Inner clamping type large-caliber high-pressure flange assembling auxiliary device
Through the combination of telescopic rod and channel steel of the internal cassette large-diameter high-pressure flange group to the auxiliary device, the problem of inconvenience in operation between the high-pressure flange and the pipeline group is solved, rapid counterpart and stable positioning are achieved, and group matching is improved. Quality and construction efficiency.
Patent Information
- Application Number
- CN202420596519.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-26
AI Technical Summary
During the high-pressure flange and pipeline set, due to the large weight, it will cause inconvenience in operation, which can easily cause quality measurement errors and affect installation quality and construction efficiency.
An internal cassette large-diameter high-pressure flange group auxiliary device is designed, and the combination of telescopic rods and channel steel is used to contact the pipe and the inner edge of the flange through the two vertical parts of the channel steel to realize the flange and pipeline. Coaxially aligned, and the gap is adjusted by the telescopic rod member to reduce the labor intensity of construction workers.
It realizes rapid counterpart and stable positioning between flanges and pipes, reduces labor intensity during the grouping process, ensures grouping quality and construction efficiency, and is suitable for pipes and flanges of different diameters.
Smart Images

Figure CN222002431U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of flange and pipeline connection, in particular to an internal clamping type large-diameter high-pressure flange assembly auxiliary device. Background Art
[0002] Flange connection is a common connection method in pipeline systems, mainly used in petrochemical, water conservancy and hydropower, shipbuilding and construction, and plays an important role in different fields. These flanges have a precise structure and can effectively connect and seal pipelines. In the field of petrochemicals, they also need to maintain good high temperature resistance, corrosion resistance, and earthquake resistance under high temperature and high pressure environments.
[0003] When assembling the high-pressure flange with the pipeline, a piece of high-pressure butt-welded flange can weigh more than ten pounds or even hundreds of pounds. The assembly process is labor-intensive. Due to its heavy weight, the operation is prone to fluctuations in quality measurement errors, affecting the subsequent installation quality.
[0004] The patent document with application number CN202122686731.4 and titled "Internal Alignment Device for Pipe Flange" discloses an alignment device that is easy to operate, does not require multiple measurements and repeated alignment, can ensure alignment quality, and has high construction efficiency. When in use, place the middle of the support plate at the joint between the pipe and the inner side of the flange, then push the rod to the left or right, the push rod pushes the movable cylinder to move left and right, the movable cylinder drives the first support rod, the second support rod, the third support rod and the fourth support rod to move in the slide groove, adjust the height of the three support plates, push the flange through the support plate, adjust the position of the flange relative to the pipe, make the flange and the pipe coaxial, the pipe and flange are aligned after coaxiality, control the pusher to keep the position of the support plate, and then perform welding operations. However, when placing the middle of the support plate at the joint between the pipe and the inner side of the flange, it is necessary to make the support plate partially located inside the flange. In the process of adjusting the position of the support plate, the flange is always mounted on multiple support plates. Therefore, when adjusting the position of the support plate, under the gravity of the flange, it is not convenient for the adapter to be stabilized in the pipe and make the flange coaxial with the pipe. If the positions of the multiple support plates are adjusted first and the support plates are supported by the inner wall of the pipe, and then the flange is mounted on the multiple support plates, it is not convenient to adjust the gap between the flange and the pipe due to the friction between the flange and the multiple support plates. Utility Model Content
[0005] The technical problem to be solved by the utility model is to provide an internal clamping type large-diameter high-pressure flange assembly auxiliary device which is easy to install and can realize rapid connection between the flange and the pipeline.
[0006] In order to achieve the above purpose, the technical solution provided by the utility model is:
[0007] An internal clamping large-diameter high-pressure flange assembly auxiliary device comprises a telescopic rod, one end of which is detachably fixedly connected with a channel steel, the length direction of the channel steel is perpendicular to the axial direction of the telescopic rod, the axis of the channel steel in the length direction intersects and is perpendicular to the axis of the telescopic rod, the two vertical parts of the channel steel are symmetrical according to the axis of the telescopic rod, the telescopic rod comprises a concentrically arranged upper rod, a lower rod and forward and reverse screws, the upper part of the forward and reverse screws is threadedly connected to the lower end of the upper rod, and the lower part of the forward and reverse screws is threadedly connected to the upper end of the lower rod.
[0008] Specifically, the two vertical parts of the channel steel face upward.
[0009] Specifically, an insert block is fixed at the lower end of the channel steel, the insert block is inserted into the insert hole at the upper end of the upper rod, and the pin passes through the upper end of the upper rod and the insert block.
[0010] Specifically, a nut is concentrically fixed in the middle of the forward and reverse lead screws.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] 1. The utility model stabilizes the channel steel part in the pipeline through the telescopic rod, and makes the two vertical parts of the channel steel contact with the inner edge of the pipeline. The flange is hung on the channel steel part outside the pipeline and makes the two vertical parts of the channel steel contact with the inner edge of the flange. At this time, the pipeline and the flange are concentric, and the inner edge of the pipeline is flush with the inner edge of the flange, so that the flange can move on the channel steel to adjust the assembly gap between the flange and the pipeline.
[0013] 2. By setting the telescopic component, when the gap between the flange and the pipe is adjusted, it is convenient to position the flange. Before welding, the stability of the flange can be effectively guaranteed.
[0014] 3. The length of the telescopic rod can be adjusted, which can be suitable for pipes and flanges of different diameters.
[0015] 4. The telescopic rod can be easily separated from the channel steel, making it convenient to store and carry when not in use.
[0016] 5. The flange is in contact with the two vertical parts of the channel steel, which makes it easy to rotate the flange and adjust the position of the flange eye, convenient to adjust the gap between the flange and the pipe mouth, and easy to control the assembly quality.
[0017] 6. The inner edge of the flange and the inner edge of the pipe are in contact with the two vertical parts of the channel steel at the same time, which can ensure the flush quality of the inner wall of the flange and the inner wall of the pipe.
[0018] 7. During the assembly process, the flange is hung on the channel steel part on the outside of the pipeline, which reduces the labor intensity of the construction workers during the assembly process. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 A schematic diagram of the device.
[0020] Figure 2 It is a position relationship diagram of the telescopic rod and the telescopic assembly.
[0021] Figure 3 This is a schematic diagram of the pipe and flange assembly.
[0022] Figure 4 It is a side view of the pipe and flange when assembled.
[0023] Figure 5 for Figure 4 A-axis section view.
[0024] The names of the parts in the attached drawings are:
[0025] 1 Downswing
[0026] 2 positive and negative screws
[0027] 3 Nut
[0028] 4 Backswing
[0029] 5 Plug-in
[0030] 6 Pins
[0031] 7 Channel steel
[0032] 8 Casing
[0033] 9 Screw
[0034] 10 Rods
[0035] 11 Flange
[0036] 12 pipes. DETAILED DESCRIPTION
[0037] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0038] Embodiment 1:
[0039] Reference Figure 1 As shown, the internal clamping type large-diameter high-pressure flange 11 is assembled with an auxiliary device, including a telescopic rod. One end of the telescopic rod is detachably fixedly connected with a channel steel 7. The length direction of the channel steel 7 is perpendicular to the axial direction of the telescopic rod, the axis of the channel steel 7 in the length direction intersects and is perpendicular to the axis of the telescopic rod, and the two vertical parts of the channel steel 7 are symmetrical according to the axis of the telescopic rod.
[0040] The telescopic rod comprises an upper rod 4, a lower rod 1 and a forward and reverse screw 2 which are arranged concentrically. The upper part of the forward and reverse screw 2 is threadedly connected to the lower end of the upper rod 4, and the lower part of the forward and reverse screw 2 is threadedly connected to the upper end of the lower rod 1. A nut 3 is concentrically fixed to the middle of the forward and reverse screw 2. By providing the nut 3, it is convenient to use a wrench to clamp the nut 3 and then twist the forward and reverse screw 2, thereby facilitating the adjustment of the distance between the upper rod 4 and the lower rod 1.
[0041] In this embodiment, the two vertical parts of the channel steel 7 face upward.
[0042] The lower end of the channel steel 7 is fixed with an insert block 5, which is inserted into the insertion hole at the upper end of the upper rod 4, and the pin 6 passes through the upper end of the upper rod 4 and the insert block 5. After the pin 6 is pulled out and the insert block 5 is pulled out from the insertion hole of the upper rod 4, the channel steel 7 can be separated from the telescopic rod.
[0043] When the pipe 12 is assembled with the flange 11, the two vertical parts of the channel steel 7 are facing upwards, and the telescopic rod is located below the channel steel 7 and kept parallel to the horizontal plane. Put the telescopic rod and the part of the channel steel 7 on one side into the port of the pipe 12, rotate the forward and reverse screws 2 and adjust the distance between the upper rod 4 and the lower rod 1, so that the lower end of the lower rod 1 and the upper ends of the two vertical parts of the channel steel 7 are close to the inner edge of the pipe 12.
[0044] Then, the flange 11 is sleeved on the outside of the channel steel 7 outside the pipe 12, and the flange 11 is released and hung on the channel steel 7. At this time, the inner edge of the flange 11 contacts the upper ends of the two vertical parts of the channel steel 7, and the pipe 12 is concentric with the flange 11. The flange 11 is moved on the channel steel 7 along the length direction of the channel steel 7, and the gap between the flange 11 and the pipe 12 is adjusted. After the gap between the flange 11 and the pipe 12 is adjusted, the flange 11 and the pipe 12 can be welded.
[0045] During the assembly process, the flange 11 is hung on the channel steel 7 on the outside of the pipe 12, which reduces the labor intensity of the construction workers during the assembly process.
[0046] Embodiment 2:
[0047] Based on Example 1, refer to Figure 2-Figure 5 As shown, a telescopic assembly is fixed to the lower end of the channel steel 7 on one side of the telescopic rod, and the axis of the telescopic assembly is parallel to the axis of the telescopic rod. Specifically, the telescopic assembly includes a sleeve 8 fixed to the lower end of the channel steel 7, and a screw 9 is coaxially threadedly connected in the sleeve 8.
[0048] A handle bar 10 is fixed on the screw rod 9. By providing the handle bar 10, it is convenient to rotate the screw rod 9 through the handle bar 10.
[0049] After the gap between the flange 11 and the pipe 12 is adjusted, the rod 10 is used to rotate the screw 9 so that the lower end of the screw 9 is pressed against the inner edge of the flange 11, and the flange 11 is stabilized on the channel steel 7. Before welding begins, the stability of the flange 11 can be effectively guaranteed.
[0050] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. Internal clamping type large-diameter high-pressure flange assembly auxiliary device, including telescopic rods, It is characterized in that One end of the telescopic rod is detachably fixedly connected with a channel steel (7), the length direction of the channel steel (7) is perpendicular to the axial direction of the telescopic rod, the axis of the channel steel (7) in the length direction intersects and is perpendicular to the axis of the telescopic rod, and the two vertical parts of the channel steel (7) are symmetrical with respect to the axis of the telescopic rod. The telescopic rod comprises an upper rod (4), a lower rod (1) and a forward and reverse screw (2) which are arranged concentrically, the upper part of the forward and reverse screw (2) is threadedly connected to the lower end of the upper rod (4), and the lower part of the forward and reverse screw (2) is threadedly connected to the upper end of the lower rod (1).
2. According to the auxiliary device for the internal clamping type large-diameter high-pressure flange assembly as described in claim 1, It is characterized in that The two vertical parts of the channel steel (7) face upward.
3. According to the auxiliary device for the internal clamping type large-diameter high-pressure flange assembly as described in claim 1, It is characterized in that The lower end of the channel steel (7) is fixed with an insert block (5), which is inserted into the insert hole at the upper end of the upper rod (4), and the pin (6) passes through the upper end of the upper rod (4) and the insert block (5).
4. According to claim 1, the auxiliary device for the internal clamping type large-diameter high-pressure flange assembly, It is characterized in that A nut (3) is coaxially fixed to the middle of the forward and reverse lead screws (2).
5. According to claim 1, the auxiliary device for assembling the internal clamping type large-diameter high-pressure flange, It is characterized in that A telescopic assembly is fixed to the lower end of the channel steel (7) on one side of the telescopic rod, and the axis of the telescopic assembly is parallel to the axis of the telescopic rod.
6. According to claim 5, the auxiliary device for assembling the internal clamping type large-diameter high-pressure flange, It is characterized in that The telescopic assembly comprises a sleeve (8) fixed to the lower end of the channel steel (7), and a screw rod (9) is coaxially threadedly connected inside the sleeve (8).
7. According to claim 6, the internal clamping type large-diameter high-pressure flange assembly auxiliary device, It is characterized in that A handle bar (10) is fixed on the screw rod (9).