Raw ore screening device
By designing a raw ore screening device, a spray nozzle flushing and air drying assembly is used to remove wet powder from the surface of the raw ore, thus solving the problem of the impact of wet powder on the permeability of the blast furnace and reducing fuel consumption and wastewater treatment costs.
Patent Information
- Application Number
- CN202323291068.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-04
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing technologies are ineffective at removing wet powder from the surface of raw ore during rainy seasons or humid climates, which affects the permeability of the blast furnace and increases fuel consumption.
A raw ore screening device was designed, comprising a screening component, an air-drying component, and a collection and treatment component. It removes moist powder through nozzle washing and air-drying, and collects and treats wastewater, thereby achieving the drying and purification of raw ore.
It effectively removes damp powder from the surface of raw ore, reduces blast furnace fuel consumption, improves blast furnace permeability and production efficiency, and reduces wastewater treatment costs.
Smart Images

Figure CN222000972U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of raw ore screening, in particular to a raw ore screening device. Background Art
[0002] Raw ore refers to the ore that is directly sent to the blast furnace for smelting after being crushed and formed after iron-containing ore is mined. Wet raw ore usually refers to raw ore with mud on the surface and heavy moisture. It is also one of the main raw materials for blast furnace ironmaking at this stage. With the rise in ore prices, smelting raw ore with low iron grade and high impurity content has become an important way for domestic blast furnaces to choose to reduce costs.
[0003] At present, most of the raw ores produced by several major mines in the world contain a lot of mud and impurities. During transportation, a large amount of powder combines with water to adhere to the surface of the raw ore, which has an adverse effect on the blast furnace smelting process. The entry of wet and powdery raw ore into the blast furnace will inevitably increase fuel consumption and increase smelting costs. For wet and powdery raw ore, the world's ores are basically not processed at present, because the processing link will increase a lot of costs. A small number of mines will use spray filtration to reduce the mud and dust content on the surface of the ore after crushing the raw ore, but during long-distance transportation, the phenomenon of wet and powdery will be further aggravated.
[0004] The existing technology has a simple screening function, but in the rainy season or humid climate conditions, it is difficult to remove the wet powder on the surface of the raw ore with the existing technology. After the raw ore with wet powder on the surface enters the blast furnace, it is easy to affect the permeability of the blast furnace, thereby increasing the consumption of blast furnace fuel. Utility Model Content
[0005] 1. Technical issues to be solved
[0006] The utility model aims to provide a raw ore screening device to solve the problem in the above background technology that the existing technology is not convenient for removing wet powder on the surface of raw ore in rainy season or humid climate conditions.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a raw ore screening device, comprising a working box and a screening assembly, wherein the screening assembly is arranged inside the working box, the screening assembly comprises an upper screen, and the upper screen is fixedly installed at the right end inside the working box, a first water pipe is fixedly installed at the upper end inside the working box, and the lower end of the first water pipe is fixedly connected to a first nozzle, a raw ore weighing bucket is fixedly installed at the left end inside the working box, a weight sensor is fixedly installed at the lower end inside the raw ore weighing bucket, a first conveyor belt is fixedly installed inside the working box, and a first discharge port is fixedly installed at the upper end inside the working box.
[0009] Preferably, a middle screen is fixedly installed inside the working box, a second water pipe is fixedly installed inside the working box, a second nozzle is fixedly connected to the lower end of the second water pipe, a powder hopper is fixedly installed at the left end inside the working box, a second conveyor belt is fixedly installed at the lower end inside the working box, a second discharge port is fixedly provided at the lower end inside the working box, and an air-drying component is provided at the upper end inside the working box. By installing the air-drying component, the staff turns on the first fan and the second fan, the first fan sucks the outside air into the air-drying box through the air inlet, and then the second fan transports the air in the air-drying box through the air duct to the air outlet, the air outlet dries the washed large pieces of raw ore, and the installed filter can effectively prevent dust from entering the air-drying box.
[0010] Preferably, the air-drying component includes an air-drying box, which is fixedly installed at the upper end of the working box, an air inlet is fixedly provided at the upper end of the air-drying box, a filter is fixedly installed inside the air inlet, and a first fan is fixedly installed inside the air-drying box.
[0011] Preferably, a second fan is fixedly installed at the lower end of the air drying box, an air outlet at the lower end of the air drying box is fixedly connected to an air supply pipe, and the lower end of the air supply pipe is fixedly connected to an air outlet.
[0012] Preferably, a raw ore bin is fixedly installed at the upper end of the working box, a valve one is fixedly installed inside the raw ore bin, a PLC controller is fixedly installed at the front end of the working box, and a collecting and processing component is provided at the lower end of the working box. By installing the collecting and processing component, the flushing water and powder form a mixture and fall into the water-saving trough, and the mixture in the water-saving trough enters the sludge pool through the connecting pipe, while the mud remains on the filter screen two, and the sewage enters the sludge pool. Further, the staff opens the valve two, and then turns on the water pump to discharge the sewage in the sludge pool through the outlet pipe, thereby increasing practicality.
[0013] Preferably, the collection and processing component includes a water-saving trough, which is fixedly arranged at the lower end inside the working box, and the lower end of the water-saving trough is fixedly connected to a connecting pipe, and the lower end of the connecting pipe is fixedly connected to a sludge pool.
[0014] Preferably, a filter screen 2 is fixedly installed inside the sludge pool, the water outlet at the right end of the sludge pool is fixedly connected to a pumping pipe, the right end of the pumping pipe is fixedly connected to a water pump, and the right end of the water pump is fixedly connected to a water outlet pipe.
[0015] Preferably, a valve 2 is fixedly installed on the right end of the water outlet pipe, and a supporting leg is fixedly installed on the lower end of the working box.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] 1. The raw ore screening device is installed with a screening assembly. When working, the first water pipe is opened to supply water to the first nozzle. The first nozzle washes the raw ore falling on the upper screen. The washed large pieces of raw ore enter the raw ore weighing bucket. The weight sensor in the raw ore weighing bucket senses the weight and issues a command to open the second water pipe to supply water to the second nozzle. The second nozzle washes the small particles of raw ore falling on the middle screen, thereby washing the wet powder on the surface of the raw ore, so that the clean raw ore enters the blast furnace, reducing the consumption of blast furnace fuel;
[0018] 2. The raw ore screening device is equipped with an air drying component. The staff turns on the first fan and the second fan. The first fan sucks the outside air into the air drying box through the air inlet. Then the second fan delivers the air in the air drying box to the air outlet through the air duct. The air outlet dries the washed large pieces of raw ore. The installed filter can effectively prevent dust from entering the air drying box.
[0019] 3. The raw ore screening device is installed with a collection and processing component. The flushing water and powder form a mixture and fall into the water-saving trough. The mixture in the water-saving trough enters the sludge pool through the connecting pipe, while the mud remains on the filter screen 2, and the sewage enters the sludge pool. The staff further opens valve 2 and then turns on the water pump to discharge the sewage in the sludge pool through the outlet pipe, which increases practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0021] Figure 2 This is a schematic diagram of the cross-sectional structure of the utility model;
[0022] Figure 3 The detailed structure of the screening component of the utility model is shown in FIG. Figure 1 ;
[0023] Figure 4 The detailed structure of the screening component of the utility model is shown in FIG. Figure 2 ;
[0024] Figure 5 This is a detailed structural diagram of the air-drying component of the utility model;
[0025] Figure 6 It is a schematic diagram of the detailed structure of the collection and processing component of the utility model.
[0026] In the figure: 1. working box; 2. screening assembly; 201. upper screen; 202. first water pipe; 203. first nozzle; 204. raw ore weighing bucket; 205. weight sensor; 206. first conveyor belt; 207. first discharge port; 208. middle screen; 209. second water pipe; 210. second nozzle; 211. powder hopper; 212. second conveyor belt; 213. second discharge port; 3. air drying assembly; 301. air drying box ; 302, air inlet; 303, filter one; 304, first fan; 305, second fan; 306, air duct; 307, air outlet; 4, raw ore bin; 5, valve one; 6, PLC controller; 7, collection and processing component; 701, water-saving trough; 702, connecting pipe; 703, sludge pool; 704, filter two; 705, pumping pipe; 706, water pump; 707, water outlet pipe; 708, valve two; 8, supporting legs. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] See also Figure 1-Figure 6The utility model provides a technical solution: a raw ore screening device, comprising a working box 1 and a screening assembly 2, the screening assembly 2 is arranged inside the working box 1, the screening assembly 2 comprises an upper screen 201, the upper screen 201 is fixedly installed at the right end inside the working box 1, a first water pipe 202 is fixedly installed at the upper end inside the working box 1, a first nozzle 203 is fixedly connected to the lower end of the first water pipe 202, a raw ore weighing bucket 204 is fixedly installed at the left end inside the working box 1, a weight sensor 205 is fixedly installed at the lower end inside the raw ore weighing bucket 204, a first conveyor belt 206 is fixedly installed inside the working box 1, a first discharge port 207 is fixedly arranged at the upper end inside the working box 1, an intermediate screen 208 is fixedly installed inside the working box 1, a second water pipe 209 is fixedly installed inside the working box 1, a second nozzle 210 is fixedly connected to the lower end of the second water pipe 209, a powder hopper 211 is fixedly installed at the left end inside the working box 1, the working box 1 is fixedly installed with a first conveyor belt 206, a first discharge port 207 is fixedly arranged at the upper end inside the working box 1, an intermediate screen 208 is fixedly installed inside the working box 1, a second water pipe 209 is fixedly installed inside the working box 1, a second nozzle 210 is fixedly connected to the lower end of the second water pipe 209, a powder hopper 211 is fixedly installed at the left end inside the working box 1, A second conveyor belt 212 is fixedly installed at the lower end of the working box 1, a second discharge port 213 is fixedly arranged at the lower end of the working box 1, an air drying component 3 is arranged at the upper end of the working box 1, and the air drying component 3 includes an air drying box 301, the air drying box 301 is fixedly installed at the upper end of the working box 1, an air inlet 302 is fixedly arranged at the upper end of the air drying box 301, a filter screen 303 is fixedly installed inside the air inlet 302, and a filter screen 303 is fixedly installed inside the air drying box 301. The first fan 304 and the lower end of the air drying box 301 are fixedly installed with the second fan 305. The air outlet end of the lower end of the air drying box 301 is fixedly connected with the air delivery pipe 306. The lower end of the air delivery pipe 306 is fixedly connected with the air outlet head 307. When the device is used, the staff first opens the first water pipe 202 to supply water to the first nozzle 203, and further opens the PLC controller 6 to open the valve 15 in the raw ore bin 4. The raw ore flows down from the valve 15 onto the upper screen 201.The upper screen 201 is arranged in an inclined shape, and the raw ore falling on the upper screen 201 slides from high to low, and while the raw ore slides, the wet powder on its surface is washed away by the first nozzle 203. While washing, the staff turns on the first fan 304 and the second fan 305. The first fan 304 sucks the outside air into the air drying box 301 through the air inlet 302, and then the second fan 305 transports the air in the air drying box 301 to the air outlet 307 through the air supply pipe 306. The air outlet 307 dries the washed large pieces of raw ore, and the air-dried large pieces of raw ore enter the raw ore weighing bucket 204, and the raw ore weighing bucket After the weight sensor 205 inside 204 detects the weight of the large raw ore, the second water pipe 209 is opened, and the second water pipe 209 supplies water to the second nozzle 210. Some small particles of raw ore pass through the upper screen 201 and fall on the middle screen 208. The second nozzle 210 washes the wet dust on its surface. The small particles of raw ore enter the powder hopper 211. Then the large pieces of raw ore pass through the raw ore weighing hopper 204 and fall on the first conveyor belt 206, and then enter the blast furnace through the first discharge port 207. At the same time, the small particles of raw ore pass through the powder hopper 211 and fall on the second conveyor belt 212, and then are discharged through the second discharge port 213 for sintering.
[0029] A raw ore bin 4 is fixedly installed at the upper end of the working box 1, a valve 1 5 is fixedly installed inside the raw ore bin 4, a PLC controller 6 is fixedly installed at the front end of the working box 1, a collecting and processing component 7 is arranged at the lower end of the working box 1, and the collecting and processing component 7 includes a water-saving tank 701, the water-saving tank 701 is fixedly arranged at the lower end of the working box 1, the lower end of the water-saving tank 701 is fixedly connected to a connecting pipe 702, the lower end of the connecting pipe 702 is fixedly connected to a sludge pool 703, a filter screen 2 704 is fixedly installed inside the sludge pool 703, the water outlet end at the right end of the sludge pool 703 is fixedly connected to a pumping pipe 705, and the right end of the pumping pipe 705 is fixedly connected to a water pump 706, the right end of the water pump 706 is fixedly connected to a water outlet pipe 707, the right end of the water outlet pipe 707 is fixedly installed with a valve 2 708, and the lower end of the working box 1 is fixedly installed with a supporting leg 8. The flushing water and powder form a mixture and fall into the water-saving tank 701. The mixture in the water-saving tank 701 enters the sludge pool 703 through the connecting pipe 702, and the mud remains on the filter screen 2 704 inside the sludge pool 703, and the sewage enters the sludge pool 703. Further, the staff opens the valve 2 708, and then opens the water pump 706 to pump out the sewage in the sludge pool 703 through the pumping pipe 705, and then discharges it through the water outlet pipe 707, which increases practicality.
[0030] Working principle: When the device is in use, the staff first opens the first water pipe 202 to supply water to the first nozzle 203, and then the staff turns on the PLC controller 6 to open the valve 15 in the raw ore bin 4, and the raw ore flows from the valve 15 to the upper screen 201, and the upper screen 201 is set to be inclined. The raw ore falling on the upper screen 201 slides from high to low, and while the raw ore slides, the wet powder on its surface is washed away by the first nozzle 203. While washing, the staff turns on the first nozzle 203. The first fan 304 and the second fan 305, the first fan 304 sucks the outside air into the air drying box 301 through the air inlet 302, and then the second fan 305 transports the air in the air drying box 301 to the air outlet 307 through the air delivery pipe 306, and the air outlet 307 air-dries the washed large pieces of raw ore, and the air-dried large pieces of raw ore enter the raw ore weighing bucket 204, and the weight sensor 205 in the raw ore weighing bucket 204 detects the weight of the large pieces of raw ore and opens the second water pipe 209, The second water pipe 209 supplies water to the second nozzle 210. Some small particles of raw ore pass through the upper screen 201 and fall on the middle screen 208. The second nozzle 210 washes the wet dust on the surface. The small particles of raw ore enter the powder hopper 211. Then the large pieces of raw ore pass through the raw ore weighing hopper 204 and fall on the first conveyor belt 206. Then they enter the blast furnace through the first discharge port 207. At the same time, the small particles of raw ore pass through the powder hopper 211 and fall on the second conveyor belt 212. Then they pass through the second discharge port 207. The water is discharged from the port 213 for sintering, and the rinsed water and powder form a mixture that falls into the water-saving tank 701. The mixture in the water-saving tank 701 enters the sludge pool 703 through the connecting pipe 702, while the mud remains on the filter screen 704 inside the sludge pool 703, and the sewage enters the sludge pool 703. Further, the staff opens the valve 708, and then opens the water pump 706 to pump out the sewage in the sludge pool 703 through the suction pipe 705, and then discharges it through the outlet pipe 707, which increases practicality.
[0031] Finally, it should be noted that the above content is only used to illustrate the technical solution of the utility model, rather than to limit the protection scope of the utility model. Simple modifications or equivalent substitutions of the technical solution of the utility model by ordinary technicians in this field do not deviate from the essence and scope of the technical solution of the utility model.
Claims
1. A raw ore screening device, comprising a working box (1) and a screening assembly (2), characterized in that: The screening component (2) is arranged inside the working box (1), and the screening component (2) comprises an upper screen (201), the upper screen (201) is fixedly installed at the right end inside the working box (1), a first water pipe (202) is fixedly installed at the upper end inside the working box (1), the lower end of the first water pipe (202) is fixedly connected to a first nozzle (203), a raw ore weighing bucket (204) is fixedly installed at the left end inside the working box (1), a weight sensor (205) is fixedly installed at the lower end inside the raw ore weighing bucket (204), a first conveyor belt (206) is fixedly installed inside the working box (1), and a first discharge port (207) is fixedly installed at the upper end inside the working box (1).
2. A raw ore screening device according to claim 1, characterized in that: An intermediate screen (208) is fixedly installed inside the working box (1), a second water pipe (209) is fixedly installed inside the working box (1), the lower end of the second water pipe (209) is fixedly connected to a second nozzle (210), a powder hopper (211) is fixedly installed at the left end inside the working box (1), a second conveyor belt (212) is fixedly installed at the lower end inside the working box (1), a second discharge port (213) is fixedly provided at the lower end inside the working box (1), and an air drying component (3) is provided at the upper end inside the working box (1).
3. A raw ore screening device according to claim 2, characterized in that: The air-drying component (3) comprises an air-drying box (301), wherein the air-drying box (301) is fixedly mounted at the upper end of the interior of the working box (1), an air inlet (302) is fixedly arranged at the upper end of the interior of the air-drying box (301), a filter screen (303) is fixedly mounted inside the air inlet (302), and a first fan (304) is fixedly mounted inside the air-drying box (301).
4. A raw ore screening device according to claim 3, characterized in that: A second fan (305) is fixedly installed at the lower end of the air drying box (301), an air outlet at the lower end of the air drying box (301) is fixedly connected to an air supply pipe (306), and an air outlet head (307) is fixedly connected to the lower end of the air supply pipe (306).
5. A raw ore screening device according to claim 4, characterized in that: A raw ore bin (4) is fixedly installed at the upper end of the working box (1), a valve (5) is fixedly installed inside the raw ore bin (4), a PLC controller (6) is fixedly installed at the front end of the working box (1), and a collection and processing component (7) is provided at the lower end of the working box (1).
6. A raw ore screening device according to claim 5, characterized in that: The collecting and processing assembly (7) comprises a water-saving trough (701), wherein the water-saving trough (701) is fixedly arranged at the lower end inside the working box (1), the lower end of the water-saving trough (701) is fixedly connected to a connecting pipe (702), and the lower end of the connecting pipe (702) is fixedly connected to a sludge pool (703).
7. A raw ore screening device according to claim 6, characterized in that: A filter screen 2 (704) is fixedly installed inside the sludge pool (703), the water outlet end at the right end of the sludge pool (703) is fixedly connected to a water pump (705), the right end of the water pump (705) is fixedly connected to a water pump (706), and the right end of the water pump (706) is fixedly connected to a water outlet pipe (707).
8. A raw ore screening device according to claim 7, characterized in that: A second valve (708) is fixedly installed at the right end of the water outlet pipe (707), and a supporting leg (8) is fixedly installed at the lower end of the working box (1).
