Auxiliary mounting trolley for gaskets and nuts of high-speed rail box girder lifting appliance

By designing a trolley for the installation of shims and nuts for high-speed railway box girder lifting, the problem of large lifting height of the lifting rod shims was solved by mechanized operation, reducing construction risks and worker injuries, and improving installation efficiency.

CN222007164UActive Publication Date: 2024-11-15中铁十四局集团青岛工程有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421302901.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-11-15
Estimated Expiration
2034-06-07

AI Technical Summary

Technical Problem

During the hoisting of high-speed railway box girders, the lifting height of the suspender rod washers and nuts is large, and existing equipment cannot be used flexibly, resulting in high construction risks and easy to cause back sprains for workers.

Method used

Design a trolley for auxiliary installation of shims and nuts for high-speed railway box girder lifting devices, comprising components such as a car body, chassis, slider, fixing frame, slide groove, threaded rod and motor, to achieve automated movement and installation of shims through mechanized operation.

Benefits of technology

It reduces the number of lifting operations required by workers, decreases the probability of mechanical injury, improves installation efficiency, reduces construction risks, and is simple to operate and low in cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222007164U_ABST
    Figure CN222007164U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of high-speed rail box girders, and discloses a high-speed rail box girder lifting appliance gasket and nut auxiliary installation trolley which comprises a trolley body and a chassis, the chassis is arranged at the top of the trolley body, a sliding block is arranged at the bottom of the chassis, a fixing frame is fixedly connected to the top of the trolley body, a sliding groove is formed in the fixing frame, and the sliding block is arranged in the sliding groove. The gasket is lifted by moving the position of the sliding block in the sliding groove, a worker in a beam hole moves the position of the gasket chassis with hands to enable a gasket hole to be aligned with a hanging rod to penetrate through the hanging rod, gasket feeding construction is completed, the number of times of lifting operation of the worker is reduced, the probability of occurrence of mechanical operation injuries is greatly reduced, and construction risks are reduced. The processing and manufacturing difficulty is low, the cost is low, power requirements are avoided, and operation is simple; the motor is started, the threaded rod runs, the sliding block is adjusted to move in the sliding groove, the moving piece is arranged in a matched mode, moving work of the gasket in the base plate is achieved, and convenience is brought to automatic operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of high-speed railway box girders, and in particular relates to a high-speed railway box girder hanger gasket nut auxiliary installation trolley. Background Art

[0002] Box girder is a type of beam in bridge engineering. It is hollow inside and has flanges on both sides of the upper part, similar to a box, hence the name. It can be divided into single box and multiple box.

[0003] Box girders of reinforced concrete structures are divided into prefabricated box girders and cast-in-place box girders. Box girders prefabricated in an independent site can be erected in combination with a bridge erection machine after the lower project is completed, which can speed up the progress of the project and save construction time; cast-in-place box girders are mostly used for large continuous bridges. There are two main types of common materials, one is prestressed reinforced concrete box girders, and the other is steel box girders. Among them, prestressed reinforced concrete box girders are constructed on-site. In addition to longitudinal prestress, some also have transverse prestress; steel box girders are generally processed in the factory and then transported to the site for installation. There are all-steel structures and some with reinforced concrete pavement layers.

[0004] During the hoisting (transportation) process of the high-speed railway bridge, 8 hangers with threads at both ends, washers and nuts are used as the connection between the hanger and the bridge. The hanger is about 1600mm long, and the weight of a single hanger is about 230kg. The nut weighs about 15kg, and the washers weigh about 35kg. Because the internal working space of the box girder is small, but the lifting height of the hanger washers and nuts is large, the existing forklifts and other equipment cannot be used flexibly in the construction. The construction mainly relies on manual installation, which has high construction risks and is easy to cause problems such as waist sprains for operators. For this reason, we propose a high-speed railway box girder hanger washers and nuts auxiliary installation trolley. Utility Model Content

[0005] The purpose of the utility model is to provide a high-speed railway box girder hanger gasket nut auxiliary installation trolley to solve the problem proposed in the above-mentioned background technology that the internal working space of the box girder is small, but the lifting height of the hanger rod gasket and nut is large, the existing forklift and other equipment cannot be flexibly used in construction, and the construction mainly relies on manual installation, which has high construction risks and is easy to cause waist sprains for operators.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A high-speed railway box girder hanger gasket nut auxiliary installation trolley comprises a car body and a chassis, wherein the top of the car body is provided with a chassis, the bottom of the chassis is provided with a slider, the top of the car body is fixedly connected with a fixing frame, the number of the slider and the fixing frame are both two, a slide groove is provided inside the fixing frame, and the chassis is slidably connected inside the slide groove through the slider.

[0008] Preferably, a movable part is provided at the bottom of the chassis, the number of the movable parts is two, the movable part is rotatably connected to the bottom of the chassis, and the bottom of the movable part is fixedly connected to the top of the slider.

[0009] Preferably, a threaded rod is provided inside the slide groove, the threaded rod is rotatably connected to the slide groove, the slider is connected to the threaded rod by threads, and a motor is provided at the bottom of the threaded rod.

[0010] Preferably, a pin hole is provided on the left side inside the chassis, and the pin hole is fixedly connected to the left side inside the chassis.

[0011] Preferably, electric push rods are fixedly connected to both sides of the pin shaft hole, and one end of the electric push rod is fixedly connected to a push plate.

[0012] Preferably, the chassis is provided with card slots at the front and rear sides, and baffles are movably connected inside the card slots.

[0013] Preferably, the bottom of the chassis is fixedly connected with moving wheels, and there are four moving wheels fixedly connected to the corners of the bottom of the chassis.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] 1. The gasket is lifted by moving the slider in the slide. The personnel in the beam hole move the gasket chassis by hand to align the gasket hole with the hanger and insert it to complete the upper gasket construction. The auxiliary installation trolley is used to reduce the number of lifting operations of the operators, greatly reduce the probability of mechanical operation injuries, reduce construction risks, and has low processing difficulty and low cost, no power requirements, and simple operation.

[0016] 2. By starting the motor, the threaded rod runs, the slider is mobilized to move in the slide slot, and the movable parts are coordinated to realize the movement of the gasket in the chassis, which brings convenience to the automated operation. By taking the baffle out of the slot and starting the electric push rod, the push plate pushes the gasket out, and the installation efficiency is greatly improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 It is a side view of the structural schematic diagram of the utility model;

[0019] Figure 3 This is a schematic diagram of the fixing frame structure of the utility model;

[0020] Figure 4 It is a schematic diagram of the internal structure of the chassis of the utility model.

[0021] In the figure: 1. body; 2. chassis; 3. slider; 4. fixing frame; 5. slide groove; 6. movable part; 7. threaded rod; 8. motor; 9. pin shaft hole; 10. electric push rod; 11. push plate; 12. slot; 13. baffle; 14. moving wheel. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-Figure 4 A technical solution for a high-speed railway box girder hanger gasket nut auxiliary installation trolley: it includes a car body 1 and a chassis 2, the car body 1 is provided with a chassis 2 on the top, a slider 3 is provided at the bottom of the chassis 2, a fixing frame 4 is fixedly connected to the top of the car body 1, the slider 3 and the fixing frame 4 are both two in number, a slide groove 5 is provided inside the fixing frame 4, and the chassis 2 is slidably connected inside the slide groove 5 through the slider 3.

[0024] Specifically, a movable part 6 is provided at the bottom of the chassis 2 . There are two movable parts 6 . The movable part 6 is rotatably connected to the bottom of the chassis 2 . The bottom of the movable part 6 is fixedly connected to the top of the slider 3 .

[0025] Specifically, a threaded rod 7 is provided inside the slide groove 5 , the threaded rod 7 is rotatably connected to the slide groove 5 , the slider 3 is connected to the threaded rod 7 by threads, and a motor 8 is provided at the bottom of the threaded rod 7 .

[0026] Specifically, a pin hole 9 is provided on the left side inside the chassis 2 , and the pin hole 9 is fixedly connected to the left side inside the chassis 2 .

[0027] Specifically, electric push rods 10 are fixedly connected to both sides of the pin shaft hole 9 , and a push plate 11 is fixedly connected to one end of the electric push rod 10 .

[0028] Specifically, the chassis 2 is provided with a card slot 12 at the front and rear sides, and a baffle 13 is movably connected inside the card slot 12 .

[0029] Specifically, the bottom of the chassis 2 is fixedly connected with moving wheels 14 , and there are four moving wheels 14 fixedly connected at the bottom corners of the chassis 2 .

[0030] In this embodiment, when the box beam is hoisted, the vehicle body 1 is pushed to the construction area by the moving wheels 14. After the boom is inserted into the beam body, two construction workers in the beam hole lift the gasket and place it in the pin shaft hole 9 on the chassis 2 on the vehicle body 1. The gasket is lifted by moving the slider 3 in the slide groove 5. The personnel in the beam hole move the gasket chassis 2 by hand to align the gasket hole with the boom and insert it to complete the upper gasket construction. By using this auxiliary installation trolley and mechanized replacement, the installation efficiency is increased by more than 50% compared with the previous manual installation, and the work intensity of the operators is greatly reduced. The auxiliary installation trolley has low difficulty in processing and manufacturing, low cost, no power requirement, and simple operation. By starting the motor 8, the threaded rod 7 is operated, the slider 3 is mobilized to move in the slide groove 5, and the movable part 6 is coordinated to realize the movement of the gasket in the chassis 2, which brings convenience to the automated operation. By taking the baffle 13 out of the slot 12, starting the electric push rod 10, and letting the push plate 11 push the gasket out, the installation efficiency is greatly improved.

[0031] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".

[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A high-speed railway box girder hanger gasket nut auxiliary installation trolley, comprising a car body (1) and a chassis (2), characterized in that: A chassis (2) is provided on the top of the vehicle body (1), a slider (3) is provided on the bottom of the chassis (2), a fixing frame (4) is fixedly connected to the top of the vehicle body (1), the slider (3) and the fixing frame (4) are both provided in two numbers, a slide groove (5) is provided inside the fixing frame (4), and the chassis (2) is slidably connected inside the slide groove (5) via the slider (3).

2. The high-speed railway box girder hanger gasket nut auxiliary installation trolley according to claim 1, characterized in that: A movable part (6) is provided at the bottom of the chassis (2), the movable parts (6) being two in number, the movable parts (6) being rotatably connected to the bottom of the chassis (2), and the bottom of the movable part (6) being fixedly connected to the top of the slider (3).

3. The high-speed railway box girder hanger gasket nut auxiliary installation trolley according to claim 1, characterized in that: A threaded rod (7) is provided inside the slide groove (5), the threaded rod (7) is rotatably connected to the slide groove (5), the slider (3) is connected to the threaded rod (7) via threads, and a motor (8) is provided at the bottom of the threaded rod (7).

4. The high-speed railway box girder hanger gasket nut auxiliary installation trolley according to claim 1, characterized in that: A pin shaft hole (9) is provided on the left side inside the chassis (2), and the pin shaft hole (9) is fixedly connected to the left side inside the chassis (2).

5. The high-speed railway box girder hanger gasket nut auxiliary installation trolley according to claim 4, characterized in that: Electric push rods (10) are fixedly connected to both sides of the pin shaft hole (9), and a push plate (11) is fixedly connected to one end of the electric push rod (10).

6. The high-speed railway box girder hanger washer nut auxiliary installation trolley according to claim 1, characterized in that: The chassis (2) is provided with a clamping slot (12) at the front and rear sides, and a baffle (13) is movably clamped inside the clamping slot (12).

7. The high-speed railway box girder hanger gasket nut auxiliary installation trolley according to claim 1, characterized in that: The bottom of the chassis (2) is fixedly connected with moving wheels (14), and the moving wheels (14) are four in number and fixedly connected at the bottom corners of the chassis (2).