, and the first threaded shaft 4 and the second threaded shaft 6 respectively drive the first clamping plate 8 to move through the first threaded block 7, and the movement of the first clamping plate 8 can clamp the steel pipe and hold the steel pipe, and then the horizontal steel pipe is placed between the second clamping plates 14, and the third threaded shaft 10 is driven to rotate by rotating the second handle 9, and the third threaded shaft 10 drives the fourth threaded shaft 12 to rotate through the second connecting shaft 11, and the third threaded shaft 10 and the fourth threaded shaft 12 respectively drive the second clamping plate 14 to move through the second threaded block 13, which can clamp the steel pipe and hold the steel pipe, so that the horizontal steel pipe and the vertical steel pipe can be assembled and fixed together, and the assembly process is simple and convenient, saving time and effort.
[0032] The above embodiments are only for the purpose of illustrating the present invention, but not for limiting the present invention. A person skilled in the relevant technical field may make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions should also belong to the scope of the present invention and should be defined by the claims.
Claims
1. A scaffold steel pipe holding device, comprising a first fixing plate (1) and a second fixing plate (2), wherein the first fixing plate and the second fixing plate are completely identical in appearance and internal structure, the two fixing plates are rectangular blocks, one side of the two rectangular blocks are cross-intersected and fixed together, the other side of the two rectangular blocks are provided with a clamping plate movable in the groove through a groove, one end of the clamping plate is a semicircular shape for matching, and the other end of the clamping plate is a threaded block; the length of the two rectangular blocks is inserted into an adjustment rod for the movable clamping plate through a through hole toward the top end, one end of the adjustment rod is a handle placed outside the rectangular block, and the other end is accommodated in the internal cavity of the rectangular block, Features: A second fixing plate (2) is provided on the outer side of the first fixing plate (1), the second fixing plate (2) is fixedly connected to the first fixing plate (1), a first handle (3) is provided on the first fixing plate (1), the first handle (3) passes through the first fixing plate (1), and a second handle (9) is provided on the second fixing plate (2), the second handle (9) passes through the second fixing plate (2); The other end of the first handle (3) is fixedly connected to a first threaded shaft (4), the other end of the first threaded shaft (4) is provided with a first connecting shaft (5), the first connecting shaft (5) is fixedly connected to the first threaded shaft (4), the other end of the first connecting shaft (5) is provided with a second threaded shaft (6), the second threaded shaft (6) is fixedly connected to the first connecting shaft (5), the outer side of the first threaded shaft (4) and the outer side of the second threaded shaft (6) are both spirally connected to a first threaded block (7), the outer side of the first threaded block (7) is provided with a first clamping plate (8), the second handle ( The other end of the third threaded shaft (9) is fixedly connected to a third threaded shaft (10), the other end of the third threaded shaft (10) is provided with a second connecting shaft (11), the second connecting shaft (11) is fixedly connected to the third threaded shaft (10), the other end of the second connecting shaft (11) is provided with a fourth threaded shaft (12), the fourth threaded shaft (12) is fixedly connected to the second connecting shaft (11), the outer sides of the third threaded shaft (10) and the outer sides of the fourth threaded shaft (12) are both spirally connected to a second threaded block (13), and the outer side of the second threaded block (13) is provided with a second clamping plate (14).
2. The scaffolding steel pipe holding device according to claim 1, It is characterized in that The thread direction of the first threaded shaft (4) is opposite to the thread direction of the second threaded shaft (6), and the first threaded shaft (4) and the second threaded shaft (6) are symmetrically arranged.
3. The scaffolding steel pipe holding device according to claim 1, It is characterized in that The first threaded block (7) passes through the first fixing plate (1), and the first threaded block (7) is slidably connected to the first fixing plate (1).
4. The scaffolding steel pipe holding device according to claim 1, It is characterized in that The first clamping plate (8) is fixedly connected to the first threaded block (7), and the first clamping plate (8) is slidably connected to the first fixing plate (1).
5. The scaffolding steel pipe holding device according to claim 1, It is characterized in that The thread direction of the third threaded shaft (10) is opposite to the thread direction of the fourth threaded shaft (12), and the third threaded shaft (10) and the fourth threaded shaft (12) are symmetrically arranged.
6. The scaffolding steel pipe holding device according to claim 1, It is characterized in that The second threaded block (13) passes through the second fixing plate (2), and the second threaded block (13) is slidably connected to the second fixing plate (2).
7. The scaffolding steel pipe holding device according to claim 1, It is characterized in that The second clamping plate (14) is fixedly connected to the second threaded block (13), and the second clamping plate (14) is slidably connected to the second fixing plate (2).