Integrated anchor breaking device of reversed loader
By integrating the installation platform and robotic arms on the coal mine transportation trough relay machine, the comprehensive precision anchor breaking is achieved, and the problems of small working range and low anchor breaking efficiency in the existing technology are solved, and the efficiency and coverage of anchor breaking are improved. The work surface is safe and efficient to recover.
Patent Information
- Application Number
- CN202420376989.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-02-28
AI Technical Summary
The hard top plate of existing coal mines has a small working range and low anchor breaking efficiency, so it is impossible to achieve anchor breaking in the entire tunnel. The transportation trough size is limited and other anchor breaking devices cannot be installed, resulting in the roof being unable to cross the top plate and the area of the suspended roof. Too large will cause hidden dangers to safe and efficient recovery of the working face.
Design an integrated anchor breaking device for reposting machines, including installing an integrated installation platform on the transport chute reposting machine, riding on the coal barrier plate, equipped with a robotic arm and a gas-to-hydraulic power system, the robotic arm is installed through a rotary bearing, including a The stage telescopic arm, the first-stage swing cylinder, the second-stage swing cylinder and the third-stage swing cylinder are connected to the anchor breaker to achieve six-degree of freedom operation and can cover the anchor cable position within the entire tunnel width range.
It realizes all-round accurate anchor breaking on the reprinter, with high efficiency of anchor breaking, flexible movement, wide coverage, does not occupy the space of transportation troughs, does not affect personnel passage, and does not require external power and water sources, which is relatively low.
Smart Images

Figure CN221990409U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of anchor breaking technology for transport chute of fully mechanized mining or fully mechanized caving working face in coal mines, in particular to an integrated anchor breaking device for a transfer machine. Background Art
[0002] As the geological conditions of coal mining become increasingly complex, the hard roof with its large layer thickness, high hardness and difficulty in collapse has become a key problem leading to frequent coal mine pressure accidents. Anchor support, as an effective underground support technology, can provide reliable support and reinforcement, reduce the risk of tunnel deformation and rock instability, but after the working face is mined, the supporting anchor cables are not destroyed in time and the rock properties of the roof are dense, resulting in the roof being unable to fall and the suspended roof area being too large, posing a great hidden danger to the safe and efficient mining of the working face. Based on this type of problem, an anchor breaking device installed in the two lanes is urgently needed to solve this problem.
[0003] For example, the patent "A device for breaking gangue and anchors in the hard roof of two lanes in a coal mine" has been published with the publication number CN218407420U. It uses the hydraulically driven top jack to drive the punch to groove or break the lane roof and anchor cables to induce the collapse of the working face and control the pressure step distance, thereby shortening the length of the suspended roof. However, the above device also has the following disadvantages: the working range is too small, and the anchor can only be broken within the range of the back and forth swing of the support jack, and the anchor cannot be broken in the entire lane. The anchor breaking efficiency is too low. It is too difficult to align the lock of the anchor cable using a cone, and the cone head is damaged quickly, resulting in too low freedom of anchor breaking and difficulty in movement. Due to the limited size of the transport chute, other anchor breaking devices cannot be installed. Utility Model Content
[0004] In order to solve the above technical problems, the utility model specifically adopts the following technical solutions.
[0005] An integrated anchor-breaking device for a transfer machine is designed, comprising an integrated mounting platform installed on the transport chute transfer machine, the integrated mounting platform straddling the coal retaining plate of the transfer machine, a mechanical arm is provided on the upper surface of the integrated mounting platform, the bottom of the mechanical arm is mounted on the integrated mounting platform via a slewing bearing, the mechanical arm comprises a first-stage telescopic arm, a first-stage swing cylinder, a second-stage telescopic arm, a second-stage swing cylinder, and a third-stage swing cylinder which are connected in sequence, and an anchor breaker is connected to the telescopic end of the third-stage swing cylinder.
[0006] Preferably, the integrated mounting platform is fixed through holes on the top of the coal retaining plate, and both ends thereof are respectively fixed to the coal retaining plate by being tightened by auxiliary threaded top screws.
[0007] Preferably, picks for assisting coal breaking are provided on the integrated installation platform in the direction of incoming coal.
[0008] Preferably, there are two robotic arms, and a control valve group for controlling the movement of the robotic arms is provided at one end of each of the integrated installation platforms.
[0009] Preferably, a gas-to-hydraulic power system is provided on the integrated installation platform, and the gas-to-hydraulic power system includes a hydraulic oil tank located between the two mechanical arms and a power unit arranged on the front side of the hydraulic oil tank, and the power unit is driven by connecting to the air duct in the transport chute.
[0010] Preferably, a hydraulic motor for driving the slewing bearing to rotate is provided on the integrated mounting platform.
[0011] Preferably, the first-level telescopic arm includes a first-level fixed arm tube and a first-level movable arm which is sleeved in the first-level fixed arm tube and extends upward, and a first-level telescopic jack arranged in the first-level fixed arm tube, and both ends of the first-level telescopic jack are respectively hinged to the first-level fixed arm tube and the first-level movable arm.
[0012] Preferably, the secondary telescopic arm includes a secondary fixed arm tube and a secondary movable arm sleeved in the secondary fixed arm tube, and a secondary telescopic jack arranged in the secondary fixed arm tube, the two ends of the secondary telescopic jack are respectively hinged to the secondary fixed arm tube and the secondary movable arm, and the two ends of the primary swing cylinder are respectively connected to the primary movable arm and the secondary fixed arm tube.
[0013] The beneficial effects of the utility model are:
[0014] 1. The utility model integrates the mechanical arm for installing the anchor breaker on the transfer machine, and the integrated installation platform is fastened to the coal retaining plate of the transfer machine by bolts and screws, so as to realize a detachable installation method. The anchor breaking operation can be carried out when the transfer machine is moving forward, without the need for additional modification of the transfer machine or additional walking power, and without affecting the passage of personnel and occupying the effective space of the transport chute, thereby solving the problem of space limitation when using the anchor breaking equipment.
[0015] 2. The utility model installs two six-degree-of-freedom robotic arms on a single integrated installation platform to perform anchor breaking operations. The rotation range of the two robotic arms can cover the positions of the anchor cables within the entire width of the transport lane. They have high degrees of freedom and flexible movements. Two people can operate them at the same time, and can achieve all-round and accurate anchor breaking of the top plate in the transport chute with high anchor breaking efficiency.
[0016] 3. The utility model installs picks in the coal-incoming direction of the integrated installation platform of the anchor breaking device, which can assist in breaking the coal when large pieces of coal come over the transfer machine, and can also prevent the large pieces of coal from damaging the integrated installation platform.
[0017] 4. The driving mode of the utility model is to drive the hydraulic gear pump by connecting the air duct in the transport chute. The above gas-to-liquid power solution is easy to select the gas source, does not require an external power supply and water source, and does not require additional cables and switches compared to electric drive. It has a low cost and a wide anchor breaking coverage range. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0019] Figure 2 A schematic diagram of the main structure of the utility model;
[0020] Figure 3 It is a schematic diagram of the top view structure of the utility model;
[0021] Figure 4 It is a side view structural schematic diagram of the utility model;
[0022] Figure 5 It is a structural schematic diagram of the mechanical arm in the utility model;
[0023] Figure 6 Schematic diagram of the gas-to-liquid power system;
[0024] The numbers in the figure are: 1 anchor breaker, 2 second-stage swing cylinder, 3 second-stage movable arm, 4 second-stage fixed arm tube, 5 second-stage telescopic jack, 6 first-stage swing cylinder, 7 first-stage movable arm, 8 first-stage fixed arm tube, 9 integrated installation platform, 10 first-stage telescopic jack, 11 hydraulic motor, 12 control valve group, 13 third-stage swing cylinder, 14 hydraulic oil tank, 15 power unit, 16 control protective cover, 17 pick, 18 transfer machine trough, 19 coal baffle, 20 slewing bearing. DETAILED DESCRIPTION
[0025] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0026] Example 1
[0027] An integrated anchor breaking device for a transfer machine, such as Figures 1 to 4 As shown, it includes an integrated mounting platform 9 installed on the transport chute transfer machine, and the integrated mounting platform 9 straddles the coal baffle plate 19 of the transfer machine. Specifically, the integrated mounting platform 9 is fixed through the holes on the top of the coal baffle plate 19, and its two ends are respectively fixed to the coal baffle plate 19 by auxiliary threaded top screws, so that the integrated mounting platform 9 does not move during the rotation of the robotic arm.
[0028] A mechanical arm is provided on the upper surface of the integrated installation platform 9, and the bottom of the mechanical arm is installed on the integrated installation platform 9 through a slewing bearing 20. A hydraulic motor 11 for driving the slewing bearing 20 to rotate is provided on the integrated installation platform 9. The hydraulic motor 11 drives the slewing bearing 20 to enable the entire mechanical arm to achieve 360° rotation and anchor breaking;
[0029] The mechanical arm includes a first-stage telescopic arm, a first-stage swing cylinder 6, a second-stage telescopic arm, a second-stage swing cylinder 2, and a third-stage swing cylinder 13 which are connected in sequence. The first-stage telescopic arm is vertically arranged on the integrated installation platform 9, and the anchor breaker 1 is connected to the telescopic end of the third-stage swing cylinder 13. The first-stage telescopic arm controls the height of the mechanical arm, and the second-stage telescopic arm can rotate with the first-stage swing cylinder 6 to realize the rotation of the mechanical arm at different heights. The second-stage swing cylinder 2 and the third-stage swing cylinder 13 make the anchor breaker 1 pitch forward and backward and tilt left and right. There are two mechanical arms, and control valve groups 12 for controlling the movements of the two mechanical arms are respectively arranged at one end of the integrated installation platform 9. The two control valve groups 12 are arranged horizontally staggered to meet the simultaneous operation of two people, and are manually controlled.
[0030] The first-level telescopic arm includes a first-level fixed arm tube 8 and a first-level movable arm 7 which is sleeved in the first-level fixed arm tube 8 and extends upward, and a first-level telescopic jack 10 which is arranged in the first-level fixed arm tube 8. The two ends of the first-level telescopic jack 10 are respectively hinged to the first-level fixed arm tube 8 and the first-level movable arm 7. The extension length of the first-level movable arm 7 is driven by the extension and retraction of the first-level telescopic jack 10.
[0031] The secondary telescopic arm includes a secondary fixed arm tube 4 and a secondary movable arm 3 sleeved in the secondary fixed arm tube 4, and a secondary telescopic jack 5 arranged in the secondary fixed arm tube 4. The two ends of the secondary telescopic jack 5 are respectively hinged to the secondary fixed arm tube 4 and the secondary movable arm 3, and the two ends of the primary swing cylinder 6 are respectively connected to the primary movable arm 7 and the secondary fixed arm tube 4. The secondary telescopic jack 5 is used to control the extension length of the secondary movable arm 3. Specifically, in order to meet actual needs, the primary telescopic arm and the secondary telescopic arm can be set to be multi-stage telescopic.
[0032] A pick 17 for auxiliary coal breaking is arranged on the integrated installation platform 9 in the direction of incoming coal, which can assist in completing the auxiliary coal breaking function when large pieces of coal come from the transfer machine, and can also prevent the large pieces of coal from damaging the integrated installation platform 9.
[0033] A gas-to-liquid power system is provided on the integrated installation platform 9, and the gas-to-liquid power system includes a hydraulic oil tank 14 located between the two mechanical arms and a power unit 15 located in front of the hydraulic oil tank 14. The power unit 15 drives the mechanical arms to move by connecting to the air duct in the transport chute. The power unit 15 includes a pneumatic motor, a gearbox, and a hydraulic gear pump. The power unit 15 is driven by connecting to the air duct in the transport chute. It can convert high-pressure gas power into hydraulic power. Two sets of proportional control valve groups 12 control the movements of the two mechanical arms respectively, covering the entire range of the lane. The proportional control valve group is used to more accurately control the movement of the mechanical arms, and fine-tuning can be achieved.
[0034] The utility model integrates an anchor breaking device on a transfer machine, and installs two six-degree-of-freedom mechanical arms consisting of a slewing bearing 20, a first-level telescopic arm, a first-level swing cylinder 6, a second-level telescopic arm, a second-level swing cylinder 2, and a third-level swing cylinder 13 on an integrated mounting platform 9. During the mining process, the control valve group 12 is controlled to achieve a 360-degree rotation of the entire mechanical arm, and the working height of the device is controlled by the first-level telescopic arm, the pitch angle of the mechanical arm is controlled by the first-level swing cylinder 6, the second-level swing cylinder 2, and the third-level swing cylinder 13, and the working radius of the mechanical arm is controlled by the second-level telescopic arm. Through a series of operations of the control valve group 12, the anchor breaker is aligned with the lock of the anchor cable, and the anchor breaking handle is rotated so that the tool in the anchor breaker cuts off the lock of the anchor cable under the power of the hydraulic pressure, rendering the anchor cable ineffective, and the breaking force can be as high as 98 tons.
[0035] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A transfer machine integrated anchor breaking device, characterized in that: The invention comprises an integrated installation platform (9) installed on a transport chute transfer machine, the integrated installation platform (9) straddles a coal baffle plate (19) of the transfer machine, and a mechanical arm is provided on the upper surface of the integrated installation platform (9), the bottom of the mechanical arm is installed on the integrated installation platform (9) via a slewing bearing (20), the mechanical arm comprises a first telescopic arm, a first swing cylinder (6), a second telescopic arm, a second swing cylinder (2), and a third swing cylinder (13) which are connected in sequence, and an anchor breaker (1) is connected to the telescopic end of the third swing cylinder (13).
2. The integrated anchor-breaking device for a transfer machine as claimed in claim 1, characterized in that: The integrated installation platform (9) is fixed through the holes on the top of the coal baffle plate (19), and its two ends are respectively fixed on the coal baffle plate (19) through auxiliary threaded top screws.
3. The integrated anchor-breaking device for a transfer machine as claimed in claim 1, characterized in that: A pick (17) for assisting coal breaking is provided on the integrated installation platform (9) in the direction of incoming coal.
4. The integrated anchor-breaking device for a transfer machine as claimed in claim 1, characterized in that: There are two mechanical arms, and a control valve group (12) for controlling the movement of the mechanical arms is respectively provided at one end of the integrated installation platform (9).
5. The integrated anchor-breaking device for a transfer machine as claimed in claim 1, characterized in that: A gas-to-liquid power system is provided on the integrated installation platform (9), the gas-to-liquid power system comprising a hydraulic oil tank (14) located between the two mechanical arms and a power unit (15) provided on the front side of the hydraulic oil tank (14), the power unit (15) being driven by connecting to an air duct in the transport chute.
6. The integrated anchor-breaking device for a transfer machine as claimed in claim 1, characterized in that: A hydraulic motor (11) for driving the slewing bearing (20) to rotate is arranged on the integrated mounting platform (9).
7. The integrated anchor-breaking device for a transfer machine as claimed in claim 1, characterized in that: The primary telescopic arm comprises a primary fixed arm tube (8), a primary movable arm (7) which is sleeved in the primary fixed arm tube (8) and extends upward, and a primary telescopic jack (10) arranged in the primary fixed arm tube (8), wherein two ends of the primary telescopic jack (10) are respectively hinged to the primary fixed arm tube (8) and the primary movable arm (7).
8. The integrated anchor-breaking device for a transfer machine as claimed in claim 1, characterized in that: The secondary telescopic arm comprises a secondary fixed arm tube (4), a secondary movable arm (3) sleeved in the secondary fixed arm tube (4), and a secondary telescopic jack (5) arranged in the secondary fixed arm tube (4); the two ends of the secondary telescopic jack (5) are respectively hinged to the secondary fixed arm tube (4) and the secondary movable arm (3); the two ends of the primary swing cylinder (6) are respectively connected to the primary movable arm (7) and the secondary fixed arm tube (4).
