Drilling machine base supporting device for geological survey
By designing the base support device of the drill rig and using the ground drill and fastening structure to grasp the soil under the ground, the equipment offset problem caused by insufficient weight of the small drill rig is solved, and the stability and stability during the drilling process are improved.
Patent Information
- Application Number
- CN202420711655.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-04-08
AI Technical Summary
When drilling into the ground, small drilling rigs are insufficient in weight, and the equipment is easily deviated due to reaction forces, affecting the stability of the drill bit trajectory.
A base support device for geological measurement drilling rig is designed, including four ground drills and fastening structures. The screw rod and pins are stabbed into the ground through the transmission of the control rod and bevel gear, forming a hook structure to grasp the soil under the ground. The connection between the base substrate and the ground is strengthened through the internal thread rotation ring and the lifting thread to ensure the stability of the equipment.
It effectively improves the stability of the drilling rig during the drilling process and the overall stability of the equipment, ensuring the accuracy of the drill bit trajectory and the stability of the equipment.
Smart Images

Figure CN221990284U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geological drilling, in particular to a drilling rig base supporting device for geological surveying. Background Art
[0002] Nowadays, in order to facilitate the measurement of underground geology, drilling rigs are usually used for excavation. According to the different geological depths to be detected, they are divided into large drilling rigs for deep geological detection and small drilling rigs for shallow geological detection. Among them, small drilling rigs have limited weight. When the drill bit descends and drills into the ground, the reaction force lifts the drilling rig equipment, causing the position of the entire equipment to shift, affecting the drilling trajectory of the drill bit. There is room for improvement in the overall stability. Utility Model Content
[0003] The utility model aims to provide a drilling rig base support device for geological surveying to solve the problems raised in the above-mentioned background technology.
[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0005] A drilling rig base support device for geological surveying includes a base structure, wherein four ground drills are fixedly installed at the four corners of the base structure, and a fastening structure is embedded and installed inside the ground drill. The fastening structure includes a control rod, and a No. 2 rotary handle is fixedly installed on the upper end of the control rod, and a bevel gear is fixedly installed on the lower end of the control rod and meshes with the bevel gear installed on one end of the screw rod. There are three screw rods, and one end of the screw rod is screwed and sleeved with a pin.
[0006] Furthermore, the base structure comprises a base substrate, and support legs are fixedly installed at four corners of the base substrate, and a drilling port is opened at the front edge of the base substrate.
[0007] Furthermore, the underground drill comprises a drill body receiving sleeve, limit sliding blocks are fixedly installed on both sides of the inner wall of the drill body receiving sleeve, a bearing is embedded in the upper end of the drill body receiving sleeve, an internal threaded swivel is rotatably installed on the upper end of the drill body receiving sleeve through the bearing, a No. 1 rotary handle is fixedly installed on the side surface of the internal threaded swivel, a drill body is slidably sleeved inside the drill body receiving sleeve, a lifting thread is provided on the side surface of the upper half of the drill body, limit sliding grooves are provided on both side surfaces of the drill body, and a limit plate is fixedly installed on the upper end of the limit drill body.
[0008] Furthermore, the limiting sliding block is slidably engaged with the limiting sliding groove, and the internal thread rotating ring is screwed with the lifting thread.
[0009] Furthermore, the pin is slidably installed in the pin receiving groove.
[0010] Furthermore, the drill body storage sleeve is fixedly installed at an opening on the support leg base.
[0011] Furthermore, the control rod is rotatably installed inside the drill inserting body, and the pin receiving groove is arranged at the lower edge of the side surface of the drill inserting body.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. Insert the drill bit into the ground and turn the No. 2 handle at the same time. Rotate the bevel gear through the control lever, and then rotate each screw rod under the transmission of the bevel gear to push each pin into the soil on the side surface of the drill bit. It forms a claw-like structure with the lower end of the drill bit to grab the underground soil and abut against the base structure to press the ground to ensure the stability of the drilling rig when it is working.
[0014] 2. When the entire drilling rig equipment is moved to the position where drilling is required, the base plate is directly in contact with the ground and supports all the equipment of the entire drilling rig. Rotate the No. 1 handle to turn the internal thread swivel, and push the drill body through the lifting thread, so that the lower half of the drill body stored in the drill body storage sleeve penetrates into the ground, strengthens the connection strength between the base plate and the ground, and relies on the ground to strengthen the stability of the entire structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 2 It is a schematic diagram of the base structure in the utility model;
[0017] Figure 3 This is a schematic diagram of the ground drilling rod in the utility model;
[0018] Figure 4 It is a schematic diagram of the fastening structure in the utility model;
[0019] Figure 5 This utility model Figure 4 Enlarged view of point A in the middle.
[0020] In the figure: 1. base structure; 101. base substrate; 102. support leg base; 103. drilling port; 2. ground drill; 201. drill body storage sleeve; 202. limit slider; 203. bearing; 204. internal thread swivel; 205. No. 1 rotary handle; 206. drill body; 207. lifting thread; 208. limit slide groove; 209. limit plate; 3. fastening structure; 301. control rod; 302. No. 2 rotary handle; 303. bevel gear; 304. screw rod; 305. pin; 306. pin storage groove. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] See also Figures 1 to 5 In the embodiment of the utility model, a geological surveying drilling rig base support device includes a base structure 1, and the base structure 1 is fixedly installed with ground drills 2 at the four corners. The number of ground drills 2 is four, and a fastening structure 3 is embedded and installed inside the ground drill 2. The fastening structure 3 includes a control rod 301, and a No. 2 screw handle 302 is fixedly installed on the upper end of the control rod 301. A bevel gear 303 is fixedly installed on the lower end of the control rod 301, and is meshed with the bevel gear 303 installed at one end of a screw rod 304. The number of screw rods 304 is three, and one end of the screw rod 304 is screwed and sleeved with a pin 305; the control rod 301 is rotatably installed inside the drill body 206, and the pin receiving groove 306 is opened at the lower edge of the side surface of the drill body 206.
[0023] Specifically, with the base structure 1 as the base, the various components of the drilling rig are fixedly installed on the upper surface of the base structure 1. When working, the drill bit 2 is inserted into the ground, and the No. 2 handle 302 is turned at the same time. The bevel gear 303 is rotated by the control rod 301, and then under the transmission of the bevel gear 303, each screw rod 304 is rotated to push each pin 305 into the soil on the side surface of the drill bit 2, forming a claw-like structure with the lower end of the drill bit 2 to grab the underground soil, and abut against each other with the posture shape of the base structure 1 pressing the ground, so as to ensure the stability of the drilling rig when it is working.
[0024] Embodiment 1
[0025] like Figure 2-3 As shown, in this embodiment, the base structure 1 includes a base substrate 101, and support bases 102 are fixedly installed at the four corners of the base substrate 101. A drilling port 103 is opened at the front edge of the base substrate 101; the drill body storage sleeve 201 is fixedly installed at the opening on the support base 102.
[0026] In this embodiment, each support base 102 provides an installation position and a connection support for the ground drill 2 during operation, and the drilling port 103 defines the position where the drill head of the drilling rig drills into the ground.
[0027] like Figure 4-5 As shown, in this embodiment, the pin 305 is slidably installed in the pin receiving groove 306.
[0028] In a specific implementation, when the drill body 206 is inserted into the ground, the pin 305 is received in the pin receiving groove 306 to avoid causing any obstruction to the insertion of the drill body 206 into the ground.
[0029] Embodiment 2
[0030] On the basis of the first embodiment, in order to supplement the specific working mode of the inserting drill body 206 which is not mentioned in the first embodiment, as well as the operation process and principle of inserting into the ground.
[0031] like Figure 2-3 As shown, in this embodiment, the underground drill 2 includes a drill body receiving sleeve 201, and limit sliders 202 are fixedly installed on both sides of the inner wall of the drill body receiving sleeve 201. A bearing 203 is embedded in the upper end of the drill body receiving sleeve 201. An internal threaded swivel 204 is rotatably installed on the upper end of the drill body receiving sleeve 201 through the bearing 203. A No. 1 rotary handle 205 is fixedly installed on the side surface of the internal threaded swivel 204. A drill body 206 is slidably sleeved inside the drill body receiving sleeve 201. A lifting thread 207 is provided on the side surface of the upper half of the drill body 206. Limiting slide grooves 208 are provided on both sides of the drill body 206. A limiting plate 209 is fixedly installed on the upper end of the limit drill body 206; the limit slider 202 is slidably engaged with the limit slide groove 208, and the internal threaded swivel 204 and the lifting thread 207 are screwed together.
[0032] In specific implementation, when the entire drilling rig equipment is moved to the position where drilling is required, the base substrate 101 is directly in contact with the ground and supports various equipment of the entire drilling rig. The No. 1 handle 205 is rotated to rotate the internal threaded swivel 204, and the drill body 206 is pushed through the lifting thread 207, so that the lower half of the drill body 206 stored in the drill body storage sleeve 201 is inserted into the ground, thereby strengthening the connection strength between the base substrate 101 and the ground, and relying on the ground to strengthen the stability of the entire structure.
[0033] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0034] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A geological survey drilling rig base support device, comprising a base structure, characterized in that: There are four underground drills fixedly installed at the four corners of the base structure. A fastening structure is embedded in the underground drill. The fastening structure includes a control rod. A No. 2 handle is fixedly installed on the upper end of the control rod. A bevel gear is fixedly installed on the lower end of the control rod and meshes with the bevel gear installed on one end of the screw rod. There are three screw rods, and one end of the screw rod is screwed and sleeved with a pin.
2. A geological survey drilling rig base support device according to claim 1, characterized in that: The base structure comprises a base substrate, and support foot bases are fixedly installed at the four corners of the base substrate. A drilling opening is opened at the front edge of the base substrate.
3. A geological survey drilling rig base support device according to claim 2, characterized in that: The underground drill comprises a drill body receiving sleeve, and limit sliding blocks are fixedly installed on both sides of the inner wall of the drill body receiving sleeve, a bearing is embedded in the upper end of the drill body receiving sleeve, an internal threaded swivel is rotatably installed on the upper end of the drill body receiving sleeve through the bearing, and a No. 1 rotary handle is fixedly installed on the side surface of the internal threaded swivel, and a drill body is slidably sleeved inside the drill body receiving sleeve, and a lifting thread is provided on the side surface of the upper half of the drill body, and limit sliding grooves are provided on both side surfaces of the drill body, and a limit plate is fixedly installed on the upper end of the drill body.
4. A geological survey drilling rig base support device according to claim 3, characterized in that: The limiting sliding block is slidably engaged with the limiting sliding groove, and the internal thread rotating ring is screwed with the lifting thread.
5. A geological survey drilling rig base support device according to claim 4, characterized in that: The pin is slidably installed in the pin receiving groove.
6. A geological survey drilling rig base support device according to claim 5, characterized in that: The drill body receiving sleeve is fixedly installed at the opening of the support leg base.
7. A geological survey drilling rig base support device according to claim 6, characterized in that: The control rod is rotatably installed inside the inserting drill body, and the pin receiving groove is arranged at the lower edge of the side surface of the inserting drill body.